Laserfiche WebLink
`T <br />.- <br />al <br />Q <br />Li <br />am <br />�a <br />4 <br />M � <br />IQ <br />:2.. <br />Ln <br />0 <br />N <br />00 <br />N <br />Un <br />Z <br />Q <br />CL <br />C� <br />4-- <br />J <br />O <br />Lii <br />L� <br />Ca <br />Z <br />D <br />.YI <br />C� <br />C7 <br />C]. <br />cn <br />a) <br />N <br />L� <br />W <br />LA <br />Q <br />N <br />V <br />iJ <br />CL <br />_0 <br />0 <br />m <br />I <br />v� <br />s <br />Q. <br />N <br />T- <br />LL. <br />I <br />N <br />d <br />U) <br />0 <br />Q <br />N <br />"II <br />J <br />OX KEYED NOTES - PLUMBING AND MED GAS <br />1. ZONE CONTROL VALVE BOX TO REMAIN. <br />(1/2"A, 1/2"02, 1/4"V, 1/2"N20) <br />2. MEDICAL GAS AREA ALARM TO REMAIN. <br />3. MEDICAL GAS CEILING OUTLETS TO BE REMOVED WITH <br />CEILING. (1-A,1-02,1-V,1-SLIDE,1-N20). REMOVE PIPING BACK <br />TO TAP FROM MAINS AND CAP PIPES. <br />4. MEDICAL GAS WALL OUTLETS FOR A, 02 & V TO REMAIN <br />FOR REUSE. MEDICAL GAS OUTLET FOR N20 TO BE <br />REMOVED AND DEMOLISHED BACK TO TAP FROM MAIN AS <br />SHOWN. (EXISTING IS 1-A,1-02,1-V,1-SLIDE,1-N20) <br />5. MEDICAL GAS MAINS IN CORRIDOR TO REMAIN. <br />6. SCRUB SINKS TO BE REMOVED AND TURNED OVER TO <br />OWNER, CAP AND SEAL EXISTING SANITARY AND WATER <br />PENETRATIONS THROUGH WALL, FLUSH WITH WALL. RISERS <br />IN WALL TO REMAIN OPERATIONAL. <br />7. DEMOLISH EXISTING SANITARY IN FIRST FLOOR CEILING AND <br />VENT PIPING BACK IN SECOND FLOOR CEILING, BACK TO <br />TAP FROM MAIN. PRESERVE WATER PIPING FOR REUSE <br />DURING RENOVATION. <br />8. REMOVE DOUBLE COMPARTMENT SINK AND TURN OVER TO <br />OWNER. MAINTAIN ROUGH -IN FOR CONNECTION TO NEW, <br />9. REMOVE CLINICAL SINK AND TURN OVER TO OWNER. CAP <br />AND SEAL EXISTING SANITARY AND WATER PIPING BEHIND <br />WALL. <br />10. 1 1/4"CW AND 1 "HW BRANCHES WITH SHUT OFF VALVE. <br />11. REMOVE SINK AND PRESERVE SANITARY AND WATER PIPING <br />FOR REUSE DURING RENOVATION. <br />12. REMOVE SHOWER/TUB AND PRESERVE SANITARY AND WATER <br />PIPING FOR REUSE DURING RENOVATION. <br />13. PLUMBING FIXTURE TO REMAIN AS INSTALLED. <br />14. REMOVE SINK AND TURN OVER TO OWNER. CAP AND SEAL <br />EXISTING SANITARY AND WATER PIPING BEHIND WALL. <br />15. DEMOLISH 2" SANITARY PIPING IN FIRST FLOOR CEILING <br />SPACE AND MAINTAIN 2" VENT IN SECOND FLOOR CEILING <br />SPACE FOR CONNECTION TO NEW. <br />16. REMOVE SHOWER DIVERTER VALVE AND SHOWER HEAD. <br />PRESERVE PIPING FOR REUSE DURING RENOVATION. <br />17. REMOVE N20 PIPING BACK TO AREA ZONE VALVES. PIPING <br />MAY BE CAPPED ABOVE THE CEILING WHERE SHOWN. <br />REMOVE THE EXISTING PRESSURE GAUGE AND VALVE <br />HANDLE IN THE EXISTING ZONE VALVE BOX FOR N20. <br />SCALE: 1/8" = 1'-O" <br />.7 <br />C.) <br />h <br />cJ] <br />U <br />Q.) <br />U <br />d) v, <br />• � <br />000 <br />U o, <br />0 N <br />c) <br />MM••+�.-�1 ap w c� <br />0 <br />ai <br />CAwa'�� <br />4 <br />.n <br />V <br />~ U <br />Ga N <br />O s-. <br />I# <br />fa <br />♦ tr�, <br />N <br />Cd <br />^4-� <br />C) <br />Cd <br />�I <br />0 <br />(ri <br />a <br />N • r-1 <br />1� <br />• r--4 <br />W Q.7 <br />03 <br />Project No. <br />p le <br />714026 <br />0 <br />02014 BH/PK Architects, Inc. <br />