My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7050 Gall Blvd (104)
Zephyrhills
>
Building Department
>
Building Plans
>
7050 Gall Blvd (104)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2025 7:46:00 PM
Creation date
1/21/2025 3:41:40 PM
Metadata
Fields
Template:
Building Plans
Street #
7050
Location
Gall Blvd
Contractor
Stevens Construction
Building Plans - Permit #
15627
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br />w <br />0o <br />,- <br />ou <br />:1 <br />to <br />d <br />IQ <br />a� <br />X <br />c� <br />N <br />CL <br />r- <br />0 <br />4 <br />L0 <br />0 <br />N <br />N <br />uo <br />z <br />w <br />U) <br />w <br />cn <br />cn <br />Q <br />cn <br />CK <br />J <br />0 <br />m <br />z <br />0 <br />u <br />z <br />0 <br />U <br />Ld <br />Ll- <br />z <br />N <br />0 <br />iE <br />W <br />ai <br />a) <br />U) <br />CL <br />w <br />I <br />a <br />C) <br />i <br />a� <br />U <br />�a <br />m <br />I <br />W <br />v <br />N <br />LL- <br />I <br />Cfi <br />C`J <br />0 <br />-I- <br />. . 'r <br />W <br />0 <br />WIN <br />0 <br />N <br />J <br />INFECTION CONTROL RISK ASSESSMENT OCRA) <br />ALL WORK SHALL CONFORM WITH THE OWNER'S INFECTION CONTROL AND CONSTRUCTION POLICIES, <br />PROCESSES AND OWNER'S PROJECT -SPECIFIC INFECTION CONTROL RISK ASSESSMENT PLAN, <br />ICRA MATRIX <br />IC RISK <br />CONSTRUCTION ACTIVITY TYPE <br />LEVEL <br />TYPE A <br />TYPE B <br />TYPE C <br />TYPE D <br />GROUP 1� <br />CLASS I <br />CLASS II <br />CLASS II <br />CLASS III/IV <br />GROUP 2 <br />CLASS I <br />CLASS II <br />CLASS III <br />CLASS IV <br />GROUP 3 <br />CLASS I <br />CLASS III <br />CLASS III <br />CLASS IV <br />GROUP 4 <br />CLASS III <br />CLASS III/IV <br />CLAS I/IV <br />CLASS IV <br />INFECTION CONTROL RISK LEVELS <br />GROUP 1 <br />GROUP 2 <br />GROUP 3 <br />GROUP 4 <br />LOWEST <br />MEDIUM <br />MEDIUM HIGH <br />HIGHEST <br />OFFICE AREAS <br />ALL PATIENT CARE UNITS <br />EMERGENCY ROOM <br />TRANSPLANT CLINIC <br />CONFERENCE ROOMS <br />WAITING ROOMS* <br />RADIOLOGY AREAS <br />SURGERY SUITES <br />PUBLIC BATHROOMS <br />ROCP <br />RECOVERY ROOMS <br />WAITING ROOMS* <br />LABOR AND DELIVERY <br />LABOR & DELIVERY ORs <br />NURSERIES <br />CARDIAC CATH / ANGIO <br />PEDIATRICS <br />CVICU <br />RIO SURGERY <br />OUTPATIENT UNITS <br />ALL INTENSIVE CARE AREAS <br />DIALYSIS AND TRANSPLANT <br />NUCLEAR MEDICINE <br />ONCOLOGY / BONE MARROW <br />ADMISSION / DISCHARGE AREA <br />CARDIOLOGY <br />PHYSICAL THERAPY TANK AREA <br />HYPERBARIC MEDICINE <br />CAFETERIA <br />ENDOSCOPY <br />ECHOCARDIOGRAPHY <br />PHARMACY ADMIXTURE <br />LABORATORIES <br />PHARMACY <br />* DEPENDENT ON LOCATION <br />CONSTRUCTION ACTIVITY TYPES <br />INSPECTIONS AND NON-INVASIVE ACTIVITIES. INCLUDES, BUT IS NOT LIMITED TO, REMOVAL OF CEILING TILES FOR VISUAL INSPECTION LIMITED TO 1 <br />TYPE A <br />TILE PER 50 SQUARE FEET, PAINTING (BUT NOT SANDING) WALL COVERING, ELECTRICAL TRIM WORK, MINOR PLUMBING, AND ACTIVITIES WHICH DO NOT <br />GENERATE DUST OR REQUIRE CUTTING OF WALLS OR ACCESS TO CEILINGS OTHER THAN FOR VISUAL INSPECTION. <br />SMALL SCALE, SHORT DURATION ACTIVITIES WHICH CREATE MINIMAL DUST. INCLUDES, BUT IS NOT LIMITED TO, INSTALLATION OF TELEPHONE AND <br />TYPE B <br />COMPUTER CABLING, ACCESS TO CHASE SPACES, CUTTING OF WALLS OR CEILING WHERE DUST MIGRATION CAN BE CONTROLLED. <br />ANY WORK WHICH GENERATES A MODERATE TO HIGH LEVEL OF DUST OR REQUIRES DEMOLITION OR REMOVAL OF ANY FIXED BUILDING COMPONENTS OR <br />ASSEMBLIES. INCLUDES, BUT IS NOT LIMITED TO, SANDING OF WALL FOR PAINTING OR WALL COVERING, REMOVAL OF FLOOR COVERINGS, CEILING TILES <br />TYPE C <br />AND CASEWORK, NEW WALL CONSTRUCTION, MINOR DUCTWORK OR ELECTRICAL WORK ABOVE CEILINGS, MAJOR CABLING ACTIVITIES, AND ANY ACTIVITY <br />WHICH CANNOT BE COMPLETED WITHIN A SINGLE WORKSHIFT. <br />TYPE D <br />MAJOR DEMOLITION AND CONSTRUCTION PROJECTS. INCLUDES, BUT IS NOT LIMITED TO, ACTIVITIES WHICH REQUIRE CONSECUTIVE WORK SHIFTS, <br />REQUIRE HEAVY DEMOLITION OR REMOVAL OF A COMPLETE CEILING SYSTEM, AND NEW CONSTRUCTION. <br />ICRA CLASSIFICATION SCHEDULE <br />CLASS I <br />1. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM CONSTRUCTION OPERATIONS. <br />2. IMMEDIATELY REPLACE ANY CEILING TILE DISPLACED FOR VISUAL INSPECTION. <br />❑ <br />3. MINOR DEMOLITION FOR REMODELING. <br />1. PROVIDES ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO ATMOSPHERE. <br />2. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING. <br />3. SEAL UNUSED DOORS WITH DUCT TAPE. <br />CLASS II <br />4. BLOCK OFF AND SEAL AIR VENTS. <br />5. WIPE SURFACES WITH DISINFECTANT. <br />❑ <br />6. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS. <br />7. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK AREA. <br />8. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK AREA, <br />9. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED. <br />1. OBTAIN INFECTION CONTROL PERMIT BEFORE CONSTRUCTION BEGINS. <br />2, ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF THE DUCT SYSTEM. <br />3. COMPLETE ALL CRITICAL BARRIERS OR IMPLEMENT CONTROL CUBE METHOD BEFORE CONSTRUCTION BEGINS. <br />4. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS AND MONITOR WITH MAGNEHELIC GAUGES. <br />5. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETE PROJECT IS THOROUGHLY CLEANED BY ENVIRONMENTAL SERVICES DEPARTMENT. <br />CLASS YII <br />6. VACUUM WORK WITH HEPA FILTERED VACUUMS. <br />C� <br />7. WET MOP WITH DISINFECTANT. <br />8. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION. <br />9. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS. <br />10. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING. <br />11. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED. <br />1. OBTAIN INFECTION CONTROL PERMIT BEFORE CONSTRUCTION BEGINS. <br />2. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF THE DUCT SYSTEM. <br />3. COMPLETE ALL CRITICAL BARRIERS OR IMPLEMENT CONTROL CUBE METHOD BEFORE CONSTRUCTION BEGINS. <br />4. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS AND MONITOR WITH MAGNEHELIC GAUGES. <br />5. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY. <br />6. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING A HEPA VACUUM CLEANER <br />BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE THE WORK SITE. <br />CLASS IV <br />7. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. <br />❑ <br />8. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS THOROUGHLY CLEANED BY THE ENVIRONMENTAL SERVICES DEPARTMENT AND <br />RELEASED BY SAFETY AND INFECTION CONTROL. <br />9. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS. <br />10. WET MOP WITH DISINFECTANT. <br />11. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION. <br />12. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS. <br />13. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING. <br />14. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE CONSTRUCTION IS BEING DONE. <br />INFECTION CONTROL RISK ASSESMENT <br />SCALE: 1 /16" = 1'-0" <br />GENERAL NOTES <br />1. LOCATIONS OF AIR SCRUBBERS AND WALL MOUNTED <br />PRESSURE MONITORS AS SHOWN ON DETAILS SHEET <br />ARE SHOWN ON THIS PLAN TO ENCLOSE THE <br />ENTIRE AREA OF CONSTRUCTION FROM THE ADJACENT OPEN <br />AREAS. THEY ARE TO BE INSTALLED PRIOR TO THE <br />COMMENCEMENT OF WORK AND DECONSTRUCTED AFTER <br />COMPLETION. <br />KEYED NOTES <br />1. INSTALL AIR SCRUBBER AND PRESSURE MONITOR IN THIS <br />LOCATION. <br />KEY PLAN <br />SCALE: NONE <br />i <br />�J <br />oop1'lw1r'1'jA ra - m s <br />U <br />H <br />U <br />U <br />bA <br />U k„ <br />N <br />00 <br />cs <br />© <br />M <br />O ��w <br />c� <br />O 00 Q <br />r5 <br />0 <br />e <br />A <br />• r-1 <br />N <br />CCU <br />cd <br />as <br />M <br />W � <br />Project No. 714026 <br />MO*2 <br />(D2014 BH/PK Architects, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.