M <br />v- <br />N <br />�,Xl <br />a <br />N <br />Qo <br />9 <br />INFECTION CONTROL MEASURES: <br />1. The Contractor shall obtain from the owner a copy of the infectlon control risk assessment (ICRA) prepared for <br />this project. The contractor shall review the requirements In this report and preform all work in <br />accordance with those requirements. The contractor shall strictly adhere to the limits of the construction area, <br />and where phasing applies shall adhere to the phasing plan. Any work outside the construction area shall be <br />coordinated with the hospital and preformed in accordance with the ICRA report. under the supervision <br />of the hospital's representative or other designated ICRA committee officer. <br />2. To the extent that It is required by the ICRA the contractor shall endeavor to maintain existing levels of <br />Indoor air quality In areas surrounding and adjacent to the construction work zone, and elsewhere in the <br />focillty. It should be anticipated that the ICRA report will require measures to this effect Including erection <br />of construction zone barriers and provisions for negative air pressure In the construction zone relative <br />to other areas of the new foclllty.Failure to comply with construction and maintenance of construction barriers <br />will result In the cessation of work until the barriers are brought Into compliance. <br />3.See Mechanical plans for additional comments on negative pressure and monitoring requirements. <br />4. Any requirement for Interruption or shut down of utilities made necessary by this construction shall be <br />coordinated with the hospital at least one week prior to Interruption. <br />5. Contractor shall endeavor to minimize any disruption of surrounding areas of the hospital. <br />6. If fire alarm and / or sprinkler systems are shut down for four (4) hours or more, <br />contractor to provide 'Fire Watch'. <br />7. If the structural steel fireproofing is damaged due to construction, then It shall be repaired <br />to its original fire rating. <br />8. For short term above celling work outside of the phased construction barriers Contractor <br />to provide a portable construction containment system as approved by the hospital. <br />9.Contractor to remove existing winodws as required to connect negative air machines. Enclose windows <br />with plywood around connections. <br />Fire retardant wood nailer 1f` <br />Close open ducts with 6 mil poly <br />Seal with duct tape <br />Close ceiling space with 6 mll fire retor <br />Poly Seal oil joint penetrations with duct <br />Seal around all pipe and duct <br />penetrations In the partition and <br />poly barrier with duct tape <br />t <br />1 <br />c <br />Provide clo; <br />retardant vl <br />do not exter, <br />at premlter <br />dotted line <br />rttcal celling the <br />,psum wall board <br />h occupied side with <br />paint <br />'0 GO 3%' Metal studs <br />4' O.C. <br />Ioints TRUE PLAN <br />ram tack KT�� ICRA PLAN - SECOND FLOOR NORTH NORTH <br />?r equal Ir <br />Q J 1/16 ' - I'-O' ( A 4 <br />TEMPORARY ONE HOUR ICRA WALL <br />3/4 ' - 1'-0' <br />Lyndon T. Pollock <br />Registered Architgct , FPk0006747 <br />Project No. 13051.00 <br />512812014 2:02:27 PM ...\A1.3 ICRA - Second floor Plan.dgn <br />A 1,9 3 <br />1 ©2014 BH/PK Architects, inc. <br />