Laserfiche WebLink
i <br />DEMOLITION NOTES <br />a- <br />N <br />N <br />GJ <br />rP <br />N f <br />Si <br />CM <br />CJUA►IC►YC nc►rrco WAM111/` EV)nl/ <br />Elev. <br />Low <br />SECOND FLOOR DEMOLITION PLAN <br />118 ' ° 1'-0' <br />l� Remove existing finished floor coverings (ceramic tile, vinyl tile, <br />carpet, etc., complete from within room, including adhesives, prep <br />for new finished flooring. <br />Remove all existing wall construction shown In dashed lines <br />completely, Including all door, hardware and frames. all existing <br />wall mounted Items (sign, coat hooks, marker boards, etc.) <br />deliver to owner. <br />�3 Remove all applied room finishes from existing walls that are to <br />remain (ceramic tile, vinyl wall covering, etc.), field verify Patch, <br />repair and prepare surface as required for new finishes. <br />4 Remove existing wall and base cabinets, shelves, brackets, fostners, <br />shown dashed. Patch and repair wall and floor as required by removals. <br />Remove existing suspended ceiling system completely from room, <br />remove all old supports and hangers, field verify extent required. <br />6 Remove existing ceiling mounted Items (curtain track, I.v. tracks, <br />monitor brackets, etc.) deliver to the owner or dispose of <br />as dlretced by the owner. Refer mechanical and eletcrical <br />drawings for futher ceiling removal work. <br />7 Remove al! accessories (ptd, s.d., shelves, grab bars, etc) Deliver <br />all accessories to the owner or dispose of as dlretced by the owner. <br />8 Remove all wall mounted fixtures, brackets or construction not <br />shown that would interfere with the new construction, finishes, etc. <br />Reinstall, deliver to the owner or dispose of as dlretced by the <br />owner, patch and repair wall as required by all such removals. <br />Fill and plug all holes in concrete floor full depth of existing slab, <br />as required by remove piping, conduit, etc. See eletcrlcol and mechanical <br />drawings for futher information. <br />10. Remove existing tub and accessories,including existing floor droln. <br />Repair existing concrete floor for new shower and drain. <br />11. Extent of file removal in existing tub area. <br />12. Existing gypsum board ceilings in toilets and shower to remain <br />13. Remove existing cubical tracts. <br />Project No. 13051.00 <br />512812014 2.02:42 PM ...\cd\A1.4 DEMO PLAN.dgn <br />A to 4 <br />Q20i4 BH/PK Architects, Inc. <br />