My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7050 Gall Blvd (105)
Zephyrhills
>
Building Department
>
Building Plans
>
7050 Gall Blvd (105)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2025 2:31:57 PM
Creation date
1/21/2025 3:41:57 PM
Metadata
Fields
Template:
Building Plans
Street #
7050
Location
Gall Blvd
Contractor
Tampa Bay Trane
Building Plans - Permit #
16849
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I _ <br />--- -- L- _L--'L-L'.ly <br />MECHANICAL RENOVATION NOTES - <br />I. <br />SET NEW CHILLER #2 ON THE EXISTING CONCRETE PAD & NEW <br />CONNECT NEW 8"CWR FROM CHILLER TO EXISTING 8"CWR <br />- <br />- <br />PAD EXTENSION. PROVIDE NEW ISOLATION PADS UNDER EACH <br />OVERHEAD PIPING & EXTEND TO UNIT WITH NEW SHUTOFF <br />j <br />LEG, SECURELY BOLT TO CONCRETE PAD. REFER TO PARTIAL <br />WAFER STYLE BUTTERFLY VALVE. PROVIDE NEW FLEXIBLE <br />FIRST FLOOR PLAN - MECHANICAL - NEW CHILLER CH-2 CLEARANCE <br />CONNECTION IN RISER BETWEEN UNIT & VALVE. PROVIDE <br />AND LOCATION DIMENSIONS FOR ELECTRICAL CLEARANCE BETWEEN <br />VICTAULIC CONNECTION TO CHILLER INLET. PROVIDE ACC. <br />UNIT MOUNTED STARTERS ON THE ADJACENT CHILLERS CH-1 <br />DEVICES FOR GAGES &CONTROLS PER DETAILS. <br />& CH-3. PROVIDE CHILLER PIPING & PIPING ACCESSORIES & <br />DEVICES PER DETAILS & REQUIREMENTS OF MANUFACTURER. <br />7O <br />LOCATE NEW FREESTANDING REMOTE CHILLER STARTER FOR <br />PROVIDE ANY ADDITIONAL CONTROLS ACCESSORIES AS <br />NEW CH-2 IN THIS LOCATION. COORDINATE ALL WORK WITH <br />REQUIRED BY TRANE, <br />ELECTRICAL. <br />2 <br />CONNECT NEW EMERGENCY REFRIGERANT RUPTURE DISC VENT <br />® <br />RELOCATE EXISTING REFRIGERANT MONITOR SYSTEM PANELS & <br />PIPING TO NEW CHILLER & EXTEND THRU WALL TO ROOF <br />CONTROL WIRING AS REQ D. TO FACE OF EXISTING COLUMN. <br />DISCHARGE AS SHOWN. REFER TO MANUFACTURER FOR <br />LOCATE EXISTING FAN TSTAT ONTO WALL NEARBY. <br />CORRECT SIZING & ALL DEVICES & APPURTENANCES REQUIRED <br />FOR THE EMERGENCY RUPTURE DISC SAFE DISCHARGE TO <br />O9 <br />MOUNT NEW CHILLED WATER PUMP CHWP-2 ON EXISTING & <br />OUTDOORS. <br />NEW PAD EXTENSION. PROVIDE NEW DEVICES & ACCESSORIES <br />I' <br />PER DETAILS ON SHT. M-3. SECURE PUMP TO SLAB WITH <br />30 <br />CONNECT NEW 8"CHS FROM PUMP CHWP-2 TO THE EXISTING <br />ANCHOR BOLTS AT ALL BOLT HOLES. COORDINATE WITH <br />OVERHEAD 8"CHS MAIN PIPING & EXTEND TO UNIT WITH NEW <br />ELECTRICAL. <br />SHUTOFF WAFER STYLE BUTTERFLY VALVE. PROVIDE NEW <br />FLEXIBLE CONNECTION IN RISER BETWEEN UNIT &VALVE. <br />10 <br />MOUNT NEW CONDENSER WATER PUMP CWP-2 ON EXISTING & <br />PROVIDE VICTAULIC CONNECTION TO CHILLER INLET. PROVIDE <br />NEW PAD EXTENSION. PROVIDE NEW DEVICES &ACCESSORIES <br />ACC. DEVICES FOR GAGES & CONTROLS PER DETAILS. <br />PER DETAILS ON SHT. M-3. SECURE PUMP TO SLAB WITH <br />�I <br />ANCHOR BOLTS AT ALL BOLT HOLES. COORDINATE WITH <br />I! <br />i <br />CONNECT NEW 8"CHS FROM THE NEW CHILLER TO THE <br />ELECTRICAL. <br />I� <br />EXISTING 8" WAFER VALVE IN THIS RISER. ROUTE NEW PIPING <br />FROM EXISTING VALVE TO UNIT CONNECTION. PROVIDE NEW <br />FLEXIBLE CONNECTION IN RISER BETWEEN UNIT & VALVE. <br />PROVIDE VICTAULIC CONNECTION TO CHILLER INLET. PROVIDE <br />ACC. DEVICES FOR GAGES & CONTROLS PER DETAILS. <br />S <br />CONNECT NEW 8"CWS TO NEW CHILLER FROM PUMP CWP-2 <br />TO THE EXISTING 8 WAFER VALVE IN THIS RISER. ROUTE NEW <br />II <br />PIPING FROM EXISTING VALVE TO UNIT CONNECTION. PROVIDE <br />I <br />NEW FLEXIBLE CONNECTION IN RISER BETWEEN UNIT & VALVE. <br />-:' <br />-....- ............. <br />PROVIDE NEW 8" WYE STRAINER WITH 2" BLOWOFF VALVE IN <br />-- -- --- <br />HORIZ. CONNECTION TO UNIT. PROVIDE VICTAULIC CONNECTION <br />TO CHILLER INLET. PROVIDE ACC. DEVICES FOR GAGES & <br />CONTROLS PER DETAILS. <br />1/4"=1--0" CHILLER <br />O 2' 4' 8' SYMBOL CH-2 <br />RUN NEW YO REFRIGERANT SAFETY DISCHARGE TYPE CENTRIFUGAL <br />PIPING FROM CH-2 RUPTURE VALVE UNDER ROOF PROVIDE 36" EXTENSION TO THE <br />OVERHANG AND EXTEND TO ROOF AS SHOWN. EXISTING CONCRETE SLAB UNDER <br />NEW CHILLER CAPACITY TONS 500 <br />-=..... _ ....... ........ ...... _ ......... .. _.... ......... _._ <br />I <br />„ PROVIDE PROVIDE 12" EXTENSION FLOW, GPM 1200 <br />3 3 NEW TO THE EXISTING PUMP <br />CH-2 REFRIG. RUPTURE RELIEF <br />WALL SLAB FOR NEW PUMP o <br />I -------------------------------- REFRIG. RUPTURE RELIEF --------------- ---------- --� J J ENT. TEMP. °F 51.95 <br />I I SLEEVE BASE FRAME w w w <br />—J <br />�_ - -- ----- ----- - -- ---- . _.. - - -- - --- ----- ---- --- - - -- �. = Q w <br />- -- - -- - --- - - - - ---- - - - -___ - - - _- --- -.-_- _._ - _- -_ -- _ _-. - --- LVG. TEMP., °F 42 <br />- _ - - - m < <br />MAX. PRESSURE DROP <br />------ ---- CWR 15.22/0.0001 <br />----- ---- CWS FT. H 20/FOULING FACTOR <br />PROVIDE REFRIG T//0000 <br />j / j j REFRIG.- <br />'/ �/ ✓ ....__ DSRE CHWP 3 FLOW, GPM 1500 <br />SAFETY DISCHARGE TO2 <br />----- <br />3 18 ABOVE ROOF AT 12" CWS LOW z w ENT. TEMP., °F 85 <br />MIN. 15 FT FROM ANY I I I J NEAR FLOORAIR w <br />DOORS.INTAKES <br />KPROVIDE --� rll - �------------ o FROM COOLING z Q � <br />I c� I • 1 TOWER o 00 Q LVG. TEMP., °F 94.36 <br />GOOSENECK ELBOW I I' j 9 CWP-3 U <br />EXIST. SAFETY REFRIG. FACING DOWN AT END I L1I ' I ' �' CHS U' MAX. PRESSURE DROP <br />RUPTURE DISCHARGE <br />ON ROOF 37.48/0.00025 <br />OF PIPEFT.H2O/FOULING FACTOR <br />C�� <br />. <br />EXIST. - <br />CH-3 I i , CH-1 I f _L'J...... �-` �'a MAX. POWER INPUT, KW/TON 0.55 <br />w <br />wwl I I I ' 0 ui I - 10 NPLV, KW/TON 0.48 <br />w I REFRIGO 6 I N W v I = CWP-2 cn 12" CWR HIGH <br />L <br />j vnwERE ro v! ABOVE FLOOR TO <br />EVAPORATOR FOULING FACTOR 0.0001 <br />DISCH.(, 14EC}�- CHWP-1 !; COOLING TOWER <br />L - - - - J I 6 MANUF. - MODEL NO. TRANE <br />I I _ I =______ ____ CVHF0485 <br />C) CWP-1 <br />w (� CH 1 AE <br />CHS CHS ��� REFRIGERANT TYPE R-123 <br />�' <br />3-J _� � PROVIDE 18" EXTENSION TO <br />3 5 CWS _ CWS J THE EXISTING PUMP SLAB REFRIGERANT CHARGE (LBS.) 900. <br />- _ FOR NEW PUMP BASE FRAME <br />LOCATION CHILLER RM. <br />ELECTRICAL, VOLTS/PHASE/Hz 480/3/60 <br />j <br />ELECTRICAL MIN. CKT. AMPS (MCA) 519.0 <br />ELECTRICAL M.O.C.P. AMPS 800.0 <br />UNIT OPERATING WEIGHT (LBS.) 20333. <br />NOTES 1,2,3,4 <br />1 /4" = V-0" <br />O 2' 4' 8' <br />NOTES: <br />1. COORDINATE WITH ELEC. FOR POWER FEED AND WIRING TO CHILLER. <br />2. PROVIDE CHILLER WITH REMOTE FREESTANDING STARTER PANEL AND <br />CONTROLS— SEE ELEC. PLAN. <br />3. CHILLERS SHALL RUN BASED ON THE ECMS CONTROL SEQUENCE SET BY TRANE CO. <br />4. CHILLER RATINGS BASED ON STANDARD AHRI CONDITIONS, <br />Tampa Bay Trane <br />® � d <br />•••N ••NN M ••N ••• <br />• •• ••N/ MN)•N•••• <br />• ••Nl••••N••N••• <br />0 <br />z <br />W <br />W <br />J <br />Revisions: <br />No. <br />Description <br />Date <br />1 <br />INITIAL ISSUE <br />1/11/15 <br />Z Z <br />W <br />H � <br />LLJ <br />> 1 T <br />J <br />Z <br />J W a M <br />r � M LL <br />CL Cl)Z CM-6 � <br />Q <br />=J O J <br />a Z im <br />acc <br />v <br />.� <br />JJ <br />0 J J 0 <br />a <br />UJ <br />LL N <br />Z <br />a <br />J <br />O Z <br />Q 0 r <br />0 JOZ <br />.J a. - <br />o <br />_ <br />LL J � <br />E <br />Jao�a <br />z <br />.. <br />Q J= w > w <br />c <br />~ J 0 J <br />ccZ —Z Q <br />aw=w c� <br />o <br />a (1) 0 oC cn <br />Project <br />Engineer: G. BARBARI <br />Project <br />Manager: S. HELMER <br />Sales <br />Engineer: R. GERUN <br />Date: 11 /11 /2015 <br />Job #: CROH5298715 <br />File <br />Name: FL HOSP CH2 <br />Sheet # : M-2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.