My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7050 Gall Blvd (105)
Zephyrhills
>
Building Department
>
Building Plans
>
7050 Gall Blvd (105)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2025 2:31:57 PM
Creation date
1/21/2025 3:41:57 PM
Metadata
Fields
Template:
Building Plans
Street #
7050
Location
Gall Blvd
Contractor
Tampa Bay Trane
Building Plans - Permit #
16849
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROVIDE NE <br />WITH NEW <br />WITH PET C <br />UNIONS ON <br />PUMP RISEI <br />NEW PUMP <br />EXISTING <br />VALVE TO <br />PROVIDE Nf <br />SPOOL PIE( <br />NEW PUMP. <br />SUCTION DI <br />AS SHOWN <br />FLOOR <br />E__________,��NEW CHILLER CH-2 <br />n n PROVIDE NEW WELDOLET WITH NEW <br />= cn cn � <br />U = 3;: U <br />�UU <br />AM� <br />CHILLER <br />PIPING <br />THERMOMETER WITH PET COCK AND <br />UNIONS ON ALL EACH EXIST PIPE <br />CONNECTIONS TO EACH CHILLER. (TYP <br />ALL CHILLED AND CONDENSER WATER <br />PIPING) \ <br />TYP. VICTAULIC <br />CONNECTION <br />TYP. FLEXIBLE <br />CONNECTIONS <br />TYP. NEW OR <br />REUSED WAFER <br />VALVE WITH <br />HANDWHEEL & <br />GEAR DRIVE <br />EX. 8" CHS <br />TO CHILLER <br />CHWP-2 PIPING AND ELEVATION DETAIL <br />NOT TO SCALE <br />PROVIDE NEW WELDOLETS AS NEEDED FOR <br />ALL WITH NEW CONTROLS DEVICES SUCH <br />AS FLOW MEASURING INSERT PROBE & <br />TEMPERATURE MEASUREMENT, COORD. W/ <br />CONTROLS FOR ALL REQUIRED WELDOLETS <br />AND DEVICES NEEDED. (TYP ALL CHILLED <br />AND CONDENSER WATER PIPING AT EACH <br />CHILLER) <br />l W <br />-/ PROVIDE WELDOLETS AT CHILLED & CONDENSER <br />WATER PIPING ON CHILLER CONNECTIONS. <br />PROVIDE W/ UNIONS, Y" BALL VALVES, Y" COPPER <br />PIPING, AND PRESSURE GAGE WITH PETCOCK <br />CHILLER CONTROLS -GAGES <br />EXTEND EXISTING CONCRETE <br />PAD BELOW PUMP APPROX. <br />18" & SECURE PUMP FRAME <br />TO CONCRETE PAD. <br />CHILLER FLOOR <br />CWP-2 PIPING AND ELEVATION DETAIL <br />C�, GAGES, VALVES, ACC. DETAIL NOT TO SCALE <br />PROVIDE NEW WELDOLETS AS <br />NEEDED FOR CONTROLS DEVICES. <br />COORD. W/ CONTROLS FOR <br />ALL REQ'D.(TYP) <br />CONCRETE <br />IP APPROX. <br />PUMP FRAME <br />AD. <br />PROVIDE 6" DISCHARGE <br />TO PUMP WITH 6" x 8" <br />TO 8" CWS TO CHILLER. <br />CONNECTION <br />REDUCER <br />PUMPS <br />SYMBOL <br />CHWP-2 <br />CWP-2 <br />DUTY <br />NEW CHILLED WATER <br />NEW COND. WATER <br />TYPE <br />END SUCTION <br />END SUCTION <br />FLOW, GPM <br />1200 <br />1500 <br />HEAD, FT. H2O <br />40 <br />70 <br />RPM <br />1800 <br />1800 <br />MIN. EFFICIENCY, % <br />68.7 <br />82.5 <br />MAX. MOTOR HP <br />20 <br />40 <br />MANUF. - MODEL NO. <br />PACO <br />8x6-60951 LF <br />PACO <br />8x6-60123LF <br />LOCATION <br />MECH. EQUIP. RM. <br />MECH. EQUIP. RM. <br />ELECTRICAL, VOLTS/PHASE/Hz <br />480/3/60 <br />480/3/60 <br />NOTES <br />1,2,3 <br />1,2,3 <br />NOTES: <br />1. COORDINATE WITH ELEC. FOR WIRING AND CONNECTION FOR STARTERS AND <br />DISCONNECT SWITCHES REQUIRED AT ALL LOCATIONS. <br />2. PROVIDE EACH PUMP WITH PREMIUM EFFICIENCY MOTOR. <br />3. ALL PUMPS SHALL RUN BASED ON THE ECMS CONTROL SEQUENCE SET BY TRANE <br />CO. PROVIDE UNISTRUT MOUNTED COMBINATION MOTOR STARTER/H-O-A SWITCH <br />FOR ALL NEW PUMPS. COORDINATE WITH ELEC. AND CONTROLS. ALL STARTERS <br />SHALL BE PROVIDED WITH OVERLOADS AND SAFETIES AND DISCONNECT SWITCH. <br />NEW VALVE CONNECTION AT EXISTING <br />OF REMOVED TRIPLE DUTY VALVE <br />PROVIDE NEW FLANGED 8" TRIPLE DUTY VALVE <br />IN NEW RISER. CONNECT TO EXIST OVERHEAD <br />FLANGES AND REUSED FLEX CONNECTION AS SHOWN. <br />EXISTING FLEXIBLE CONNECTION <br />PIPING RISER <br />PROVIDE TWO WELDOLETS AT <br />PUMP, W/ UNIONS, Y" BALL <br />VALVES, Y" COPPER PIPING, AND <br />PRESSURE GAGE WITH PETCOCK <br />EXISTING FLEX CONNECTION TO <br />REMAIN. CONNECT NEW 8" <br />FLANGED SPOOL PIECE TO FLEX <br />AND PUMP INLET AS SHOWN. <br />PROVIDE NEW WELDOLETS AS <br />NEEDED FOR CONTROLS DEVICES. <br />COORD. W/ CONTROLS FOR <br />ALL REQ'D.(TYP) <br />EXISTING WAFER SHUTOFF <br />VALVE TO REMAIN <br />NOT TO SCALE <br />EX. 8" CWS <br />TO PUMP FROM <br />COOLING TOWER <br />Tampa Bay Trane <br />® a <br />•••« ••NN w ••w ••• <br />• •• •••M w•w•w•••• <br />• •w•••••NN•••N••N••• <br />z <br />W <br />0 <br />J <br />Revisions: <br />No. <br />Description <br />Date <br />1 <br />INITIAL ISSUE <br />11/11/15 <br />Z <br />OZ <br />— W <br />Q W <br />> V r <br />J <br />Z CM <br />a�W <br />J <br />F.. M LL <br />.. <br />n <br />Cn Q CM-d C <br />a� <br />E <br />=J0 mJ <br />aZ - <br />z <br />aMCr. Cr <br />in <br />� � <br />v <br />�� <br />J J <br />0JJ 0a <br />o. <br />LL 0 0 N <br />U) <br />W <br />J <br />M <br />0 <br />Z W <br />a 0 J = W <br />Joao z <br />acc0cn O <br />J. %..' Z <br />aWZcn <br />E <br />z <br />.. <br />J= J a J W <br />Z V a <br />�v <br />W = W W C� <br />p <br />0020 U) <br />Project <br />Engineer: <br />G. BARBARI <br />Project <br />Manager: S. HELMER <br />Sales <br />Engineer: <br />R. GERUN <br />Date: 11 /11 /2015 <br />Job #: CROH5298715 <br />File Name: FL HOSP CH2 <br />Sheet # : M-3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.