Laserfiche WebLink
DEMOLITION GENERAL NOTES <br />b <br />03 <br />Ln <br />z <br />c� <br />0 <br />N <br />O <br />O <br />O <br />O <br />tL <br />a <br />G DEMOLITION KEY NOTES <br />I . EXISTING CEILING GRID AND TILE TO REMAIN. REPLACE ANY DAMAGED OR DIRTY TILES WITH NEW <br />TO MATCH EXISTING. <br />2. EXISTING CEILING GRID TO REMAIN, REMOVE EXISTING TILE. REFER TO SHEET A2 FOR EXTENTS OF NEW TILE. <br />3. REMOVE CEILING AND GRID AS SHOWN (VERIFY WITH PROJECT MANAGER). REFER TO REFLECTED CEILING PLAN <br />FOR NEW WORK. REWORK HVAC AIR DEVICES AND ASSOCIATED DUCTWORK ONLY IF REQUIRED. <br />4. NOT U5LD <br />5. NOT USED <br />G. NOT USED <br />7. EXISTING DIFFUSERS AND RETURN GRILLES TO REMAIN. <br />8, NO3 USED <br />9. EXISTING CEILING MOUNTED EXHAUST FAN TO REMAIN. <br />10. NOT USED <br />I NOT USED <br />€ 2. NOT U5ED <br />13. IF NECESSARY, REMOVE AND RELOCATE MOTION SENSORS, DOOR CONTACTS, CAMERAS AND SECURITY 5Y5TE EQUIPMENT <br />VERIFY WITH PROJECT MANAGER. REFER TO SECURITY PLAN FOR NEW AND RELOCATED CAMERAS <br />AND ASSOCIATED WIRING. <br />14. EXISTING LIGHT FIXTURE TO REMAIN. <br />15. REMOVE EXISTING LIGHT FIXTURE AND PULL WIRE AND CONDUIT BACK TO NEXT REMAINING DEVICE. MAINTAIN POWER <br />CONNECTION TO REMAINING DEVICES IN CIRCUIT. REFER TO ELECTRICAL DRAWINGS FOR NEW WORK OR REUSE OF <br />SALVAGED FIXTURE5. <br />I G. EXISTING EXIT LIGHT/ EMERGENCY UNIT TO REMAIN, <br />17. REMOVE EXIT LIGHT/EMERGENCY UNIT AND PULL WIRE AND CONDUIT BACK TO NEXT REMAINING DEVICE. MAINTAIN POWER <br />CONNECTION TO REMAINING DEVICES IN CIRCUIT. REFER TO ELECTRICAL DRAWINGS FOR NEW WORK OR REUSE OF <br />SALVAGED FIXTURES. <br />15. EXISTING CEILING RECEPTACLE5 TO REMAIN. <br />19. N01- USED <br />20. REMOVE EXISTING EVAPORATOR, DISCONNECT POWER AND REFRIGERANT PIPING. <br />2 1 . REMOVE EXISTING EVAPORATOR FOR RELOCATION, DISCONNECT POWER AND REFRIGERANT PIPING. REFER TO MECHANICAL <br />SHEETS. <br />22. EXISTING CAMERAS TO REMAIN. <br />23, NOT USED <br />24. NO WORK IN THIS AREA, UNLESS NOTED OTHERWISE. <br />25, NOT USED <br />2G. EXISTING EXTERIOR SOFFIT, LIGHTING AND COMPONENT TO REMAIN. <br />27. EXISTING CEILING MOUNTED EVAPORATOR TO REMAIN. <br />25. EXISTING SPEAKERS TO REMAIN. <br />29. EXISTING CEILING MOUNTED AIR -CURTAIN TO BE REMOVED. <br />30. NO U5ED <br />3 1. EXISTING WI-FI CONNECTION TO REMAIN. <br />32. REMOVE EXISTING POWER POLE AND ALL A550CIATED WIRING BACK TO PANEL. <br />u <br />LEGEND <br />0 <br />0 <br />CEILING DEMOLITION PLAN <br />SCALE: 114" = I '- 0" <br />SEE DEMOLITION KEY NOTES <br />EXISTING CEILING GRID, LIGHTS, AND EQUIPMENT, <br />ETC. TO REMAIN. <br />EXISTING CEILING GRID, LIGHTS, AND EQUIPMENT, <br />BULKHEAD, WALL, ETC. TO BE REMOVED AND / OR <br />RELOCATED <br />4'-TWO - LAMP FLUORESCENT <br />LOW -PROFILE WRAP AROUND FIXTURE. <br />RECESSED LIGHTING. <br />RECESSED LIGHTING. <br />COMBINATION EXIT 51GN AND DUALITE <br />EMERGENCY LAMP5. <br />EMERGENCY LIGHTING UNIT W/ 2 HEADS. <br />DUALITE OUTDOOR LXT05 WITH <br />MINIMUM OF 90 MINUTE BACK-UP <br />BATTERY. INSTALL ONLY WHEN <br />REQUIRED BY CODE. <br />A. THE GENERAL CONTRACTOR SHALL COORDINATE ALL WORK WITH <br />PERSPECTIVE TRADES. BUILDING / FIRE / HEALTH OFFICIALS, AND OWNER'S <br />REPRESENTATIVE. <br />B. THE GENERAL CONTRACTOR SHALL VERIFY EXISTING CONDITIONS, LOAD <br />BEARING WALLS, AND STRUCTURAL ITEMS PRIOR TO STARTING WORK. <br />NOTIFY AND COORDINATE WITH OWNER'S REPRESENTATIVE ALL <br />DISCREPANCIES BETWEEN EXISTING CONDITIONS AND CONSTRUCTION <br />DOCUMENTS. <br />C. LEGALLY DISPOSE ALL REMOVED MATERIALS PER GOVERNING AUTHORITIES <br />AND AS DIRECTED BY OWNER'S REPRESENTATIVE. ALL DEBRIS SHALL BE <br />REMOVED FROM THE SITE, UNLESS PLACED IN APPROVED CONTAINERS. <br />D. ALL TEMPORARY SUPPORTS, SHORING AND BRACING ETC. SHALL BE <br />DESIGNED BY A REGISTERED PROFESSIONAL ENGINEER. SUBMIT TO <br />OWNER'S REPRESENTATIVE FOR APPROVAL. <br />E. DEMOLITION EQUIPMENT THAT PRODUCES EXCESSIVE NOISE SHALL BE <br />OPERATED ONLY WHEN ADJOINING BUSINESSES ARE CLOSED, OR AS <br />COORDINATED WITH ALL CONCERNED PARTIES AND LOCAL MUNICIPALITY <br />RESTRICTION. <br />F. ALL HAZARDOUS MATERIAL REMOVAL, ASBESTOS ABATEMENT, LEAD PAINT <br />ENCAPSULATION PROCEDURES ARE TO MEET E.P.A. AND LOCAL <br />REQUIREMENTS. <br />G. REMOVE ALL FLOOR FINISHES AND PREP SUB -FLOORS TO RECEIVE NEW <br />FLOOR FINISHES AS INDICATED ON THE FLOOR FINISH PLAN. COORDINATE <br />RESILIENT FLOORING REMOVAL WITH ASBESTOS ASSESSMENT REPORT. <br />H. THE GENERAL CONTRACTOR SHALL COORDINATE AND PROVIDE A WRITTEN <br />RECORD, TO THE OWNER'S REPRESENTATIVE, OF ALL SALVAGED FIXTURES, <br />TRIMS, EQUIPMENT, CABINET, ETC. PRIOR TO DEMOLITION. ALL DECOR <br />ITEMS ARE THE RESPONSIBILITY OF THE OWNER, HOWEVER, THE GENERAL <br />CONTRACTOR SHALL PROVIDE A SECURE AND ADEQUATE STORAGE AREA <br />FOR SUCH ITEMS. <br />I. THE GENERAL CONTRACTOR SHALL REMOVE ALL FIXTURES AND EQUIPMENT <br />(SHOWN DASHED). THE GENERAL CONTRACTOR 15 RESPONSIBLE FOR THE <br />RECORDING OF EXISTING EQUIPMENT. LOCATIONS, CONNECTION TYPES, AND <br />ROUGH -INS, AS WELL AS, NEW ROUGH -INS AND ALL FINAL CONNECTIONS, AS <br />REQUIRED FOR ALL REUSED AND RELOCATED EQUIPMENT. <br />J. THIS PLAN INDICATES ONLY THE APPROXIMATE DEMOLITION REQUIRED FOR <br />COMPLETION OF THI5 REMODEL. EXISTING CONDITIONS NOT SHOWN OR <br />NOTED SHALL REMAIN UNCHANGED UNLESS APPROVED BY THE ARCHITECT <br />OR OWNER'S REPRESENTATIVE. ALL EXISTING MATERIALS ADJACENT TO THE <br />NEW CONSTRUCTION SHALL BE PATCHED, REPAIRED, AND FINISHED TO <br />PROVIDE A SMOOTH, LEVEL, AND UNNOTICEABLE TRANSITION BETWEEN NEW <br />AND EXISTING FINISHES. <br />K. EXISTING MATERIALS MAY BE REUSED ONLY IF SPECIFICALLY NOTED, OR, IF <br />PRIOR APPROVAL IS OBTAINED FROM THE OWNER'S REPRESENTATIVE. <br />REUSED MATERIALS SHALL, EITHER BE REAPPLIED AND / OR REFINISHED TO A <br />LIKE NEW CONDITION IN A C05T EFFECTIVE WAY, OR NEW MATERIALS SHALL <br />BE USED. <br />L. THOROUGHLY CLEAN, PATCH AND REPAIR ALL EXISTING SURFACES TO A LIKE <br />NEW CONDITION. PROVIDE PROPER PREPARATION FOR ALL SURFACES TO <br />RECEIVE NEW FINISHES. COORDINATE FINI5HE5 WITH CONSTRUCTION <br />DOCUMENTS AND / OR OWNER'S REPRESENTATIVE. <br />M. SEE ARCHITECTURAL, PLUMBING, AND ELECTRICAL SHEETS FOR ADDITIONAL <br />CONCRETE SLAB REMOVAL. PATCH AND REPAIR SLAB AS REQUIRED TO <br />MATCH EXISTING. <br />N. REMOVE ALL UNUSED OR ABANDONED PLUMBING, MECHANICAL, AND <br />ELECTRICAL ITEMS IN THEIR ENTIRETY AND PROVIDE PROPER CAP <br />TERMINATION BELOW THE SLAB. COORDINATE WITH LOCAL BUILDING AND <br />UTILITY OFFICIALS. REPAIR ADJACENT SURFACES AS REQUIRED FOR NEW <br />CONSTRUCTION. SEE PLUMBING, MECHANICAL, AND ELECTRICAL SHEETS <br />FOR ADDITIONAL DEMOLITION AND / OR RELOCATION INFORMATION. <br />O. THE GENERAL CONTRACTOR SHALL PROVIDE AN ASSESSMENT OF ALL <br />EXISTING ROOFING TO REMAIN. ALL DAMAGED FLASHING, COPING, <br />MEMBRANE, SHINGLES, TILES, ETC. SHALL BE REPAIRED TO PROVIDE A <br />WATERTIGHT BUILDING ENVELOPE. UNUSED OR ABANDONED ROOFTOP <br />ITEMS SHALL BE REMOVED AND ROOF OPENINGS SHALL BE CLOSED AND <br />ROOFED WITH SIMILAR MATERIALS. ROOF DRAINS SHALL BE CLEARED AND <br />REPAIRED AS REQUIRED AND WORKING OVERFLOWS SHALL BE PROVIDED. <br />SEE ROOF PLAN FOR ADDITIONAL NOTES AND NEW ROOFING CONDITIONS. <br />P. REMOVE ALL EXTRANEOUS MATERIALS FROM FLOORS, WALLS, AND CEILINGS <br />WHICH ARE NOT APPLICABLE TO THE NEW OR EXISTING CONSTRUCTION. <br />ITEMS INCLUDE BUT ARE NOT LIMITED TO: ELECTRIC OUTLETS, CONDUITS, <br />DUCTWORK; CEILING ANGLES, DRYWALL, FRAMING, FURRING, SOFFITS, <br />MECHANICAL ITEMS, ELECTRICAL ITEMS, PLUMBING ITEMS, HANGERS, AND <br />RELATED CONSTRUCTION DEBRIS. <br />Q. PREVENT FUBLIC ACCESS TO WORK AREA. INSTALL BARRIERS AND SIGNAGE <br />TO ALERT THE GENERAL PUBLIC, EMPLOYEES, AND CONTRACTORS OF <br />DANGER. <br />R. CONTRACTOR SHALL SET THEIR SAW BLADES NO DEEPER THAN 3 1 /2" WHEN <br />SAW CUTTING FLOOR. <br />NORTH <br />+ COOLER/ FREEZER LIGHTING <br />SPEAKER <br />0o CEILING MOUNTED RECEPTACLE <br />Qn SECURITY CAMERA <br />OR Z <br />SUPPLY DIFFUSER <br />OR z z RETURN AIR GRILLE/ EXHAUST GRILLE. <br />CEILING SYSTEM <br />Loco <br />O <br />W 0 i <br />I -j ci <br />o <br />a <br />�cc <br />o a <br />O m <br />U N <br />O co <br />z <br />O cn j:z- II <br />I ) 1 <br />a=_ <br />W } O <br />U L I <br />'X96612 <br />ci <br />STIPUM I-15E <br />THIS DRAWING WAS SPECIFICALLY <br />PREPARED FOR USE IN REGARD5 TO THE <br />PERMITTING AND CONSTRUCTION OF THIS <br />PROJECT AND 15 NOT SUITABLE FOR USE <br />FOR ANY OTHER PROJECT. USE OF THIS <br />DRAWING FOR REFERENCE OR EXAMPLE <br />ON ANOTHER PROJECT REQUIRES THE <br />SERVICES OF PROPERLY LICENSED <br />ARCHITECTS AND ENGINEERS. <br />REPRODUCTION OF THIS DRAWING FOR <br />REUSE ON ANOTHER PROJECT 15 NOT <br />AUTHORIZED AND MAY BE CONTRARY TO <br />THE LAW. <br />o u� <br />O <br />Lo <br />> <br />�S <br />C� <br />my <br />3a <br />'a <br />�n <br />N L <br />o <br />�o <br />LL1 <br />C) <br />® <br />o <br />cm <br />m <br />z <br />LL <br />J <br />z <br />_ <br />LJ <br />y <br />W <br />IN <br />LLJ <br />STORE OR <br />BLDG NO. <br />/ Q <br />G6 58 <br />VERSION OR <br />PROJECT ID <br />751 1 93-0 <br />SCALE O <br />4' <br />1 /4" = P-0" <br />DESIGN TEAM <br />DATE <br />DGNR. <br />P.MGR. <br />CESO <br />0G.24.2015 <br />RVWR. <br />JAD <br />DRWG. NO. <br />G858- D-2 <br />KE <br />