My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7317 Gall Blvd (2)
Zephyrhills
>
Building Department
>
Building Plans
>
7317 Gall Blvd (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2025 7:56:19 PM
Creation date
1/21/2025 3:41:59 PM
Metadata
Fields
Template:
Building Plans
Street #
7317
Location
Gall Blvd
Contractor
Gilbane Building
Building Plans - Permit #
16530
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EX15TING GREASE INTERCEPTOR <br />co <br />Ln <br />co <br />QD <br />n <br />W <br />J <br />z <br />s <br />�s <br />WQ <br />(S) to <br />co <br />�O <br />�(S) <br />m uw <br />Ln � <br />o <br />N � <br />t\ <br />TO REMAIN <br />(ETK)CO I l r r <br />--- - - - - - - - - - - <br />� I � <br />� I � <br />� � I <br />FIELD VERIFY ALL CONDITIONS <br />• DE51GN DRAWINGS ARE SCHEMATIC. TH15 CONTRACTOR SHALL V151T <br />THE 51TE PRIOR TO BIDDING OR AWARD OF CONTRACT TO INSPECT <br />EXISTING FIELD CONDITIONS. TH15 CONTRACT SHALL INCLUDE ALL <br />LABOR AND MATERIALS NECESSARY FOR FIELD MODIFICATIONS DUE <br />TO EXISTING CONDITIONS. <br />• THE CONTRACTOR SHALL CONTACT THE ARCHITECT, ENGINEER OR <br />OWNER PRIOR TO BIDDING FOR INTERPRETATIONS AND <br />CLARIFICATIONS OF THE DESIGN AND INCLUDE IN H15 BID ALL COSTS <br />TO MEET THE DESIGN INTENT. CLARIFICATIONS MADE BY THE <br />ARCHITECT, ENGINEER OR OWNER AFTER BIDDING WILL BE FINAL AND <br />SHALL BE IMPLEMENTED AT CONTRACTORS COST. <br />• BIDDING CONTRACTORS 5HALL HAVE A WORKING KNOWLEDGE OF <br />LOCAL CODES AND ORDINANCES AND SHALL INCLUDE IN THEIR BIDS <br />THE COSTS FOR ALL WORK INSTALLED IN STRICT ACCORDANCE WITH <br />GOVERNING CODES, THE PLANS AND 5PECIFICATION5 NOT <br />WITHSTANDING. THE CONTRACTOR SHALL ALERT ARCHITECT, <br />ENGINEER OR OWNER OF ANY APPARENT DISCREPANCIES BETWEEN <br />GOVERNING CODES AND DE51GN INTENT. <br />— — EX.5AN — — — — — <br />SANITARY SYSTEM PLAN ,m <br />SCALE: 1 /4" = P-0" 0 G" P 2' 4' <br />FIELD VERIFY EXACT PATH OF EX15TING GREASE <br />WASTE AND SANITARY: <br />DIRECTION OF FLOW, SIZE, AND INVERT PRIOR <br />TO 5AWCUTTING. <br />REMOVE ALL ABANDONED UNDERFLOOR <br />SANITARY BACK TO MAIN AND CAP. <br />I 2 <br />— — — — — — — — — — — — — — — — — — — — — —__� <br />r__ <br />— <br />0 PLUMBING KEYNOTES: <br />I . THOROUGHLY CLEAN EX15TING SANITARY. <br />2. VERIFY EXISTING SANITARY LINE INVERT ELEVATION AND ROUTING BEFORE ROUTING NEW SANITARY LINE. <br />3. CONTRACTOR SHALL TRENCH FLOOR. LAY PIPING ON SAND TO PROVIDE CONTINUOUS STRUCTURAL SUPPORT. <br />BACKFILL USING CLEAN MATERIALS AND PLACE CONCRETE. <br />4. ALL PLUMBING UNDER LAVATORIE5 SHALL BE COVERED OR INSULATED WITH "TRAP WRAP" BY BROCAK-PRODUCTS, <br />INC. <br />5. CLEAN EXISTING MOP BASIN. <br />G. CLEAN EXISTING THREE COMPARTMENT SINK. <br />7. CLEAN WATER CLOSET/URINAL. <br />6. CLEAN EX15TING LAVATORY. <br />9. CLEAN EX15TING HAND SINK. <br />10. INSTALL HAND SINK "55-3" AND 1 -1 /2" TRAP AND DRAIN. MAKE DIRECT DRAIN CONNECTION TO SANITARY. INSTALL <br />PER MANUFACTURER'S RECOMMENDATIONS. <br />1 1. INSTALL MUG -RINSE 51NK "55-4". MAKE INDIRECT DRAIN CONNECTION TO SANITARY. INSTALL TRAP AND DRAIN <br />PER MANUFACTURER'S RECOMMENDATIONS. REFER TO DETAIL #5/P-3. <br />12. NOT USED. <br />13. INSTALL FLOOR 51NK WITH "P" TRAP FLUSH TO FINISHED FLOOR. ELEVATE ABOVE FINISHED FLOOR PER OWNER <br />REQUIREMENTS WHEN REQUESTED. REFER TO DETAIL #5/P-4. <br />14, NOT USED. <br />15. INSTALL FIXTURE VENT CONCEALED IN WALL. DO NOT OFFSET LE55 THAN G" ABOVE FLOOD LEVEL RIM OF FIXTURE <br />SERVED. CONNECT TO NEAREST VENT THRU ROOF. <br />I G. INSTALL 3/4" INDIRECT CONNECTED DRAIN AT A MINIMUM I % PITCH FROM EQUIPMENT TO FLOOR DRAIN. <br />MAINTAIN 1- 1 /2" AIR GAP AT FLOOR DRAIN, DO NOT MANIFOLD INDIRECT DRAINS. INSTALL TRAP AT EQUIPMENT <br />CONNECTION WHERE DEVELOPED LENGTH OF DRAIN EXCEEDS 2' HORIZONTALLY OR 4' TOTAL. <br />17. INSTALL 1- 1/4" INDIRECT CONNECTED DRAIN AT A MINIMUM 2% PITCH FROM EQUIPMENT TO FLOOR DRAIN. <br />MAINTAIN 2-1/2" AIR GAP AT FLOOR DRAIN. CONTRACTOR SHALL CUT 1- 1 /4" HOLE IN FROZEN BEVERAGE DRAIN <br />PAN AND ENSURE DRIP PROOF CONNECTION. <br />16. EXTEND BACKFLOW PREVENTER VENT LINE AND D15CHARGE OVER FLOOR DRAIN PER MANUFACTURER'S <br />REQUIREMENTS. DO NOT MANIFOLD INDIRECT DRAINS. <br />19. EXISTING WALK-IN COOLERS TO BE REWORKED, MAINTAIN EX15TING CONDENSATE A5 REQUIRED TO <br />ACCOMMODATE NEW CONSTRUCTION. <br />20. NOT USED. <br />2 1 . INSTALL I " CONDENSATE DRAIN AT MINIMUM I % PITCH FROM EVAPORATORS TO COOLER WALL PENETRATION. <br />SECURE CONDENSATE DRAIN TO COOLER WALL, <br />22, INSTALL PVC SLEEVE WHERE CONDENSATE LINE PENETRATES WALLS, COMPLETELY SEAL BOTH SIDES OF ANNULAR <br />SPACE WITH EXPANDABLE FOAM INSULATION. EXTEND CONDENSATE DRAIN TO CONNECT TO EXISTING <br />CONDENSATE DRAIN PIPING. 5EE DETAIL #3/P-4. <br />23. INDIRECTLY DRAIN TO EXISTING FUNNEL FLOOR DRAIN PREVIOUSLY SERVING WALK-IN EVAPORATORS IN TH15 <br />AREA. <br />� 1 `,,o � H • SI �Fp 'd. <br />s' <br />NO 67782 • O <br />' S AT <br />,s 0 1 <br />�, � • ..L LNG` ®>` <br />///,°tttll�tt,e <br />STIPULATION FOR REUSE <br />TH15 DRAWING WA55PECIFICALLY <br />PREPARED FOR U5E IN REGARDS TO THE <br />PERMITTING AND CONSTRUCTION OF TH15 <br />PROJECT AND 15 NOT 5UITABLE FOR U5E <br />FOR ANY OTHER PROJECT. U5E OF TH15 <br />DRAWING FOR REFERENCE OR EXAMPLE <br />ON ANOTHER PROJECT REQUIRE5 THE <br />SERVICES OF PROPERLY LICENSED <br />ARCHITECT5 AND ENGINEER5, <br />REPRODUCTION OF TH15 DRAWING FOR <br />REU5E ON ANOTHER PROJECT 15 NOT <br />AUTHORIZED AND MAYBE CONTRARY TO <br />THE LAW. <br />n <br />.0 <br />— <br />U <br />nQ <br />l9 <br />V <br />h <br />� C <br />N <br />co <br />u <br />4k <br />N <br />w <br />w <br />w <br />O N <br />Z <br />J <br />J <br />J <br />L <br />O <br />n <br />> <br />> <br />m <br />> <br />m <br />n <br />n U <br />W <br />Z <br />O <br />Z <br />O <br />Z <br />O <br />O <br />t_o <br />N <br />Fss <br />(S) <br />O� <br />> <br />> <br />> <br />� <br />o/ <br />cL <br />L/ <br />N N <br />oz <br />oz <br />oz <br />c� <br />W <br />W <br />'u <br />� O <br />® <br />O <br />O <br />O <br />nn <br />�L <br />O <br />�o <br />z <br />Q <br />® <br />L <br />Q <br />J <br />i <br />ILL <br />—i <br />cn <br />0 J <br />Cn <br />I.LJ <br />Q <br />N <br />(f) <br />STORE OR <br />Q <br />6 5 8 <br />BLDG NO. <br />VER51ON OR <br />7 5 1 1 9 3 -0 1 <br />PROJECT ID <br />SCALE 0 <br />4' <br />DE51GN <br />TEAM <br />DATE <br />DGNR. <br />P.MGR. WH5 I0G.24.2015 <br />RVWR. WH5 <br />DRWG. NO. <br />6858—P-2 <br />cn> <br />
The URL can be used to link to this page
Your browser does not support the video tag.