<br />SECTION I GENERAL CONDITIONS
<br />PART 1 - GENERAL
<br />1.1 SCOPE OF WORK: THE WORK INCLUDED IN THE CONTRACT FOR THIS PROJECT CONSISTS OF THE FURNISHING OF ALL
<br />LABOR, MATERIALS, SERVICES, EQUIPMENT AND APPLIANCES REQUIRED IN CONJUNCTION WITH OR PROPERLY INCIDENTAL
<br />TO THE COMPLETE CONSTRUCTION OF A GASOLINE INSTALLATION FOR 7-ELEVEN, INC.
<br />PART -AGREEMENT
<br />2.1 CONTRACTOR SHALL NOT START WORK WITHOUT CONTRACT AND APPROVED SEALED PLANS.
<br />PART 3 - INTENT OF DRAWING AND SPECIFICATIONS
<br />3.1 THE INTENT OF THE DRAWINGS AND SPECIFICATIONS IS TO PRESCRIBE A COMPLETE WORK OR IMPROVEMENT WHICH THE
<br />CONTRACTOR SHALL PERFORM IN FULL COMPLIANCE WITH THE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL
<br />PERFORM ALL WORK NECESSARY TO COMPLETE THE WORK IN A SATISFACTORY AND ACCEPTABLE MANNER.
<br />3.2 THE CONTRACTOR SHALL, UPON DISCOVERY, REPORT ANY DISCREPANCIES IN THE DRAWINGS AND SPECIFICATIONS TO
<br />THE OWNER'S CONSTRUCTION MANAGER.
<br />3.3 THE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO BE COMPLIMENTARY. ANYTHING MENTIONED IN THE
<br />SPECIFICATIONS AND NOT SHOWN ON THE DRAWINGS, OR SHOWN ON THE DRAWINGS AND NOT MENTIONED IN THE
<br />SPECIFICATIONS, SHALL BE OF LIKE EFFECT AS IF SHOWN OR MENTIONED IN BOTH. GENERALLY, THE SPECIFICATIONS
<br />DESCRIBE WORK WHICH CANNOT BE READILY IDENTIFIED ON THE DRAWINGS AND INDICATED TYPES, QUALITIES AND
<br />METHODS OF INSTALLATION OF THE VARIOUS MATERIALS AND EQUIPMENT REQUIRED FOR THE WORK. IT IS NOT INTENDED
<br />TO MENTION EVERY ITEM OF WORK IN THE SPECIFICATIONS WHICH CAN BE ADEQUATELY SHOWN ON THE DRAWINGS NOR
<br />TO SHOW ON THE DRAWINGS ALL ITEMS OF WORK DESCRIBED OR REQUIRED BY THE SPECIFICATIONS EVEN IF THEY ARE
<br />OF SUCH NATURE THAT THEY COULD HAVE BEEN SHOWN THEREON. ALL MATERIALS OR LABOR FOR WORK WHICH IS
<br />SHOWN ON THE DRAWINGS OR IS REASONABLY INFERABLE AS BEING NECESSARY TO PRODUCE A FINISHED JOB SHALL BE
<br />PROVIDED BY THE CONTRACTOR WHETHER OR NOT THE WORK IS EXPRESSLY COVERED IN THE SPECIFICATIONS.
<br />3.4 THE CONTRACTOR, SUBCONTRACTORS AND ALL TRADES SHALL EXAMINE THE SITE AND ASCERTAIN EXISTING CONDITIONS
<br />PRIOR TO THE START OF THEIR PORTIONS OF THE WORK. BEFORE ORDERING MATERIALS OR DOING ANY WORK, THE
<br />CONTRACTOR SHALL VERIFY AND BE RESPONSIBLE FOR THE CORRECTNESS OF ALL MEASUREMENTS AT THE SITE. ANY
<br />DIFFERENCES WHICH MAY BE FOUND BETWEEN ACTUAL DIMENSIONS AND DIMENSIONS INDICATED ON THE DRAWINGS OR
<br />SHOP DRAWINGS SHALL BE SUBMITTED TO THE OWNER'S CONSTRUCTION MANAGER FOR CONSIDERATION BEFORE
<br />PROCEEDING WITH THE ACTUAL DIMENSIONS AND MEASUREMENTS INDICATED ON THE DRAWINGS UNLESS A SUBSTANTIAL
<br />ERROR HAS BEEN MADE. IF SUCH AN ERROR SHOULD OCCUR, IT SHALL BE BROUGHT TO THE ATTENTION OF THE OWNER'S
<br />CONSTRUCTION MANAGER AND RESOLVED BEFORE PROCEEDING WITH WORK.
<br />3.5 THE ORGANIZATION OF SPECIFICATIONS INTO DIVISIONS, SECTIONS AND PARAGRAPHS, AND THE ARRANGEMENT OF THE
<br />DRAWINGS ARE NOT INTENDED TO CONTROL THE CONTRACTOR IN DIVIDING THE WORK AMONG SUBCONTRACTORS OR IN
<br />THE ESTABLISHING THE EXTENT OF WORK TO BE PERFORMED BY ANY TRADE.
<br />3.6 DRAWINGS AND SPECIFICATIONS: DRAWINGS INDICATE GENERAL DESIGN AND ARRANGEMENTS DRAWINGS ARE
<br />DIAGRAMMATIC AND ARE NOT SCALED FOR DIMENSIONS. TAKE ALL DIMENSIONS FROM ARCHITECTURAL PLANS AND
<br />EQUIPMENT TO BE FURNISHED. VERIFY DIMENSIONS IN THE FIELD.
<br />PART 4 - RESPONSIBILITY OF THE CONTRACTOR
<br />4.1 CONTRACTOR HEREBY DECLARES HE HAS READ ALL SPECIFICATIONS AND EXAMINED THE DRAWINGS AND
<br />THAT HE UNDERSTANDS ALL CONDITIONS.
<br />4.2 CONTRACTOR HEREBY DECLARES HE HAS VISITED THE SITE AND IS FAMILIAR WITH THE CONDITIONS
<br />AFFECTING THE WORK. NO ALLOWANCES SHALL BE MADE SUBSEQUENTLY ON BEHALF OF THE
<br />CONTRACTOR FOR ANY ERROR NEGLIGENCE ON HIS PART. IF IN THE PERFORMANCE OF THE CONTRACT,
<br />LATENT CONDITIONS AT THE SITE ARE FOUND TO BE MATERIALLY DIFFERENT FROM THOSE INDICATED
<br />BY THE DRAWINGS AND SPECIFICATIONS, OR UNKNOWN CONDITIONS UNUSUALLY INHERENT IN WORK OF
<br />THIS CHARACTER SHOWN AND SPECIFIED, THE ATTENTION OF THE OWNER'S CONSTRUCTION MANAGER
<br />SHALL BE CALLED IMMEDIATELY TO SUCH CONDITIONS BEFORE THEY ARE DISTURBED.
<br />4.3 CONTRACTOR HEREBY DECLARES THAT HE HAS READ AND IS FAMILIAR WITH THE APPLICABLE SOILS
<br />REPORT.
<br />CONTRACTOR SHALL BE RESPONSIBLE FOR STRICTLY ADHERING TO THE RECOMMENDATIONS OF SAID
<br />SOILS REPORT FOLLOWING ALL APPLICABLE PROCEDURES NOTED THEREIN. EXISTING WATER TABLE SHALL
<br />POSSIBLY DETERMINE A DIFFERENT UTILIZATION OF THE TANK STRAPS AND TYPE OF BACK FILL
<br />MATERIAL. SHOULD GROUND WATER OR CONTAMINATION BE DISCOVERED DURING TANK EXCAVATION,
<br />WORK SHALL BE SUSPENDED PENDING REVIEW BY 7-ELEVEN CONSTRUCTION MANAGER.
<br />4.4 CONTRACTOR SHALL REPORT ANY OBJECTION TO MATERIALS, APPLIANCES, OR METHODS OF
<br />CONSTRUCTION SHOWN OR SPECIFIED TO THE OWNER'S CONSTRUCTION MANAGER AND OBTAIN A
<br />DECISION BEFORE PROCEEDING.
<br />4.5 PROPOSALS: CONTRACTOR SHALL SUBMIT BID ONLY ON 7-ELEVEN'S FORM THAT WILL BE PROVIDED BY
<br />7-ELEVEN'S LOCAL CONSTRUCTION MANAGER, "COST OF CONSTRUCTION" PROPOSALS SUBMITTED ON ANY
<br />OTHER FORM SHALL BE REJECTED AND RETURNED. PROPOSALS NOT COMPLETELY AND PROPERLY FILLED
<br />OUT SHALL BE REJECTED. PROPOSALS SHALL INCLUDE MONEYS FOR REMOVAL OF ALL EXISTING
<br />IMPROVEMENTS AS REQUIRED FOR GASOLINE INSTALLATION.
<br />4.6 PERMITS: CONTRACTOR SHALL, AS DIRECTED BY 7-ELEVEN, PAY FOR ALL APPLICABLE PERMITS AND AND FEES. COPIES OF
<br />PERMITS AND CERTIFICATES SHALL BE FORWARDED TO LOCAL 7-ELEVEN CONSTRUCTION MANAGER'S OFFICE OR SITE
<br />MANAGER PRIOR TO COMMENCEMENT OF WORK. FINAL CERTIFICATION OF ACCEPTANCE BY GOVERNING AUTHORITIES
<br />SHALL ALSO BE ON FILE WITH LOCAL CONSTRUCTION OFFICE OR SITE MANAGER PRIOR TO THE PROCESSING OF FINAL
<br />PAYMENT REQUEST.
<br />4.7 INSPECTIONS: CONTRACTOR SHALL BE REQUIRED TO ADHERE TO ALL REQUIREMENTS OF OWNER'S INSPECTION
<br />PROGRAM. CONTRACTOR SHALL COMPLY WITH REQUIREMENTS FOR NOTIFICATION, SITE PREPARATION REQUIREMENTS,
<br />COMPLIANCE, ON -SITE PRESENCE DURING INSPECTION AND CORRECTION OF ANY DEFECTS OR RELATED PROBLEMS AS
<br />DIRECTED BY INSPECTING REPRESENTATIVE CONTRACTOR SHALL PROVIDE NO LESS THAN 48 HOURS NOTICE PRIOR TO
<br />INSPECTION.
<br />4.8 COORDINATION: GASOLINE CONTRACTOR SHALL BE RESPONSIBLE FOR SCHEDULING ALL PHASES OF THE GASOLINE
<br />INSTALLATION WITH THE GENERAL CONTRACTOR IN CHARGE OF THE BUILDING OR MAJOR PORTION OF THE PROJECT. THE
<br />BUILDING GENERAL CONTRACTOR AND THE GASOLINE CONTRACTOR SHALL JOINTLY DEVELOP A MUTUALLY AGREEABLE
<br />SCHEDULE AND TIMETABLE FOR COMPLETION ON THE GASOLINE INSTALLATION. TIMETABLE FOR BUILDING AND GASOLINE
<br />SHALL COINCIDE AND COMPLIMENT EACH OTHER SO THAT ONE DOES NOT DELAY THE OTHER.
<br />SHOULD GASOLINE CONTRACTOR FAIL TO MEET DEADLINES AS ESTABLISHED BY THE SCHEDULE AND/OR HOLD UP THE
<br />COMPLETION OF THE OVERALL BUILDING PROJECT, 7-ELEVEN, INC. RESERVES THE RIGHT TO RECTIFY THE SITUATION
<br />ACCORDINGLY.
<br />4.9 CONTRACTOR SHALL PROVIDE OWNER WRITTEN CERTIFICATION AS TO THE FOLLOWING:
<br />4.9.1 CERTIFICATION FROM LOCAL/STATE GOVERNING AUTHORITIES AS APPLICABLE FOR CONTRACTOR
<br />CERTIFICATION/LICENSING FOR INSTALLATION OF GASOLINE STORAGE TANK SYSTEM.
<br />4.9.2 CERTIFICATION FROM EQUIPMENT MANUFACTURES AND SUPPLIERS (TANKS, PRODUCT LINES,
<br />ATG'S, ETC.) AS TO ATTENDING AND ACHIEVING CERTIFICATION FROM APPROPRIATE COMPANY FOR
<br />INSTALLATION OF EQUIPMENT.
<br />4.9.3 CERTIFICATION ON APPROPRIATE FORMAT AS TO INSTALLATION OF COMPLETE SYSTEM BEING
<br />PERFORMED IN COMPLIANCE WITH ALL LOCAL, STATE AND FEDERAL LAWS AND REGULATIONS.
<br />4.9.4 CERTIFICATION THAT ALL EQUIPMENT EITHER SUPPLIED BY OWNER OR CONTRACTOR HAS BEEN
<br />INSTALLED AS PER MANUFACTURER'S SPECIFICATIONS BY PERSONNEL TRAINED AND QUALIFIED
<br />FOR THAT SPECIFIC ITEM.
<br />SECTION I GENERAL CONDITIONS - CONTINUED
<br />PART 4 - CONTINUED
<br />4.11 LIENS: CONTRACTOR SHALL PERMIT NO LIENS OF ANY KIND TO BE FIXED UPON OR AGAINST THE PROPERTY BY ITS
<br />LABORERS, MECHANICS OR MATERIAL MEN, AND SHALL INDEMNIFY, PROTECT AND SAVE OWNER HARMLESS FROM AND
<br />AGAINST ALL SUCH CLAIMS AND LIENS.
<br />4.12 EQUIPMENT RESPONSIBILITY: CONTRACTOR SHALL BE RESPONSIBLE FOR SCHEDULING, RECEIVING, UNLOADING,
<br />HANDLING AND PROVIDING PROTECTED INSIDE STORAGE FOR ALL OWNER SUPPLIED EQUIPMENT AND MATERIAL.
<br />CONTRACTOR SHALL INSPECT EQUIPMENT UPON RECEIPT AND IMMEDIATELY REPORT ANY DAMAGE DUE TO SHIPPING TO
<br />THE OWNER'S REPRESENTATIVE. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE DUE TO FAILURE TO COMPLY
<br />WITH THESE REQUIREMENTS. DISPENSERS SHALL BE PROTECTED WITH SHIPPING BOXES UNTIL STORE IS TURNED OVER
<br />FOR OPENING. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ADEQUATE AND LOCKED STORAGE OF OWNER'S
<br />MISCELLANEOUS EQUIPMENT, TO INCLUDE GASOLINE CONSOLE, PRIOR TO OPENING OF THE STORE.
<br />4.13 GASOLINE CONTRACTOR SHALL BE RESPONSIBLE FOR FILING OF RECEIVING FORMS AND MISCELLANEOUS CONFIRMATION
<br />OF EQUIPMENT RECEIVING INFORMATION AS REQUIRED BY LOCAL CONSTRUCTION OFFICE.
<br />4.14 GASOLINE CONTRACTOR SHALL PROVIDE ALL PLUMBING, WIRING, MATERIAL AND LABOR AS REQUIRED TO INSTALL OWNER
<br />SUPPLIED EQUIPMENT. INCLUDE MONEY IN BID PROPOSAL FOR INSTALLATION OF OWNER SUPPLIED EQUIPMENT UNLESS
<br />NOTED OTHERWISE.
<br />PART 5 PROTECTION
<br />5.1 CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ANY LOSS OR DAMAGE CAUSED BY HIM OR HIS WORKMEN TO THE
<br />PROPERTY OR EQUIPMENT OF THE OWNER, OR TO THE WORK OR MATERIALS OF OTHER CONTRACTORS. CONTRACTOR
<br />SHALL MAKE GOOD ANY LOSS, DAMAGE OR INJURY WITHOUT COST TO OWNER FOR SUCH LOSS OR DAMAGE.
<br />5.2 CONTRACTOR SHALL PROVIDE AND MAINTAIN SUITABLE TEMPORARY SIDEWALKS, FENCES, LIGHTS, SIGNS OR OTHER
<br />STRUCTURES AND DEVICES AS REQUIRED BY LAW, DO NOT OBSTRUCT OR INTERFERE WITH TRAFFIC IN PUBLIC STREETS,
<br />ALLEYWAYS OR PRIVATE RIGHT-OF-WAYS. IF WORK IS SUSPENDED, KEEP ALL ROADWAYS AND SIDEWALKS IN PROPER
<br />CONDITION AND PUT AND LEAVE THEM IN PROPER CONDITION AT TERMINATION OF WORK.
<br />5.3 CONTRACTOR SHALL SEND PROPER NOTICES, MAKE NECESSARY ARRANGEMENTS AND PERFORM ALL WORK REQUIRED
<br />FOR THE CARE, PROTECTION AND MAINTENANCE OF PUBLIC UTILITIES ON AND AROUND THE BUILDING SITE, ASSUMING ALL
<br />RESPONSIBILITY AND PAYING ALL COSTS FOR WHICH THE OWNER MAY BE LIABLE. CONTRACTOR HEREBY DECLARES HE
<br />HAS VERIFIED THE LOCATIONS OF THE EXISTING UNDERGROUND UTILITIES ON SITE PRIOR TO THE START OF WORK.
<br />CONTRACTOR HEREBY AGREES TO MAKE ARRANGEMENTS FOR AND TO PAY ALL CHARGES IN CON- JUNCTION WITH THE
<br />RELOCATION'S OF EXISTING UTILITIES AS REQUIRED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY AND ALL UTILITY
<br />EASEMENTS, HOOKUP CHARGES, TAP FEES & SYSTEM DEVELOPMENT FEES OR BONDS AS NECESSARY FOR COMPLETION
<br />OF THIS PROJECT.
<br />5.4 IF ALL OR PART OF THE WORK IS SUSPENDED FOR ANY REASON, CONTRACTOR SHALL PROPERLY COVER OVER, SECURE
<br />AND PROTECT ANY PORTION LIABLE TO SUSTAIN INJURY FROM ANY CAUSE.
<br />5.5 PRODUCT PROTECTION: CONTRACTOR SHALL PROVIDE ADEQUATE AND SECURE PROTECTION OF PRODUCT IN TANKS
<br />UPON DELIVERY UNTIL TURNED OVER FOR OPERATION. ALL FILL, VENT AND GAUGING CAPS AND/OR OPENINGS SHALL BE
<br />SECURED AND PADLOCKED TO PREVENT VANDALISM OR THEFT.
<br />PART 6 - SUBSTITUTION OF MATERIALS
<br />6.1 MATERIALS AS SPECIFIED REPRESENT REQUIRED STANDARDS. SUBSTITUTION MAY BE PROPOSED IN WRITING WITH
<br />ADEQUATE SUPPORTING DATA FURNISHED. USE OF SUBSTITUTE MATERIALS IS DEPENDENT ON RECEIPT OF WRITTEN
<br />APPROVAL FROM OWNER'S APPROVED REPRESENTATIVE.
<br />PART 7 - COMPLETION OF CONTRACT
<br />7.1 THE CONTRACT SHALL BE CONSIDERED FULFILLED, SAVE AS PROVIDED IN ANY MAINTENANCE STIPULATIONS, BOND OR BY
<br />LAW, WHEN ALL THE WORK HAS BEEN COMPLETED WITH FINAL INSPECTION AND ACCEPTANCE MADE BY ALL APPLICABLE
<br />GOVERNING BUILDING DEPARTMENTS, FIRE MARSHAL'S OR OTHER JURISDICTIONS.
<br />7.2 NOT USED
<br />7.3 CLEANING:
<br />7.3.1 ALL WORK SHALL BE CLEAN AND READY FOR USE UPON COMPLETION. REMOVE TEMPORARY TAPES,
<br />WRAPPING, COATING, PAPER LABELS AND OTHER ITEMS.
<br />7.3.2 CLEANING METHODS FOR PROPRIETARY MATERIALS SHALL BE IN STRICT ACCORDANCE WITH
<br />MANUFACTURER'S INSTRUCTIONS. CLEANING SOLUTIONS, AGENTS, SOLVENTS, WAXES OR OTHER
<br />MATERIALS SHALL BE ONLY AS APPROVED BY THE MANUFACTURER OF THE MATERIAL INSTALLED IN
<br />THE WORK.
<br />7.3.3 CLEANUP: CONTRACTOR SHALL CLEAN UP ALL DEBRIS CAUSED BY THE WORK OF THIS SECTION,
<br />KEEPING THE PREMISES NEAT AT ALL TIMES.
<br />PART 8-CODES
<br />8.1 THE FOLLOWING CODES ARE MADE APART OF THIS SPECIFICATION. SAID CODES SHALL DICTATE MINIMAL ACCEPTABLE
<br />STANDARDS. CODE SHALL BE ADHERED TO UNLESS LOCAL GOVERNING AUTHORITIES DICTATE HIGHER OR MORE
<br />STRINGENT REQUIREMENTS WHICH SHALL TAKE PRECEDENCE:
<br />8.1.1 NFPA 30 FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE
<br />8.1.2 PEI MANUAL "RECOMMENDED PRACTICES FOR INSTALLATION OF UNDERGROUND LIQUID STORAGE
<br />SYSTEMS." #RP-100-96 (OR LATEST EDITION)
<br />8.1.3 OSHA AND LOCAL MUNICIPALITIES
<br />PART 9 - WARRANTY / GUARANTEE
<br />9.1 EXCEPT WHERE SPECIAL GUARANTEES ARE REQUIRED IN EXCESS OF ONE (1) YEAR, THE CONTRACTOR AGREES TO REPAIR
<br />AND RE -CERTIFY OR REPLACE THE DEFECTIVE COMPONENT OR ANY DEFECT IN MATERIAL OR WORKMANSHIP (BEYOND
<br />ORDINARY WEAR AND TEAR) TO THE SATISFACTION OF THE OWNER'S CONSTRUCTION MANAGER FOR A PERIOD OF ONE (1)
<br />YEAR AFTER DATE OF ACCEPTANCE, WHETHER IN HIS WORK OR IN THAT OF SUBCONTRACTOR'S, WITHOUT COST TO THE
<br />OWNER.
<br />E'1�►�_1�>�i�llZ[ei%ik1144
<br />T1T1
<br />PART 10 - AS BUILT PLAN AND DOCUMENTATION
<br />10.1 UPON COMPLETION OF PROJECT CONTRACTOR SHALL PROVIDE "AS -BUILT " U T SITE PLAN VERIFYING FINAL LOCATION OF
<br />IMPROVEMENTS INCLUDING, BUT NOT LIMITED TO, PIPING, PLUMBING AND ELECTRICAL.
<br />10.2 CONTRACTOR SHALL KEEP PHOTOGRAPHIC JOURNAL OF ALL PHASES OF THE COMPLETE INSTALLATION. PHOTOGRAPHS
<br />ARE TO BE PROPERLY DATED, IDENTIFIED AND FORWARDED TO LOCAL 7-ELEVEN, INC. CONSTRUCTION OFFICE, WITH FINAL
<br />INVOICE PACKAGE.
<br />SECTION 11 INSPECTIONS / TESTING
<br />BEFORE PLACING COMPONENTS IN THE EXCAVATION
<br />COMPONENT
<br />TEST PROCEDURE
<br />Double -walled tank
<br />Inspection and 5 psig air/soap test or
<br />Sec. 3.3, 3.57
<br />according to manufacturer's
<br />recommendations.
<br />Piping
<br />Careful Inspection
<br />Sec. 10.3
<br />Table below lists procedures that may be applied to storage -system components
<br />prior to placing them in the excavation.
<br />AFTER ASSEMBLY BUT BEFORE BACKFILLING
<br />COMPONENT
<br />TEST PROCEDURE
<br />New primary piping. Piping must
<br />be isolated from tank. Sec. 11.1.1
<br />50 psig air/soap test.
<br />Secondary piping Sec. 11.2.1
<br />5 or 10 psig air/soap test.
<br />Tank -top sumps and dispenser
<br />sumps Sec. 8.4-5
<br />y ros a Ic es or manufacturer's
<br />recommendations.
<br />Table below lists test procedures that may be applied to storage -system
<br />components after assembly but before backfilling.
<br />TEST BEFORE PLACING THE SYSTEM IN SERVICE
<br />COMPONENT
<br />TEST PROCEDURE
<br />Double -walled storage tank
<br />Inspect tank interstice or check vacuum or liquid
<br />level (Sec. 3.6-7)
<br />Double -walled piping
<br />Tightness test primary piping Sec. 11.1.4.). Test
<br />Secondary according to Section 11.2.3 or
<br />Manufacturer's instructions.
<br />Tank shell deflection
<br />Compare before/after backfilling vertical
<br />diameter. If measurements differ, consult
<br />manufacturer's instructions for allowable
<br />variation.
<br />Leak detection sensor
<br />Ensure ability to detect alarm condition (e.g.,
<br />water, product).
<br />Verify set up parameters (e.g., water, product).
<br />Automatic tank gauges
<br />Overfill prevention devices
<br />Verify that device is set at the proper height and
<br />ensure proper operation.
<br />Spill -containment manholes
<br />Check the operation of the liquid drain (if
<br />present) and the clearance between the fill -pipe
<br />cap and the manway cover. Remove liquids, trash,
<br />installation aides, etc.
<br />Impact Valves
<br />Ensure that the valve is securely anchored and
<br />that the valve mechanism operates freely. Check
<br />the level of the shear section relative to the
<br />pump island surface.
<br />Mechanical line leak detectors
<br />Test for ability to detect three gallon per hour
<br />leak according to manufacturer's instructions.
<br />Electronic line leak detectors
<br />Verify set up parameters (e.g., piping length,
<br />diameter, type). Test for ability to detect three
<br />gallon per hour leak according to manufacturer's
<br />instructions.
<br />PART 1 - GENERAL
<br />1.1 SCOPE: THIS SECTION COVERS THE FURNISHING OF ALL LABOR, SERVICES AND EQUIPMENT AS REQUIRED TO PROVIDE
<br />INSPECTION SERVICES OF THE GAS INSTALLATION.
<br />PART 2 - INSPECTIONS
<br />2.1 INSPECTOR: 7-ELEVEN, INC. LOCAL CONSTRUCTION DEPARTMENT AND/OR APPOINTED REPRESENTATIVE SHOULD BE
<br />NOTIFIED TO OBSERVE TIGHTNESS TESTING OF PRODUCT PIPING, STAGE I & STAGE II PIPING PRIOR TO BACKFILL.
<br />2.2 NOTIFICATION: CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING 7-ELEVEN'S CONSTRUCTION DEPARTMENT 48
<br />HOURS PRIOR TO REQUESTED INSPECTION
<br />2.3 SPILLAGE: SHOULD SPILLAGE OF PRODUCT OCCUR AT ANY PHASE OF INSTALLATION OR TESTING, LOCAL 7-ELEVEN
<br />CONSTRUCTION DEPARTMENT AND ENVIRONMENTAL DEPARTMENT ARE TO BE NOTIFIED IMMEDIATELY, ESTIMATED LOSS
<br />OF PRODUCT AS WELL AS ACTION TO BE TAKEN BY CONTRACTOR TO SAFEGUARD THE EVENT FROM FURTHER MISHAP AND
<br />TO PROTECT THE GENERAL PUBLIC IS TO BE NOTED AND RECORDED.
<br />2.4 REPRESENTATIVE OF CONTRACTOR AND PIPING SUBCONTRACTOR SHALL BE AVAILABLE ON SITE DURING TESTING
<br />PROGRAMS. FAILURE TO COMPLY WITH THIS REQUIREMENT WILL RESULT IN ANY CORRECTIONS AND/OR REPAIRS
<br />REQUIRED BEING PERFORMED BY OWNER AS REQUIRED. COST OF SAID REPAIRS AND/OR CONNECTIONS SHALL BE
<br />DEDUCTED FROM CONTRACT AMOUNT AS REQUIRED TO SATISFY THE SITUATION.
<br />2.5 PROHIBITED WORK: CONTRACTOR SHALL SCHEDULE WORK SUCH THAT NO HEAVY EQUIPMENT IS OPERATING ON SITE
<br />DURING INSPECTION PROGRAMS. NO WELDING OR OPEN FLAMES SHALL BE ALLOWED ON SITE AT ANY TIME DURING TEST
<br />PROCEDURES.
<br />2.6 INSTALLATION REPORTS: SHOULD 7-ELEVEN OR THEIR APPOINTED REPRESENTATIVES BE UNABLE TO BE PRESENT AT SITE
<br />FOR PURPOSES OF FILING ANY INSPECTION REPORTS, CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETE INSPECTION
<br />AND FILING OF REPORT WITH LOCAL 7-ELEVEN, INC. CONSTRUCTION OFFICE. WRITTEN REPORT SHALL INCLUDE
<br />PHOTOGRAPHIC DOCUMENTATION OF ALL PROCEDURES.
<br />2.7 TEST FAILURE: SHOULD SYSTEM FAIL ANY PORTION OF TEST PROGRAM, CONTRACTOR SHALL IMMEDIATELY INSTIGATE
<br />PROCEDURES AS REQUIRED TO BRING SYSTEM INTO COMPLIANCE SHOULD FAILURE OF TEST DUE TO FACILITY WORK
<br />REQUIRE EXPENDITURE OF ADDITIONAL MONIES FOR RESCHEDULING AND/OR RETESTING OF SYSTEM, CONTRACTOR
<br />SHALL BE HELD RESPONSIBLE FOR COMPENSATION ACCORDINGLY.
<br />2.8 CLEANUP: IN THE EVENT PRODUCT SPILLAGE SHOULD OCCUR DURING CONSTRUCTION OR DURING WARRANTY PERIOD
<br />DUE TO WORK PERFORMED BY CONTRACTOR, CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANUP AS MAY BE REQUIRED.
<br />2.9 TEST REPORT: UPON COMPLETION OF TESTING PROGRAMS, REPRESENTATIVE OF TESTING/ INSPECTION COMPANY SHALL
<br />BE RESPONSIBLE FOR FILING COPIES OF TANK AND PIPING TEST/INSPECTION REPORTS WITH LOCAL 7-ELEVEN, INC.
<br />CONSTRUCTION OFFICE OR THE OWNER'S ASSIGNED SITE MANAGER WITH COPY TO JOB SITE.
<br />c
<br />0
<br />4-
<br />.Q-
<br />U
<br />0
<br />��,
<br />M
<br />0
<br />0
<br />Proto 2nd Qtr 04-03-15
<br />co
<br />c0
<br />O
<br />Lo
<br />ti
<br />Cn
<br />X
<br />Z
<br />CU w
<br />0
<br />0
<br />Z Z
<br />Q
<br />w >
<br />Z _
<br />A�a�
<br />• W
<br />�
<br />0
<br />LL
<br />W o
<br />MOB
<br />� m
<br />0
<br />i O
<br />�
<br />IZ
<br />W QY
<br />a lY
<br />U)
<br />J
<br />O
<br />W Ceti�a
<br />Z
<br />ti m
<br />�N
<br />W
<br />Y
<br />�
<br />Q
<br />LL
<br />O
<br />O
<br />M
<br />(0 C
<br />N W
<br />O P
<br />00 Z00
<br />CO
<br />00
<br />O
<br />cM CO
<br />O Q m
<br />W m N
<br />U
<br />M s
<br />(n 0 1 CIO
<br />54)imM (1)om•c88m
<br />C)2z>,wt5JCr-0) 2
<br />7 U o° C.... N C N�V `O
<br />>o2Uc3oc0Waoi���'
<br />Q °t ° OL O n,2 O ° ai 0
<br />,U:Eo�O3c _ o
<br />oN YU �2
<br />CL 000
<br />0
<br />.42wQoa-0NL�Y>3ofjmcu
<br />Nil O atNa.62'
<br />N dmNo9a
<br />OWfn N a0= fa p[gca}.00x°omc;�
<br />o N c" 0(3
<br />,`,,111111111,,I
<br />`j�0
<br />i
<br />P• E �
<br />No 68170
<br />- ' STATE OF
<br />r®rraear���
<br />d
<br />SHEET:
<br />G13
<br />FUELING - USA
<br />
|