PERFORMANCE SPECIFICATION - CONT.
<br />E
<br />I
<br />0
<br />N
<br />0
<br />0
<br />cl-
<br />SECTION 11 INSPECTIONS / TESTING -CONTINUED
<br />PART 3 - TANK INSTALLATION INSPECTION
<br />3.1 SCHEDULE: CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING SCHEDULE SO TANKS ARE TESTED AND SET IN TANK
<br />HOLE SAME DAY OF DELIVERY.
<br />3.2 EXCAVATION: ALL EXCAVATIONS SHALL BE COMPLETED WITH BEDDING MATERIAL IN PLACE AND READY FOR INSTALLATION
<br />PRIOR TO TANK DELIVERY.
<br />3.3 ANCHORS: CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETE INSTALLATION OF CONCRETE ANCHORS (DEAD MAN).
<br />3.4 STRAPS: HOLD DOWN STRAPS TO BE INSTALLED AS PER MANUFACTURER'S SPECIFICATIONS - MINIMUM OF 4 - MORE IF
<br />REQUIRED BY MANUFACTURER (STRAPS SHALL BE SHIPPED WITH APPROPRIATE PADDING MATERIAL.
<br />3.5 AIR TEST: TANKS SHALL BE AIR TESTED AS PER MANUFACTURER'S SPECIFICATIONS PRIOR TO PLACEMENT. CONTRACTOR
<br />SHALL BE RESPONSIBLE FOR PROVIDING ALL MATERIALS TO PROVIDE COMPLETE AIR TEST INCLUDING, BUT NOT LIMITED
<br />TO, AIR COMPRESSOR OF SUFFICIENT SIZE AND CAPACITY, SPECIFIED SOAP MATERIAL AND ACCEPTABLE SOAP
<br />APPLICATION EQUIPMENT.
<br />3.6 MINIMUM TESTING: DOUBLE WALL FIBERGLASS TANKS SHOULD ARRIVE AT THE JOB SITE WITH A MINIMUM OF 4" HG ON THE
<br />INTERSTICE. OBSERVE THE VACUUM HOLD TEST FOR AT LEAST ONE (1) HOUR PRIOR TO SETTING THE TANKS. SHOULD THE
<br />INTERSTICE NOT HOLD A MINIMUM 4" HG VACUUM, THEN CONTACT THE TANK MANUFACTURER IMMEDIATELY.
<br />3.7 OBSERVATION: 7-ELEVEN'S CONSTRUCTION DEPARTMENT AND/OR REPRESENTATIVE SHALL BE RESPONSIBLE FOR
<br />INSPECTION OF AIR OR VACUUM TEST, OBSERVATION OF LIFTING, SETTING AND BURIAL OF TANKS.
<br />3.8 TANK INSPECTION REPORT: WRITTEN REPORT SHALL INCLUDE PHOTOGRAPHIC DOCUMENTATION OF ALL PROCEDURES.
<br />PART 4 - TANK AND LINE TESTING
<br />4.1 CONTRACTOR SHALL COMPLETE AND BE RESPONSIBLE FOR THE FOLLOWING PRIOR TO FINAL PLACEMENT OF CONCRETE
<br />AND FINAL SYSTEM TEST:
<br />4.1.1 PIPING: ALL PIPING SHALL BE COMPLETED EXCEPT INSTALLATION OF OVERFILL PROTECTION.
<br />OVERFILL PROTECTION SHALL BE INSTALLED UPON COMPLETION OF TEST.
<br />4.1.2 VENTS: VENT LINES SHALL BE COMPLETED UNDERGROUND AND STUBBED UP MINIMUM OF 12'ABOVE
<br />FINISHED GRADE.
<br />4.1.3 PRODUCT LINES: ALL PRODUCT LINES SHALL BE COMPLETE WITH EMERGENCY SHUTOFF IMPACT VALVE
<br />INSTALLED AT DISPENSER BOX WITH MECHANICAL LEAK DETECTOR IN PLACE.
<br />4.1.4 PUMPS: SUBMERSIBLE PUMPS AND LINES SHALL BE COMPLETELY INSTALLED.
<br />4.1.6 SITE PREPARATION: CONTRACTOR SHALL PREPARE TANK AREA FOR WATER OR PRODUCT DELIVERY AND
<br />TANK TESTING PROCEDURES.
<br />4.1.7 FILL: CONTRACTOR SHALL PROVIDE 42" MINIMUM BACK FILL OVER TANKS.
<br />4.1.8 WATER: SHOULD WATER BE PRESENT IN TANK HOLE, CONTRACTOR SHALL VERIFY AND NOTIFY 7-ELEVEN
<br />CONSTRUCTION MANAGER OF STATUS.
<br />4.2 AFTER PLACEMENT OF CONCRETE, A COMPLETE SYSTEM TIGHTNESS TEST INCLUDING TANKS, PRODUCT LINES, STAGE II
<br />VAPOR RECOVERY LINES, SECONDARY CONTAINMENT PIPING AND VENT LINES SHALL BE PERFORMED. TESTING SYSTEM
<br />SHALL BE AS APPROVED BY 7-ELEVEN. 7-ELEVEN WILL BE BILLED DIRECTLY FOR TESTS. CONTRACTOR TO COORDINATE &
<br />SCHEDULE. RETEST OR STAND AROUND TIME BY THE TESTING COMPANY TO BE BILLED TO CONTRACTOR. DETAILS FOR
<br />THIRD PARTY TESTING REQUIREMENTS LISTED ON G9.X SHEETS.
<br />4.2.1 AFTER ALL UNDERGROUND PIPING AND ELECTRIC CONDUITS ARE INSTALLED AND DURING EXCAVATION
<br />BACKFILLING AND CONCRETE POURING, A CONTINUOUS HYDROSTATIC TEST SHALL BE PERFORMED ON
<br />ALL SUMPS & SPILL BUCKETS TO ENSURE TIGHTNESS AND PROPER INSTALLATION.
<br />4.3 PRODUCT DELIVERY: CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFICATION TO 7-ELEVEN REPRESENTATIVE OF TEST
<br />DATE AND VERIFICATION OF NEED FOR TANKS TO BE FILLED WITH PRODUCT AND TANK MONITORING SYSTEM TO BE
<br />OPERATIONAL FOR TESTING PROCEDURES. A MINIMUM OF 72 HOURS ADVANCE NOTIFICATION WILL BE REQUIRED FOR
<br />PRODUCT DELIVERY. CHECK WITH LOCAL REGULATORY AGENCIES FOR ANY FURTHER REQUIREMENTS.
<br />4.4 CONTRACTOR SHALL HAVE REPRESENTATIVES ON SITE TO ACCEPT AND RECORD ALL PRODUCT DELIVERIES.
<br />CONTRACTOR'S REPRESENTATIVE SHALL REMIND DELIVERY COMPANY THAT NO OVERFILL PROTECTION IS INSTALLED AND
<br />TO FOLLOW PROCEDURES FOR DELIVERY AS SITUATION DICTATES.
<br />4.5 PRODUCT REMOVAL: ANY REMAINING PRODUCT IN VENT LINES UPON COMPLETION OF TEST SHALL BE REMOVED BY
<br />TESTING COMPANY.
<br />PART 5 - STARTUP INSPECTION
<br />5.1 SCHEDULING: CONTRACTOR SHALL BE RESPONSIBLE FOR FINAL SCHEDULING STARTUP AND CHECK-OUT. CONTRACTOR
<br />SHALL NOTIFY LOCAL CONSTRUCTION DEPARTMENT AND APPLICABLE MAINTENANCE DEPARTMENT OFFICE A MINIMUM OF
<br />48 HOURS PRIOR TO INTENDED FINAL STARTUP AND CHECK-OUT DATE AND TIME.
<br />5.2 PERSONNEL: CONTRACTOR, PLUMBING SUBCONTRACTOR AND ELECTRICAL SUBCONTRACTOR SHALL BE AVAILABLE
<br />ON -SITE DURING STARTUP, AS APPROVED BY 7-ELEVEN, INC. ALL STARTUPS ARE TO BE DONE BY AN AUTHORIZED
<br />MANUFACTURER'S CONTRACTOR FOR THAT PIECE OF EQUIPMENT.
<br />5.3 STARTUP: PHYSICAL STARTUP AND CHECK-OUT OF SYSTEMS AND EQUIPMENT SHALL BE DONE BY AND AT THE DIRECTION
<br />OF 7-ELEVEN REPRESENTATIVE ONLY. CONTRACTOR SHALL NOT START OR ACTIVATE ANY EQUIPMENT WITHOUT THE
<br />SPECIFIC DIRECTIVE OF 7-ELEVEN REPRESENTATIVE. DAMAGE TO ANY 7-ELEVEN EQUIPMENT DUE TO IMPROPER
<br />INSTALLATION AND/OR UNAUTHORIZED STARTUP WILL BE THE RESPONSIBILITY OF THE CONTRACTOR.
<br />5.4 SITE COMPLETION: ALL SITE WORK, INCLUDING CONCRETE/ASPHALT PAVEMENTS, SHALL BE COMPLETE. ALL UTILITIES
<br />SHALL BE CONNECTED AND OPERATIONAL. ALL LANDSCAPING, INCLUDING SPRINKLER SYSTEMS, SHALL BE COMPLETE.
<br />5.5 VERIFICATION: PRIOR TO SCHEDULING OF STARTUP, CONTRACTOR SHALL OBSERVE AND VERIFY CORRECTNESS AND
<br />COMPLIANCE TO 7-ELEVEN'S DRAWINGS AND SPECIFICATIONS FOR THE FOLLOWING, BUT THESE SHALL NOT COMPRISE
<br />THE TOTAL LIMIT OF THE CONTRACTOR'S VERIFICATION:
<br />5.5.1 MAN WELLS SHALL BE PROPERLY CENTER/INSTALLED AT OVERFILLS, SUBMERSIBLES, VAPOR
<br />RECOVERY, AUTO GAUGING, OBSERVATION WELLS AND SUMP/RISER.
<br />5.5.2 PROPER HEIGHT OF GRAVEL BACK FILL AROUND SUMP/RISERS.
<br />5.5.3 TANK I.D. MARKERS INSTALLED IN CONCRETE AT PROPER LOCATIONS.
<br />SECTION
<br />11 INSPECTIONS / TESTING -CONTINUED
<br />PART 5 -
<br />STARTUP INSPECTION - CONTINUED
<br />5.5.4
<br />ALL BRASS GOODS AND FITTINGS PROPERLY INSTALLED, TIGHT AND SECURE.
<br />5.5.5
<br />LEAK DETECTORS INSTALLED.
<br />5.5.6
<br />PROTECTED FLEX LINES PROPERLY INSTALLED WITHOUT TWIST IN INSTALLATION.
<br />5.5.7
<br />MANHOLE EXTENDERS PROPERLY INSTALLED AND SCREWED IN FRAME OF MANHOLE SUMP/RISERS,
<br />PROPERLY SET AND SEALED TO TANK MAN WAY OR FITTINGS AND CLEANED OUT FREE OF DEBRIS AND
<br />CONCRETE.
<br />5.5.8
<br />TANKS CLEAN AND FREE OF WATER.
<br />5.5.9
<br />ISLAND FORM INNER BOXES PROPERLY CLEANED OUT FREE OF DEBRIS AND CONCRETE.
<br />5.5.10
<br />DISPENSERS PROPERLY SET AND SECURED TO ISLAND BOX FRAME AND DISPENSER SUMPS PROPERLY
<br />CLEANED OUT FREE OF DEBRIS AND CONCRETE.
<br />5.5.11
<br />SHEAR VALVES SECURED TO FRAME WITH PROPER HARDWARE.
<br />5.5.12
<br />PHASE II VAPOR RECOVERY LINES STUBBED UP AND SECURED IN PROPER LOCATION.
<br />5.513
<br />ELECTRICAL CONDUITS SECURED WITH ALL CONNECTIONS COMPLETED. VERIFY COMPLIANCE WITH
<br />REQUIREMENTS FOR ISOLATED GROUND WIRING TO JUNCTION BOX CASING.
<br />5.5.14
<br />DISPENSER CANOPIES INSTALLED AND LIFTING LUGS REMOVED WITH PROPER PLUGS INSERTED.
<br />5.5.15
<br />ALL NOZZLES AND SWIVELS AVAILABLE ON -SITE, INSTALLED PRIOR ONLY IF REQUIRED BY GOVERNING
<br />AUTHORITIES FOR INSPECTION PURPOSES.
<br />5.5.16
<br />ALL INSPECTIONS BY GOVERNING AUTHORITIES COMPLETED AND SIGNED. SIGNED AND COMPLETED
<br />PERMIT CARD ON SITE.
<br />5.5.17
<br />ELECTRICAL DEVICES INCLUDING LIGHTS, SIGNS AND INTERCOMS PROPERLY INSTALLED, SECURED AND
<br />PLUMB.
<br />5.5.18
<br />ANY WIRING INSPECTION PORTS IN CANOPY COLUMNS COVERED WITH ACCEPTABLE PLATES.
<br />5.5.19
<br />VENT LINES PROPERLY SECURED, PROTECTED AND INSTALLED AT PROPER HEIGHT
<br />5.5.20
<br />VERIFICATION OF COMPLIANCE FOR TANK AND LINE TEST AVAILABLE ON SITE.
<br />5.5.21
<br />ALL MANHOLES FREE OF CONCRETE AND DEBRIS.
<br />5.5.22
<br />MANHOLE COVERS PROPERLY PAINTED.
<br />5.5.23
<br />ALL PAINTING COMPLETE INCLUDING CANOPY, DOWN SPOUTS, METALS AND MISCELLANEOUS METALS.
<br />5.5.24
<br />CONCRETE AT ISLANDS AND TANK PAD TRUE, PROPERLY SLOPED AND FINISHED WITH ACCEPTABLE RISE
<br />TO MANHOLES.
<br />5.5.25
<br />ELECTRICAL PANELS PROPERLY COMPLETED TO INCLUDE:
<br />(A) ONE BREAKER FOR EACH SUBMERSIBLE PUMP, DISPENSER, CONSOLE AUTO GAUGING, DISPENSER LIGHTS
<br />(ALL) AND CANOPY LIGHTS (ALL).
<br />(B) GAS PANEL CONTROLLED BY A MAIN BREAKER.
<br />(C) CONTROL BOXES AND DISTRIBUTION BOXES INSTALLED AND WIRED.
<br />(D) INTERCOM INSTALLATION COMPLETE AND PROPERLY WORKING.
<br />(E) ALL APPLICABLE CONSOLE INSTALLATION COMPLETE AND FUNCTIONAL.
<br />(F) ALL WIRING PROPERLY IDENTIFIED WITH COLOR CODED WIRING.
<br />(G) CONDUITS PROPERLY IDENTIFIED. (H) ALL BREAKERS IN "OFF" POSITION.
<br />5.6
<br />NOTIFICATION: CONTRACTOR SHALL VERIFY ITEMS AS INDICATED ABOVE PRIOR TO SCHEDULING OF STARTUP
<br />MONIES AND/OR TIME LOST AT STARTUP DUE TO NOW COMPLIANCE SHALL BE CHARGED TO CONTRACTOR
<br />ACCORDINGLY.
<br />5.7
<br />EQUIPMENT SHALL BE TESTED PER SPECIFICATIONS ON SHEET G9.2.
<br />5.8
<br />CLEANUP: CLEAN UP ALL DEBRIS CAUSED BY WORK OF THIS SECTION, KEEPING PREMISES CLEAN AND NEAT AT
<br />ALL TIMES.
<br />SECTION
<br />III EARTHWORK
<br />PART 1 - GENERAL
<br />1.1 SCOPE: THIS SECTION COVERS THE FURNISHING OF ALL LABOR, MATERIALS, SERVICES, EQUIPMENT AND APPLIANCES
<br />REQUIRED IN CONJUNCTION WITH OR PROPERLY INCIDENTAL TO EARTHWORK.
<br />PART 2 - PRODUCTS
<br />2.1 FILL MATERIAL: SHALL BE MATERIAL IN COMPLIANCE WITH TANK AND LINE MANUFACTURER'S SPECIFICATIONS.
<br />2.1.1 PEA GRAVEL: SHALL BE CLEAN, NATURALLY ROUNDED AGGREGATE WITH A MIX OF PARTICLE SIZE
<br />NOT LESS THAN 1/8" OR MORE THAN 3/4".
<br />2.1.2 STONE OR GRAVEL CRUSHING: SHALL BE WASHED MATERIAL WITH ANGULAR PARTICLE SIZE NOT
<br />LESS THAN 1/8" OR MORE THAN 1/2".
<br />2.1.3 BACKFILL OR OTHER MATERIAL MUST BE APPROVED BY TANK MANUFACTURER.
<br />NOTE: MATERIALS MUST MEET ASTM C-33 PARAGRAPH 7.1 FOR QUALITY AND SOUNDNESS. FILL MATERIAL
<br />SHALL NOT HAVE MORE THAN 3% PASSING A #8 SIEVE. DRY GRAVEL DENSITY MUST BE A MINIMUM
<br />OF 95 POUNDS PER CUBIC FOOT.
<br />SECTION III EARTH WORK- CONTINUED
<br />PART 3 - EXECUTION
<br />3.1 PROTECTIONS: PROVIDE ADEQUATE SHORING, BRACING, PILING AND CRIBBING. COMPLY WITH ALL OSHA AND LOCAL
<br />REGULATIONS AS IT PERTAINS TO SAFETY.
<br />3.2 LAYOUT: CONTRACTOR SHALL BE RESPONSIBLE FOR LAYOUT AS PRESENTED IN PERMITTED PLANS AND SPECIFICATIONS.
<br />3.3 EXCAVATION: EXCAVATE TO LINES, ELEVATIONS AND LIMITS REQUIRED BY THE DRAWINGS, PLUS SUFFICIENT DISTANCE
<br />AND SPACE TO PERMIT INSTALLATION OF TANKS. EXCAVATE AS REQUIRED, REGARDLESS OF TYPE, CONDITION OR
<br />MOISTURE CONTENT OF THE MATERIAL ENCOUNTERED. HAUL EXCESS MATERIAL OFF THE SITE AND DISPOSE OF SAME.
<br />DIMENSIONS OF TANK EXCAVATION SHALL BE MINIMAL AS ESTABLISHED BY 7-ELEVEN DRAWINGS UNLESS TANK
<br />MANUFACTURER REQUIREMENTS ARE GREATER. IF EXCAVATION MATERIAL IS FROM AN EXISTING GASOLINE FACILITY ALL
<br />MATERIALS MUST BE TESTED PRIOR TO REMOVAL.
<br />3.4 SAW CUTTING: IF PAVING MUST BE REMOVED, THE PERIMETER OF THE TANK HOLE AND ALL TRENCHES SHALL BE CUT WITH
<br />A CONCRETE SAW. NOTE: PAVING TO BE CUT 2' BEYOND EDGES OF TANK HOLE IN ALL DIRECTIONS IN ORDER TO GIVE
<br />PROPER SUPPORT TO NEW SLAB TO AVOID SETTLING.
<br />3.5 HAZARDOUS MATERIAL: SHOULD ROCK, WATER OR OTHER HAZARDOUS MATERIALS NOT SHOWN ON SOILS TEST BE
<br />ENCOUNTERED, LOCAL CONSTRUCTION OFFICE SITE MANAGER SHALL BE IMMEDIATELY CONTACTED FOR APPROVAL TO
<br />PROCEED.
<br />3.6 PROTECTION: CONTRACTOR SHALL PROVIDE SUFFICIENT PROTECTION WITH EARTHEN BERMS AT ALL TIMES TO PROTECT
<br />TANK HOLE AND TRENCHES FROM DRAINAGE OF SURFACE WATERS. EXCAVATIONS SHALL BE PROPERLY MARKED,
<br />PROTECTED AND BARRICADED FOR SAFETY UNTIL BACK FILL IS COMPLETE AND SURFACING FINISHED.
<br />3.7 SHORING: CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING REQUIREMENTS FOR SHORING AND PROVIDING SAME
<br />SHOULD SITE AND/OR SOIL CONDITIONS WARRANT SAME. REFERENCE SOIL REPORT FOR CONDITIONS WARRANTING
<br />SPECIAL REQUIREMENTS.
<br />3.8 FILLING AND BACK FILLING: PLACE APPROVED FILL MATERIAL IN STRICT ACCORDANCE WITH TANK AND PIPING
<br />MANUFACTURER'S SPECIFICATIONS. PROVIDE A 12" BED OF APPROVED BACK FILL OVER BOTTOM OF EXCAVATION PRIOR
<br />TO TANK PLACEMENT. BACK FILL SHALL BE PLACED AND COMPACTED IN MAXIMUM 12" LIFTS.
<br />3.9 CLEANUP: CLEAN UP ALL DEBRIS CAUSED BY WORK OF THIS SECTION, KEEPING PREMISES CLEAN AND NEAT AT ALL TIMES.
<br />SECTION IV TANK INSTALLATION
<br />PART 1 - GENERAL
<br />1.1 SCOPE: THIS SECTION COVERS THE FURNISHING OF ALL LABOR, MATERIALS, SERVICES, EQUIPMENT AND RELATED
<br />APPLIANCES REQUIRED IN CONJUNCTION WITH OR PROPERLY INCIDENTAL TO THE INSTALLATION OF GASOLINE STORAGE
<br />TANKS.
<br />PART 2 - PRODUCTS
<br />2.1 TANKS: SHALL BE DESIGNED AND MANUFACTURED SO AS TO BE CORROSION PROTECTED PER EPA REQUIREMENTS.
<br />APPROVED TANKS SHALL BE:
<br />2.1.1 DOUBLE WALL FIBERGLASS TANKS
<br />2.2 HOLD DOWN STRAPS: SHALL BE SUPPLIED BY TANK MANUFACTURER ONLY. FIELD FABRICATED UNITS ARE NOT
<br />PART 3 - INSTALLATION
<br />3.1 MANUFACTURING: REFER TO TANK MANUFACTURER'S CRITERIA AND SPECIFICATIONS FOR TANK INSTALLATION AND
<br />ADHERE TO AS REQUIRED.
<br />3.2 CLEARANCES: MINIMUM CLEARANCE FOR TANKS SHALL BE AS FOLLOWS: SHOULD REQUIREMENTS OF TANK
<br />MANUFACTURER OR SOIL CONDITIONS DICTATE GREATER CLEARANCE, ADHERE TO ACCORDINGLY.
<br />3.2.1 BOTTOM: PROVIDE MINIMUM OF 12" BEDDING MATERIAL BETWEEN BOTTOM OF EXCAVATION OR PAD
<br />AND BOTTOM OF TANK.
<br />3.2.2 SIDES: PROVIDE MINIMUM OF 2'0" BETWEEN TANKS AND 3' FROM SIDE/END OF TANK TO WALL OF
<br />EXCAVATION.
<br />3.2.3 TOP: PROVIDE 42" FILL MATERIAL OVER TANK PLUS 8" OF CONCRETE
<br />3.3 TESTING: PRIOR TO INSTALLATION OF TANKS, TESTING PER MANUFACTURER'S INSTRUCTIONS SHALL BE PERFORMED ON
<br />TANK(S). ON DUAL WALL TANKS, CONSULT TANK MANUFACTURER FOR TESTING CRITERIA BUT MINIMUM 4" HG VACUUM
<br />MUST BE HELD ON INTERSTITIAL SPACE FOR AT LEAST ONE (1) HOUR.
<br />3.4 PLACEMENT:
<br />3.4.1 REFER TO SITE PLAN FOR TANK PLACEMENT AND PRODUCT ROTATION.
<br />3.4.2 PRIOR TO SETTING OF TANKS, REMOVE ALL FOREIGN DEBRIS, ROCKS, CLODS, GARBAGE, ETC. FROM
<br />EXCAVATION.3.4.3 PLACE TANKS ONLY ON APPROVED FILL. DO NOT SET ON CONCRETE OR WOOD.
<br />3.4.4 NOT USED.
<br />3.4.5 TANKS SHALL BE BURIED TO MINIMUM DEPTH AS PER ABOVE AND AS SHOWN ON GASOLINE
<br />DRAWINGS. TANKS MAY REQUIRE GREATER BURIAL DEPTH IF INSTALLED IN REMOTE POSITION TO
<br />ALLOW FOR PROPER SLOPE ON VENT LINES,VAPOR LINES, SECONDARY CONTAINMENT PRODUCT
<br />LINES. VERIFY DEPTH AS REQUIRED. (IF BURIAL DEPTH EXCEEDS 5'-0" (60"), NOTIFY 7-ELEVEN
<br />MANAGER)
<br />c
<br />0
<br />:b..
<br />CL
<br />a�
<br />cv
<br />0
<br />a�
<br />Proto 2nd Qtr 04-03-15
<br />cM
<br />0
<br />0
<br />LO
<br />r•
<br />QW
<br />X
<br />dW
<br />H
<br />0 It
<br />Lf) Er. LA J
<br />Z
<br />Z
<br />qqt��
<br />Z
<br />w
<br />J
<br />� j LL
<br />W
<br />0
<br />_j
<br />O
<br />W
<br />a�
<br />w
<br />�,qa.
<br />i`
<br />W
<br />Y
<br />~ N
<br />U
<br />Q
<br />0
<br />0
<br />N
<br />M
<br />W
<br />Z
<br />O
<br />Q
<br />U
<br />LL
<br />W
<br />U)
<br />Z
<br />J
<br />Lu
<br />Z)
<br />LL
<br />WIgo
<br />m
<br />Wm a
<br />WOOL- MEMNONd o
<br />r- (6
<br />�C00
<br />Oti
<br />o 0)o�
<br />�ita�
<br />co 0 co
<br />LO N H a0 U
<br />0 o
<br />0 Z o
<br />Q m
<br />w m M
<br />N
<br />U) 0 Q U
<br />0(L)MM moc"ac��m
<br />V 2t >,o6 42 .2 WE 2
<br />a� c �- a� m •- U
<br />�� °� �°-, os o �w no
<br />N O aO C >,.- O'-- mL N m
<br />m,por4)'a3c�Ym= O
<br />O (AL 3
<br />C a0 O Nt ca
<br />vai=CWL �N3t>ju�
<br />w2amu,Q2_-d.2o_ OE
<br />a�NM`NN`c0
<br />U N� O� p >`� O W O r C1
<br />O M >,y 0 c ao >I- c
<br />0 7ECL..0OX Ncoc�
<br />o m c•. 0Um 3-cn
<br />Q ; 6, • :�,�
<br />ftb
<br />No 68170
<br />STATE OFAWP
<br />SHEET:
<br />G14
<br />FUELING - USA
<br />
|