Laserfiche WebLink
S. <br />a <br />0 <br />IMPROVING YOUR WORLD <br />AGRIBOARD STRUCTURAL <br />WELLS FARGO <br />ZEPHYR COMMONS <br />7780 GALL BLVD <br />ZEPHYR HILLS, FL 33541 <br />ARCHITECT: <br />INSULATED PANEL REPAIR: <br />REYNOLDS, SMITH AND HILLS, INC. <br />10748 DEERWOOD PARK BLVD SOUTH <br />JACKSONVILLE, FLORIDA 32256 <br />904=256=2500 FAX 904=256=2502 <br />FL.Cert.Nos. AAC001886 • EB0005620 • LCCO00210 <br />INDEX OF DRAWINGS <br />ARCHITECTURAL <br />G1 LEGEND, INDEX, AND SCOPE OF WORK <br />Al FLOOR PLAN AND NOTES <br />A2 ROOF PLAN <br />A3 ELEVATIONS <br />A4 WALL SECTIONS <br />AS WALL SECTION & DETAILS <br />STRUCTURAL <br />81 <br />STRUCTURAL <br />NOTES <br />S2 <br />WALL PANEL <br />REPAIR PLAN <br />$3 <br />ROOF PANEL <br />REPAIR PLAN <br />S4 <br />STRUCTURAL <br />REPAIR DETAILS <br />Ic <br />Q <br />0. <br />W <br />0. <br />� <br />N <br />Cc <br />T <br />�I <br />xoa <br />id <br />in <br />Q <br />.sIc <br />.. <br />Q <br />W <br />W <br />� <br />ILI <br />W" <br />W <br />0 <br />N.4Cc <br />STRUCTURAL ENGINEER, <br />C5 <br />ARMS TRONG=DOUGLAS PARTNERS <br />•... <br />6060 N. ENTRAL <br />c EXPRES S W Ay <br />DALLAS, TEXAS <br />�ro,a <br />214=237=7022 FAX 214=237=7025 i <br />FL PE *62291 (Jj <br />PREPARED FORv <br />WELLS FARGO <br />10401 DEERWOOD PARK BLVD, BLDG 1, 2ND FLOOR <br />JACKSONVILLE, FLORIDA 32256 <br />(904) 391-7830 <br />SCOPE OF WORKm - <br />: <br />SEE PHASING NOTES ON SHEET Al FOR FULL DESCRIPTION OF SCOPE, <br />PHASE I. PRECONSTRUCTION -INDOOR AIR QUALITY CONTROLS <br />• ENSURE POSITIVE PRESSURIZATION OF THE BUILDING. <br />• ACTIVELY SCRUB AIR WITH HEPA FILTERS. <br />• PROTECT EXISTING HVAC SYSTEMS. <br />• MONITOR INDOOR AIR QUALITY. <br />PHASE II: SHORING OF EXISTING ROOF FRAMING <br />• ESTABLISH A SHORING PLAN. <br />• SEAL OPENINGS ON THE UNDERSIDE OF THE DECK. <br />• JACK UP DEFLECTED PANELS <br />• INSTALL SHORING <br />PHASE Ills. REPAIR AGRIBOARD ROOF PANELS <br />• CUT AND ROLL BACK EXISTING TPO ROOFING. <br />• REMOVE EXTERIOR OSB AND AGRI-CORE FROM ROOF PANELS. <br />• INSTALL NEW WOOD ROOF FRAMING. <br />• INSTALL NEW TPO ROOF. <br />PHASE IV: REPAIR AGRIBOARD WALL PANELS <br />• REMOVE STUCCO AND MASONRY WAINSCOT. <br />• REMOVE EXTERIOR OSB AND AGRI-CORE FROM WALL PANELS. <br />0 INSTALL NEW WOOD WALL FRAMING. <br />0 INSTALL NEW STUCCO AND REBUILD MASONRY WAINSCOT. <br />Y-pl�ylil <br />1. <br />