Laserfiche WebLink
DEMOLITION NOTES <br />GENERAL NOTES <br />1. FIELD VERIFY ALL EXISTING CONDITIONS. <br />2, ITEMS INDICATED TO BE REMOVED SHALL BE REMOVED AND LEGALLY <br />DISPOSED OF. <br />3. NOTIFY BUILDING OWNER PRIOR TO COMMENCEMENT OF DEMOLITION <br />ACTIVITI ES. <br />4. SURVEY THE CONDITION OF THE BUILDING TO DETERMINE WHETHER <br />REMOVING ANY ELEMENT MIGHT RESULT IN STRUCTURAL DEFICIENCY OR <br />UNPLANNED COLLAPSE OF ANY PORTION OF THE STRUCTURE OR <br />ADJACENT STRUCTURES DURING SELECTIVE DEMOLITION. <br />5. MAINTAIN EXISTING UTILITIES INDICATED TO REMAIN IN SERVICE AND <br />PROTECT THEM. <br />6. PROTECT EXISTING ITEMS TO REMAIN ADJACENT TO DEMOLITION. <br />7. REPAIR EXISTING ITEMS TO REMAIN DAMAGED DURING DEMOLITION. <br />8. NEATLY CUT OPENINGS AND HOLES PLUMB, SQUARE, AND TRUE TO <br />DIMENSIONS REQUIRED. USE CUTTING METHODS LEAST LIKELY TO DAMAGE <br />CONSTRUCTION TO REMAIN OR ADJOINING CONSTRUCTION. TO MINIMIZE <br />DISTURBANCE OF ADJACENT SURFACES, USE HAND OR SMALL POWER <br />TOOLS DESIGNED FOR SAWING AND GRINDING, NOT HAMMERING AND <br />CHOPPING. TEMPORARILY COVER OPENINGS TO REMAIN. <br />9. SEE STRUCTURAL DRAWINGS FOR ADDITIONAL DEMOLITION NOTES. <br />MICROBIAL ENCAPSULANT PROCESS <br />1. ANY MATERIALS EXHIBITING MOLD GROWTH THAT ARE NOT TO BE REMOVED <br />(SUCH AS WOOD STUDS OR FRAMING) SHALL BE SANDED WHEREVER <br />POSSIBLE, HEPA VACUUMED AND WET -WIPED WITH A DISINFECTANT <br />BIOCIDE SUCH AS FOSTER 40-80. CARE MUST BE TAKEN TO MINIMIZE <br />THE AMOUNT OF DUST GENERATED DURING SANDING IF THE WALL OR <br />ROOF CAVITY IS OPENED FROM THE INTERIOR OF THE STORE. ANY <br />MECHANICAL SANDER USED SHOULD BE EQUIPPED WITH A HEPA VACUUM <br />TO CAPTURE AND FILTER THE DUST PRODUCED. <br />2. SURFACES THAT HAVE BEEN WATER AND/OR MOLD DAMAGED, AND AREAS <br />OF POTENTIAL MOLD RE -GROWTH (E.G., WOOD FRAMING) SHOULD THEN <br />BE TREATED WITH AN EPA -REGISTERED ANTI -MICROBIAL INHIBITOR <br />ENCAPSULANT, SUCH AS FOSTER 40-20. THE ENCAPSULANT MUST NOT <br />BE APPLIED TO SURFACES THAT STILL DISPLAY VISIBLE MOLD. <br />3. ANY DRYWALL EXHIBITING VISIBLE MOLD GROWTH SHOULD BE REMOVED <br />AND REPLACED. <br />4. ANY ROTTEN WOOD SHOULD BE REMOVED AND REPLACED. <br />O 1 O <br />I <br />O O <br />W <br />1. ALL WORK SHALL CONFORM TO ALL APPLICABLE CODES, STANDARDS AND <br />GOVERNING AUTHORITIES. <br />2. REFER TO STRUCTURAL DRAWINGS FOR COORDINATION OF WORK, <br />J. EACH TRADE CONTRACTOR SHALL VISIT THE SITE AND BECOME <br />KNOWLEDGEABLE OF CONDITIONS THEREIN. EACH TRADE CONTRACTOR <br />SHALL INVESTIGATE, VERIFY AND BE RESPONSIBLE FOR ALL' THE <br />REQUIREMENTS OF THE PROJECT AND SHALL NOTIFY THE OWNER AND <br />ARCHITECT OF ANY CONDITIONS REQUIRING INFORMATION BEFORE <br />PROCEEDING WITH THE WORK. <br />4. ANY UTILITY SHUT -OFFS AS REQUIRED BY THE CONTRACTOR FOR <br />COMPLETION OF THE WORK SUCH AS ELECTRICAL, GAS, WATER, SEWER, <br />STEAM, ETC., MUST BE SCHEDULED WITH THE OWNER, ARCHITECT AND <br />UTILITY CO. PRIOR TO COMMENCING WORK, <br />5. DETAILS SHOWN ARE INTENDED TO BE INDICATIVE OF THE PROFILES AND <br />TYPE OF DETAILING REQUIRED FOR THE WORK. DETAILS NOT SHOWN ARE <br />SIMILAR IN CHARACTER TO THOSE DETAILED. <br />6. WHERE SPECIFIC DIMENSIONS, DETAILS AND DESIGN INTENT CANNOT BE <br />DETERMINED, NOTIFY THE ARCHITECT IN WRITING BEFORE PROCEEDING <br />WITH ANY WORK IN QUESTION. <br />7. DIMENSIONS SHALL GOVERN. DO NOT SCALE DRAWINGS. THE CONTRACTOR <br />SHALL NOTIFY THE ARCHITECT IN WRITING OF ANY DISCREPANCIES, <br />OMISSIONS AND/OR CONFLICTS BEFORE PROCEEDING WITH THE WORK. <br />8. ALL DIMENSIONS SHALL BE VERIFIED ON THE SITE BEFORE PROCEEDING <br />WITH THE WORK. NOTIFY THE ARCHITECT IN WRITING OF ANY <br />DISCREPANCIES. <br />9. UNLESS NOTED OTHERWISE, ALL DIMENSIONS ARE TO THE FACE OF STUD, <br />EDGE OF MASONRY OR COLUMN CENTERLINE. <br />10. UNLESS NOTED OTHERWISE, ALL SHAFTS ARE DIMENSIONED TO THEIR <br />CLEAR INSIDE OPENING. <br />11. UNLESS NOTED OTHERWISE, ALL FASTENERS AND FASTENING DEVICES ARE <br />TO BE CONCEALED IN ALL FINISHED SPACES. <br />12. ALL DISSIMILAR METALS SHALL BE EFFECTIVELY ISOLATED FROM EACH <br />OTHER BY GASKETS OR COATINGS OR BOTH TO AVOID GALVANIC <br />CORROSION ACTION. <br />13. COAT ALL ALUMINUM ITEMS IN CONTACT WITH OR EMBEDDED IN CONCRETE <br />WITH A BITUMINOUS PAINT TO PREVENT GALVANIC CORROSION ACTION. <br />14. PROVIDE PRESSURE TREATED WOOD WHERE WOOD IS IN CONTACT WITH <br />CONCRETE, EARTH OR EXPOSED TO THE WEATHER, UNLESS NOTED <br />OTHERWISE. <br />15. ALL EXTERIOR FERROUS METAL WORK LOCATED ON EXTERIOR OR IN <br />NON -CONDITIONED SPACES (INTERIOR) SHALL BE HOT -DIPPED GALVANIZED <br />(MINIMUM G-90 COATING THICKNESS). <br />16, THE EXTENT OF THE WORK SHOWN ON THE PLANS AND DETAILS <br />REFLECTS THE BEST JUDGMENT OF THE ARCHITECT/ENGINEER. THE <br />CONTRACTOR SHALL FAMILIARIZE HIMSELF WITH THE EXISTING CONDITIONS <br />AND ADVISE THE ARCHITECT, IN WRITING, OF ANY SITUATION THAT WOULD <br />NOT ALLOW HIM TO PROCEED ON THE BASIS OF THESE DOCUMENTS. <br />17. THE ARCHITECT/ENGINEER'S SELECTION OF MATERIALS AND (DETAILS DOES <br />NOT RELIEVE THE CONTRACTOR FROM VERIFYING WITH THE 'MATERIAL <br />SUPPLIERS THAT THE PROPOSED MATERIALS ARE CORRECT ,AND PROPER <br />FOR THE INTENDED APPLICATION AND USE. <br />PHASING NOTES <br />I. PRECONSTRUCTION: <br />1. GC TO PROVIDE NEW TEST & BALANCE REPORT PRIOR TO <br />COMMENCING CONSTRUCTION TO ENSURE POSITIVE PRESSURIZATION <br />PER BASE BUILDING DESIGN. <br />2. GC TO COORDINATE INSTALLATION OF HEPA FILTER AIR SCRUBBERS <br />WITH WELLS FARGO GROUP MOBILE MAINTENANCE MANAGER. <br />SCRUBBERS WILL RUN CONTINUOUSLY DURING CONSTRUCTION <br />ACTIVITY AND WHEN STORE IS NOT OPEN. <br />3. PROVIDE MERV 13 FILTER AT MECHANICAL UNIT. GC TO REPLACE <br />EVERY TWO WEEKS DURING CONSTRUCTION. <br />4, PROVIDE CARBON FILTERS OVER ALL AIR INTAKES INCLUDING <br />SCRUBBERS. <br />5. PROVIDE PVC STACK W/ GOOSENECK AT EXTERIOR FRESH AIR INTAKE <br />OF ALL ROOF TOP AC UNITS AT 10'-0" ABOVE ROOF DECK TO <br />MINIMIZE DUST/ DEBRIS FROM ENTERING BUILDING MECHANICAL <br />SYSTEM. <br />6. GC SHALL COORDINATE WITH WELLS FARGO PROPERTY MANAGER TO <br />OBTAIN A BASE LINE AIR SAMPLE PRIOR TO CONSTRUCTION. AIR <br />SAMPLES WILL BE TAKEN WEEKLY WHILE AGRI-FIBER IS BEING <br />REMOVED FROM THE BUILDING. <br />II. SHORING: <br />1. GC SHALL SUBMIT SHORING PLAN FOR APPROVAL. <br />2. SEE STRUCTURAL DRAWINGS FOR ADDITIONAL SHORING NOTES, <br />3. SEAL ALL PANEL SEAMS, MOUNTING PIN HOLES & ALL OTHER ROOF <br />PENETRATIONS UNDERSIDE OF THE ROOF PANELS TO ENSURE THAT <br />NO AGRI-FIBER OR OTHER DUST AND DEBRIS IS ALLOWED TO <br />INFILTRATE INTO THE STORE. SEE DETAILS. <br />4. JACK UP ALL DEFLECTED ROOF PANELS UNTIL THEY ARE FLAT AND <br />STRAIGHT DURING SHORING. <br />III. ROOF: <br />1. DETERMINE ORIGINAL ROOFING MANUFACTURER AND ENGAGE ROOFING <br />7 <br />SUBCONTRACTOR THAT CAN SOURCE A NEW ROOF FROM THE SAME <br />MANUFACTURER. PROVIDE NEW 15 YEAR COMPLETE ROOFING SYSTEM <br />WARRANTY. <br />2. CAREFULLY CUT TPO ROOF MEMBRANE AND PEEL BACK ONLY AREA <br />OF WORK TO BE PERFORMED THAT DAY, <br />3. WHERE IT EXISTS, REMOVE EXISTING RIGID INSULATION IN ITS <br />ENTIRETY. <br />4. REMOVE EXTERIOR LAYER OF OSB. <br />5. REMOVE EXISTING AGRI-CORE INSULATION IN ITS ENTIRETY. <br />6, TEST INTERIOR LAYER OF OSB FOR MOISTURE CONTENT USING A <br />DELMHORST PIN PROBE MOISTURE METER AT 2 REMOTE LOCATIONS <br />PER PANEL. IF EITHER READING IS OVER 18% THEN NOTIFY THE <br />OWNER & ARCHITECT. FURTHER CONSIDERATION MAY BE REQUIRED BY <br />ARCHITECT AND STRUCTURAL ENGINEER TO DETERMINE IF OSB SHALL <br />BE REPLACED. <br />7. IF THERE IS ANY EVIDENCE OF INSECT ACTIVITY WITHIN THE PANEL, <br />THEN TREAT ENTIRE CAVITY WITH AN EPA APPROVED PESTICIDE. <br />8. IF THERE IS ANY EVIDENCE OF MICROBIAL OR FUNGAL STAINING, <br />TREAT ENTIRE CAVITY WITH ANTI -MICROBIAL AND ANTI -FUNGAL <br />SEALER. <br />9, PROVIDE NEW ROOF FRAMING AS INDICATED ON STRUCTURAL <br />DRAWINGS. <br />10. INSTALL NEW PLYWOOD ROOF DECK AS INDICATED ON THE <br />STRUCTURAL DRAWINGS. <br />11. COVER ALL WORK AT END OF DAY. ROOFING SUBCONTRACTOR TO <br />SEAL ROOF MEMBRANE TO PREVENT MOISTURE FROM GETTING BELOW <br />ROOF MEMBRANE. <br />12. AFTER ALL ROOF REPAIR COMPLETE, REMOVE ENTIRE EXISTING ROOF <br />MEMBRANE UP TO POINT ON PARAPET INDICATED ON DRAWINGS. <br />13. INSTALL NEW DENSDECK PRIMED ROOF BOARD OVER THE NEW ROOF <br />DECK. <br />14. INSTALL NEW TAPERED RIGID INSULATION (MIN 1" THICK) MIN SLOPE <br />1/4"PER FOOT WHERE INDICATED ON THE DRAWINGS, <br />15. INSTALL NEW TPO PER MANUFACTURE'S WRITTEN INSTRUCTIONS. <br />16. INSTALL NEW OR SALVAGED WALK PADS AS INDICATED ON DRAWING. <br />17, RE -LEVEL THE SUSPENDED CEILING SYSTEM, LIGHT FIXTURES AND <br />HVAC DIFFUSERS ONCE THE WORK ON THE ROOF IS COMPLETE <br />IV. WALLS: <br />1. CAREFULLY REMOVE STUCCO ASSEMBLY TO HORIZONTAL CONTROL <br />JOINT AS INDICATED ON ELEVATIONS. <br />2. WHEN REMOVING PAPER BACKED LATH, LEAVE APPROXIMATELY 6" <br />GRADE D PAPER TO LAP OVER NEW GRADE D PAPER. NEATLY TRIM. <br />3. REMOVE EXISTING MASONRY WAINSCOT. PRIOR TO COMMENCEMENT <br />MEET WITH WELLS FARGO PROJECT MANAGER TO DETERMINE <br />FEASIBILITY OF REUSE OF MASONRY WAINSCOT VERSUS REPLACEMENT. <br />THE INTENTION IS TO REMOVE AND SALVAGE ANY PRECAST CONCRETE <br />WATER TABLES AND MASONRY WAINSCOT FOR REUSE. <br />4. CAREFULLY REMOVE WEATHER RESISTIVE BARRIER WHERE STUCCO IS <br />REMOVED. NEATLY CUT 6" TO REMAIN TO LAP OVER NEW FLUID <br />APPLIED WEATHER BARRIER. <br />5. REMOVE EXISTING EXTERIOR LAYER OF OSB. <br />6. REMOVE ALL AGRI-CORE INSULATION IN ITS ENTIRETY. <br />7. TEST INTERIOR LAYER OF OSB FOR MOISTURE CONTENT USING A <br />DELMHORST PIN PROBE MOISTURE METER AT 2 REMOTE LOCATIONS <br />PER PANEL. IF EITHER READING IS OVER 18% THEN NOTIFY THE <br />OWNER & ARCHITECT. FURTHER CONSIDERATION MAY BE REQUIRED BY <br />ARCHITECT AND STRUCTURAL ENGINEER TO DETERMINE IF INTERIOR <br />LAYER OF OSB AND GWB SHALL BE REPLACED. <br />8. IF IT IS DETERMINED THAT THE INTERIOR LAYER OF OSB AND GWB <br />NEEDS TO BE REMOVED AND REPLACED, THEN CONSTRUCT A <br />TEMPORARY DUST BARRIER CONSTRUCTED OF 2 X 4'S WOOD STUD <br />FRAMING AND PLYWOOD, THREE FEET TO THE INTERIOR OF THE <br />ROOM, PAINT THE INTERIOR FACE OF THE PLYWOOD AND REARRANGE <br />FURNITURE AS NECESSARY. <br />9. IF THERE IS ANY EVIDENCE OF INSECT ACTIVITY WITHIN' THE PANEL, <br />THEN TREAT ENTIRE CAVITY WITH AN EPA APPROVED PESTICIDE. <br />10. IF THERE IS ANY EVIDENCE OF MICROBIAL OR FUNGAL STAINING, <br />TREAT ENTIRE CAVITY WITH ANTI -MICROBIAL AND ANTI -'FUNGAL <br />SEALER. <br />11. PROVIDE NEW FRAMING AS INDICATED ON STRUCTURAL DRAWINGS. <br />12. REMOVE AND REINSTALL EXISTING WINDOWS. SEE DETAILS. <br />13. INSTALL NEW 6" UNFACED FIBERGLASS BATTS AS INDICATED ON <br />DRAWINGS. <br />14, INSTALL NEW PLYWOOD AS INDICATED ON STRUCTURAL DRAWINGS. <br />15. INSTALL FLUID APPLIED WEATHER RESITIVE BARRIER. <br />16. INSTALL NEW STUCCO ASSEMBLY AS INDICATED ON DRAWINGS AND AS <br />SPECIFIED. <br />RqStffo <br />IMPROVING YOUR WORLD <br />Reynolds, Smith and Hills, Inc. <br />10748 Deerwood Park Blvd. S. <br />Jacksonville, Florida 32256-0597 <br />904-256-2500 FAX 904-256-2501 <br />www.rsandh.com <br />FL Ceti Nos. AAC001886 * IB26000956 <br />EB0005620 * LCC000210 * GB238 <br />WELLS FARGO <br />AGRIBOARD REPAIR <br />ZEPHYR COMMONS <br />7780 GALL BLVD <br />ZEPHYR HILLS, FL 33541 <br />REGISTRATION <br />REVISIONS <br />DATE ISSUED: 10-22-13 <br />REVIEWED BY: SPJ <br />DRAWN BY: PEK <br />DESIGNED BY: <br />AEP PROJECT NUMBER <br />501-2717-033 <br />© 2013 REYNOLDS, SMITH AND HILLS INC. <br />SHEET TITLE <br />FLOOR PLAN <br />AND <br />NOTES <br />SHEET NUMBER <br />CONSTRUCTION <br />SET <br />V' <br />