OUTLINE SPECIFICATION
<br />0133 00 - SUBMITTAL PROCEDURES
<br />1. PROVIDE THREE (3) SETS OF SHOP DRAWINGS TO PROJECT MANAGER FOR REVIEW AND FORWARD TO ARCHITECT FORAPPROVAL AFTER THE
<br />0173 00 - EXECUTION
<br />00 70 00 - CONDITIONS OF THE CONTRACT
<br />CONTRACTOR HAS REVIEWED THEM FOR CONSTRUCTIBILITY, COORDINATION BETWEEN TRADES, AND CONFORMANCE VVITH THE CONTRACT
<br />1. CONSTRUCTION LAYOUT
<br />1. THE AIA GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION (ALA DOCUMENT A201-97) AND SUPPLEMENTAL CONDITIONS ARE PROVIDED UNDER
<br />DOCUMENTS. ARCHITECT TO REVIEW AND RETURN WITHIN 5 BUSINESS DAYS UON.
<br />A DO NOT SCALE DRAWINGS, DIMENSIONS GOVERN. LARGE SCALE DETAILS GOVERN OVER SMALLER SCALE DETAILS.
<br />SEPARATE COVER, AND ARE INCORPORATED INTO THESE SPECIFICATIONS BY REFERENCE. WHERE ANY PART OF THE CONTRACT DOCUMENTS IS INCONSISTENT
<br />B. INFORM PROJECT MANAGER WHEN CHALK LINE LAYOUT OF PARTITIONS IS COMPLETED SOTHAT IT CAN BE VERIFIED. MAKE REQUIRED CHANGES
<br />WITH THESE CONDITIONS OF THE CONTRACT, THE CONDITIONS OF THE CONTRACT SHALL GOVERN.
<br />2. SUBMIT SAMPLES OF FINISH MATERIALS TO PROJECT MANAGER FOR APPROVAL PRIOR TO INSTALLATION. THE CONTRACTOR ASSUMES
<br />PRIOR TO START OF CONSTRUCTION.
<br />RESPONSIBILITY FOR REPLACEMENT OF FINISH MATERIALS THAT HAVE NOT BEEN APPROVED.
<br />C. SUPPLY ALL NECESSARY INFORMATION ON REQUIRED CUTOUTS FOR PLUMBING FIXTURES TO MILLWORK CONTRACTOR
<br />2. DEFINITIONS:
<br />D. DOOR OPENINGS IN GYPSUM BOARD PARTITIONS NOT DIMENSIONED ARE TO BE LOCATED IN CENTER OF ROOM OR 4' FROM ADJOINING PARTITION
<br />A "DAY": A DAY IS ACALENDAR DAY BEGINNING AND ENDING AT 12:00 MIDNIGHT.
<br />3. SUBMITTALS SHALL BE NEAT AND LEGIBLE, OF UNIFORM SCALE, RESPONSIVE TO REQUIREMENTS, WITH ALL SHEETS OF SIMILAR INFORMATION OF
<br />AS Ste.
<br />B. "ALIGN': MEANS TO INSTALL FINISHED FACES OF NEW MATERIAL FLUSH, PLUMB AND TRUE TO LINE WITH ADJACENT EXISTING CONSTRUCTION.
<br />SAME SIZE.
<br />C. "FURNISH": MEANS TO SUPPLY AND DELIVER TO PROJECT SITE, READY FOR UNLOADING, UNPACKING, ASSEMBLY, INSTALLATION, AND SIMILAR
<br />2. COMPLY WITH MANUFACTURERS WRITTEN INSTRUCTIONS AND RECOMMENDATIONS FOR INSTALLING PRODUCTS IN APPLICATIONS INDICATED.
<br />OPERATIONS.
<br />4. TRANSMIT EACH SUBMITTAL SUFFICIENTLY IN ADVANCE OF PERFORMANCE OF RELATED CONSTRUCTION ACTIVITIES TO AVOID DELAY.
<br />D. "INSTALL": MEANS TO UNLOAD, PROVIDE TEMPORARY STORAGE AT THE SITE, UNPACK, ASSEMBLE, ERECT, PLACE, ANCHOR, APPLY, WORK TO DIMENSION,
<br />3. ENSURE THAT INSTALLATION CONFORMS TO BUILDING CODE REQUIREMENTS. THE MATERIALS SPECIFIED ARE INTENDED TO MEET CODE
<br />FINISH, CURE, PROTECT, CLEAN, AND SIMILAR OPERATIONS TO PROVIDE THE WORK REQUI RED BY THE CONTRACT DOCUMENTS.
<br />5. PACKAGE SUBMITTALS TO COVER COMPLETE ASSEMBLIES OR SYSTEMS. PARTIAL OR INCOMPLETE SUBMITTALS WILL BE RETURNED REJECTED
<br />REQUIREMENTS. IMMEDIATELY NOTIFY ARCHITECT OF ALL DISCREPANG ES BETWEEN THE CONSTRUCTION DOCUMENTS AND CODE REQUIREMENTS. DO
<br />E. "PROVIDE": MEANS TO FURNISH AND INSTALL, COMPLETE, AND READY FOR THE INTENDED USE.
<br />WITHOUT REVIEW.
<br />NOT PROCEED VVITH INSTALLATION UNTIL INSTRUCTIONS RESOLVING DISCREPANCIES HAVE BEEN RECEIVED.
<br />F. "SIMILAR': MEANS SYSTEM OR CONSTRUCTION COMPARABLE TO CONDITION NOTED. IN CASE OF CONTROVERSY, REQUEST INSTRUCTION FROM
<br />ARCHITECT PRIOR TO PROCEEDING.
<br />6. THE ARCHITECT RESERVES THE RIGHT TO WITHHOLD ACTION ON A SUBMITTAL REQUIRING COORDINATION WITH OTHER SUBMITTALS UNTIL ALL
<br />G. "TYPICAL": MEANS IDENTICAL SYSTEM CR OONSTRUCTION AT SIMILAR LOCATIONS NOTED.
<br />RELATED SUBMITTALS ARE RECEIVED.
<br />0173 30 - CORRECTION OF DEFECTIVE WORK
<br />1. PATCH, REPAIR, REPLACE, AND/OR REFINISH EXISTING CONSTRUCTION AS NECESSARY TO REFURBISH DAMAGED AND NONCONFORMING AREA OFF.
<br />3. ALL COMMUNICATIONS FROM OWNER RELATIVE TO C 4ANGES IN THE WORK WILL BE THROUGH PROJECT MANAGERTO CONTRACTOR IF CONTRACTOR
<br />7. THE CONTRACTOR IS RESPONSIBLE FOR CONFIRMING AND CORRELATING DIMENSIONS AT JOB SITES FOR TOLERANCES, CLEARANCES,
<br />CLAIMS THAT A REVISION TO CONTRACT DOCUMENTS INVOLVES EXTRA COST, CONTRACTOR SHALL SUBMIT WRITTEN NOTICE TO THE PROJECT MANAGER WITHIN
<br />QUANTITI ES, FABRICATION PROCESSES AND TECHNIQUES OF CONSTRUCTION, COORDINATION OF THEIR WORK VNTH OTHER TRADES AND FULL
<br />30 DAYS AFTER RECEIPT OF SUCH INSTRUCTIONS. NO G-1ANGE IN THE WORK SHALL BE PERFORMED WITHOUT A VALID CHANGE ORDER COVERING THE SCOPE OF
<br />COMPLIANCE WITH
<br />0174 00 - CLEANING AND WASTE MANAGEMENT
<br />THE CHANGE AND SIGNED BY THE OVVNER
<br />1. CLEAN PREMISES WITHIN CONSTRUCTION LIMITS AND ALONG ACCESS ROUTES DAILY, INCLUDING COMMON AREAS. COORDINATE PROGRESS
<br />8. THE CONTRACT DOCUMENTS.
<br />CLEANING FOR JOINT -USE AREAS WHERE MORE THAN ONE INSTALLER HAS WORKED. ENFORCE REQUIREMENTS STRICTLY. DISPOSE OF MATERIALS
<br />4. BY ENTERING INTO THIS AGREEMENT WITH THE OWNER, THE CONTRACTOR REPRESENTS THAT HE HAS VISITED THE JOB SITE, FAMILIARIZED HIMSELF WITH
<br />a. PROPOSED DEVIATIONS, FROM THE CONTRACT DOCUMENTS MUST BE CONSIDERED
<br />LAWFULLY.
<br />EXISTING CONDITIONS, AND NOTED DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THOSE OF THE CONTRACT DOCUMENTS.
<br />b. SEPARATELY FROM SUBMITTALS, USING THE "CHANGES" PROCEDURES OF THE CONTRACT
<br />c. CONDITIONS.
<br />2. KEEP INSTALLED WORK CLEAN.
<br />5. SUBMIT A COMPLETE WRITTEN DESCRIPTION OF THE SCOPE OF EACH CHANGE IN THE WORK INCLUDING ROOM NUMBERS AFFECTED. PREPARE QUOTATIONS
<br />FOR PROPOSED CHANGES IN THE WORK IN A "BREAK DOAN' FORM, GIVING THE NUMBER OF UNITS, UNIT COST OF MATERIALS, HOURS OF LABOR HOURLY COST
<br />0140 00 - QUALITY REQUIREMENTS
<br />3. CONCEALED SPACES: REMOVE DEBRIS FROM CONCEALED SPACES BEFORE ENCLOSING THE SPACE.
<br />ROF LABOR, TOOLS, SUPPLIES, EQUIPMENT, TRANSPORTATION, SUPERINTENDENTS, CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS OF EVERY NATURE,
<br />1. TESTING AND INSPECTING SERVICES ARE REQUIRED TO VERIFY COMPLIANCE WITH REQUIREMENTS SPECIFIED OR INDICATED. PROVIDE SPECIAL
<br />INSURANCE, TAXES, BONDS, ALL OTHER OVERHEAD COSTS AND PROFIT, AND SHALL REFLECT CREDITS AS WELL AS EXTRAS.
<br />INSPECTIONS BY INDEPENDENT TESTING AGENCY WHEN REQUIRED BY CODE AUTHORITIES. THESE SERVICES DO NOT RELIEVE CONTRACTOR OF
<br />RESPONSIBILITY FOR OOMPLIANCE WITH THE CONTRACT DOCUMENT REQUIREMENTS.
<br />0175 00 - STARTING AND ADJUSTING
<br />1. START EQUIPMENT AND OPERATING COMPONENTS TO CONFIRM PROPER OPERATION. REMOVE MALFUNCTIONING UNITS, REPLACE WITH NEW UNITS, &
<br />6. CONTRACTOR SHALL MAINTAIN A CURRENT AND COMPLETE SET OF CONTRACT DOCUMENTS ON SITE DURING CONSTRUCTION FOR USE OF ALL TRADES.
<br />RETEST.
<br />ENSURE THAT ALL SUBCONTRACTORS RECEIVE COMPLETE SETS OF CONSTRUCTION DRAWINGS. CONTRACTOR SHALL_ ASSUME RESPONSIBILITY FOR
<br />0142 00 - REFERENCES
<br />COORDI NATION OF ALL WORK
<br />1. ABBREVIATIONS AND ACRONYMS: WHERE ABBREVIATIONS AND ACRONYMS ARE USED IN CONTRACT DOCUMENTS, THEY SHALL MEAN THE
<br />2. ADJUST OPERATING COMPONENTS FOR PROPER OPERATION VWATHCXJE BINDING, VIBRATING, OR PRODUCING EXCESSIVE NOISE. ADJUST EQUIPMENT
<br />RECOGNIZED NAME OF THE ENTITIES INDICATED IN GALE RESEARCHS "ENCYCLOPEDIA OF ASSOCIATIONS" OR IN COLUMBIA BOOKS' "NATIONAL
<br />FOR PROPER OPERATION.
<br />7. THE OIVTNER, VVITHOUT INVALIDATING THE CONTRACT, MAY ORDER EXTRA WORK OR MAKE CHANGES BY ALTERING, ADDING TO, OR DEDUCTING FROM THE
<br />TRADE & PROFESSIONAL ASSOCIATIONS OF THE U.S," AND THE ABBREVIATION LIST INCLUDED VVITH THE PROJECT DOCUMENTS.
<br />WORK. CONTRACT SUM AND CLAIMS FOR EXTENSION OF TIME VVILL BE ADJUSTED IN ACCORDANCE WITH CONTRACT CONDITIONS RELATIVE TO CHANGES IN THE
<br />3. PROTECT INSTALLED CONSTRUCTION.
<br />WORK. CHANGES IN THE WORK SHALL BE PROVIDED IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.
<br />0150 00 - TEMPORARY FACILITIES AND CONTROLS
<br />8. SECTIONS OF DIVISION 1 -GENERAL REQUIREMENTS, GOVERN THE EXECUTION OF THE WORK OF ALL SECTIONS OF THE SPECIFICATIONS.
<br />1. REMOVE ALL RUBBISH AND WASTE MATERIALS FROM THE PREMISES ON AT LEAST A WEEKLY BASIS, AND PROM DE LEGAL DISPOSAL.
<br />0177 00 - CLOSEOUT PROCEDURES
<br />1. CONTRACT CLOSE-OUT SHALL OCCUR ONLY AFTER PROJECT MANAGER HAS PREPARED THE CERTIFICATE OF SUBSTANTIAL COMPLETION AND PUNCH LIST,
<br />9. GC WILL ASSIGN PM TO ATTEND WEEKLY PROJECT CALLS LASTING APPROXIMATELY ONE HOURAND OTHER CALLS AS NEEDED.
<br />2. EXERCISE STRICT DUST CONTAINMENT CONTROL_ TO PREVENT DIRT OR DUST FROM LEAVING LIMITS OF CONSTRUCTION.
<br />AND PUNCH LIST ITEMS HAVE BEEN CORRECTED. THE CONTRACTOR SHALL_ SUBMIT MAINTENANCE AND WARRANTY MANUALS, RELEASE OF LIENS, AND
<br />RECORD DRAWINGS TO PROJECT MANAGER WITH HIS FINAL APPLICATION FOR PAYMENT. PROJECT MANAGER SHALL PREPARE ANY NECESSARY CHANGE
<br />3. UNLESS OTHERWISE REQUIRED BY THE CONTRACT DOCUMENTS, WATER, GAS, LIGHTING, POWER AND TELEPHONE CONDUITS AND WIRES, SEWER
<br />ORDERS REQUIRED TO FINALIZE THE COST OF THE PROJECT BASED ON THE CONTRACTORS FINAL SUBMITTALS.
<br />LINES, STREETS, CURBS, DRIVEWAY APPROACHES, TREES, LANDSCAPING, BUILDINGS AND OTHER SURFACE AND SUBSURFACE STRUCTURES AND
<br />LINES, OPENINGS, FINISHES, FURNISHINGS, EQUIPMENT, AND SIMILAR IMPROVEMENT ITEMS SHALL BE PROTECTED BY CONTRACTOR AND SHALL
<br />2. "EXISTING TO REMAIN', "EXISTING TO BE RELOCATED", AND/OR NEW ITEMS INSTALLED BY THE CONTRACTOR, IN ADDITION TO BEING AMIPLY PROTECTED
<br />NOT BE DISTURBED, DISCONNECTED OR DAMAGED BY HIM DURING PROGRESS OF WORK SHOULD CONTRACTOR IN PERFORMANCE OF WORK
<br />THROUGHOUT THE PERIOD OF CONSTRUCTION, SHALL BE THOROUGHLY CLEANED TO THE SATISFACTION OF ARCHITECT PRIOR TO BEING TURNED OVER TO
<br />DISTURB, DISCONNECT OR DAMAGE ANY OF THE ABOVE ITEMS, REMOVE, REPAIR, OR REPLACE SUCH DISCONNECTED OR DAMAGED ITEMS WITH
<br />MATERIALS, CONSTRUCTION, AND IMPROVEMENTS MATCHING EXISTING UNDATVIAGED WORK AND RESTORE TO A CONDITION AS GOOD AS OR BETTER
<br />THE OWNER
<br />0110 00 - SUMMARY OF WORK
<br />THAN EXISTED PRIOR TO SUCH DISTURBANCE, DISCONNECTION OR DAMAGE AT NO ADDITIONAL EXPENSE TO DINER. PROVIDED TEMPORARY
<br />3. BEFORE ACCEPTANCE BY THE OWNER, THE COMPLETED CONSTRUCTION SHALL BE CLEANED, LABELS REMOVED, AND ALL OTHER TOUCH UP COMPLETED.
<br />1. SCOPE OF WORK, LOCATION, AND OTHER DATA IS INDICATED BY DRAWING CONTENT.
<br />PROTECTION OF THE WORK UNTIL REMOVAL OF TEMPORARY PROTECTION IS APPROVED BY ARCHITECT.
<br />4. GCTO PROVIDEAS-BUILT CAD DRAWINGS UPON COMPLETION OF WORK.
<br />2. PROVIDE WORK IN ACCORDANCE VVITH REQUIREMENTS OF THE "AMERICANS WITH DISABILITIES ACT' (ADA), INCLUDING LATEST AMENDMENTS. WHERE
<br />4. CONTRACTOR IS RESPONSIBLE FOR THE WORK AND PROPERTY OF OTHERS THAT IS IN CONTRACTORS CARE, CUSTODY, AND CONTROL AT ALL
<br />WORK SHOVWM DOES NOT COMPLY WITH THE ADA, HALT THE EFFECTED WORK AND REQUEST WRITTEN INSTRUCTIONS FROM THE ARCHITECT PRIOR TO
<br />TIMES DURING PROGRESS OF THE WORK AND UNTIL FINAL ACCEPTANCE. SECURE AND LOCK THE PREMISES WHEN WORKMEN ARE LOT PRESENT.
<br />PROCEEDING.
<br />018113 - SUSTAINABLE DESIGN REQUIREMENTS
<br />5. CONTRACTOR IS RESPONSIBLE FOR LIFE SAFETY EQUIPMENT REQUIRED BY AUTHORITIES HAVING JURISDICTION.
<br />1. COMPLY WITH GENERAL REQUIREMENTS AND PROCEDURES FOR COMPLIANCE WITH U.S. GREEN BUILDING COUNCIUS (USGBC) LEED PREREQUISITES
<br />3. IDENTIFY TOILET FACILITIES WITH SIGNAGE COMPLYING WITH THE INTERNATIONAL SYM30L OF ACCESSIBILITY (UBC CHAPTER 11).
<br />AND CREDITS NEEDED TO OOTvPLYWITH PROJECT GOALS FOR "SUSTAINABILITY' INCLUDING LEED CERTIFICATION WHEN INDICATED ON DRAWINGS.
<br />6. DURING THE ENTIRE PERIOD OF DEMOLITION AND CONSTRUCTION, EXISTING EXIT SIGNS, EXIT LIGHTING, FIRE PROTECTION DEVICES AND ALARMS
<br />4. THE PATH OF TRAVEL FROM THE DESIGINATED HANDICAP PARKING SPACES AND THE PUBLIC SIDEWALK PROVIDES A FREE AND UNOBSTRUCTED
<br />SHALL BE CONTINUOUSLY MAINTAINED.
<br />2. LEED WORKBOOK INCLUDED UNDER SEPARATE COVER (AS APPLICABLE).
<br />PASSAGE FOR ACCESS TO AND EGRESS FROM THE AREA OF WORK.
<br />7. MAINTAIN REQUI RED EXITS AND EXIT EGRESS FREE FROM ALL OBSTRUCTIONS AND IMPEDIMENTS.
<br />3. SUBMITTALS:
<br />5. NIOUNT LIGHT AND CONTROL_ SWITCHES NOT MORE THAN 4-FEET-0-INCHES ABOVE FINISHED FLOOR OR WORKING LEVEL.
<br />A LEED CREDIT EQ 4.1: MANUFACTURERS' PRODUCT DATA FOR CONSTRUCTION ADHESIVE, INCLUDING PRINTED STATEMENT OF VOC CONTENT.
<br />8. MAINTAIN EXISTING UTILITIES AND SERVICES TO EXISTING FACILITIES INDICATED TO REMAIN, KEEP IN SERVICE, AND PROTECT AGAINST DAMAGE
<br />B. LEED CREDIT EQ4A COMPOSITE WOOD MANUFACTURERS PRODUCT DATA FOR EACH COMPOSITE WOOD PRODUCT USED INDICATING THAT
<br />6. PROVIDE DOORS NOT LESS THAN 3-FEET-0-INCH WIDE BY 6-FEET -&INCHES IN HIGH.
<br />DURING DEMOLITION OPERATIONS. GIVE MINIMUM 72 HOURADVANCE NOTICE TO OIINERS REPRESENTATIVE IF SERVICE SHUT -DOWN -DO \N IS
<br />BONDING AGENT USED CONTAINS NO UREA FORMALDEHYDE.
<br />NECESSARY.
<br />C. LEED C REDIT MR 7: CERTIFICATES OF CHAIN -OF -CUSTODY SIGNED BY MANUFACTURERS CERTIFYING THAT PRODUCTS SPECIFIED TO BE MADE
<br />7. PROVIDE FLOORS AND LANDINGS LOCATED AT A DOORWAYS NOT MORE THAN 1/2-INCH LOWER THAN THE TOP OF THE THRESHOLD. PROVIDE
<br />FROM CERTIFIED WOOD WERE MADE FROM WOOD OBTAINED FROM FORESTS CERTIFIED BY AN FSGACCREDITED CERTIFICATION BODY TO COMPLY WITH
<br />THRESHOLDS WITH 1/4-INCH MAXIMUM VERTICAL EDGE AND WITH A CHANGE IN LEVEL NOT GREATER THAN 1:2.
<br />9. EXISTING WATER, PERMANENT FIRE PROTECTION, ELECTRICAL POWER SERVICE AND LIGHTING, HEATING, AIR CONDITIONING, AND TOILETS VVITHIN
<br />FSC 1.2, "PRINCIPLES AND CRITERIA." INCLUDE EVIDENCE THAT MILL IS CERTIFIED FOR CHAIN-C CUSTODY RYAN FSGAOCREDTTED CERTIFICATION BODY.
<br />THE VARIOUS AREAS OF WORK WILL BE MADE AVAILABLE TO CONTRACTOR WITHOIJT ADDITIONAL METERING AND WITHOUT PAYMENT OF USE
<br />D. LEED REQUIREMENTS- CREDIT EQ 4.2 SUBMITTAL: MANUFACTURERS' PRODUCT DATA FOR PAINTS AND COATINGS, INCLUDING PRINTED
<br />8. PROVIDE A CLEAR AND LEVEL AREA ON EACH SIDE OF EXIT DOORS WITH A LENGTH OF AT LEAST 60-INC-IES IN THE DIRECTION OF THE DOOR SWING AND
<br />CHARGES FOR SERVICES. PROVIDE AND PAY FOR ALL OTHER TEMPORARY LFFILITIES AND UTILITY SERVICES, TEMPORARY SUPPORT FACILITIES AND
<br />STATEMENT OF VOC CONTENT AND CHEMICAL COMPONENTS.
<br />AT LEAST 48-INCHES IN THE OPPOSITE DIRECTION, MEASURED AT RIGHT ANGLE TO DOOR IN ITS CLOSED POSITION.
<br />SERVICES, TEMPORARY SECURITY AND PROTECTION FACILITIES NECESSARY FOR THE PROPER AND EXPEDITIOUS EXECUTION OF THE AVOW
<br />E. TEED REQUIREMENTS - CREDIT EQ 4.1 SUBMITTALS: FURNISH MANUFACTURERS PRODUCE DATA FOR INTERIOR SEALANTS, INCLUDING PRINTED
<br />STATEMENT OF VOC CONTENT.
<br />9. PROVIDE LEVER TYPE HARDWARE COMPLYING WITH ADA REQUIREMENTS.
<br />10. KEEP ALL EXISTING FACILITIES AND SERVICES CLEAN AND IN GOOD WORKING CONDITION. CLEAN OR REPLACE CHANGEABLE FILTER MEDIA AND
<br />TURN OVER WITH NEW FILTER MEDIA AT COMPLETION OF WORK. CONTRACT DOC IMENTS.
<br />10. PROVIDE BOTTOM 10-INC-IES OF DOORS, EXCEPTAUTOMATICAND SLIDING DOORS, WITH A SMOOTH, UNINTERRUPTED SURFACE.
<br />11. COSTS FOR DELAYS BECAUSE OF NON -AVAILABILITY OF SPECIFIED ITEMS, WHEN SUCH DELAYS COULD HAVE BEEN AVOIDED BY CONTRACTOR,
<br />03 5416 - HYDRAULIC CEMENT UNDERLAYMENT
<br />11. PROVIDE EXIT DOORS TO SWING IN THE DIRECTION OF TRAVEL WHEN SERVING AN OCCUPANT LOAD OF MORE THAN 50 (UBC CI-IAPTER 10).
<br />WILL BE BORNE BY THE CONTRACTOR.
<br />1. USE SELF -LEVELING UNDERLAYMENT FOR INTERIOR FINISH FLOORING AT LOCATIONS INDICATED, AND TO ACHIEVE FLATNESS WHERE STRUCTURAL
<br />SLAB DOES NOT COMPLY WITH SPECIFIED FLATNESS REQUIREMENTS.
<br />12. ARRANGE EXIT DOORS TO OPERATE FROM THE INSIDE VVITHOUT USE OF A KEY OR ANY SPECIAL KNOWLEDGE OR EFFORT. USE ONLY SPECIAL LOCKING
<br />0160 00 - PRODUCT REQUIREMENTS
<br />DEVICES OF AN APPROVED TYPE. PROVIDE EXIT DOOR CLOSERS ADJUSTED SO THAT THE DOOR TAKES AT LEAST 3 SECONDS TO CLOSE FROM AN OPEN
<br />1. MANUFACTURERS NAME, TRADEMARK, LOGOS, ETC., SHALL NOT BE VISIBLE TO THE PUBLIC.
<br />2. UNDERLAYMENT: CEMENT -BASED, POLYMER -MODIFIED, SELF -LEVELING PRODUCT THAT CAN BE APPLIED IN UNIFORM THICKNESSES FROM 1/8 INCH
<br />POSITION OF 70 DEGREES TO WITHIN 3-INCHES OF THE LATCH.
<br />(3 MM) AND THAT CAN BE FEATHERED AT EDGES TO MATCH ADJACENT FLOOR ELEVATIONS.
<br />2. NO SUBSTITUTIONS OF LISTED MATERIALS OR PRODUCTS SHALL BE PERMITTED VVITHOUT FIRST SUBMITTING SPECIFICATIONS, SAMPLES, AND COST
<br />A CEMENT BINDER ASTM C 150, PORTLAND CEMENT, OR HYDRAULIC OR BLENDED HYDRAULIC CEMENT AS DEFINED BYASTM C 219.
<br />I MPACT FOR ARCHITECTS APPROVAL.
<br />B. COMPRESSIVE STRENGTH: NOT LESS THAN 4100 PSI (28 MPA) AT 28 DAYS WHEN TESTED ACCORDING TO ASTM C 1091C 109M.
<br />A USE SUBSTITUTION REQUEST FOPJVIS AVAILABLE FROM ARCHITECT.
<br />C. PRODUCTS:
<br />B. AT THE TIME OF BID SUBMITTAL, THE CONTRACTOR SHALL ADVISE ARCHITECT, IN WRITING OF ANY SPECIFIED MATERIAL OR EQUIPMENT THAT IS
<br />I. K 15 SELF -LEVELING UNDERLAYMENT CONCRETE; ARDDC, INC.
<br />013100 -PROJECT MANAGEMENT AND COORDINATION
<br />EITHER UNAVAILABLE OR WILL CAUSE A DELAY IN THE COMPLETION OF CONSTRUCTION.
<br />IL SELF -LEVELING UNDERLAYMENT; W. R BONSAL COMPANY.
<br />1. FORWARD COPIES OF EXECUTED PERMITS TO PROJECT MANAGER
<br />C. PROPOSED REVISIONS SHALL BE SUBMITTED IN THE FORM OF A WRITTEN CHANGE ORDER TO BE APPROVED AND AUTHORIZED BY ARCHITECT AND
<br />III. 300 PREMIUM UNDERLAYMENT; BURL GROUP, LLC (THE).
<br />OVVNER PRIOR TO START OF PROPOSED WORK.
<br />IV. LEVELEX UNDERLAYMENT; L&M CONSTRUCTION CHEMICALS, INC.
<br />2. SYMBOLS AND ABBREVIATIONS USED ON THE DRAWINGS ARE CONSTRUCTION STANDARD. (REFER QUESTIONS REGARDING THEIR DEFINITION TO ARCHITECT
<br />D. NO SUBSTITUTIONS ALLOWED FOR PAINT, RESILIENT BASE, PLASTIC LAMINATES, SOLID SURFACES, CARPET, VINYL COMPOSITION TILE, ACOUSTICAL
<br />V. LEVEL -RIGHT; MAXXON CORPORATION.
<br />FOR CLARIFICATION..
<br />CEILING TILE, AND UPHOLSTERY.
<br />3. AGGREGATE: WELL -GRADED, WASHED GRAVEL, 1/8 TO 1/41 NCH (3 TO 6 MM), OR COARSE SAND AS (RECOMMENDED BY UNDERLAYMENT
<br />MANUFACTURER
<br />3. ALL DIMENSIONS ARE FROM FACE OF FINISH TO FACE OF FINISH, U.N.O.
<br />3. EXISTING MANUFACTURED ITEMS NOT BEING REMOVED SHALL BE REFURBISHED AS REQUIRED, ANY LOOSE ITEMS TIGHTENED (INCLUDING, BUT
<br />A PROVIDE AGGREGATE WHEN RECOMMEENDED IN WRITING BY UNDERLAYMENT MANUFACTURER FOR UNDERLAYMENT THICKNESS REQUIRED.
<br />LIMITED TO, EXIT SIGNS, DOV\/N LIGHTS, SPEAKERS, MOLDINGS, ETC.), AND ANY MISSING PARTS REPLACED BY THE 0014TRACTOR TO ACHIEVE A COMPLETE
<br />4. ARRANGE FOR EACH TRADE TO CHECK AND VERIFY ALL DIMENSIONS AND CONDITIONS AT JOB SITE RELATING TO THEIR WORK NOALLOWANCE SHALL BE
<br />FUNCTIONING INSTALLATION WITH A NEW APPEARANCE.
<br />4. WATER POTABLE AND AT A TEMPERATURE OF NOT MORE THAN 70 DEG F (21 DEG C).
<br />MADE FOR ANY EXTRA EXPENSE OR EXTENSION OF TIME DUE TO CONTRACTORS FAILURE OR NEGLIGENCE I N COMPLETELY EXAMINING THE JOB SITE AND
<br />4. COMPATIBILITY OF OPTIONS: IF CONTRACTOR IS GIVEN OPTION OF SELECTING BETWEEN TWO OR MORE PRODUCTS FOR USE ON PROJECT, PRODUCT
<br />REINFORCEMENT: FOR UNDERLAYMENTAPPLIEDTO WOOD SUBSTRATES, PROVIDE GALVANIZED METAL LATH OR OTHER COTRRN OSIO-RESISTANT
<br />CONDITIONS EFFECTING DECUTICN OF THE WOW
<br />SELECTED
<br />SELECTED SHALL BE COMPATIBLE WITH PRODUCTS PREVIOUSLY SELECTED, EVEN IF PREVIOUSLY SELECTED PRODUCTS WERE ALSO OPTIONS.
<br />REINFORCEMENT RECOMMENDED IN WRITING BY UNDERLAYMENT MANUFACTURER
<br />5. CONTACT OWNERS REPRESENTATIVE FOR RULES FOR USE OF EXISTING FACILITIES, DELIVERIES, REMOVALS, STORAGE, TEMPORARY FACILITIES AND
<br />5. RELIABILITY OF CALCULATIONS BY DATE SENSITIVE EQUIPMENT, SYSTEMS AND COMPONENTS
<br />6. PRIMER PRODUCT OF UNDERLAYMENT MANUFACTURER RECOMMENDED IN WRITING FOR SUBSTRATE, CONDITIONS, AND APPLICATION INDICATED.
<br />CONTROLS, TEMPORARY UTILITIES AND SERVICES, CONSTRUCTION OPERATIONS, WORK PERFORMED OUTSIDE REGULAR BUSINESS HOURS, AND OTHER
<br />A DEFINITIC�1: DATE SENSITIVE EQUIPMENT INCLUDES EQUIPMENT, SYSTEMS AND COMPONENTS THEREOF WWHIC-I RELY ON OR UTILIZE COMPUTERS,
<br />REQUIREMENTS AFFECTING USE OF THE SITE AND PROSECUTION OF THE WORK IF OVERTIME WORK IS REQUIRED BY ANY TRADE, APPROVAL (INCLUDING
<br />SUBSYSTEMS, HARDWARE, SOFTWARE, FIRMWARE, INCLUDING EMBEDDED GRIP SYSTEMS COMPONENTS, WHICH PROCESS, SEQUENCE, CALCULATE,
<br />COST APPROVAL) MUST BE OBTAINED FROM DINER PRIOR TO EXXECUTION OF THE OVERTIME WORK. THE GENERAL INTENT IS THAT ALL WORK EXCEPT FOR
<br />UTILIZE, IN ANY FASHION ARE AFFECTED IN FUNCTION! OR OPERATION BY DATE AND DATEE RELATED OF2TIME AND TIME RELATED DATA, INCLUDING
<br />05 00 00 - MErALS - COMMON WORK RESULTS
<br />NOISE -GENERATING CONSTRUCTION SHALL BE PERFORMED ON REGULAR TIME.
<br />THE PASSAG
<br />AG E OF TINE.
<br />1. DESIGN, ENGINEER, FABRICATE, AND INSTALL METAL FABRICATIONS TO WITHSTAND THE FOLLOWING STRUCTURAL LOADS WITHOUT EXCEEDING THE
<br />B. DATE SENSITIVE EQUIPMENT, SYSTEMS AND COMPONENTS THEREOF MUST INDIVIDUALLY AND IN COMBINATION PROPERLY FUNCTION AND
<br />ALLOWABLE DESIGN V'VORKING STRESS OF THE MATERIALS INVOLVED, INCLUDING ANCHORS AND CONNECTIONS. APPLY EACH LOAD TO PRODUCE .THE
<br />6. COORDINATE AND VERIFY SIZE, LOCATION AND CHARACTERISTICS OF OIVNER SUPPLIED MATERIAL AND EQUIPMENT WITH WORK OF THIS CONTRACT TO
<br />CONTINUE TO CORRECTLY PROCESS, SEQUENCE AND UTILIZE DATE AND TIME RELATED DATA FOR ALL DATES AND TIMES, WHICH OCCUR DURING A
<br />N44XMUM STRESS IN EACH RESPECTIVE COMPONENT OF EACH METAL FABRICATION. ARRANGE FOR REQUIRED DESIGN WORK TO BE PERFORMED BY A
<br />PROVIDE A NEAT VV0RKQVIANLIKE INSTALLATION OF ALL WORK THAT FITS AVAILABLE SPACE, PROVIDES THE FUNCTION OR USE INTENDED, AND PROVIDES
<br />REASONABLELIFE EXPECTANCY FOR SAID EQUIPMENT, SYSTEMS AND COMPONENTS THEREOF.
<br />PROFESSIONAL ENGINEER WHO IS LEGALLY AUTHORIZED TO PRACTICE IN THE JURISDICTION V*V AND THE PROJECT IS LOCATED ND WHO IS EXPERIENCED
<br />ADEQUATE SERVICE ACCESS.
<br />C. CORRECTLY PROCESS, SEQUENCE, AND CALCULATE ALL DATE AND DATE RELATED DATA FOR ALL DATES PRIOR TO, THROUGH AND AFTER
<br />IN PROVIDING ENGINEERING SERVICES OF THE KIND INDICATED AND THAT HAVE RESULTED IN SUCCESSFUL INSTALLATION OF METAL FABRICATIONS
<br />JANUARY 1, 2000, INCLUDING LEAP YEAR CALCULATIONS.
<br />SIMILAR IN MATERIAL, DESIGN, AND EXTENT TO THOSE REQUIRED FOR PROJECT.
<br />7. VERIFY AND COORDINATE LOCATION OF ALL ACCESS PANELS (IN PARTITIONS, FLOORS, OR CEILINGS). CONFIRM LOCATIONS WITH ARCHITECT PRIOR TO
<br />SHALL
<br />D. SOFTWARE PRODUCTS THAT PROCESS DATE OR DATE RELATED DATA RECOGNIZE, STORE AND TRANSMIT DATE DATA IN A FORMAT WHICH
<br />INSTALLATION.
<br />EXPLICITLY AND UNAMBIGUOUSLY SPECIFIES THE CORRECT CENTURY.
<br />E. CONTRACTOR SHALL INCLUDE THIS REQUIREMENT IN ALL SUB -CONTRACTS AND EQUIPMENT ORDERS FOR THIS PROJECT.
<br />05 50 00 - METAL FABRICATIONS
<br />8. PROVIDE BLOCKING, RAGING, FRAMING HANGERS, OR OTHER SUPPORT FOR ALL FIXTURES, EQUIPMENT, CABINETRY, FURNISHINGS, AND OTHER HEAVY
<br />F. SUBMITTALS: PROVIDE CERTIFICATION FROM SUPPLIERS AND SUB -CONTRACTORS PROVIDING DATE SENSITIVE EQUIPMENT, SYSTEMS, AND
<br />1. METALSURFACES, GENERAL: PROVIDE MATERIALS WITH SMOOTH, FLAT SURFACES WITHOUT BLEMISHES.
<br />CONSTRUCTION
<br />SOFTWARE THAT THE PROPOSED EQUIPMENT, COMPONENTS AND SYSTEMS COMPLY VVITH THESE REQUIREMENTS.
<br />6. COMPLETE ASSEMBLIES: PROVIDE PRODUCTS COMPLETE VVITH ACCESSORIES, TRIM FINISH, FASTENERS, AND OTHER ITEMS NEEDED FORA COMPLETE
<br />2. STEEL PLATES, SHAPES, AND BARS: ASTM A 36A 36M.
<br />INSTALLATION FOR THE INDICATED USE AND EFFECT.
<br />3. STAINLESS -STEEL BARS AND SHAPES: ASTM A 276, TYPE 304.
<br />0132 00 - CONSTRUCTION PROGRESS DOCUMENTATION
<br />7. PROVIDE STANDARD PRODUCTS IF AVAILABLE, AND UNLESS CUSTOM PRODUCTS OR NON-STANDARD OPTIONS ARE SPECIFIED, PROVIDE STANDARD
<br />4. STEEL TUBING: COLD -FORMED STEEL TUBING COMPLYING WITH ASTM A 500.
<br />PRODUCTS OF THE TYPES THAT HAVE BEEN PRODUCED AND USED SUCCESSFULLY IN SIMILAR SITUATIONS ON OTHER PROJECTS.
<br />1. SUBMIT A DETAILED CONSTRUCTION SCHEDULE TO THE OVVIMER INDICATI NG SEQUENCE AND PHASING OF WORK FROM START TO FINISH OF THE PROJECT.
<br />5. STEEL PIPE: AST1Vl A 53, STANDARD WEIGHT (SCHEDULE 40), UNLESS ANOTHER WEIGHT IS INDICATED OR REQUI RED BY STRUCTURAL LOADS.
<br />8. THE OMER RESERVES THE RIGHT TO LIMIT SELECTION TO PRODUCTS WITH WARRANTIES NOT IN CONFLICT WITH REQUIREMENTS OF THE CONTRACT
<br />2. SUBMITTALS SCHEDULE: TABULATE THE FOLLOWING: SCHEDULED DATE FOR FIRST SUBMITTAL; SPECIFICATION SECTION NUMBER AND TITLE; SUBMITTAL
<br />DOCUMENTS
<br />CATEGORY (ACTION OR INFORMATIONAL); NAME OF SUBCONTRACTOR; DESCRIPTION OF THE WORK COVERED; SCHEDULED DATE FOR ARCHITECTS /
<br />6. ALUMINUM: EXTRUSIONS: ASTM B 221 (ASTM B 221 M), ALLOY 6063-T6.
<br />PROJECT MANAGER FINAL RELEASE OR APPROVAL
<br />9. WHERE PRODUCTS ARE ACCOMPANIED BY THE TERM "AS SELECTED', ARCHITECT WILL MAKE SELECTION.
<br />7. SHEAR AND PUNCH METALS CLEANLY AND ACCURATELY. REMOVE BURRS.
<br />3. REPORTS: PROVIDE AS REQUIRED TO DOCUMENT EVENTS DAILY CONSTRUCTION REPORTS; MATERIAL LOCATION REPORTS; FIELD CONDITION REPORTS;
<br />10. WHERE PRODUCTS ARE ACCOMPANIED BY THE TERM "MATCH SAMPLE", SAMPLE IS ARCHITECTS.
<br />8. CONTINUOUSLY. CORNERS AND SEAMS OONEINUSLY. USE MATERIALS AND METHODS THAT MINIMIZE DISTORTION AND DEVELOP' STRENGTH AND CORROSION
<br />SPECIAL REPORTS, AND WEENY PROGRESS PHOTOS.
<br />RESISTANCE OF BASE METALS. OBTAIN FUSION WITHOUT UNDERCUT OR OVERLAP. REMOVE WELDING FLUX IMMEDIATELY. FINISH EXPOSED VVELDS
<br />11. DESCRIPTIVE, PERFORMANCE, AND REFERENCE STANDARD REQUIREMENTS IN THE SPECIFICATIONS ESTABLISH "SALIENT CCTERISTICS" OF
<br />SMOOTH AND BLENDED.
<br />4. GC TO PROVIDE A WEEKLY PROGRESS REPORT TO INCLUDE A TIMELINE SHC7�MNG PERCENT COM
<br />PRODUCTS
<br />9. MISCELLANEOUS FRAMING AND SUPPORTS: FABRICATE STEEL FRAMING AND SUPPORTS THAT ARE NOT APART OF STRUCTURAL -STEEL FRAMEWORK
<br />12. VERIFY PRIOR TO BIDDING THAT ALL SPECIFIED ITEMS WILL BE AVAILABLE IN TIME FOR INSTALLATION TO ASSURE COMPLETION OF THE PROJECT
<br />AS NECESSARY TO COMPLETE THE WORK. CUT, DRILL, AND TAP UNITS TO RECEIVE HARDWARE, HANGERS, AND SIMILAR ITEMS.
<br />WITHIN THE TIME REQUIRED BY THE CONTRACT DOCUMENTS.
<br />10. FINISH METAL FABRICATIONS AFTER ASSEMBLY. COMPLY WITH NAAMv1 "METAL FINISHES MANUAL FOR ARCHITECTURAL AND METAL PRODUCTS"
<br />13. COSTS FOR DELAYS BECAUSE OF NON -AVAILABILITY OF SPECIFIED ITEMS, WHEN SUCH DELAYS COULD HAVE BEEN AVOIDED BY CONTRACTOR, WILL BE
<br />FOR RECOMMENDATIONS FOR APPLYING AND DESIGNATING FINISHES. SHOP PRIME FERROUS -METAL ITEMS NOT INDICATED TO BE GALVANIZED.
<br />BORNE BYTHE CONTRACTOR.
<br />Project
<br />HUMANA- ZEPHYRHILLS,
<br />FLORIDA - GUIDANCE
<br />CENTER
<br />7920 GALL BLVD.
<br />ZEPHYRHILLS, FLORIDA 33541
<br />Prepared for
<br />HUMANA INC.
<br />Contract No: 12.01622.00
<br />HOK
<br />One Tampa City Center, Suite 1800
<br />Tampa, FL 33602 USA
<br />t +1 813 229 0300 f +1 813 223 7116
<br />FL Reg: AAC001139
<br />All reproduction & intellectual property rights reserved © 2012
<br />-In Association with
<br />SDM Consulting Engineers
<br />MEP Engineer
<br />135 AKrneria Ave_
<br />Coral Gables, FL 33134
<br />305.446.2788
<br />Key Plan
<br />Professional Seals
<br />Jonathan Rae License #
<br />No. Issue Description YYYY-MM-DD
<br />Drawn by Author Reviewed by Checker
<br />Project No 12.01622.00
<br />Sheet Title:
<br />OUTLINE SPEC.
<br />Original drawing is 36 x 24 Do not scale contents of this drawing
<br />Sheet Number
<br />
|