OUTLINE SPECIFICATION <br />0133 00 - SUBMITTAL PROCEDURES <br />1. PROVIDE THREE (3) SETS OF SHOP DRAWINGS TO PROJECT MANAGER FOR REVIEW AND FORWARD TO ARCHITECT FORAPPROVAL AFTER THE <br />0173 00 - EXECUTION <br />00 70 00 - CONDITIONS OF THE CONTRACT <br />CONTRACTOR HAS REVIEWED THEM FOR CONSTRUCTIBILITY, COORDINATION BETWEEN TRADES, AND CONFORMANCE VVITH THE CONTRACT <br />1. CONSTRUCTION LAYOUT <br />1. THE AIA GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION (ALA DOCUMENT A201-97) AND SUPPLEMENTAL CONDITIONS ARE PROVIDED UNDER <br />DOCUMENTS. ARCHITECT TO REVIEW AND RETURN WITHIN 5 BUSINESS DAYS UON. <br />A DO NOT SCALE DRAWINGS, DIMENSIONS GOVERN. LARGE SCALE DETAILS GOVERN OVER SMALLER SCALE DETAILS. <br />SEPARATE COVER, AND ARE INCORPORATED INTO THESE SPECIFICATIONS BY REFERENCE. WHERE ANY PART OF THE CONTRACT DOCUMENTS IS INCONSISTENT <br />B. INFORM PROJECT MANAGER WHEN CHALK LINE LAYOUT OF PARTITIONS IS COMPLETED SOTHAT IT CAN BE VERIFIED. MAKE REQUIRED CHANGES <br />WITH THESE CONDITIONS OF THE CONTRACT, THE CONDITIONS OF THE CONTRACT SHALL GOVERN. <br />2. SUBMIT SAMPLES OF FINISH MATERIALS TO PROJECT MANAGER FOR APPROVAL PRIOR TO INSTALLATION. THE CONTRACTOR ASSUMES <br />PRIOR TO START OF CONSTRUCTION. <br />RESPONSIBILITY FOR REPLACEMENT OF FINISH MATERIALS THAT HAVE NOT BEEN APPROVED. <br />C. SUPPLY ALL NECESSARY INFORMATION ON REQUIRED CUTOUTS FOR PLUMBING FIXTURES TO MILLWORK CONTRACTOR <br />2. DEFINITIONS: <br />D. DOOR OPENINGS IN GYPSUM BOARD PARTITIONS NOT DIMENSIONED ARE TO BE LOCATED IN CENTER OF ROOM OR 4' FROM ADJOINING PARTITION <br />A "DAY": A DAY IS ACALENDAR DAY BEGINNING AND ENDING AT 12:00 MIDNIGHT. <br />3. SUBMITTALS SHALL BE NEAT AND LEGIBLE, OF UNIFORM SCALE, RESPONSIVE TO REQUIREMENTS, WITH ALL SHEETS OF SIMILAR INFORMATION OF <br />AS Ste. <br />B. "ALIGN': MEANS TO INSTALL FINISHED FACES OF NEW MATERIAL FLUSH, PLUMB AND TRUE TO LINE WITH ADJACENT EXISTING CONSTRUCTION. <br />SAME SIZE. <br />C. "FURNISH": MEANS TO SUPPLY AND DELIVER TO PROJECT SITE, READY FOR UNLOADING, UNPACKING, ASSEMBLY, INSTALLATION, AND SIMILAR <br />2. COMPLY WITH MANUFACTURERS WRITTEN INSTRUCTIONS AND RECOMMENDATIONS FOR INSTALLING PRODUCTS IN APPLICATIONS INDICATED. <br />OPERATIONS. <br />4. TRANSMIT EACH SUBMITTAL SUFFICIENTLY IN ADVANCE OF PERFORMANCE OF RELATED CONSTRUCTION ACTIVITIES TO AVOID DELAY. <br />D. "INSTALL": MEANS TO UNLOAD, PROVIDE TEMPORARY STORAGE AT THE SITE, UNPACK, ASSEMBLE, ERECT, PLACE, ANCHOR, APPLY, WORK TO DIMENSION, <br />3. ENSURE THAT INSTALLATION CONFORMS TO BUILDING CODE REQUIREMENTS. THE MATERIALS SPECIFIED ARE INTENDED TO MEET CODE <br />FINISH, CURE, PROTECT, CLEAN, AND SIMILAR OPERATIONS TO PROVIDE THE WORK REQUI RED BY THE CONTRACT DOCUMENTS. <br />5. PACKAGE SUBMITTALS TO COVER COMPLETE ASSEMBLIES OR SYSTEMS. PARTIAL OR INCOMPLETE SUBMITTALS WILL BE RETURNED REJECTED <br />REQUIREMENTS. IMMEDIATELY NOTIFY ARCHITECT OF ALL DISCREPANG ES BETWEEN THE CONSTRUCTION DOCUMENTS AND CODE REQUIREMENTS. DO <br />E. "PROVIDE": MEANS TO FURNISH AND INSTALL, COMPLETE, AND READY FOR THE INTENDED USE. <br />WITHOUT REVIEW. <br />NOT PROCEED VVITH INSTALLATION UNTIL INSTRUCTIONS RESOLVING DISCREPANCIES HAVE BEEN RECEIVED. <br />F. "SIMILAR': MEANS SYSTEM OR CONSTRUCTION COMPARABLE TO CONDITION NOTED. IN CASE OF CONTROVERSY, REQUEST INSTRUCTION FROM <br />ARCHITECT PRIOR TO PROCEEDING. <br />6. THE ARCHITECT RESERVES THE RIGHT TO WITHHOLD ACTION ON A SUBMITTAL REQUIRING COORDINATION WITH OTHER SUBMITTALS UNTIL ALL <br />G. "TYPICAL": MEANS IDENTICAL SYSTEM CR OONSTRUCTION AT SIMILAR LOCATIONS NOTED. <br />RELATED SUBMITTALS ARE RECEIVED. <br />0173 30 - CORRECTION OF DEFECTIVE WORK <br />1. PATCH, REPAIR, REPLACE, AND/OR REFINISH EXISTING CONSTRUCTION AS NECESSARY TO REFURBISH DAMAGED AND NONCONFORMING AREA OFF. <br />3. ALL COMMUNICATIONS FROM OWNER RELATIVE TO C 4ANGES IN THE WORK WILL BE THROUGH PROJECT MANAGERTO CONTRACTOR IF CONTRACTOR <br />7. THE CONTRACTOR IS RESPONSIBLE FOR CONFIRMING AND CORRELATING DIMENSIONS AT JOB SITES FOR TOLERANCES, CLEARANCES, <br />CLAIMS THAT A REVISION TO CONTRACT DOCUMENTS INVOLVES EXTRA COST, CONTRACTOR SHALL SUBMIT WRITTEN NOTICE TO THE PROJECT MANAGER WITHIN <br />QUANTITI ES, FABRICATION PROCESSES AND TECHNIQUES OF CONSTRUCTION, COORDINATION OF THEIR WORK VNTH OTHER TRADES AND FULL <br />30 DAYS AFTER RECEIPT OF SUCH INSTRUCTIONS. NO G-1ANGE IN THE WORK SHALL BE PERFORMED WITHOUT A VALID CHANGE ORDER COVERING THE SCOPE OF <br />COMPLIANCE WITH <br />0174 00 - CLEANING AND WASTE MANAGEMENT <br />THE CHANGE AND SIGNED BY THE OVVNER <br />1. CLEAN PREMISES WITHIN CONSTRUCTION LIMITS AND ALONG ACCESS ROUTES DAILY, INCLUDING COMMON AREAS. COORDINATE PROGRESS <br />8. THE CONTRACT DOCUMENTS. <br />CLEANING FOR JOINT -USE AREAS WHERE MORE THAN ONE INSTALLER HAS WORKED. ENFORCE REQUIREMENTS STRICTLY. DISPOSE OF MATERIALS <br />4. BY ENTERING INTO THIS AGREEMENT WITH THE OWNER, THE CONTRACTOR REPRESENTS THAT HE HAS VISITED THE JOB SITE, FAMILIARIZED HIMSELF WITH <br />a. PROPOSED DEVIATIONS, FROM THE CONTRACT DOCUMENTS MUST BE CONSIDERED <br />LAWFULLY. <br />EXISTING CONDITIONS, AND NOTED DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THOSE OF THE CONTRACT DOCUMENTS. <br />b. SEPARATELY FROM SUBMITTALS, USING THE "CHANGES" PROCEDURES OF THE CONTRACT <br />c. CONDITIONS. <br />2. KEEP INSTALLED WORK CLEAN. <br />5. SUBMIT A COMPLETE WRITTEN DESCRIPTION OF THE SCOPE OF EACH CHANGE IN THE WORK INCLUDING ROOM NUMBERS AFFECTED. PREPARE QUOTATIONS <br />FOR PROPOSED CHANGES IN THE WORK IN A "BREAK DOAN' FORM, GIVING THE NUMBER OF UNITS, UNIT COST OF MATERIALS, HOURS OF LABOR HOURLY COST <br />0140 00 - QUALITY REQUIREMENTS <br />3. CONCEALED SPACES: REMOVE DEBRIS FROM CONCEALED SPACES BEFORE ENCLOSING THE SPACE. <br />ROF LABOR, TOOLS, SUPPLIES, EQUIPMENT, TRANSPORTATION, SUPERINTENDENTS, CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS OF EVERY NATURE, <br />1. TESTING AND INSPECTING SERVICES ARE REQUIRED TO VERIFY COMPLIANCE WITH REQUIREMENTS SPECIFIED OR INDICATED. PROVIDE SPECIAL <br />INSURANCE, TAXES, BONDS, ALL OTHER OVERHEAD COSTS AND PROFIT, AND SHALL REFLECT CREDITS AS WELL AS EXTRAS. <br />INSPECTIONS BY INDEPENDENT TESTING AGENCY WHEN REQUIRED BY CODE AUTHORITIES. THESE SERVICES DO NOT RELIEVE CONTRACTOR OF <br />RESPONSIBILITY FOR OOMPLIANCE WITH THE CONTRACT DOCUMENT REQUIREMENTS. <br />0175 00 - STARTING AND ADJUSTING <br />1. START EQUIPMENT AND OPERATING COMPONENTS TO CONFIRM PROPER OPERATION. REMOVE MALFUNCTIONING UNITS, REPLACE WITH NEW UNITS, & <br />6. CONTRACTOR SHALL MAINTAIN A CURRENT AND COMPLETE SET OF CONTRACT DOCUMENTS ON SITE DURING CONSTRUCTION FOR USE OF ALL TRADES. <br />RETEST. <br />ENSURE THAT ALL SUBCONTRACTORS RECEIVE COMPLETE SETS OF CONSTRUCTION DRAWINGS. CONTRACTOR SHALL_ ASSUME RESPONSIBILITY FOR <br />0142 00 - REFERENCES <br />COORDI NATION OF ALL WORK <br />1. ABBREVIATIONS AND ACRONYMS: WHERE ABBREVIATIONS AND ACRONYMS ARE USED IN CONTRACT DOCUMENTS, THEY SHALL MEAN THE <br />2. ADJUST OPERATING COMPONENTS FOR PROPER OPERATION VWATHCXJE BINDING, VIBRATING, OR PRODUCING EXCESSIVE NOISE. ADJUST EQUIPMENT <br />RECOGNIZED NAME OF THE ENTITIES INDICATED IN GALE RESEARCHS "ENCYCLOPEDIA OF ASSOCIATIONS" OR IN COLUMBIA BOOKS' "NATIONAL <br />FOR PROPER OPERATION. <br />7. THE OIVTNER, VVITHOUT INVALIDATING THE CONTRACT, MAY ORDER EXTRA WORK OR MAKE CHANGES BY ALTERING, ADDING TO, OR DEDUCTING FROM THE <br />TRADE & PROFESSIONAL ASSOCIATIONS OF THE U.S," AND THE ABBREVIATION LIST INCLUDED VVITH THE PROJECT DOCUMENTS. <br />WORK. CONTRACT SUM AND CLAIMS FOR EXTENSION OF TIME VVILL BE ADJUSTED IN ACCORDANCE WITH CONTRACT CONDITIONS RELATIVE TO CHANGES IN THE <br />3. PROTECT INSTALLED CONSTRUCTION. <br />WORK. CHANGES IN THE WORK SHALL BE PROVIDED IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. <br />0150 00 - TEMPORARY FACILITIES AND CONTROLS <br />8. SECTIONS OF DIVISION 1 -GENERAL REQUIREMENTS, GOVERN THE EXECUTION OF THE WORK OF ALL SECTIONS OF THE SPECIFICATIONS. <br />1. REMOVE ALL RUBBISH AND WASTE MATERIALS FROM THE PREMISES ON AT LEAST A WEEKLY BASIS, AND PROM DE LEGAL DISPOSAL. <br />0177 00 - CLOSEOUT PROCEDURES <br />1. CONTRACT CLOSE-OUT SHALL OCCUR ONLY AFTER PROJECT MANAGER HAS PREPARED THE CERTIFICATE OF SUBSTANTIAL COMPLETION AND PUNCH LIST, <br />9. GC WILL ASSIGN PM TO ATTEND WEEKLY PROJECT CALLS LASTING APPROXIMATELY ONE HOURAND OTHER CALLS AS NEEDED. <br />2. EXERCISE STRICT DUST CONTAINMENT CONTROL_ TO PREVENT DIRT OR DUST FROM LEAVING LIMITS OF CONSTRUCTION. <br />AND PUNCH LIST ITEMS HAVE BEEN CORRECTED. THE CONTRACTOR SHALL_ SUBMIT MAINTENANCE AND WARRANTY MANUALS, RELEASE OF LIENS, AND <br />RECORD DRAWINGS TO PROJECT MANAGER WITH HIS FINAL APPLICATION FOR PAYMENT. PROJECT MANAGER SHALL PREPARE ANY NECESSARY CHANGE <br />3. UNLESS OTHERWISE REQUIRED BY THE CONTRACT DOCUMENTS, WATER, GAS, LIGHTING, POWER AND TELEPHONE CONDUITS AND WIRES, SEWER <br />ORDERS REQUIRED TO FINALIZE THE COST OF THE PROJECT BASED ON THE CONTRACTORS FINAL SUBMITTALS. <br />LINES, STREETS, CURBS, DRIVEWAY APPROACHES, TREES, LANDSCAPING, BUILDINGS AND OTHER SURFACE AND SUBSURFACE STRUCTURES AND <br />LINES, OPENINGS, FINISHES, FURNISHINGS, EQUIPMENT, AND SIMILAR IMPROVEMENT ITEMS SHALL BE PROTECTED BY CONTRACTOR AND SHALL <br />2. "EXISTING TO REMAIN', "EXISTING TO BE RELOCATED", AND/OR NEW ITEMS INSTALLED BY THE CONTRACTOR, IN ADDITION TO BEING AMIPLY PROTECTED <br />NOT BE DISTURBED, DISCONNECTED OR DAMAGED BY HIM DURING PROGRESS OF WORK SHOULD CONTRACTOR IN PERFORMANCE OF WORK <br />THROUGHOUT THE PERIOD OF CONSTRUCTION, SHALL BE THOROUGHLY CLEANED TO THE SATISFACTION OF ARCHITECT PRIOR TO BEING TURNED OVER TO <br />DISTURB, DISCONNECT OR DAMAGE ANY OF THE ABOVE ITEMS, REMOVE, REPAIR, OR REPLACE SUCH DISCONNECTED OR DAMAGED ITEMS WITH <br />MATERIALS, CONSTRUCTION, AND IMPROVEMENTS MATCHING EXISTING UNDATVIAGED WORK AND RESTORE TO A CONDITION AS GOOD AS OR BETTER <br />THE OWNER <br />0110 00 - SUMMARY OF WORK <br />THAN EXISTED PRIOR TO SUCH DISTURBANCE, DISCONNECTION OR DAMAGE AT NO ADDITIONAL EXPENSE TO DINER. PROVIDED TEMPORARY <br />3. BEFORE ACCEPTANCE BY THE OWNER, THE COMPLETED CONSTRUCTION SHALL BE CLEANED, LABELS REMOVED, AND ALL OTHER TOUCH UP COMPLETED. <br />1. SCOPE OF WORK, LOCATION, AND OTHER DATA IS INDICATED BY DRAWING CONTENT. <br />PROTECTION OF THE WORK UNTIL REMOVAL OF TEMPORARY PROTECTION IS APPROVED BY ARCHITECT. <br />4. GCTO PROVIDEAS-BUILT CAD DRAWINGS UPON COMPLETION OF WORK. <br />2. PROVIDE WORK IN ACCORDANCE VVITH REQUIREMENTS OF THE "AMERICANS WITH DISABILITIES ACT' (ADA), INCLUDING LATEST AMENDMENTS. WHERE <br />4. CONTRACTOR IS RESPONSIBLE FOR THE WORK AND PROPERTY OF OTHERS THAT IS IN CONTRACTORS CARE, CUSTODY, AND CONTROL AT ALL <br />WORK SHOVWM DOES NOT COMPLY WITH THE ADA, HALT THE EFFECTED WORK AND REQUEST WRITTEN INSTRUCTIONS FROM THE ARCHITECT PRIOR TO <br />TIMES DURING PROGRESS OF THE WORK AND UNTIL FINAL ACCEPTANCE. SECURE AND LOCK THE PREMISES WHEN WORKMEN ARE LOT PRESENT. <br />PROCEEDING. <br />018113 - SUSTAINABLE DESIGN REQUIREMENTS <br />5. CONTRACTOR IS RESPONSIBLE FOR LIFE SAFETY EQUIPMENT REQUIRED BY AUTHORITIES HAVING JURISDICTION. <br />1. COMPLY WITH GENERAL REQUIREMENTS AND PROCEDURES FOR COMPLIANCE WITH U.S. GREEN BUILDING COUNCIUS (USGBC) LEED PREREQUISITES <br />3. IDENTIFY TOILET FACILITIES WITH SIGNAGE COMPLYING WITH THE INTERNATIONAL SYM30L OF ACCESSIBILITY (UBC CHAPTER 11). <br />AND CREDITS NEEDED TO OOTvPLYWITH PROJECT GOALS FOR "SUSTAINABILITY' INCLUDING LEED CERTIFICATION WHEN INDICATED ON DRAWINGS. <br />6. DURING THE ENTIRE PERIOD OF DEMOLITION AND CONSTRUCTION, EXISTING EXIT SIGNS, EXIT LIGHTING, FIRE PROTECTION DEVICES AND ALARMS <br />4. THE PATH OF TRAVEL FROM THE DESIGINATED HANDICAP PARKING SPACES AND THE PUBLIC SIDEWALK PROVIDES A FREE AND UNOBSTRUCTED <br />SHALL BE CONTINUOUSLY MAINTAINED. <br />2. LEED WORKBOOK INCLUDED UNDER SEPARATE COVER (AS APPLICABLE). <br />PASSAGE FOR ACCESS TO AND EGRESS FROM THE AREA OF WORK. <br />7. MAINTAIN REQUI RED EXITS AND EXIT EGRESS FREE FROM ALL OBSTRUCTIONS AND IMPEDIMENTS. <br />3. SUBMITTALS: <br />5. NIOUNT LIGHT AND CONTROL_ SWITCHES NOT MORE THAN 4-FEET-0-INCHES ABOVE FINISHED FLOOR OR WORKING LEVEL. <br />A LEED CREDIT EQ 4.1: MANUFACTURERS' PRODUCT DATA FOR CONSTRUCTION ADHESIVE, INCLUDING PRINTED STATEMENT OF VOC CONTENT. <br />8. MAINTAIN EXISTING UTILITIES AND SERVICES TO EXISTING FACILITIES INDICATED TO REMAIN, KEEP IN SERVICE, AND PROTECT AGAINST DAMAGE <br />B. LEED CREDIT EQ4A COMPOSITE WOOD MANUFACTURERS PRODUCT DATA FOR EACH COMPOSITE WOOD PRODUCT USED INDICATING THAT <br />6. PROVIDE DOORS NOT LESS THAN 3-FEET-0-INCH WIDE BY 6-FEET -&INCHES IN HIGH. <br />DURING DEMOLITION OPERATIONS. GIVE MINIMUM 72 HOURADVANCE NOTICE TO OIINERS REPRESENTATIVE IF SERVICE SHUT -DOWN -DO \N IS <br />BONDING AGENT USED CONTAINS NO UREA FORMALDEHYDE. <br />NECESSARY. <br />C. LEED C REDIT MR 7: CERTIFICATES OF CHAIN -OF -CUSTODY SIGNED BY MANUFACTURERS CERTIFYING THAT PRODUCTS SPECIFIED TO BE MADE <br />7. PROVIDE FLOORS AND LANDINGS LOCATED AT A DOORWAYS NOT MORE THAN 1/2-INCH LOWER THAN THE TOP OF THE THRESHOLD. PROVIDE <br />FROM CERTIFIED WOOD WERE MADE FROM WOOD OBTAINED FROM FORESTS CERTIFIED BY AN FSGACCREDITED CERTIFICATION BODY TO COMPLY WITH <br />THRESHOLDS WITH 1/4-INCH MAXIMUM VERTICAL EDGE AND WITH A CHANGE IN LEVEL NOT GREATER THAN 1:2. <br />9. EXISTING WATER, PERMANENT FIRE PROTECTION, ELECTRICAL POWER SERVICE AND LIGHTING, HEATING, AIR CONDITIONING, AND TOILETS VVITHIN <br />FSC 1.2, "PRINCIPLES AND CRITERIA." INCLUDE EVIDENCE THAT MILL IS CERTIFIED FOR CHAIN-C CUSTODY RYAN FSGAOCREDTTED CERTIFICATION BODY. <br />THE VARIOUS AREAS OF WORK WILL BE MADE AVAILABLE TO CONTRACTOR WITHOIJT ADDITIONAL METERING AND WITHOUT PAYMENT OF USE <br />D. LEED REQUIREMENTS- CREDIT EQ 4.2 SUBMITTAL: MANUFACTURERS' PRODUCT DATA FOR PAINTS AND COATINGS, INCLUDING PRINTED <br />8. PROVIDE A CLEAR AND LEVEL AREA ON EACH SIDE OF EXIT DOORS WITH A LENGTH OF AT LEAST 60-INC-IES IN THE DIRECTION OF THE DOOR SWING AND <br />CHARGES FOR SERVICES. PROVIDE AND PAY FOR ALL OTHER TEMPORARY LFFILITIES AND UTILITY SERVICES, TEMPORARY SUPPORT FACILITIES AND <br />STATEMENT OF VOC CONTENT AND CHEMICAL COMPONENTS. <br />AT LEAST 48-INCHES IN THE OPPOSITE DIRECTION, MEASURED AT RIGHT ANGLE TO DOOR IN ITS CLOSED POSITION. <br />SERVICES, TEMPORARY SECURITY AND PROTECTION FACILITIES NECESSARY FOR THE PROPER AND EXPEDITIOUS EXECUTION OF THE AVOW <br />E. TEED REQUIREMENTS - CREDIT EQ 4.1 SUBMITTALS: FURNISH MANUFACTURERS PRODUCE DATA FOR INTERIOR SEALANTS, INCLUDING PRINTED <br />STATEMENT OF VOC CONTENT. <br />9. PROVIDE LEVER TYPE HARDWARE COMPLYING WITH ADA REQUIREMENTS. <br />10. KEEP ALL EXISTING FACILITIES AND SERVICES CLEAN AND IN GOOD WORKING CONDITION. CLEAN OR REPLACE CHANGEABLE FILTER MEDIA AND <br />TURN OVER WITH NEW FILTER MEDIA AT COMPLETION OF WORK. CONTRACT DOC IMENTS. <br />10. PROVIDE BOTTOM 10-INC-IES OF DOORS, EXCEPTAUTOMATICAND SLIDING DOORS, WITH A SMOOTH, UNINTERRUPTED SURFACE. <br />11. COSTS FOR DELAYS BECAUSE OF NON -AVAILABILITY OF SPECIFIED ITEMS, WHEN SUCH DELAYS COULD HAVE BEEN AVOIDED BY CONTRACTOR, <br />03 5416 - HYDRAULIC CEMENT UNDERLAYMENT <br />11. PROVIDE EXIT DOORS TO SWING IN THE DIRECTION OF TRAVEL WHEN SERVING AN OCCUPANT LOAD OF MORE THAN 50 (UBC CI-IAPTER 10). <br />WILL BE BORNE BY THE CONTRACTOR. <br />1. USE SELF -LEVELING UNDERLAYMENT FOR INTERIOR FINISH FLOORING AT LOCATIONS INDICATED, AND TO ACHIEVE FLATNESS WHERE STRUCTURAL <br />SLAB DOES NOT COMPLY WITH SPECIFIED FLATNESS REQUIREMENTS. <br />12. ARRANGE EXIT DOORS TO OPERATE FROM THE INSIDE VVITHOUT USE OF A KEY OR ANY SPECIAL KNOWLEDGE OR EFFORT. USE ONLY SPECIAL LOCKING <br />0160 00 - PRODUCT REQUIREMENTS <br />DEVICES OF AN APPROVED TYPE. PROVIDE EXIT DOOR CLOSERS ADJUSTED SO THAT THE DOOR TAKES AT LEAST 3 SECONDS TO CLOSE FROM AN OPEN <br />1. MANUFACTURERS NAME, TRADEMARK, LOGOS, ETC., SHALL NOT BE VISIBLE TO THE PUBLIC. <br />2. UNDERLAYMENT: CEMENT -BASED, POLYMER -MODIFIED, SELF -LEVELING PRODUCT THAT CAN BE APPLIED IN UNIFORM THICKNESSES FROM 1/8 INCH <br />POSITION OF 70 DEGREES TO WITHIN 3-INCHES OF THE LATCH. <br />(3 MM) AND THAT CAN BE FEATHERED AT EDGES TO MATCH ADJACENT FLOOR ELEVATIONS. <br />2. NO SUBSTITUTIONS OF LISTED MATERIALS OR PRODUCTS SHALL BE PERMITTED VVITHOUT FIRST SUBMITTING SPECIFICATIONS, SAMPLES, AND COST <br />A CEMENT BINDER ASTM C 150, PORTLAND CEMENT, OR HYDRAULIC OR BLENDED HYDRAULIC CEMENT AS DEFINED BYASTM C 219. <br />I MPACT FOR ARCHITECTS APPROVAL. <br />B. COMPRESSIVE STRENGTH: NOT LESS THAN 4100 PSI (28 MPA) AT 28 DAYS WHEN TESTED ACCORDING TO ASTM C 1091C 109M. <br />A USE SUBSTITUTION REQUEST FOPJVIS AVAILABLE FROM ARCHITECT. <br />C. PRODUCTS: <br />B. AT THE TIME OF BID SUBMITTAL, THE CONTRACTOR SHALL ADVISE ARCHITECT, IN WRITING OF ANY SPECIFIED MATERIAL OR EQUIPMENT THAT IS <br />I. K 15 SELF -LEVELING UNDERLAYMENT CONCRETE; ARDDC, INC. <br />013100 -PROJECT MANAGEMENT AND COORDINATION <br />EITHER UNAVAILABLE OR WILL CAUSE A DELAY IN THE COMPLETION OF CONSTRUCTION. <br />IL SELF -LEVELING UNDERLAYMENT; W. R BONSAL COMPANY. <br />1. FORWARD COPIES OF EXECUTED PERMITS TO PROJECT MANAGER <br />C. PROPOSED REVISIONS SHALL BE SUBMITTED IN THE FORM OF A WRITTEN CHANGE ORDER TO BE APPROVED AND AUTHORIZED BY ARCHITECT AND <br />III. 300 PREMIUM UNDERLAYMENT; BURL GROUP, LLC (THE). <br />OVVNER PRIOR TO START OF PROPOSED WORK. <br />IV. LEVELEX UNDERLAYMENT; L&M CONSTRUCTION CHEMICALS, INC. <br />2. SYMBOLS AND ABBREVIATIONS USED ON THE DRAWINGS ARE CONSTRUCTION STANDARD. (REFER QUESTIONS REGARDING THEIR DEFINITION TO ARCHITECT <br />D. NO SUBSTITUTIONS ALLOWED FOR PAINT, RESILIENT BASE, PLASTIC LAMINATES, SOLID SURFACES, CARPET, VINYL COMPOSITION TILE, ACOUSTICAL <br />V. LEVEL -RIGHT; MAXXON CORPORATION. <br />FOR CLARIFICATION.. <br />CEILING TILE, AND UPHOLSTERY. <br />3. AGGREGATE: WELL -GRADED, WASHED GRAVEL, 1/8 TO 1/41 NCH (3 TO 6 MM), OR COARSE SAND AS (RECOMMENDED BY UNDERLAYMENT <br />MANUFACTURER <br />3. ALL DIMENSIONS ARE FROM FACE OF FINISH TO FACE OF FINISH, U.N.O. <br />3. EXISTING MANUFACTURED ITEMS NOT BEING REMOVED SHALL BE REFURBISHED AS REQUIRED, ANY LOOSE ITEMS TIGHTENED (INCLUDING, BUT <br />A PROVIDE AGGREGATE WHEN RECOMMEENDED IN WRITING BY UNDERLAYMENT MANUFACTURER FOR UNDERLAYMENT THICKNESS REQUIRED. <br />LIMITED TO, EXIT SIGNS, DOV\/N LIGHTS, SPEAKERS, MOLDINGS, ETC.), AND ANY MISSING PARTS REPLACED BY THE 0014TRACTOR TO ACHIEVE A COMPLETE <br />4. ARRANGE FOR EACH TRADE TO CHECK AND VERIFY ALL DIMENSIONS AND CONDITIONS AT JOB SITE RELATING TO THEIR WORK NOALLOWANCE SHALL BE <br />FUNCTIONING INSTALLATION WITH A NEW APPEARANCE. <br />4. WATER POTABLE AND AT A TEMPERATURE OF NOT MORE THAN 70 DEG F (21 DEG C). <br />MADE FOR ANY EXTRA EXPENSE OR EXTENSION OF TIME DUE TO CONTRACTORS FAILURE OR NEGLIGENCE I N COMPLETELY EXAMINING THE JOB SITE AND <br />4. COMPATIBILITY OF OPTIONS: IF CONTRACTOR IS GIVEN OPTION OF SELECTING BETWEEN TWO OR MORE PRODUCTS FOR USE ON PROJECT, PRODUCT <br />REINFORCEMENT: FOR UNDERLAYMENTAPPLIEDTO WOOD SUBSTRATES, PROVIDE GALVANIZED METAL LATH OR OTHER COTRRN OSIO-RESISTANT <br />CONDITIONS EFFECTING DECUTICN OF THE WOW <br />SELECTED <br />SELECTED SHALL BE COMPATIBLE WITH PRODUCTS PREVIOUSLY SELECTED, EVEN IF PREVIOUSLY SELECTED PRODUCTS WERE ALSO OPTIONS. <br />REINFORCEMENT RECOMMENDED IN WRITING BY UNDERLAYMENT MANUFACTURER <br />5. CONTACT OWNERS REPRESENTATIVE FOR RULES FOR USE OF EXISTING FACILITIES, DELIVERIES, REMOVALS, STORAGE, TEMPORARY FACILITIES AND <br />5. RELIABILITY OF CALCULATIONS BY DATE SENSITIVE EQUIPMENT, SYSTEMS AND COMPONENTS <br />6. PRIMER PRODUCT OF UNDERLAYMENT MANUFACTURER RECOMMENDED IN WRITING FOR SUBSTRATE, CONDITIONS, AND APPLICATION INDICATED. <br />CONTROLS, TEMPORARY UTILITIES AND SERVICES, CONSTRUCTION OPERATIONS, WORK PERFORMED OUTSIDE REGULAR BUSINESS HOURS, AND OTHER <br />A DEFINITIC�1: DATE SENSITIVE EQUIPMENT INCLUDES EQUIPMENT, SYSTEMS AND COMPONENTS THEREOF WWHIC-I RELY ON OR UTILIZE COMPUTERS, <br />REQUIREMENTS AFFECTING USE OF THE SITE AND PROSECUTION OF THE WORK IF OVERTIME WORK IS REQUIRED BY ANY TRADE, APPROVAL (INCLUDING <br />SUBSYSTEMS, HARDWARE, SOFTWARE, FIRMWARE, INCLUDING EMBEDDED GRIP SYSTEMS COMPONENTS, WHICH PROCESS, SEQUENCE, CALCULATE, <br />COST APPROVAL) MUST BE OBTAINED FROM DINER PRIOR TO EXXECUTION OF THE OVERTIME WORK. THE GENERAL INTENT IS THAT ALL WORK EXCEPT FOR <br />UTILIZE, IN ANY FASHION ARE AFFECTED IN FUNCTION! OR OPERATION BY DATE AND DATEE RELATED OF2TIME AND TIME RELATED DATA, INCLUDING <br />05 00 00 - MErALS - COMMON WORK RESULTS <br />NOISE -GENERATING CONSTRUCTION SHALL BE PERFORMED ON REGULAR TIME. <br />THE PASSAG <br />AG E OF TINE. <br />1. DESIGN, ENGINEER, FABRICATE, AND INSTALL METAL FABRICATIONS TO WITHSTAND THE FOLLOWING STRUCTURAL LOADS WITHOUT EXCEEDING THE <br />B. DATE SENSITIVE EQUIPMENT, SYSTEMS AND COMPONENTS THEREOF MUST INDIVIDUALLY AND IN COMBINATION PROPERLY FUNCTION AND <br />ALLOWABLE DESIGN V'VORKING STRESS OF THE MATERIALS INVOLVED, INCLUDING ANCHORS AND CONNECTIONS. APPLY EACH LOAD TO PRODUCE .THE <br />6. COORDINATE AND VERIFY SIZE, LOCATION AND CHARACTERISTICS OF OIVNER SUPPLIED MATERIAL AND EQUIPMENT WITH WORK OF THIS CONTRACT TO <br />CONTINUE TO CORRECTLY PROCESS, SEQUENCE AND UTILIZE DATE AND TIME RELATED DATA FOR ALL DATES AND TIMES, WHICH OCCUR DURING A <br />N44XMUM STRESS IN EACH RESPECTIVE COMPONENT OF EACH METAL FABRICATION. ARRANGE FOR REQUIRED DESIGN WORK TO BE PERFORMED BY A <br />PROVIDE A NEAT VV0RKQVIANLIKE INSTALLATION OF ALL WORK THAT FITS AVAILABLE SPACE, PROVIDES THE FUNCTION OR USE INTENDED, AND PROVIDES <br />REASONABLELIFE EXPECTANCY FOR SAID EQUIPMENT, SYSTEMS AND COMPONENTS THEREOF. <br />PROFESSIONAL ENGINEER WHO IS LEGALLY AUTHORIZED TO PRACTICE IN THE JURISDICTION V*V AND THE PROJECT IS LOCATED ND WHO IS EXPERIENCED <br />ADEQUATE SERVICE ACCESS. <br />C. CORRECTLY PROCESS, SEQUENCE, AND CALCULATE ALL DATE AND DATE RELATED DATA FOR ALL DATES PRIOR TO, THROUGH AND AFTER <br />IN PROVIDING ENGINEERING SERVICES OF THE KIND INDICATED AND THAT HAVE RESULTED IN SUCCESSFUL INSTALLATION OF METAL FABRICATIONS <br />JANUARY 1, 2000, INCLUDING LEAP YEAR CALCULATIONS. <br />SIMILAR IN MATERIAL, DESIGN, AND EXTENT TO THOSE REQUIRED FOR PROJECT. <br />7. VERIFY AND COORDINATE LOCATION OF ALL ACCESS PANELS (IN PARTITIONS, FLOORS, OR CEILINGS). CONFIRM LOCATIONS WITH ARCHITECT PRIOR TO <br />SHALL <br />D. SOFTWARE PRODUCTS THAT PROCESS DATE OR DATE RELATED DATA RECOGNIZE, STORE AND TRANSMIT DATE DATA IN A FORMAT WHICH <br />INSTALLATION. <br />EXPLICITLY AND UNAMBIGUOUSLY SPECIFIES THE CORRECT CENTURY. <br />E. CONTRACTOR SHALL INCLUDE THIS REQUIREMENT IN ALL SUB -CONTRACTS AND EQUIPMENT ORDERS FOR THIS PROJECT. <br />05 50 00 - METAL FABRICATIONS <br />8. PROVIDE BLOCKING, RAGING, FRAMING HANGERS, OR OTHER SUPPORT FOR ALL FIXTURES, EQUIPMENT, CABINETRY, FURNISHINGS, AND OTHER HEAVY <br />F. SUBMITTALS: PROVIDE CERTIFICATION FROM SUPPLIERS AND SUB -CONTRACTORS PROVIDING DATE SENSITIVE EQUIPMENT, SYSTEMS, AND <br />1. METALSURFACES, GENERAL: PROVIDE MATERIALS WITH SMOOTH, FLAT SURFACES WITHOUT BLEMISHES. <br />CONSTRUCTION <br />SOFTWARE THAT THE PROPOSED EQUIPMENT, COMPONENTS AND SYSTEMS COMPLY VVITH THESE REQUIREMENTS. <br />6. COMPLETE ASSEMBLIES: PROVIDE PRODUCTS COMPLETE VVITH ACCESSORIES, TRIM FINISH, FASTENERS, AND OTHER ITEMS NEEDED FORA COMPLETE <br />2. STEEL PLATES, SHAPES, AND BARS: ASTM A 36A 36M. <br />INSTALLATION FOR THE INDICATED USE AND EFFECT. <br />3. STAINLESS -STEEL BARS AND SHAPES: ASTM A 276, TYPE 304. <br />0132 00 - CONSTRUCTION PROGRESS DOCUMENTATION <br />7. PROVIDE STANDARD PRODUCTS IF AVAILABLE, AND UNLESS CUSTOM PRODUCTS OR NON-STANDARD OPTIONS ARE SPECIFIED, PROVIDE STANDARD <br />4. STEEL TUBING: COLD -FORMED STEEL TUBING COMPLYING WITH ASTM A 500. <br />PRODUCTS OF THE TYPES THAT HAVE BEEN PRODUCED AND USED SUCCESSFULLY IN SIMILAR SITUATIONS ON OTHER PROJECTS. <br />1. SUBMIT A DETAILED CONSTRUCTION SCHEDULE TO THE OVVIMER INDICATI NG SEQUENCE AND PHASING OF WORK FROM START TO FINISH OF THE PROJECT. <br />5. STEEL PIPE: AST1Vl A 53, STANDARD WEIGHT (SCHEDULE 40), UNLESS ANOTHER WEIGHT IS INDICATED OR REQUI RED BY STRUCTURAL LOADS. <br />8. THE OMER RESERVES THE RIGHT TO LIMIT SELECTION TO PRODUCTS WITH WARRANTIES NOT IN CONFLICT WITH REQUIREMENTS OF THE CONTRACT <br />2. SUBMITTALS SCHEDULE: TABULATE THE FOLLOWING: SCHEDULED DATE FOR FIRST SUBMITTAL; SPECIFICATION SECTION NUMBER AND TITLE; SUBMITTAL <br />DOCUMENTS <br />CATEGORY (ACTION OR INFORMATIONAL); NAME OF SUBCONTRACTOR; DESCRIPTION OF THE WORK COVERED; SCHEDULED DATE FOR ARCHITECTS / <br />6. ALUMINUM: EXTRUSIONS: ASTM B 221 (ASTM B 221 M), ALLOY 6063-T6. <br />PROJECT MANAGER FINAL RELEASE OR APPROVAL <br />9. WHERE PRODUCTS ARE ACCOMPANIED BY THE TERM "AS SELECTED', ARCHITECT WILL MAKE SELECTION. <br />7. SHEAR AND PUNCH METALS CLEANLY AND ACCURATELY. REMOVE BURRS. <br />3. REPORTS: PROVIDE AS REQUIRED TO DOCUMENT EVENTS DAILY CONSTRUCTION REPORTS; MATERIAL LOCATION REPORTS; FIELD CONDITION REPORTS; <br />10. WHERE PRODUCTS ARE ACCOMPANIED BY THE TERM "MATCH SAMPLE", SAMPLE IS ARCHITECTS. <br />8. CONTINUOUSLY. CORNERS AND SEAMS OONEINUSLY. USE MATERIALS AND METHODS THAT MINIMIZE DISTORTION AND DEVELOP' STRENGTH AND CORROSION <br />SPECIAL REPORTS, AND WEENY PROGRESS PHOTOS. <br />RESISTANCE OF BASE METALS. OBTAIN FUSION WITHOUT UNDERCUT OR OVERLAP. REMOVE WELDING FLUX IMMEDIATELY. FINISH EXPOSED VVELDS <br />11. DESCRIPTIVE, PERFORMANCE, AND REFERENCE STANDARD REQUIREMENTS IN THE SPECIFICATIONS ESTABLISH "SALIENT CCTERISTICS" OF <br />SMOOTH AND BLENDED. <br />4. GC TO PROVIDE A WEEKLY PROGRESS REPORT TO INCLUDE A TIMELINE SHC7�MNG PERCENT COM <br />PRODUCTS <br />9. MISCELLANEOUS FRAMING AND SUPPORTS: FABRICATE STEEL FRAMING AND SUPPORTS THAT ARE NOT APART OF STRUCTURAL -STEEL FRAMEWORK <br />12. VERIFY PRIOR TO BIDDING THAT ALL SPECIFIED ITEMS WILL BE AVAILABLE IN TIME FOR INSTALLATION TO ASSURE COMPLETION OF THE PROJECT <br />AS NECESSARY TO COMPLETE THE WORK. CUT, DRILL, AND TAP UNITS TO RECEIVE HARDWARE, HANGERS, AND SIMILAR ITEMS. <br />WITHIN THE TIME REQUIRED BY THE CONTRACT DOCUMENTS. <br />10. FINISH METAL FABRICATIONS AFTER ASSEMBLY. COMPLY WITH NAAMv1 "METAL FINISHES MANUAL FOR ARCHITECTURAL AND METAL PRODUCTS" <br />13. COSTS FOR DELAYS BECAUSE OF NON -AVAILABILITY OF SPECIFIED ITEMS, WHEN SUCH DELAYS COULD HAVE BEEN AVOIDED BY CONTRACTOR, WILL BE <br />FOR RECOMMENDATIONS FOR APPLYING AND DESIGNATING FINISHES. SHOP PRIME FERROUS -METAL ITEMS NOT INDICATED TO BE GALVANIZED. <br />BORNE BYTHE CONTRACTOR. <br />Project <br />HUMANA- ZEPHYRHILLS, <br />FLORIDA - GUIDANCE <br />CENTER <br />7920 GALL BLVD. <br />ZEPHYRHILLS, FLORIDA 33541 <br />Prepared for <br />HUMANA INC. <br />Contract No: 12.01622.00 <br />HOK <br />One Tampa City Center, Suite 1800 <br />Tampa, FL 33602 USA <br />t +1 813 229 0300 f +1 813 223 7116 <br />FL Reg: AAC001139 <br />All reproduction & intellectual property rights reserved © 2012 <br />-In Association with <br />SDM Consulting Engineers <br />MEP Engineer <br />135 AKrneria Ave_ <br />Coral Gables, FL 33134 <br />305.446.2788 <br />Key Plan <br />Professional Seals <br />Jonathan Rae License # <br />No. Issue Description YYYY-MM-DD <br />Drawn by Author Reviewed by Checker <br />Project No 12.01622.00 <br />Sheet Title: <br />OUTLINE SPEC. <br />Original drawing is 36 x 24 Do not scale contents of this drawing <br />Sheet Number <br />