Laserfiche WebLink
� I I <br />t* -;d <br />L — — — J <br />DEMO PLAN - LEVEL 1 <br />1 /8" = V-0" <br />GENERAL DEMOLITION NOTES <br />1. OBTAIN DEMOLITION PERMITS AND INCLUDE ALL COSTS OF SAME IN CONTRACT PRICE, <br />IF REQUIRED. <br />2. PROVIDE ALL LABOR AND MATERIALS/EQUIPMENT AS REQUIREDTO COMPLETE <br />DEMOLITION AND REMOVAL OF ALL ITEMS AS INDICATED. <br />3. PROVIDE STRICT CONTROL OF JOB CLEANING AND PREVENT DUST AND DEBRIS FROM <br />REMAINING FROM DEMOLITION/ CONSTRUCTION AREA. KEEP AREA CLEAN. <br />4. IF ANY QUESTIONS ARISE AS TO THE REMOVAL OF ANY MATERIAL, CLARIFY THE <br />POINT IN QUESTION WITH THE ARCHITECT BEFORE PROCEEDING. <br />5. DEBRIS REMOVAL SHALL BE PERFORMED USING THE BUILDING FREIGHT ELEVATOR. <br />CONTACTTHE BUILDING MGMT OFFICE TO OBTAIN SCHEDULE FORTHE USE OF THE <br />FREIGHT ELEVATORS PRIOR TO SUBMITTING BID. AT COMPLETION CF DEMOLITION <br />WORK, THE CONSTRUCTIONAREA(S) SHALL BE LEFT IN "BROOM CLEAN" CONDITION. ALL <br />DEBRIS AND MISCELLANEOUS MATERIAL SHALL BE REMOVED. ALL DEBRIS REMOVAL <br />SHALL BE PERFORMED IN ACCORDANCE WITH BUILDING MANAGEMENT REQUIREMENTS <br />AND PROCEDURES. <br />6. ALL DOORS, FRAMES, HARDWARE, MECHANICAL ITEMS, PLUMBING FIXTURES, LIGHT <br />FIXTURES (INCLUDING DOVVNLIGHTS & FLUORESCENTS), & SPECIAL EQUIPMENT SHO/\N <br />TO BE REMOVED, SHALL BE CLEAN AND FREE OF DEFECTS, PROTECTED, SAVED AND RE- <br />USED AS DIRECTED HEREIN, RETURNED TO BUILDING STOCK OR DISPOSED OF AS <br />DIRECTED BY BLDG MGMT. <br />7. THE ELECTRICAL CONTRACTOR SHALL FURNISH A SYSTEM OF TEMPORARY LIGHT & <br />POWER IN THE SPACE DURING CONSTRUCTION. <br />& CAREFULLY REMOVE ALL EXISTING LIGHT FIXTURES AND LENSES WHERE <br />DEMOLITION IS NOTED AND RETURN TO BLDG OWNER <br />9. IN PARTITIONS TO BE REMOVED, REMOVE AND CAP ALL OUTLETS, SWITCHES, WIRES <br />THERMOSTATS, ETC. TO THEIR SOURCE AS REQUIRED. <br />10. CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING AND/OR REPAIRING ANY <br />DAMAGE CAUSED BY HIM OR HIS SUBCONTRACTORS TO EXISTING CONSTRUCTION IN <br />ELEVATOR LOBBY, PUBLIC CORRIDORS, RESTROOMS OR TENANT SPACES. REFINISH TO <br />MATCH EXISTING ADJACENT FINISH, OR AS NOTED HEREIN. <br />11. NO EXISTING SMOKE DETECTOR, PUBLIC ADDRESS SPEAKER, FIRE ALARM BOX OR <br />SIMILAR DEVICE, INCLUDING THE ASSOCIATED WIRING SHALL BE DAMAGED DURING <br />DEMOLITION AND SUBSEQUENT CONSTRUCTION. RELOCATION OF SMOKE DETECTORS, <br />PUBLIC ADDRESS SPEAKERS AND FIRE ALARM EQUIPMENT, IF NECESSITATED BY NEW <br />CONSTRUCTION, SHALL BE ACCOMPLISHED AS A FIRST PRIORITY, AND PER THE PLANS. <br />NO ACTIVE SMOKE DETECTOR SHALL BE COVERED OR OTHER VASE REMOVED OR USED <br />FOR OTHER THAN ITS INTENDED PURPOSE. <br />12. REMOVE TO SOURCE ALL PIPES, VENTS, APPLIANCES OR DRAINS NOT BEING RE- <br />USED. <br />13. RE -USE OR RELOCATE ALL ABOVE CEILING DUCTWORK, DIFFUSERS, GRILLES, <br />SPRINKLER PIPES OR OTHER EQUIPMENT, AS REQUIRED FOR PROPER DISTRIBUTION WITH <br />NEW LAYOUT. <br />14. REMOVAL OF ANY EQUIPMENT, CABLING SWITCHES, AND CONDUIT PERTAINING TO <br />DATA/ COMMUNICATIONS AND TELEPHONE SHALL BE VERIFIED WITH TELEPHONE <br />COMPANIES SERVICE OWNER OR TENANT DATA/COMMUNICATIONS REPRESENTATIVE AS <br />REQUIRED TO PREVENT NEW CONSTRUCTION DELAYS. <br />15. REMOVE ALL EXISTING IRREGULAR MATERIALS WHICH CAUSE RISES OR <br />DEPRESSIONS IN FLOORING SURFACE, SUCH AS FASTENERS, OUTLET CORES, COVER <br />PLATES, RESILIENT FLOOR COVERINGS, CARPET, CARPET PAD, FLASH PATCH, CONCRETE <br />FILL, PLYV\CDOD, ETC. <br />16. DEMOLITION IS NOT NECESSARILY LIMITED TO WHAT IS SHOd\M ON DRAWINGS. THE <br />INTENT IS TO INDICATE THE GENERAL SCOPE OF DEMOLITION REQUIRED TO COMPLETE <br />THE WORK IN ACCORDANCE WITH THE CONTRACT DRAWINGS. <br />17. STAIRWAYS AND EXIT PATHS MUST REMAIN ACCESSIBLE AT ALL TIMES DURING <br />DEMOLITION. <br />18. REMOVE EXISTING SIGNAGE/GRAPHICS AND STORE FOR RE -USE, WHERE <br />APPLICABLE. <br />19. ALL CEILING AND LIGHTING TO BE REMOVED IN AREAS SHOAN IN CONTRACT. <br />20. ALL FLOOR AND WALL BASE TO BE REMOVED IN AREAS SHOJVN IN CONTRACT. <br />KEYED NOTES <br />2 <br />PATCH AND REPAIR AS REQUIRED IN PREPARATION FOR NEW <br />CONSTRUCTION. <br />44 <br />LANDLORD TO REMOVE AND REPLACE EXISTING VAPOR BARRIER <br />PER INDUSTRY STANDARDS, FILL IN SLAB OUT AND COMPLETE <br />SLAB ON GRADE TO COVER ALL REQUIRED INTERIOR AREA <br />DEMOLITION LEGEND <br />EXISTING CONSTRUCTION PARTITION, <br />DOOR, GLAZING AND FRAMES TO REMAIN <br />II <br />r EXISTING PARTITION, DOOR, GLAZING AND <br />J L — FRAMES TO BE REMOVED <br />Ie1 +Me\01.6lrlkq[•?4F kqIIG7_T•� r <br />Project <br />HUMANA- ZEPHYRHILLS, <br />FLORIDA - GUIDANCE <br />CENTER <br />7920 GALL BLVD. <br />ZEPHYRHILLS, FLORIDA 33541 <br />Prepared for <br />HUMANA INC. <br />Contract No: 12.01622.00 <br />One Tampa City Center, Suite 1800 <br />Tampa, FL 33602 USA <br />t +1 813 229 0300 f +1 813 223 7116 <br />FL Reg: AAC001139 <br />All reproduction & intellectual property rights reserved © 2012 <br />-In Association with <br />Key Plan <br />C' <br />Professional Seals <br />Jonathan Rae License # ARN14342 <br />No. Issue Description YYYY-MM-DD <br />01 BID SET 06.29.2012 <br />02 ISSUE FOR PERMIT 07.27.2012 <br />No. Revision Description YYYY-MM-DD <br />- <br />Drawn by Author Reviewed by Checker <br />Project No 12.01622.00 <br />Sheet Title: <br />DEMO PLAN <br />Original drawing is 36 x 24 Do not scale contents of this drawing <br />Sheet Number <br />