REFERENCE SYMBOLS (NOT ALL USED) I ABBREVIATIONS I GENERAL NOTES
<br />m
<br />i
<br />GENERAL
<br />DUCTWORK
<br />NORTH ARROW 19 R - H r 1 R-- 1 i, DIRECTION OF RISE FOR DUCT
<br />};
<br />DETAIL IDENTIFICATION NUMBER I--��,� ♦ I --0 I ♦ DIRECTION OF DROP FOR DUCT
<br />ID 18x12
<br />ID -"I 20x12 DUCT (FIRST FIGURE DENOTES VIEW SHOWN)
<br />DRAWING ON WHICH DETAIL IS DRAWN
<br />SECTION OR ELEVATION IDENTIFICATION RECTANGULAR OR SQUARE BRANCH CONNECTION
<br />LETTER
<br />M-7 DRAWING ON WHICH SECTION OR Z---® SUPPLY DUCT TURNING UP OR TOWARD
<br />ELEVATION IS DRAWN
<br />SECTION OR DETAIL IDENTIFICATION SUPPLY DUCT TURNING DOWN OR AWAY
<br />LABEL
<br />�m EXHAUST OR RETURN DUCT TURNING UP OR TOWARD
<br />LIGHT LINE WEIGHT INDICATES EXISTING WORK ♦I _ i I EXHAUST OR RETURN DUCT TURNING DOWN OR AWAY
<br />BOLD LINE WEIGHT INDICATES NEW WORK �Q ROUND DUCT TURNING UP OR TOWARD
<br />r------------ DASHED LINES INDICATES WORK TO BE REMOVED
<br />ROUND DUCT TURNING DOWN OR AWAY
<br />EQUIPMENT ABBREVIATION (SEE ABBREVIATION L TIS) _
<br />2---()=0
<br />FLAT OVAL DUCT TURNING UP OR TOWARD
<br />EQUIPMENT SCHEDULE NUMBER FLAT OVAL DUCT TURNING DOWN OR AWAY
<br />MATCHLINE
<br />r TURNING VANES (TV)
<br />IU rr
<br />REVISION
<br />ODRAWING REFERENCE NOTE
<br />® ACCESS DOORS (AD)
<br />POINT OF NEW CONNECTION (POC)
<br />AIR TERMINAL UNIT WITH IDENTITY MARK
<br />POINT OF DISCONNECTION (POD) (SEE ABBREVIATION LIST)
<br />300 SQUARE FACE SUPPLY DIFFUSER OR GRILLE
<br />300 CFM SEE DIFFUSER SCHEDULE
<br />RETURN, TRANSFER OR EXHAUST CEILING GRILLE
<br />DAMPERS
<br />RETURN, TRANSFER OR EXHAUST CEILING GRILLE
<br />-BDD BACK DRAFT DAMPER
<br />-0 ELECTRICAL DAMPER SUPPLY GRILLE
<br />-� AUTOMATIC DAMPER (PNEUMATIC)
<br />�--�-06 RETURN, TRANSFER OR EXHAUST GRILLE
<br />MOTOR OPERATED DAMPER
<br />VOLUME DAMPER (E) EXISTING EQUIPMENT
<br />FD FIRE DAMPER AND ACCESS DOOR (VERTICAL) (D) DEMOLITION EQUIPMENT
<br />-♦ FD FIRE DAMPER AND ACCESS DOOR (HORIZONTAL) (N) NEW WORK
<br />-Q� FD/SD COMBINATION FIRE DAMPER/SMOKE DAMPER (R) RELOCATED, EXISTING EQUIPMENT
<br />0 ROUND DUCT INDICATOR
<br />® CARBON DIOXIDE SENSOR
<br />DIFFUSERS
<br />O THERMOSTAT (OR) TEMPERATURE SENSOR
<br />® SUPPLY
<br />® OCCUPANCY SENSOR
<br />® SUPPLY WITH NECK
<br />® SUPPLY WITH BLANKING PLATE VAV AND REHEAT COILS
<br />® SUPPLY ROUND �
<br />REHEAT COIL a4� VAV BOX W/ REHEAT COIL
<br />® SUPPLY ROUND WITH BLANKING PLATE
<br />z RETURN\EXHAUST VAV BOX PARALLEL FAN POWERED
<br />VAV BOX W/ REHEAT
<br />® RETURN\EXHAUST WITH NECK
<br />RETURN\EXHAUST WITH BLANKING PLATE
<br />FIRE PROTECTION SYMBOLS
<br />0 RETURWEXHAUST ROUND
<br />EXISTING SEMI -RECESSED PENDANT SPRINKLER
<br />0 RETURN\EXHAUST ROUND WITH BLANKING PLATE
<br />• NEW SENI-CONCEALED PENDANT SPRINKLER
<br />® CD -A RECTANGULAR CEILING DIFFUSER (CD -A)
<br />(400) WITH 400 CFM SUPPLY AIR
<br />CLD A TYPE A CEILING DIFFUSER
<br />® (400) 400 CFM. SUPPLY AIR
<br />CLD-B TYPE B ROUND CEILING DIFFUSER
<br />® (400) 400 CFM. SUPPLY AIR
<br />0 13X)300 CFM
<br />CR (CG) CEILING RE REGISTER (CEILING GRILLE)
<br />A
<br />AIR; COMPRESSED AIR, AMPS
<br />ACC
<br />AIR COOLED CONDENSER
<br />AD
<br />ACCESS DOOR; AIR DRYER
<br />ADJ
<br />ADJACENT; ADJUST; ADJUSTABLE; ADJUSTMENT
<br />ADMIN
<br />ADMINISTRATION
<br />AFF
<br />ABOVE FINISHED FLOOR
<br />AHJ
<br />AUTHORITY HAVING JURISDICTION
<br />AHU
<br />AIR HANDLING UNIT
<br />AI
<br />ANALOG INPUT
<br />AMP
<br />AMPERE
<br />ANCH
<br />ANCHOR
<br />AO
<br />ANALOG OUTPUT
<br />AP
<br />ACCESS PANEL; ANGLE POINT
<br />APPROX
<br />APPROXIMATELY
<br />ARCH
<br />ARCHITECT
<br />ATM
<br />ATMOSPHERE; ATMOSPHERIC
<br />AUTO
<br />AUTOMATIC
<br />AVG
<br />AVERAGE
<br />AWS
<br />AMERICAN WELDING SOCIETY
<br />BAUD
<br />BOTTOM ANGLE UPWARDS DISCHARGE
<br />BDD
<br />BACKDRAFT DAMPER
<br />BHP
<br />BRAKE HORSEPOWER; BOILER HORSEPOWER
<br />BI
<br />BACKWARDS INCLINED
<br />BLDG
<br />BUILDING
<br />BMS
<br />BUILDING MANAGEMENT SYSTEM
<br />BOD
<br />BOTTOM OF DUCT
<br />BOP
<br />BOTTOM OF PIPE
<br />BOT
<br />BOTTOM
<br />BTU
<br />BRITISH THERMAL UNIT
<br />BTUH
<br />BRITISH THERMAL UNITS PER HOUR
<br />C TO C
<br />CENTER TO CENTER
<br />CC
<br />COOLING COIL
<br />CD
<br />CEILING DIFFUSER
<br />CENT
<br />CENTRIFUGAL
<br />CEWA
<br />CRITICAL ENVIRONMENT WORK AUTHORIZATION
<br />CFF
<br />CAP FOR FUTURE
<br />CFM
<br />CUBIC FEET PER MINUTE
<br />CG
<br />CEILING GRILLE
<br />CH
<br />CABINET HEATER; CHANNEL; CHILLED
<br />CHLR
<br />CHILLER
<br />CHW
<br />CHILLED WATER
<br />CHWS
<br />CHILLED WATER SUPPLY
<br />CHWR
<br />CHILLED WATER RETURN
<br />CI
<br />CAST IRON
<br />CIRC
<br />CIRCULATING; CIRCULATOR
<br />CKT
<br />CIRCUIT
<br />CLG
<br />CEILING
<br />CO
<br />CLEANOUT;COMPANY
<br />COL
<br />COLUMN
<br />COMPR
<br />COMPRESSOR
<br />CONC
<br />CONCRETE
<br />COND
<br />CONDENSER
<br />CONN
<br />CONNECT; CONNECTED; CONNECTION
<br />CONST
<br />CONSTRUCTION
<br />CONT
<br />CONTINUOUS; CONTINUATION
<br />CONTR
<br />CONTRACTOR
<br />COORD
<br />COORDINATE
<br />CORR
<br />CORRIDOR
<br />Cu
<br />CUBIC; COPPER; CONDENSING UNIT
<br />CV
<br />CONVECTOR; CONSTANT VOLUME
<br />CW
<br />DOMESTIC COLD WATER
<br />D
<br />CONDENSATE DRAIN
<br />DB
<br />DRY BULB TEMPERATURE
<br />DDC
<br />DIRECT DIGITAL CONTROL
<br />DEG
<br />DEGREE
<br />DET
<br />DETAIL
<br />DI
<br />DIGITAL INPUT
<br />DIA
<br />DIAMETER
<br />DIFF
<br />DIFFERENTIAL; DIFFERENCE; DELTA
<br />DIM
<br />DIMENSION
<br />DISCH
<br />DISCHARGE
<br />DIV
<br />DIVISION
<br />DMPR
<br />DAMPER
<br />DN
<br />DOWN
<br />DO
<br />DAMPER OPERATOR; DIGITAL OUTPUT
<br />DOM
<br />DOMESTIC
<br />DP
<br />DRIP PAN DRAIN; DEPTH; DEEP
<br />DPV
<br />DIFFERENTIAL PRESSURE VALVE
<br />DR
<br />DRAIN; INDIRECT DRAIN; INDIRECT WASTE
<br />DSD
<br />DUCT SMOKE DETECTOR
<br />DWG
<br />DRAWING
<br />E EAST
<br />EA EACH; EXHAUST AIR
<br />EAC ENVIRONMENTAL AIR CONDITIONER
<br />EAT ENTERING AIR TEMPERATURE
<br />EDB ENTERING DRY BULB (TEMP.)
<br />EF EXHAUST FAN
<br />EFF EFFICIENCY
<br />EG EXHAUST GRILLE
<br />EL ELEVATION
<br />ELEC ELECTRICAL; ELECTRIC
<br />ELIM ELIMINATOR
<br />EMER EMERGENCY
<br />ENT ENTERING
<br />EP ELECTRIC PNEUMATIC
<br />EQUIP EQUIPMENT
<br />ET EXPANSION TANK
<br />EWB ENTERING WET BULB (TEMP.)
<br />EWT ENTERING WATER TEMPERATURE
<br />EXH EXHAUST
<br />EXIST EXISTING
<br />EXP EXPANSION; EXPOSED; EXPLOSION PROOF
<br />EXT EXTERNAL
<br />F FAHRENHEIT; FEED; FILTER
<br />F TO F FACE TO FACE
<br />FA FACE AREA; FIRE ALARM
<br />FBC FLORIDA BUILDING CODE
<br />FMC FLORIDA MECHANICAL CODE
<br />FC FORWARD CURVED
<br />FCO FLOOR CLEAN OUT
<br />FD FIRE DAMPER
<br />FF FINAL FILTER
<br />FLA FULL LOAD AMPS
<br />FLEX FLEXIBLE
<br />FLR FLOOR
<br />FOB FLAT ON BOTTOM
<br />FOIC FURNISHED BY OWNER INSTALLED BY CONTRACTOR
<br />FPM FEET PER MINUTE
<br />FPS FEET PER SECOND
<br />FT FEET; FOOT; FAN TERMINAL
<br />FTG FOOTING
<br />FTR FINNED TUBE RADIATION
<br />FTU FAN TERMINAL UNIT
<br />FUT FUTURE
<br />FV FACE VELOCITY
<br />GA
<br />GAGE
<br />GAL
<br />GALLON
<br />GALV
<br />GALVANIZED
<br />GENL
<br />GENERAL
<br />GPM
<br />GALLONS PER MINUTE
<br />GR
<br />GRILLE; GRAINS
<br />H HEIGHT; HIGH; HUMIDITY; HUMIDISTAT; HUMIDIFIER
<br />HB HOSE BIBB
<br />HC HEATING COIL
<br />HORIZ HORIZONTAL
<br />HP HORSEPOWER
<br />HT HEIGHT
<br />HVAC HEATING, VENTILATING AND AIR CONDITIONING
<br />HX HEAT EXCHANGER
<br />HYD HYDRAULIC
<br />HZ HERTZ
<br />ID INSIDE DIAMETER
<br />IN INCH
<br />KW KILOWATT
<br />KWH KILOWATT HOUR
<br />LAN LOCAL AREA NETWORK
<br />LAT LEAVING AIR TEMPERATURE
<br />LAV LAVATORY
<br />LBS POUNDS
<br />LD LINEAR DIFFUSER
<br />LDB LEAVING DRY BULB (TEMP.)
<br />LF LINEAL FOOT OR FEET
<br />LWB LEAVING WET BULB (TEMP.)
<br />LWT LEAVING WATER TEMPERATURE
<br />MAX MAXIMUM
<br />MBH THOUSAND BRITISH THERMAL UNITS PER HOUR
<br />MCA MINIMUM CIRCUIT AMPS
<br />MECH MECHANICAL
<br />MER MECHANICAL EQUIPMENT ROOM
<br />MIN MINIMUM; MINUTE
<br />MISC MISCELLANEOUS
<br />MOCP MAXIMUM OVER CURRENT PROTECTION
<br />MOD MOTOR OPERATED DAMPER
<br />MTD MOUNTED
<br />MTG MOUNTING
<br />N
<br />NORTH
<br />N/A
<br />NOT APPLICABLE
<br />NC
<br />NORMALLY CLOSED; NOISE CRITERIA
<br />NIC
<br />NOT IN CONTRACT
<br />NO
<br />NORMALLY OPEN; NUMBER
<br />NOM
<br />NOMINAL
<br />NTS
<br />NOT TO SCALE
<br />OA OUTSIDE AIR
<br />OC ON CENTER
<br />OD OUTSIDE DIAMETER
<br />ODP OPEN DRIPPROOF
<br />%
<br />PERCENT
<br />P
<br />PUMP, PRESSURE
<br />PD
<br />PRESSURE DROP; PUMP DISCHARGE
<br />PLBG
<br />PLUMBING
<br />PNEU
<br />PNEUMATIC
<br />POC
<br />POINT OF CONNECTION
<br />PRELIM
<br />PRELIMINARY
<br />PRESS
<br />PRESSURE
<br />PSI
<br />POUNDS PER SQUARE INCH
<br />PSIG
<br />POUNDS PER SQUARE INCH GAGE
<br />QTY
<br />QUANTITY
<br />R
<br />RISER; RADIUS
<br />RA
<br />RETURN AIR
<br />RAID
<br />RADIATOR; RADIUS
<br />RECIP
<br />RECIPROCATING
<br />REFG
<br />REFRIGERATION
<br />REL
<br />RELIEF
<br />REQD
<br />REQUIRED
<br />RG
<br />RETURN GRILLE
<br />RH
<br />RELATIVE HUMIDITY
<br />RHC
<br />REHEAT COIL
<br />RM
<br />ROOM
<br />RND
<br />ROUND
<br />RPM
<br />REVOLUTIONS PER MINUTE
<br />S
<br />SOUTH
<br />SA
<br />SUPPLY AIR; SOUND ATTENUATOR
<br />SE
<br />SOUTHEAST
<br />SEC
<br />SECOND
<br />SECT
<br />SECTION
<br />SF
<br />SUPPLY FAN
<br />SFD
<br />COMBINATION SMOKE -FIRE DAMPER
<br />SG
<br />SUPPLY GRILLE; SPECIFIC GRAVITY
<br />SP
<br />STATIC PRESSURE
<br />SPEC
<br />SPECIFICATION
<br />SQ
<br />SQUARE
<br />SS
<br />STAINLESS STEEL
<br />STD
<br />STANDARD
<br />SUCT
<br />SUCTION
<br />SUP
<br />SUPPLY
<br />T
<br />TIME, TEMPERATURE
<br />TBD
<br />TO BE DETERMINED
<br />TE
<br />TOP ELEVATION
<br />TEMP
<br />TEMPERATURE; TEMPORARY
<br />TERM
<br />TERMINAL
<br />TH
<br />TOTAL HEAD
<br />TSTAT
<br />THERMOSTAT
<br />THRU
<br />THROUGH
<br />TO
<br />TIMED OPEN
<br />TOD
<br />TOP OF DUCT
<br />TONS
<br />TONS OF REFRIGERATION
<br />TOP
<br />TOP OF PIPE
<br />TV
<br />TURNING VANES
<br />TXV
<br />THERMOSTATIC EXPANSION VALVE
<br />TYP
<br />TYPICAL
<br />UBC
<br />UNIFORM BUILDING CODE
<br />UC
<br />UNDER COUNTER; UNDERCUT
<br />UFC
<br />UNIFORM FIRE CODE
<br />UG
<br />UNDERGROUND
<br />UH
<br />UNIT HEATER
<br />UMC
<br />UNIFORM MECHANICAL CODE
<br />LION
<br />UNLESS OTHERWISE NOTED
<br />UPC
<br />UNIFORM PLUMBING CODE
<br />UR
<br />URINAL
<br />V
<br />VENT; VOLT
<br />VA
<br />VALVE; VOLT AMPERE
<br />VAV
<br />VARIABLE AIR VOLUME
<br />VD
<br />VOLUME DAMPER
<br />VEL
<br />VELOCITY; VERIFY EXACT LOCATION
<br />VENT
<br />VENTILATE; VENTILATION; VENTILATOR
<br />VERT
<br />VERTICAL
<br />VP
<br />VAPOR PROOF; VELOCITY PRESSURE
<br />W/O
<br />WITHOUT
<br />WB
<br />WET BULB TEMPERATURE
<br />WG
<br />WALL GRILLE; WATER GAGE
<br />WMS
<br />WIRE MESH SCREEN
<br />MECHANICAL SHEET INDEX
<br />SHEET DESCRIPTION
<br />MFP-0.1 MECHANICAL AND FIRE PROTECTION COVER SHEET
<br />MFP-1.0 MECHANICAL AND FIRE PROTECTION FLOOR PLANS
<br />1. PROVIDE ALL APPROPRIATE LABOR, TOOLS, MATERIALS, FABRICATION, EQUIPMENT, SERVICES, TRAINING, SUPERVISION, AND INCIDENTALS AS REQUIRED TO REMOVE AND
<br />REPLACE EXISTING MECHANICAL (HVAC) EQUIPMENT AND SYSTEMS COMPLETE; AS INDICATED AND SPECIFIED ON THE PROJECT DRAWINGS. ALL WORK SHALL CONFORM TO:
<br />A. FLORIDA BUILDING CODE 6th EDITION - BUILDING
<br />B. FLORIDA BUILDING CODE 6th EDITION - MECHANICAL
<br />C. FLORIDA FIRE PREVENTION CODE - 6TH EDITION
<br />D. FLORIDA BUILDING CODE 6th EDITION - ENERGY CONSERVATION
<br />E. NATIONAL ELECTRICAL CODE
<br />F. NATIONAL FIRE PROTECTION ASSOCIATION STANDARDS AS FOLLOWS:
<br />NFPA 13 - STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS
<br />NFPA 70 - NATIONAL ELECTRIC CODE
<br />NFPA 72 - NATIONAL FIRE ALARM CODE
<br />NFPA 101 - LIFE SAFETY CODE
<br />G. AUTHORITY HAVING JURISDICTION REQUIREMENTS
<br />H. LATEST SMACNA STANDARDS
<br />WHERE THE REQUIREMENTS BETWEEN THE DIFFERENT CRITERIA AND CODES ARE AT VARIANCE, THE MOST STRINGENT REQUIREMENTS SHALL APPLY.
<br />2. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL APPROPRIATE AND NECESSARY PERMITS, FEES, TESTS, INSPECTIONS, LICENSES AND CERTIFICATES OF APPROVAL
<br />REQUIRED IN CONNECTION WITH WORK UNDER THIS CONTRACT. THIS CONTRACTOR SHALL COMPLY WITH LOCAL LAWS, STATE LAWS, ORDINANCES, RULES AND
<br />REGULATIONS.
<br />3. BEFORE SUBMITTING BID, BECOME THOROUGHLY FAMILIAR WITH EXISTING CONDITIONS AND OF THE PRESENT INSTALLATIONS TO WHICH CONNECTIONS MUST BE MADE OR
<br />WHICH MUST BE CHANGED OR ALTERED. THE INTENT OF THE WORK IS SHOWN ON THE DRAWINGS AND DESCRIBED HEREIN, AND NO CONSIDERATION WILL BE GRANTED BY
<br />REASON OF LACK OF FAMILIARITY ON THE PART OF THE CONTRACTOR WITH ACTUAL PHYSICAL CONDITIONS, REQUIREMENTS, AND PRACTICES AT THE SITE.
<br />4. CONTRACTOR SHALL NOTE THE CRITICAL SPACE AVAILABLE ABOVE CEILINGS. PROVIDE TRANSITION PIECES AT CROSSOVERS, UNDER BEAMS, OVER/UNDER PIPES, AS
<br />REQUIRED TO ACCOMMODATE DUCTS WITHIN SPACE AVAILABLE, PROVIDING EQUIVALENT DUCT SIZE TO THE SIZE SHOWN. COORDINATE CLOSELY WITH OTHER TRADES TO
<br />REDUCE THE NECESSITY FOR TRANSITIONS TO A MINIMUM. NO ADDITIONAL COSTS WILL BE PAID FOR ANY REQUIRED TRANSITIONS OR OTHER SPECIAL CHANGE SHAPE
<br />PIECES. WHERE CONNECTING FLEXIBLE DUCTWORK TO CEILING DIFFUSERS AND CEILING REGISTERS, SIZE OF FLEXIBLE DUCT SHALL BE SAME SIZE AS NECK OF CEILING
<br />DIFFUSER OR CEILING REGISTER.
<br />5. THE MECHANICAL WORK INCLUDES DEMOLITION OF PORTIONS OF THE EXISTING HVAC SYSTEM. REFER TO DRAWINGS FOR EXTENT.
<br />6. PROVIDE TEST, ADJUSTMENT, AND BALANCE OF ALL EXISTING HVAC EQUIPMENT AND SYSTEMS AFTER ALL WORK HAS BEEN ACCOMPLISHED. TAB WORK PERFORMED FOR
<br />WORK UNDER THIS CONTRACT, INCLUDING BUT NOT LIMITED TO SINGLE DUCT VAV, GRILLES, REGISTERS, AND DIFFUSERS. TAB WORK SHALL BE ACCOMPLISHED IN
<br />ACCORDANCE WITH THE REQUIREMENTS OF "NEBB". PROVIDE THREE COPIES OF THE FINAL REPORT.
<br />7. ALL MECHANICAL DUCTWORK, ETC., SHALL BE SUPPORTED AS INDICATED OR SPECIFIED. PROVIDE ALL SUPPORTS, CONNECTIONS, CONTROLS, AND ACCESSORIES WHETHER
<br />OR NOT SPECIFICALLY CALLED OUT. ALL MECHANICAL EQUIPMENT, DUCTWORK PIPING, ETC., SHALL BE SUPPORTED AS INDICATED OR SPECIFIED. ADDITIONAL SUPPORTS
<br />SHALL BE PROVIDED AS REQUIRED TO ENSURE A VIBRATION FREE INSTALLATION AND SHALL COMPLY WITH LOCAL BUILDING CODE.
<br />8. DESIGN BASIS: THE MECHANICAL DRAWINGS AND PLANS ARE DIAGRAMMATIC AND ARE BASED ON THE MANUFACTURER AND MODEL NUMBER OF THE MECHANICAL
<br />EQUIPMENT AND DEVICES AS SCHEDULED. THE DRAWINGS ARE NOT INTENDED TO SHOW EVERY ITEM IN ITS EXACT LOCATION, THE EXACT DIMENSIONS, OR ALL DETAILS
<br />NECESSARY FOR THE EQUIPMENT INSTALLATION. THE CONTRACTOR SHALL COORDINATE ALL HVAC EQUIPMENT AND NEW DUCTWORK WITH ALL OTHER NEW WORK, WITH
<br />THE EXISTING CONDITIONS, AND WITH THE WORK OF OTHER TRADES. IF FIELD CONDITIONS DIFFER SIGNIFICANTLY FROM THOSE SHOWN ON THE DRAWINGS AND AFFECT THE
<br />MECHANICAL WORK, INFORM THE ENGINEER IMMEDIATELY BEFORE PROCEEDING WITH THE WORK INVOLVED.
<br />9. UPON COMPLETION OF THE WORK EACH DAY, THE CONTRACTOR SHALL CLEAN THE PREMISES AND REMOVE AND DISPOSE OF ALL DEBRIS ASSOCIATED WITH HIS WORK. THE
<br />JOBSITE AND PROJECT WORK AREAS SHALL BE LEFT IN A CONDITION ACCEPTABLE TO THE OWNER. THE BUILDING IS TO REMAIN OCCUPIED DURING THE WORK EFFORT,
<br />COORDINATE WITH OWNER FOR TIMES WORK CAN OCCUR.
<br />10. PROVIDE ALL DUCT AND PIPING FITTINGS, OFFSETS, AND TRANSITIONS, AS REQUIRED FOR A COMPLETE INSTALLATION. ALL DUCTWORK SIZES SHOWN ARE CLEAR INSIDE
<br />DIMENSIONS.
<br />11. THE CONTRACTOR SHALL MAINTAIN A RECORD SET OF DRAWINGS ON THE PROJECT SITE AND SHALL MARK THIS SET TO MAKE RECORD OF ALL CHANGES MADE IN THE
<br />INSTALLATION OF THE MECHANICAL SYSTEMS. THE CONTRACTOR SHALL PROVIDE A WRITTEN WARRANTY TO REPLACE ALL FAULTY MATERIALS AND/OR LABOR, AT NO
<br />ADDITIONAL COST TO THE BUILDING OWNER, FOR A PERIOD OF ONE YEAR FROM DATE OF OWNER ACCEPTANCE.
<br />12. DAMAGE TO OTHER WORK: REPAIR ANY DAMAGE CAUSED BY THIS SECTION TO WORK OF OTHER SECTIONS. DAMAGE TO FIREPROOFING: REPAIR ANY DAMAGED
<br />FIREPROOFING CAUSED BY THIS SECTION TO INTEGRITY OF ORIGINAL CONSTRUCTION. INSULATION: FURNISH INSULATION FOR ALL EQUIPMENT AND DISTRIBUTION SYSTEM
<br />THAT PERMIT HEAT LOSS OR GAIN OR WILL FORM CONDENSATION. REPLACE ANY DAMAGED OR REMOVED INSULATION ON EXISTING SYSTEMS, THE CONTRACTOR SHALL
<br />SUBMIT AN ADD ALTERNATE PRICE FOR DUCTWORK INSULATION REPAIRS WITH HIS BID.
<br />13. PROVIDE THE ENGINEER WITH SIX (6) COPIES OF SUBMITTALS FOR APPROVAL FOR ALL EQUIPMENT, SYSTEMS, PRODUCTS, AND DEVICES AS INDICATED HEREIN. SUBMIT
<br />PRODUCT AND PERFORMANCE DATA FOR EQUIPMENT, CONTROLS, DEVICES, AND FOR EACH ITEM OF EQUIPMENT. PROVIDE TWO-LINE DUCTWORK SHOP DRAWINGS FOR ALL
<br />HVAC DUCTWORK SYSTEMS. PROVIDE COMMISSIONING REPORT FOR AUTOMATIC CONTROLS FOR HVAC SYSTEMS.
<br />14. ALL AUTOMATIC FIRE PROTECTION SPRINKLER WORK SHALL COMPLY WITH NFPA 13, NFPA 14, NFPA 101, LOCAL BUILDING CODES, ALL REQUIREMENTS OF THE LOCAL
<br />AUTHORITY HAVING JURISDICTION.
<br />15. PROVIDE FIRE WATCH PROCEDURES DURING ALL SHUT -DOWNS TO EXISTING FIRE SPRINKLER SYSTEMS AND FIRE WATER SERVICE.
<br />16. CONTRACTOR SHALL PROVIDE SPRINKLER SYSTEM SHOP DRAWINGS ("WORKING DRAWINGS" AS DEFINED BY NFPA 13), AND HYDRAULIC CALCULATIONS FOR ALL SPRINKLER
<br />SYSTEM MODIFICATIONS. SHOP DRAWINGS SHALL INCLUDE ALL ITEMS REQUIRED BY NFPA 13, AND PRODUCT DATA ON ALL MATERIALS AND COMPONENTS OF THE NEW
<br />SPRINKLER SYSTEM(S).
<br />17. NEW SPRINKLER AND MODIFIED ZONES SHALL HAVE A 10 PSI CUSHION BETWEEN THE AVAILABLE PRESSURE AND DESIGN PRESSURE AT THE DESIGN FLOW RATE.
<br />18. A NEW MUNICIPAL WATER FLOW TEST SHALL BE OBTAINED ON THE EXISTING PUBLIC WATER MAIN AT THE PROJECT SITE, PRIOR TO PERFORMING HYDRAULIC CALCULATIONS.
<br />SUBMIT ALL FLOW TEST DATA WITH SPRINKLER SHOP DRAWINGS.
<br />19. PIPING, FITTINGS, AND JOINTING METHODS SHALL BE AS LISTED IN THE SCHEDULE ON THIS SHEET, NO EXCEPTIONS.
<br />20. PROVIDE PIPE HANGERS, BRACING, AND ATTACHMENT METHODS, AS REQUIRED BY NFPA 13.
<br />21. THE CONTRACTOR SHALL PAY FOR AND OBTAIN ALL NECESSARY FEES, PERMITS AND INSPECTIONS FOR APPLICABLE PORTIONS OF THE WORK.
<br />22. MAINTAIN BUILDING FIRE INTEGRITY WITH PIPING PENETRATIONS BY PROVIDING METAL SLEEVES AND UL APPROVED FIRE SAFEING.
<br />23. AFTER ALL WORK IS COMPLETE, SPRINKLER SHOP DRAWINGS FOR THE PROJECT SHALL BE MODIFIED, AS REQUIRED, TO REFLECT ALL NEW AND EXISTING CONDITIONS FOR
<br />THE ENTIRE ZONE. SUBMIT FINAL "AS -BUILT" DRAWINGS TO THE ENGINEER IN ELECTRONIC FORMAT, AUTOCAD RELEASE 14 OR 2000. SUBMIT FINAL HYDRAULIC
<br />CALCULATIONS WITH MODIFICATIONS MADE TO ADDRESS AS -BUILT CONDITIONS.
<br />24. PROVIDE OPERATION AND MAINTENANCE MANUALS FOR ALL NEW SPRINKLER SYSTEM DEVICES INSTALLED. COMPLETE "CONTRACTOR'S MATERIAL AND TEST CERTIFICATES
<br />FOR ABOVEGROUND PIPING", AND INCLUDE IN OPERATION AND MAINTENANCE MANUALS.
<br />RENOVATION/DEMOLITION NOTES
<br />1. THIS CONTRACTOR SHALL VISIT THE SITE AND ADJOINING AREAS AND EXAMINE THE EXISTING CONDITIONS TO BECOME FAMILIAR WITH THEM AND TO DETERMINE THE
<br />DIFFICULTIES WHICH WILL AFFECT THE EXECUTION OF THE WORK OF THIS CONTRACT. THIS CONTRACTOR SHALL PERFORM THIS PRIOR TO THE SUBMISSION OF HIS PROPOSAL.
<br />SUBMISSION OF A PROPOSAL WILL BE CONSTRUED AS EVIDENCE THAT SUCH AN EXAMINATION HAS BEEN MADE AND LATER CLAIMS WILL NOT BE RECOGNIZED FOR EXTRA LABOR,
<br />EQUIPMENT OR MATERIALS REQUIRED BECAUSE OF DIFFICULTIES ENCOUNTERED WHICH COULD HAVE BEEN FORESEEN HAD SUCH AN EXAMINATION BEEN MADE.
<br />2. THE DEMOLITION WORK SHALL INCLUDE, PROVIDING ALL MATERIALS, ALL NECESSARY EXTENSIONS, CONNECTIONS, CUTTING, REPAIRING, ADAPTING AND OTHER MECHANICAL
<br />WORK REQUIRED, TOGETHER WITH ANY REQUIRED TEMPORARY CONNECTIONS TO MAINTAIN SERVICE PENDING THE COMPLETION OF THE PERMANENT WORK. NOTES AND
<br />GRAPHIC REPRESENTATION SHALL NOT LIMIT THE EXTENT OF DEMOLITION REQUIRED. EXTENT OF DEMOLITION WORK SHALL BE COORDINATED WITH THE ARCHITECT AND
<br />BUILDING MANAGEMENT.
<br />3. COORDINATE ALL EQUIPMENT AND SYSTEM SHUT DOWNS AND DRAIN DOWNS WITH BUILDING MANAGEMENT AND PROVIDE A MINIMUM OF 48 HOUR NOTICE.
<br />4. ALL MATERIALS AND EQUIPMENT REMOVED AS A RESULT OF DEMOLITION ACTIVITIES SHALL BE TAKEN FROM THE SITE AND DISPOSED OF IN ACCORDANCE WITH ALL APPLICABLE
<br />LAWS AND ENVIRONMENTAL REGULATIONS.
<br />5. REMOVE ALL EXISTING DUCT, AIR TERMINALS, AND EQUIPMENT, WHETHER SPECIFICALLY INDICATED OR NOT, AS REQUIRED DUE TO THE ARCHITECTURAL AND MECHANICAL
<br />DEMOLITION WORK IN THE AREA TO BE RENOVATED. ALL EQUIPMENT THAT HAS BEEN REMOVED AND IS NOT REUSED SHALL BE RETURNED TO THE OWNER, OR DISPOSED OF AS
<br />DIRECTED BY THE OWNER'S REPRESENTATIVE.
<br />6. FIELD VERIFY EXISTING DUCTWORK AND MAKE ADJUSTMENTS AS NECESSARY TO THE DUCT SHOWN ON THE PLANS, AS REQUIRED BY FIELD CONDITIONS.
<br />7. COORDINATE ALL DEMOLITION WORK WITH NEW REQUIREMENTS TO ASSURE THAT EXISTING EQUIPMENT, THAT IS REQUIRED FOR A COMPLETE AND OPERABLE SYSTEM IS NOT
<br />REMOVED.
<br />8. ALL EXISTING MECHANICAL EQUIPMENT, DUCT AND PIPING THAT INTERFERE WITH ANY NEW CONSTRUCTION SHALL BE RELOCATED OR RE-ROUTED AS REQUIRED TO CLEAR THE
<br />NEW CONSTRUCTION. RECONNECT ALL EXISTING EQUIPMENT THAT ARE TO REMAIN AND NOT AFFECTED BY THE NEW CONSTRUCTION, TO THE NEWLY RELOCATED OR RE-ROUTED
<br />SYSTEM TO ENSURE A SAFE AND OPERATIONAL SYSTEM.
<br />9. DISCONNECT AND RECONNECT THE EXISTING MECHANICAL EQUIPMENT AS REQUIRED BY THE CONSTRUCTION MODIFICATIONS.
<br />10. IF ANY SUPPLY, RETURN, OR OUTDOOR AIR DUCTWORK IS FOUND TO BE LEAKING, BLOWN OUT, OR HAS BROKEN INSULATION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR
<br />REPAIR OR REPLACEMENT. THE CONTRACTOR SHALL SUBMIT AN ADD ALTERNATE PRICE FOR DUCTWORK REPAIRS WITH HIS BID.
<br />11. CONTRACTOR SHALL PROVIDE TEMPORARY PROTECTION TO ANY EXPOSED OR UNCAPPED NEW OR EXISTING DUCTWORK OR PIPING TO REMAIN, TO MINIMIZE DUST
<br />CONTAMINATION IN ANY AND ALL OF THE AIR AND WATER SYSTEMS. THIS SHALL INCLUDE BUT IS NOT LIMITED TO TEMPORARY FILTERS, CAPS, ENCLOSURES, ETC.
<br />12. REMOVE OR RELOCATE ALL EXISTING FIRE PROTECTION EQUIPMENT AND SPRINKLERS, AS REQUIRED DUE TO THE ARCHITECTURAL AND MECHANICAL DEMOLITION WORK IN THE
<br />AREA TO BE RENOVATED. ALL EQUIPMENT THAT HAS BEEN REMOVED AND IS NOT REUSED SHALL BE RETURNED TO THE OWNER, OR DISPOSED OF AS DIRECTED BY THE OWNER'S
<br />REPRESENTATIVE.
<br />13. PROVIDE CUTTING AND PATCHING AS REQUIRED, WHETHER OR NOT SPECIFICALLY INDICATED. VERIFY EXTEND OF NEW AND EXISTING PARTITIONS WITH ARCHITECTURAL
<br />DRAWINGS.
<br />14. FIELD VERIFY EXISTING SPRINKLER PIPING AND MAKE ADJUSTMENTS AS NECESSARY TO THE SPRINKLER PIPING SHOWN ON THE PLANS, AS REQUIRED BY FIELD CONDITIONS.
<br />15. COORDINATE ALL DEMOLITION WORK WITH NEW REQUIREMENTS TO ASSURE THAT EXISTING EQUIPMENT THAT IS REQUIRED FOR A COMPLETE AND OPERABLE SYSTEM IS NOT
<br />REMOVED.
<br />16. ALL EXISTING FIRE PROTECTION SPRINKLERS AND PIPING THAT INTERFERE WITH ANY NEW CONSTRUCTION SHALL BE RELOCATED OR RE-ROUTED AS REQUIRED TO CLEAR THE
<br />NEW CONSTRUCTION. RECONNECT ALL EXISTING EQUIPMENT THAT IS TO REMAIN AND NOT AFFECTED BY THE NEW CONSTRUCTION, TO THE NEWLY RELOCATED OR RE-ROUTED
<br />SYSTEM TO ENSURE A SAFE AND OPERATIONAL SYSTEM.
<br />17. DISCONNECT AND RECONNECT THE EXISTING FIRE PROTECTION EQUIPMENT AS REQUIRED BY THE CONSTRUCTION MODIFICATIONS.
<br />2017 -Humana
<br />Zephyrhills Guidance
<br />Center
<br />7920 GALL BLVD.
<br />ZEPHYRHILLS, FL
<br />33541
<br />SYSKA HEIVIVuSY
<br />GROUP
<br />A member company of SH Group, Inc.
<br />Syska Hennessy group, Inc
<br />9000 Southside Blvd.
<br />Building 100, 1st Floor
<br />Jacksonville, FI 32256
<br />Tel: 904.525.8669
<br />www-syska.com
<br />Florida C.O.A. #00001897
<br />EVANGELOS STEFAS FIB# 75946
<br />1 ISSUE FOR CONSTRUCTION 4/18/18
<br />Delta Issue Description Date
<br />Nr.
<br />DECLARATIVE STATEMENT. TO THE BEST OF THE ENGINEER'S
<br />KNOWLEDGE, THE PLANS AND SPECIFICATIONS COMPLY WITH
<br />THE APPLICABLE MINIMUM BUILDING CODES AND THE
<br />APPLICABLE FIRE -SAFETY STANDARDS AS DETERMINED BY
<br />THE LOCAL AUTHORITY IN ACCORDANCE WITH CHAPTER
<br />533.70 AND CHAPTER 633, FLORIDA STATUTES.
<br />Drawn: SEW Check: ES Owner Approval:
<br />Job No: HUM17390
<br />Scale: NONE
<br />MECHANICAL FIRE
<br />PROTECTION
<br />Tom: COVER SHEET
<br />Sheet: ■
<br />
|