Laserfiche WebLink
DEMOLITION NOTES <br />PARTITION PLAN NOTES <br />SPRINKLER NOTES <br />HARDWARE NOTES <br />1. SUMMARY <br />1. DIMENSIONS <br />WORK NECESSARY FOR COMPLETE DEMOLITION INCLUDES FURNISHING LABOR FOR DEMOLITION, REMOVAL OF DEBRIS, PATCHING AS <br />DO NOT SCALE DRAWINGS, WRITTEN DIMENSIONS GOVERN, ALL PARTITION LOCATIONS SHALL BE AS SHOWN ON PARTITION PLAN. IN CASE OF <br />1. LAYOUT <br />8. ELECTRONIC HARDWARE <br />REQUIRED, CONTROL DUST, AND NECESSARY PERMITS. <br />CONFLICT, NOTIFY ARCHITECT. PARTITION PLAN BY ARCHITECT TAKES PRECEDENCEOVER ALL OTHER PLANS. <br />SEE DESIGN BUILD ENGINEERING DRAWINGS FOR LOCATION OF RISERS, MAINS, HEADS, BRANCH PIPING, ETC., AND ALL WORK REQUIRED TO COMPLETE <br />ALL EXIT DOORS SCHEDULED WITH ELECTRONIC HARDWARE SHALL UNLOCK UPON THE ACTUATION OF A LIFE SAFETY DEVICE. ALL DOORS <br />2. HAZARDOUS MATERIALS <br />2. PARTITIONS <br />THIS PROJECT. SUBMIT PLANS TO OWNER AND OBTAIN THEIR REVIEW PRIOR TO COMMENCEMENT OF ANY SPRINKLER WORK. PROVIDE ACCESS PANELS <br />WHERE REQUIRED, COORDINATE LOCATIONS WITH ARCHITECT PRIOR TO START OF WORK. <br />REQUIRED AS EXITS WITH ELECTRONIC HARDWARE UNLOCK UPON THE LOSS OF POWER CONTROLLING THE LOCK OR LOCK MECHANISM. ALL <br />DOORS REQUIRED AS EXITS WITH ELECTRONIC HARDWARE SHALL HAVE THE CAPABILITY OF BEING UNLOCKED BY A SIGNAL FROM THE FIRE <br />IF ASBESTOS OR OTHER HAZARDOUS MATERIALS ARE DISCOVERED DURING CONSTRUCTION THE CONTRACTOR SHALL NOTIFY THE OWNER IN <br />ALL GYPSUM BOARD PARTITIONS SHALL BE TAPED AND SANDED SMOOTH WITH NO VISIBLE JOINTS OR LINES. ALL SCREWS OR OTHER <br />COMMAND CENTER IN HIGHRISE BUILDINGS WHERE APPLICABLE. SEE DOOR SCHEDULE, HARDWARE GROUPS AND SEQUENCE OF OPERATION <br />WRITING, THEN WAIT FOR DIRECTION FROM THE OWNER. <br />ATTACHMENT DEVICES SHALL BE PATCHED AND NOT VISIBLE. PATCH AND REPAIR SURFACES TO MATCH ADJACENT OR ADJOINING SURFACES <br />2. FIRE WATCH <br />FOR COMPLETE DESCRIPTION. <br />U I U.- <br />WHERE REQUIRED. ALL SURFACES SHALL BE ALIGNED AND SANDED SMOOTH. <br />G.C. SHALL BE RESPONSIBLE FOR TEMPORARY FIRE WATCH AND ALL PROTECTIVE MEASURES REQUIRED BY OWNER WHEN SYSTEM IS MADE INACTIVE TO <br />OTHER MATERIALS AND WASTE IN ANY FORM AT THE PROJECT SITE MAY BE LOCATED ON THE PROJECT SITE, WHICH MAY INCLUDE, BUT NOT <br />ACCOMMODATE SPRINKLER WORK. <br />9. DELAYED EGRESS ELECTRIC HARDWARE <br />BE LIMITED TO ACBM, PCB'S OR OTHER TOXIC SUBSTANCES. <br />3. DIMENSION REFERENCE POINTS <br />EMERGENCY LIGHTING AND AUDIBLE ALARM SHALL BE PROVIDED AT ALL DOORS REQUIRED AS EXITS WITH DELAYED EGRESS ELECTRIC <br />ALL PARTITIONS ARE DIMENSIONED FROM FINISH FACE OF GYPSUM BOARD TO FINISH FACE OF GYPSUM BOARD, U.O.N. ALL DIMENSIONS <br />3. TESTS AND INSPECTIONS <br />HARDWARE. ALARM SHALL NOTIFY TENANT FLOOR AND CUSTOMER'S BURGLAR ALARM SYSTEM. <br />3. SCHEDULE <br />MARKED "CLEAR" OR "CLR" SHALL BE MAINTAINED AND SHALL ALLOW FOR THICKNESS OF ALL WALL FINISHES, U.O.N. <br />G.C. SHALL BE RESPONSIBLE FOR ALL FINAL TESTS AND INSPECTIONS OF COMPLETED WORK REQUIRED BY THE OWNER PRIOR TO OCCUPANCY OF <br />SUBMIT SCHEDULE INDICATING PROPOSED SEQUENCE OF OPERATIONS FOR SELECTIVE DEMOLITION WORK TO ARCHITECT AND THEIR <br />SPACE, G.C. SHALL PROPERLY TEST AND INSPECT EXISTING SPRINKLER SYSTEM PRIOR TO COMMENCEMENT OF WORK, AND SHALL NOTIFY BUILDING <br />10. DOOR HANDLES <br />CONSULTANTS, AND THE OWNER'S REPRESENTATIVE CITY BUILDING OFFICIALS, AND BUILDING MANAGEMENT FOR REVIEW. INCLUDE <br />ALL DIMENSIONS TO THE EXTERIOR WINDOW WALL ARE TO THE INSIDE FACE OF WINDOW FRAME ASSEMBLY, U.O.N. <br />OWNER AND ARCHITECT IMMEDIATELY IF REPAIR WORK OF EXISTING SPRINKLER SYSTEM IS REQUIRED. <br />ALL DOORS WITH LOCK SETS AND LATCH SETS SHALL HAVE A LEVER HANDLE. <br />COORDINATION FOR SHUT OFF, CAPPING, AND CONTINUATION OF UTILITY SERVICES AS REQUIRED TOGETHER WITH DETAILS FOR DUST AND <br />NOISE CONTROL. PROVIDE DETAILED SEQUENCE OF DEMOLITION, FLOOR BY FLOOR, AND REMOVAL WORK TO ENSURE UNINTERRUPTED <br />4. CLEAR DIMENSIONS <br />4. TEMPORARY DISCONNECT <br />11. MOUNTING HEIGHTS <br />PROGRESS OF OWNER'S ON -SITE OPERATIONS, AND BUILDING OPERATIONS. <br />DIMENSIONS NOTED "CLEAR" OR "CLR" MUST BE ACCURATELY MAINTAINED, AND SHALL NOT VARY MORE THAN ±1/8" WITHOUT WRITTEN <br />G.C. SHALL COORDINATE ARRANGEMENTS FOR TEMPORARY DISCONNECT AND RECONNECT OF FIRE SYSTEMS WITH OWNER. <br />HAND -ACTIVATED DOOR OPENING HARDWARE MUST BE MOUNTED BETWEEN 30 AND 44 INCHES ABOVE FINISH FLOOR. <br />2017 - Humana <br />INSTRUCTION FROM ARCHITECT. <br />4. CONDITION OF STRUCTURES <br />5. PERMITS AND APPROVALS <br />12. DOOR HARDWARE <br />Ze hyr h i I I Guidance <br />OWNER ASSUMES NO RESPONSIBILITY FOR ACTUAL CONDITION OF ITEMS OR STRUCTURES TO BE DEMOLISHED. <br />5. DIMENSION TOLERANCES <br />G.C. SHALL BE RESPONSIBLE FOR OBTAINING PERMITS AND APPROVALS REQUIRED BY BUILDING INSPECTORS AND FIRE MARSHAL IN CONJUNCTION <br />DOOR HARDWARE SHALL BE OPERABLE WITH A SINGLE EFFORT WITHOUT REQUIRING THE ABILITY TO GRASP THE HARDWARE (LEVER OR PUSH <br />p s <br />CONDITIONS EXISTING AT THE TIME OF COMMENCEMENT OF CONTRACT WILL BE MAINTAINED BY OWNER INSOFAR AS PRACTICAL. <br />DIMENSIONS TOLERANCES SHALL NOT EXCEED (LOCAL JURISDICTION CODE DEFINED CRITERIA). VERIFY FIELD DIMENSIONS EXCEEDING <br />TOLERANCE WITH THE ARCHITECT AND SECURE ARCHITECT'S APPROVAL. <br />WITH CHANGES TO EXISTING SPRINKLER SYSTEM. <br />TYPE IS ACCEPTABLE PER LOCAL JURISDICTION CODE DEFINED CRITERIA) <br />Center <br />VARIATIONS WITHIN STRUCTURE MAY OCCUR BY OWNER'S REMOVAL AND SALVAGE OPERATIONS PRIOR TO START OF SELECTIVE DEMOLITION <br />6. LOCATIONS <br />13. CARD READERS <br />WORK. <br />6. DISCREPANCIES <br />ALL SPRINKLER HEADS (BUILDING STANDARD TYPE) UNLESS NOTED OTHERWISE, SHALL BE INSTALLED IN THE CENTER OF CEILING TILES. ANY <br />CARD READER DEVICES TO BE PROVIDED AS REFERENCED IN DOOR SCHEDULE. ALL DEVICES AND INSTALLATION SHALL COMPLY WITH ALL <br />NOTIFY ARCHITECT IN WRITING OF ANY DISCREPANCIES OR CONFLICTS IN THE LOCATION(S) OF NEW CONSTRUCTION. UPON COMPLETION OF <br />DEVIATION TO THIS NOTE MUST BE REVIEWED WITH BUILDING OWNER PRIOR TO PROCEEDING WITH WORK. PROVIDE CONCEALED HEADS AT ALL GYP. BD. <br />APPLICABLE BUILDING CODES. SEE DOOR SCHEDULE, HARDWARE GROUPS AND SEQUENCE OF OPERATION FOR COMPLETE DESCRIPTION. <br />5. PARTIAL DEMOLITION AND REMOVAL <br />PARTITION OF THE LAYOUT, NOTIFY THE ARCHITECT. VERIFICATION OF THE LAYOUT TO BE PROVIDED BY THE ARCHITECT PRIOR TO PARTITION <br />CEILINGS. CENTER HEADS WITH ADJACENT DEVICES AT GYPSUM BOARD CEILING IN PUBLIC AREAS SUCH AS LOBBIES, RECEPTIONS, AND CONFERENCE <br />STORAGE OF REMOVED ITEMS WILL BE PERMITTED AS DIRECTED BY THE OWNER. <br />INSTALLATION.FOR BID PRICING, G.C. TO PRICE HIGHER OPTION REQUIRED BY ANY DISCREPANCY NOTED IN CONTRACT DOCUMENTS. NOTIFY <br />ROOMS. THESE DEVICES INCLUDE BUT NOT LIMITED TO SPEAKERS, EXIT SIGNS, SMOKE DETECTORS, MOTION SENSORS, AND ACCESS PANELS. <br />ARCHITECT FOR FINAL SCOPE DECISION FOR THESE ITEMS PRIOR TO PURCHASING. <br />6. PROTECTIONS <br />PROVIDE PROTECTIVE BARRICADES, PROTECTIVE CANOPIES, AND OTHER FORMS OF PROTECTION AS REQUIRED TO PROTECT OWNER'S <br />7. EXPOSED EDGES <br />7920 GALL B LVD, <br />REFLECTED CEILING PLAN NOTES <br />POWER AND SIGNAL PLAN NOTES <br />PERSONNEL AND GENERAL PUBLIC FROM INJURY DUE TO SELECTIVE DEMOLITION WORK. <br />ALL EXPOSED GYPSUM BOARD EDGES TO HAVE METAL EDGE TRIM. <br />PROVIDE PROTECTIVE MEASURES AS REQUIRED TO PROVIDE FREE AND SAFE PASSAGE OF OWNER'S PERSONNEL, TENANT, THEIR EMPLOYEES <br />8. ALIGNMENT <br />ZE P HYR H I LLS FL <br />1. COORDINATION <br />COORDINATE THE WORK OF ALL TRADES INVOLVED CEILING <br />1. OVERTIME WORK <br />CORING ON AN OVERTIME <br />AND THEIR INVITEES, AND GENERAL PUBLIC TO AND FROM OCCUPIED PORTIONS OF BUILDING. <br />ALL WORK SHALL BE ERECTED AND INSTALLED PLUMB, LEVEL, SQUARE AND TRUE, AND IN PROPER ALIGNMENT, <br />IN THE WORK TO INSURE CLEARANCES FOR FIXTURES, DUCTS, PIPING, CEILING <br />WHEN FLOOR BELOW IS OCCUPIED, PRICE EXTENSIVE FLOOR SLAB PENETRATIONS AND/OR BASIS. <br />"ALIGN" <br />SUSPENSION SYSTEM, ETC., NECESSARY TO MAINTAIN THE FINISHED CEILING HEIGHTS. SEE REFLECTED CEILING PLANS FOR FINISHED CEILING <br />HEIGHTS. VERIFY IN FIELD. <br />ALL CORE AND/OR FLOOR TRENCHING FOR TELEPHONE/ELECTRICAL CONDUITING SHALL BE PERFORMED AFTER HOURS AS REQUIRED AND <br />33541 <br />PROTECT FROM DAMAGE EXISTING FINISH WORK THAT IS TO REMAIN IN PLACE AND BECOMES EXPOSED DURING DEMOLITION OPERATIONS. <br />MEANS TO ACCURATELY LOCATE FINISHED FACES IN THE SAME PLANE. <br />COORDINATED WITH BUILDING OWNER FOR APPROVAL. <br />PROTECT FLOORS WITH SUITABLE COVERINGS WHEN NECESSARY. <br />9. MILLWORK <br />2. PERIMETER CEILING ANGLES <br />REFER TO MILLWORK SHOP DRAWINGS FOR SPECIFIC DETAILS OF COORDINATION BETWEEN DRYWALUMILLWORK CONDITIONS. <br />PERIMETER CEILING ANGLE, WHERE OCCURS, SHALL BE INSTALLED TIGHT TO VERTICAL SURFACES, FREE FROM CURVES, BREAKS, OR OTHER <br />2. COORDINATION OF THE WORK <br />CONSTRUCT TEMPORARY INSULATED SOLID DUST PROOF PARTITIONS WHERE REQUIRED TO SEPARATE AREAS WHERE NOISY OR EXTENSIVE <br />IRREGULARITIES, AND PAINTED TO MATCH CEILING FINISH. <br />SURVEY FIELD CONDITIONS AND VERIFY THAT WORK IS FEASIBLE AS SHOWN. VERIFY LOCATION OF FLOOR OUTLETS AND OTHER OUTLETS IN <br />DIRT OR DUST OPERATIONS ARE PERFORMED. EQUIP PARTITIONS WITH DUST PROOF DOORS AND SECURITY LOCKS IF REQUIRED. <br />10. CEILING HEIGHT PARTITIONS <br />RELATION TO STRUCTURAL AND OTHER ELEMENTS AS REQUIRED. NOTIFY ARCHITECT IN WRITING OF ANY DISCREPANCIES BEFORE PROCEEDING <br />REFER TO REFLECTED CEILING PLANS FOR SOFFITS, CEILING HEIGHTS, AND PLENUM BARRIER LOCATIONS. <br />3. FIXTURE TRIM <br />WITH WORK. <br />PROVIDE TEMPORARY WEATHER PROTECTION WHEN APPLICABALE DURING INTERVAL BETWEEN DEMOLITION AND REMOVAL OF EXISTING <br />FURNISH AND INSTALL ALL FIXTURES, ASSOCIATED TRIM, FIXTURE LAMPS, AND SEISMIC BRACING AS REQUIRED. <br />CONSTRUCTION ON EXTERIOR SURFACES AND INSTALLATION OF NEW CONSTRUCTION TO ENSURE THAT NO WATER LEAKAGE OR DAMAGE <br />11. NOTES AND REFERENCES <br />ELECTRICAL SWITCH AND OUTLET COVER PLATES, SURFACE HARDWARE, ETC., SHALL BE INSTALLED AFTER PAINTING AND/OR APPLICATION OF <br />OCCURS TO STRUCTURE OR INTERIOR AREAS OF EXISTING BUILDING. REMOVE PROTECTIONS AT COMPLETION OF WORK. <br />REFER TO SHEET A-1.0 FOR ADDITIONAL NOTES, LEGENDS, SYMBOLS, ABBREVIATIONS, AND SCHEDULES. <br />4. FIXTURE LOCATIONS <br />WALLCOVERINGS AND CARPET SPECIFIED. <br />LIGHT FIXTURES, EXIT SIGNS, SPRINKLERS, AND OTHER CEILING ELEMENTS SHALL BE LOCATED IN CENTER OF INDIVIDUAL CEILING TILE, U.O.N. <br />7. DAMAGES <br />12. ELECTRICAL WORK <br />3. OUTLET LOCATIONS <br />PROMPTLY REPAIR DAMAGES CAUSED TO ADJACENT FACILITIES BY DEMOLITION WORK AT NO ADDITIONAL COST TO OWNER. <br />REFER TO POWER &SIGNAL AND REFLECTED CEILING PLANS FOR LOCATIONS OF SWITCHES OUTLETS AND THE LIKE TO BE REMOVED. PATCH <br />ALL SWITCHES AND DIMMERS SHALL BE LOCATED 48" ABOVE FINISHED FLOOR TO CENTER OF SWITCH, U.O.N. MULTIPLE SWITCHES AT ONE <br />ARCHITECTURAL DRAWINGS DETERMINE LOCATION AND TYPE (ARCHITECT TO VERIFY WITH ENGINEER) OF ALL OUTLETS AND TAKE <br />AND REPAIR PARTITION TO MATCH ADJACENT SURFACE AND FINISH. <br />LOCATION SHALL BE GANGED TOGETHER AND FINISHED WITH ONE COVER PLATE, U.O.N. <br />PRECEDENCE OVER ALL OTHERS, U.O.N. ELECTRICAL ENGINEER'S POWER PLAN SHALL GOVERN THE WIRING LAYOUT AND INSTALLATION IN <br />8. TRAFFIC <br />COMPLIANCE WITH ALL LAWS APPLICABLE AND ENFORCED BY GOVERNING AUTHORITIES. <br />CONDUCT SELECTIVE DEMOLITION OPERATIONS AND DEBRIS REMOVAL IN A MANNER TO ENSURE MINIMUM INTERFERENCE WITH ROADS, <br />13. ARCHITECT APPROVAL <br />5. CEILING ACCESS <br />STREETS, WALKS, AND OTHER ADJACENT OCCUPIED OR USED FACILITIES. <br />OBTAIN APPROVAL FROM ARCHITECT PRIOR TO MODIFYING COLUMN FURRING, RELOCATING PIPES, AND SIMILAR SYSTEMS AND ITEMS, <br />PROVIDE CEILING ACCESS AS REQUIRED FOR EQUIPMENT AND SYSTEM MAINTENANCE, AND MATCH ADJACENT CEILING FINISH, U.O.N. <br />4. WALL MOUNTED OUTLETS <br />ADJUSTING ANY AND ALL OTHER FIELD CONDITIONS REQUIRED TO FIT PLANS. <br />OUTLETS SHOWN BACK TO BACK ON PARTITION WALLS SHALL BE OFFSET 1'-0" MAXIMUM, OR MOUNTED AT DIFFERENT HEIGHTS IF INDICATED. <br />9. UTILITY SERVICES <br />6. SOFFITS AND CEILING HEIGHTS DIMENSIONS <br />MAINTAIN EXISTING FIRE PROTECTION SYSTEM AND UTILITIES TO REMAIN, KEEP IN SERVICE, IDENTITY, AND PROTECT AGAINST DAMAGE <br />14. SLAB WORK <br />ALL SOFFITS AND CEILING HEIGHTS ARE DIMENSIONED FROM TOP OF FINISHED FLOOR TO BOTTOM OF FINISHED GYPBOARD OR CEILING TILE AND <br />5. FURNITURE LAYOUT <br />DURING DEMOLITION OPERATIONS. PROVIDE TEMPORARY LIGHT AND POWER AS REQUIRED. SEE DRAWINGS FOR EXISTING STANDPIPE <br />ALL EXISTING AND NEW UL RATED FLOOR SLAB PENETRATIONS FOR PIPING AND CONDUIT SHALL BE FULLY PACKED AND SEALED IN <br />SHALL ALLOW FOR THICKNESS OF ALL FLOOR FINISHES. <br />FURNITURE, IF SHOWN, IS FOR REFERENCE ONLY AND IS NOT IN CONTRACT, U.O.N. <br />GEORGE W. DE LA HOZ <br />LOCATIONS. <br />ACCORDANCE WITH THE APPLICABLE BUILDING AND FIRE CODES. <br />7. COORDINATION <br />6. EQUIPMENT COORDINATION <br />FL LICENSE #AR0016664 <br />REMOVAL OF ANY EQUIPMENT, CABLING SWITCHES, AND CONDUIT PERTAINING TO DATA/COMMUNICATIONS AND TELEPHONE SHALL BE <br />15. DOOR CLEARANCES <br />THE REFLECTED CEILING PLAN INDICATES THE LOCATION OF CEILING HEIGHTS, LIGHT TYPES, LIGHT FIXTURES, SWITCH LOCATIONS, AND ASSOCIATED <br />COORDINATE ALL WORK RELATED TO EQUIPMENT WITH MANUFACTURER'S RECOMMENDATIONS, SPECIFICATIONS, AND INSTRUCTIONS. <br />VERIFIED WITH TELEPHONE COMPANIES SERVICE OWNER OR TENANT DATA/COMMUNICATIONS REPRESENTATIVE AS REQUIRED TO PREVENT <br />TRIM THE BOTTOMS OF DOORS TO CLEAR THE TOP OF FINISHED FLOOR, AS APPLICABLE, BY 1/4" INCH MAXIMUM, U.O.N. VERIFY SLAB <br />ITEMS. REFER TO ENGINEERING DRAWING (LIGHTING PLAN) FOR CIRCUITING, WIRING LAYOUT, AND ADDITIONAL INFORMATION. <br />NEW CONSTRUCTION DELAYS. REMOVE TO SOURCE ALL PIPES, VENTS, APPLIANCES, OR DRAINS NOT BEING RE -USED. <br />CONDITIONS AND TRIM EACH DOOR TO FIT CONDITIONS. WHERE RADICAL VARIATIONS IN FLOOR ELEVATION EXIST, DOORS SHALL BE ORDERED <br />7. EXISTING FLOOR PENETRATIONS <br />WITH BOTTOM STILE SIZED TO ACCOMMODATE ESE UNDERCUT CONDITIONS. <br />8. DISCREPANCIES <br />ALL EXISTING AND NEW UL RATED FLOOR SLAB PENETRATIONS FOR CONDUIT SHALL BE FULLY PACKED AND SEALED IN ACCORDANCE WITH <br />10. ENVIRONMENTAL CONTROLS <br />IN THE EVENT OF DISCREPANCIES BETWEEN THE ARCHITECT'S REFLECTED CEILING PLAN AND THE ENGINEER'S LIGHTING PLAN, IMMEDIATELY NOTIFY <br />THE APPLICABLE BUILDING AND FIRE CODES. <br />USE TEMPORARY ENCLOSURES AND OTHER SUITABLE METHODS TO ISOLATE DUST AND DIRT RISING AND SCATTERING. COMPLY WITH <br />16. GLASS WORK <br />THE ARCHITECT IN WRITING BEFORE ORDERING MATERIALS OR PROCEEDING WITH WORK. <br />BUILDING MANAGEMENT REGULATIONS AND GOVERNING REGULATIONS PERTAINING TO ENVIRONMENTAL PROTECTION. <br />� <br />ALL GLASS SHALL B S, U.O.N. GLAZING TONG MARKS SHALL NOT BE VISIBLE. CLEAN AND POLISH ALL GLASS PRIOR <br />ED GL <br />8. OUTLET FINISHES <br />TO PROJECT DELIVER <br />9. PLENUM <br />REFER TO FINISH PLAN FOR OUTLET AND SWITCH COVERPLATE FINISH. VERIFY SELECTION AND CHOICE WITH THE ARCHITECT PRIOR TO <br />11. INSPECTION <br />ALL SPECIFIC INFORMATION CONCERNING INSTALLATION OF VARIOUS ABOVE -CEILING ELEMENTS ARE TO BE FOUND IN THE HVAC, PLUMBING, FIRE <br />ORDERING MATERIALS. <br />PRIOR TO COMMENCEMENT OF SELECTIVE DEMOLITION WORK, INSPECT AREAS IN WHICH WORK WILL BE PERFORMED IF NECESSARY. <br />17. CEILING HEIGHT PARTITIONS <br />PROTECTION, ELECTRICAL, AND LIGHTING DRAWINGS. <br />PHOTOGRAPH EXISTING CONDITIONS TO STRUCTURE SURFACES, EQUIPMENT, OR TO SURROUNDING PROPERTIES WHICH COULD BE <br />CEILING HEIGHT PARTITIONS SHALL BE INSTALLED TIGHT TO FINISHED CEILING; WITH NO JOINTS VARYING MORE THAN 1/8" OVER 6'-0" AND NO <br />9. ELECTRICAL COORDINATION <br />MISCONSTRUCTED AS DAMAGE RESULTING FROM DEMOLITION WORK. FILE WITH OWNER PRIOR TO STARTING WORK. <br />JOINTS GREATER THAN 3/16", U.O.N. <br />10. CONFLICT <br />COORDINATE NEW ELECTRICAL WITH EXISTING, WHERE OCCURS. <br />NOTIFY ARCHITECT OF ANY CONFLICTS OF LIGHT FIXTURE LOCATIONS WITH MAIN RUNNERS, DUCTS, STRUCTURES, HVAC, AND/OR (E)CONDUIT, PRIOR <br />12. PREPARATION <br />18. DOOR DIMENSIONS <br />TO FRAMING FOR LIGHTS. ANY DISCREPANCIES BETWEEN ARCHITECT'S CEILING GRID LOCATION AND ACTUAL FIELD CONDITIONS ARE TO BE <br />10. OUTLET LAYOUT <br />CONTRACTOR IS SOLELY RESPONSIBLE FOR ANY INTERIOR AND EXTERIOR SHORING, BRACING, OR SUPPORT TO PREVENT MOVEMENT, <br />DIMENSIONS LOCATING DOORS ARE TO THE INSIDE EDGE OF JAMB, U.O.N. <br />CLARIFIED WITH THE ARCHITECT PRIOR TO FRAMING. <br />UPON COMPLETION OF OUTLET LAYOUT, NOTIFY THE ARCHITECT. ARCHITECT SHALL SITE VERIFY ALL OUTLET LOCATIONS PRIOR TO <br />SETTLEMENT, OR COLLAPSE OF STRUCTURES TO BE DEMOLISHED AND ADJACENT FACILITIES TO REMAIN. WORK SHALL BE DONE UNDER THE <br />COMMENCEMENT CORING OUTLET INSTALLATION. G.C. TO PROVIDE AND INSTALL COVER PLATES FOR ALL WALL MOUNTED ELECTRICAL <br />SUPERVISION OF A LICENSED STRUCTURAL ENGINEER PROVIDED BY THE CONTRACTOR AT THE PROJECT SITE. <br />ALL INTERIOR DOORS SHALL HAVE MIN. V-6" CLEAR ON STRIKE/PULL SIDE OF DOOR. VERIFY AND ADVISE ARCHITECT OF EXCEPTIONS PRIOR TO <br />11. FIXTURE LAYOUT <br />AND COMMUNICATIONS OUTLETS. <br />CLOSING OUT PARTITIONS. ALL EXTERIOR DOORS TO HAVE 2'-0" CLEAR ON STRIKE/PULL SIDE OF DOOR U.O.N. <br />SUBMIT GRILLE, SPRINKLER, THERMOSTAT, AND OTHER FIXTURE AND ELEMENT LAYOUTS TO THE ARCHITECT FOR REVIEW AT LEAST 2 WEEKS <br />CONTRACTOR SHALL CEASE OPERATIONS AT HIS/HER DISCRETION AND NOTIFY OWNER AND BUILDING MANAGEMENT IMMEDIATELY IF SAFETY <br />PRIOR TO INSTALLATION. <br />11. UL RATED ASSEMBLIES <br />OF STRUCTURE APPEARS TO BE ENDANGERED. CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS AS DIRECTED BY THE <br />19. MILLWORK <br />FURNISH AND INSTALL UNDERWRITERS LABORATORIES, INC. (UL) LABELED DEVICES THROUGHOUT. <br />CONTRACTORS LICENSED STRUCTURAL ENGINEER TO SAFELY SUPPORT THE STRUCTURE UNTIL A DETERMINATION IS MADE FOR CONTINUING <br />ALL MILLWORK TO BE FASTENED TO THE PARTITION. PROVIDE BLOCKING FOR ALL MILLWORK NOT SUPPORTED BY SLABS OR ABOVE 4'-0" <br />12. FIELD VERIFICATION OF WORK <br />THE WORK AS DIRECTED BY THE CONTRACTOR'S LICENSED STRUCTURAL ENGINEER. <br />HEIGHT. ALL CONCEALED LUMBER AND BLOCKING TO BE FIRE TREATED. <br />VERIFY FIELD CONDITIONS AND LOCATIONS OF ALL PLUMBING, MECHANICAL DUCTS, STRUCTURAL ELEMENTS, AND ANY AND ALL OTHER APPLICABLE <br />12. MOUNTING HEIGHTS <br />ITEMS; INSTALL APPLICABLE NEW PLUMBING, MECHANICAL FANS, DUCTS, CONDUITS, AND OTHER RELATED AND APPURTENANT ITEMS SO AS TO NOT <br />INSTALL WALL MOUNTED OUTLETS 18 INCHES ABOVE FINISHED FLOOR, U.O.N. HEIGHTS SHALL BE DETERMINED FROM FINISHED FLOOR TO THE <br />TAKE PRECAUTIONS TO SUPPORT STRUCTURE UNTIL DETERMINATION IS MADE FOR CONTINUING OPERATIONS. CONTRACTOR IS SOLELY <br />20. WHERE NOT STATED IN THE SHEET SPECIFICATIONS AND THERE IS NO PROJECT MANUAL AT A MINIMUM PROVIDE SHOP DRAWINGS FOR: <br />CONFLICT WITH LUMINARIES AND ANY AND ALL FIELD CONDITIONS. <br />CENTERLINE OF COVERPLATE, INSTALLED VERTICALLY, GROUNDING POLE AT BOTTOM, U.O.N. OUTLETS MOUNTED HIGHER THAN 27" SHALL BE <br />RESPONSIBLE FOR DEMOLITION MEANS AND METHODS. <br />MILLWORK <br />INSTALLED HORIZONTALLY, GROUNDING POLE AT LEFT, U.O.N. FOURPLEX OUTLETS TO BE INSTALLED VERTICALLY, U.O.N. <br />• DOORS/FRAMES/HARDWARE <br />13. UL RATED ASSEMBLIES <br />13. COVER AND PROTECT <br />GLAZING <br />FURNISH AND INSTALL UNDERWRITERS LABORATORIES INC. (UL) LABELED DEVICES THROUGHOUT. <br />13. HORIZONTAL CLEARANCES <br />COVER AND PROTECT FURNITURE, EQUIPMENT AND FIXTURES, AND OTHER ITEMS TO REMAIN FROM SOILING OR DAMAGE WHEN DEMOLITION <br />CARPET SEAMING DIAGRAM <br />MAINTAIN A 4-INCH HORIZONTAL CLEARANCE IN ALL DIRECTIONS, MIN. FROM EDGE OF COVERPLATE, FOR WALL MOUNTED OUTLETS, OR FROM <br />3 ISSUE FOR CONSTRUCTION 04.18.2018 <br />WORK IS PERFORMED IN ROOMS OR AREAS FROM WHICH SUCH ITEMS HAVE BEEN REMOVED. <br />FABRIC WRAPPED PANELS <br />14. <br />14. LIGHTING FIXTURES <br />EDGE OF MONUMENT FOR FLOOR MOUNTED OUTLETS, WHEN ADJACENT TO A WALL, COLUMN, OR SIMILAR ELEMENTS,. U.O.N. <br />DEMOUNTABLE PARTITIONS <br />INSTALL LIGHT FIXTURES WITH PROTECTIVE FILM OR SIMILAR COVER OVER LOUVER, LENS, BAFFLE, AND THE LIKE, TO AVOID FIXTURE SOILING OR <br />14. CLEAN UP <br />SPECIAL CONSTRUCTION <br />DAMAGE; FIXTURES SHALL BE MAINTAINED CLEAN AND AS NEW; LAMPS SHALL BE NEW AT PROJECT COMPLETION. <br />14. DIMENSIONS <br />Delta Issue Description Date <br />AT COMPLETION OF DEMOLITION WORK, THE CONSTRUCTION AREAS SHALL BE LEFT IN BROOMED AND CLEAN CONDITION. CARPETED AREAS <br />INDICATED DIMENSIONS ARE TO THE CENTER OF THE COVERPLATE OR MONUMENT; CLUSTERS OF OUTLETS ARE DIMENSIONED TO THE CENTER <br />r. <br />TO BE LEFT IN A VACUUM CLEAN CONDITION. VINYL FLOORING SHALL BE DAMP MOPPED AT THE END OF EACH WORK DAY. ALL DEBRIS AND <br />21. PATCH AND REPAIR <br />LIFE SAFETY DEVICES <br />OF THE CLUSTER, U.O.N.; GANG COVERPLATES SHALL BE ONE-PIECE TYPE, U.O.N. <br />MISCELLANEOUS MATERIAL SHALL BE REMOVED AT THE END OF EACH WORK DAY. <br />AT ALL PERIMETER CONDITIONS WHERE DEMO OCCURS SHALL BE PATCHED AND REPAIRED. ALL EXISTING WALLS DAMAGED SHALL BE <br />RE <br />REFER TO ENGINEERING DRAWINGS FOR ALL LIFE SAFETY DEVICES REQUIRED CODE AND ALL EMERGENCY LIGHT FIXTURES. ARCHITECTURAL <br />REPAIRED AS REQUIRED TO RECEIVE SCHEDULED FINISH. <br />DRAWINGS SHALL GOVERN LOCATION OF THESE DEVICES. COORDINATE LOCATION OF DEVICES WITH ALL ARCHITECTURAL DOCUMENTS PRIOR TO <br />15. CABINETRY <br />15. FREIGHT ELEVATOR <br />INSTALLATION OF BACK BOXES. REVIEW ALL ARCHITECTURAL AND ENGINEERING DOCUMENTS AND NOTIFY ARCHITECT OF ANY CONFLICTS. GENERAL <br />CONTRACTOR TO COORDINATE AND VERIFY LOCATIONS OF EXISTING DEVICES TO REMAIN WITH ARCHITECTURAL PLANS AND NOTIFY ARCHITECT OF <br />OUTLETS INSIDE AND/OR ATTACHED TO CABINETRY SHALL BE FURNISHED AND INSTALLED TO MATCH SIMILAR CONDITIONS SUCH AS WALL, <br />FLOOR, AND THE LIKE. FURNISH AND INSTALL BOX EXTENSION OR OTHER APPROPRIATE DEVICES AS REQUIRED. ADJACENT OUTLETS SHALL <br />I N T E R 1 O R <br />DEBRIS REMOVAL MUST BE PERFORMED USING THE FREIGHT ELEVATOR. CONTACT THE BUILDING MANAGEMENT OFFICE TO OBTAIN <br />22. GYPSUM WALLBOARD ASSEMBLIES: <br />ANY CONFLICTS DURING THE ROUGH PHASE OF PROJECT. <br />NOT BE GREATER THAN 6" O.C. APART, U.O.N. <br />SCHEDULE FOR THE USE OF THE FREIGHT ELEVATOR PRIOR TO SUBMITTING BID. ALL DEBRIS REMOVAL SHALL BE PERFORMED IN <br />WHERE LOCAL GREEN BUILDING ORDINANCE DOES NOT DICTATE TO THE CONTRARY AND LEED CERTIFICATION IS NOT REQUIRED BY THE <br />-IN <br />1A <br />ACCORDANCE WITH BUILDING MANAGEMENT REQUIREMENTS AND PROCEDURES. <br />OWNER; <br />FRAMING: MINIMUM RECYCLED CONTENT SHALL INCLUDE 50% POST -CONSUMER RECYCLED CONTENT LAMINATING ADHESIVE: <br />17. WALL SWITCH LOCATIONS <br />16. PANEL BOARDS <br />ARCHITECTS,STEEL <br />P.C. <br />16. EXISTING ELECTRICAL <br />ADHESIVE OR JOINT COMPOUND RECOMMENDED FOR DIRECTLY ADHERING GYPSUM PANELS TO CONTINUOUS SUBSTRATE. ADHESIVES SHALL <br />TO BE COORDINATED WITH FURNITURE AND WALL MOUNTED EQUIPMENT LOCATIONS PRIOR TO BOX ROUGH -INS. NOTIFY ARCHITECT OF ANY <br />CIRCUIT BREAKERS SHALL BE NEATLY TAGGED AND NUMBERED BY G.C. TO CORRESPOND WITH CIRCUITING OUTLINED ON ENGINEERING <br />IN PARTITIONS TO BE REMOVED, REMOVE AND CAP ALL OUTLETS, SWITCHES, WIRES, THERMOSTATS, ETC. TO THEIR SOURCE AS REQUIRED, <br />HAVE A VOC CONTENT OF 50 G/L OR LESS WHEN CALCULATED ACCORDING TO 40 CFR 59, SUBPART D (EPA METHOD 24). <br />CONFLICTS PRIOR TO INSTALLATION OF ROUGH -INS. <br />DRAWINGS. <br />ALL EXISTING FLOOR MOUNTED OUTLETS, WHERE NOTED TO BE REMOVED OR RELOCATED, SHALL BE CAPPED OFF TO THE NEAREST <br />GYPSUM WALLBOARD: RECYCLED CONTENT SHOULD BE A PRIORITY, LOCALLY MANUFACTURED PRODUCTS SHALL BE SOURCED WHERE <br />JUNCTION BOX. FILL AND LEVEL FLOOR TO ACCEPT NEW FLOOR COVERING. REMOVAL OF ANY EQUIPMENT, CABLING SWITCHES, AND <br />POSSIBLE. <br />18. ENGINEERING DOCUMENTS <br />17. DATA AND RECEPTACLES <br />CONDUIT PERTAINING TO DATA/COMMUNICATIONS AND TELEPHONE SHALL BE VERIFIED WITH TELEPHONE COMPANIES, SERVICE OWNER, OR <br />REFER TO ENGINEERING PLANS FOR ADDITIONAL NOTES AND SPECIFICATIONS. <br />ALL WALL MOUNTED DATA AND VOICE RECEPTACLES TO HAVE 3/4" CONDUIT STUB UP AND TERMINATED 6" ABOVE HUNG CEILING. <br />TENANT DATA/COMMUNICATIONS REPRESENTATIVE AS REQUIRED TO PREVENT NEW CONSTRUCTION DELAYS. <br />DOOR NOTES <br />M � A M i <br />19. SUSPENDED CEILING GRID LAYOUT <br />18. MILLWORK <br />17. PATCHING <br />CENTER FULL TILES IN ROOM IN BOTH DIRECTIONS AS INDICATED ON DRAWINGS UNLESS DIMENSIONED OR NOTED OTHERWISE. <br />THE G.C. SHALL COORDINATE ANY ELECTRICAL WORK OR LIGHTING INSTALLATION INTO CABINET WORK IF AND AS REQUIRED, <br />CONTRACTOR SHALL RESPONSIBLE FOR PATCHING AND REPAIRING ANY DAMAGE CAUSED HIM OR HIS SUBCONTRACTORS TO <br />EXISTING CONSTRUCTION <br />N IN ELEVATOR LOBBY, PUBLIC CORRIDORS, RESTROOMS, OR TENANT SPACES. REFINISH TO MATCH EXISTING <br />1. DOOR SCHEDULE <br />REFER TO DOOR SCHEDULE FOR ALL DOOR/HARDWARE SPECIFICATIONS. <br />19. PULL STRINGS <br />HARDWARE <br />NOTES <br />ADJACENT FINISH, OR AS NOTED HEREIN. <br />G.C. TO PROVIDE PULL STRINGS IN ALL EMPTY CONDUIT. <br />2100 PONCE DE LEON BLVD <br />2. FIELD MEASURE <br />18. PIPES AND VENTS <br />FIELD MEASURE FLOOR TO CEILING DOORS FOR PROPER FIT. <br />1. LOCKSETS <br />20. SLAB ON GRADE <br />SUITE 1090 <br />REMOVE TO SOURCE ALL ANCILLARY PIPES, VENTS, APPLIANCES AND DRAINS SCHEDULED FOR DEMOLITION. WHERE APPLICABLE, CAP AT <br />ALL LOCKSETS SHALL HAVE LIPS OF SUFFICIENT LENGTH TO CLEAR TRIM AND PROTECT CLOTHING. <br />WHERE FLOOR OUTLETS ARE SHOWN AT SLAB ON GRADE LOCATIONS, SAW CUT AND DEMO EXISTING SLAB AS REQUIRED FOR NEW WORK. <br />EXPOSE SLAB REINFORCING V-0" MIN. BACK FROM EA. SAWCUT. PROVIDE NEW SLAB REINFORCING TO MATCH EXISTING. REPAIR AND TAPE <br />CORAL GABLES, FLORIDA 33134 <br />RISER AND FIRESAFE PER UL EXISTING PENETRATIONS. <br />3. SLOPE <br />(E) <br />EXTERIOR LEVEL LANDING MAY SLOPE UP TO 1/4" PER FOOT MAX. IN ANY DIRECTION FOR SURFACE DRAINAGE. <br />2. COORDINATION <br />JOINTS AT VAPOR BARRIER WHERE ENCOUNTERED. PROVIDE CRUSHED AGGREGATE TO MATCH EXISTING. PROVIDE 3,000 PSI CONCRETE. FINISH <br />TEL 786-405-0230 <br />19. FLOORING <br />GENERAL CONTRACTOR TO COORDINATE HARDWARE PURCHASE, SPECIFICATION, AND INSTALLATION WITH BUILDING MANAGEMENT. <br />TO MATCH EXISTING PER APPLICABLE ACI CRITERIA. <br />REMOVE ALL EXISTING IRREGULAR MATERIALS WHICH CAUSE RISES AND DEPRESSIONS IN FLOORING SURFACE, SUCH AS FASTENERS, OUTLET <br />4. THRESHOLDS <br />CORES, COVER PLATES, RESILIENT FLOOR COVERINGS, CARPET, CARPET PAD, FLASH PATCH, CONCRETE FILL, PLYWOOD, ETC. <br />THE FLOOR OR LANDING SHALL NOT BE MORE THAN 1/2" LOWER THAN THE THRESHOLD OF THE DOORWAY. BEVEL (1:2 MAX. SLOPE) <br />3. KEYING <br />21. ABANDONED CORE/FLOOR PENETRATIONS <br />WHERE THE THRESHOLD EXCEEDS 1/4" IN HEIGHT. <br />KEYING OF CYLINDER LOCKS SHALL BE COORDINATED WITH THE OWNER; FOR ESTIMATE USE GRANDMASTER KEYING CHARGE. UNDER OWNER'S <br />ALL ABANDONED CORE AND ABANDONED FLOOR PENETRATIONS THAT ARE NOT SCHEDULED TO BE REUSED ARE TO BE REMOVED. FLOOR TO BE <br />©2018 1 N T E R 10 R A R C H I T E C T S P.C. LICENSE #AA26001062. <br />20. WALL COVERING <br />DIRECTION, KEY TO NEW OR EXISTING SYSTEM TO BE APPROVED BY OWNER'S REPRESENTATIVE IN WRITING. FURNISH CONSTRUCTION KEY <br />REPAIRED AS REQUIRED PER UL AND LOCAL CODE. <br />ALL DRAWINGS AND WRITTEN MATERIAL HERE IN CONSTITUTE THE <br />SHOULD PAPER LAYER OF EXISTING GYP BD BE DAMAGED, REMOVE AND REPLACE EXISTING GYP BD AT SCHEDULED WALL COVERING <br />5. DOOR OPENINGS <br />SYSTEM WITH KEYS WHICH CAN BE RENDERED INOPERATIVE BY THE TURN OF THE CHANGE KEY. STAMP ALL KEYS "DO NOT DUPLICATE". FOR <br />ORIGINAL AND UNPUBLISHED WORK THE ARCHITECT, AND THE <br />SAME MAY NOT BE DUPLICATED, USED, OR DISCLOSED WITHOUT THE <br />REMOVAL, LOCATIONS. <br />DOOR OPENINGS IN PARTITIONS NOT DIMENSIONED ARE TO BE LOCATED WITHIN 4" OF ADJOINING PARTITION, U.O.N. <br />PROTECTION OF THE OWNER, ALL LOCKS AND CYLINDERS SHALL BE KEYED AT THE FACTORY OF THE LOCK MANUFACTURER WHERE <br />22, EXISTING LIFE SAFETY DEVICES <br />WRITTEN CONSENT OF THE ARCHITECT, <br />PERMANENT RECORDS ARE MAINTAINED. <br />GENERAL CONTRACTOR TO COORDINATE LOCATIONS OF EXISTING LIFE SAFETY DEVICES WITH ENGINEERING AND ARCHITECTURAL PLANS AND <br />21. DEMOLITION <br />6. GLASS <br />FURNITURE AND WALL MOUNTED EQUIPMENT. ALL DEVICES THAT ARE IN CONFLICTS WITH CONSTRUCTION DOCUMENTS, FURNITURE AND <br />DEMOLITION IS NOT NECESSARILY LIMITED TO WHAT IS SHOWN ON DRAWINGS. THE INTENT IS TO INDICATE THE GENERAL SCOPE OF <br />ALL GLASS IN DOORS SHALL BE TEMPERED SAFETY GLASS, U.O.N. <br />4. HINGES <br />WALL MOUNTED EQUIPMENT ARE TO BE RELOCATED, NOTIFY ARCHITECTS IN WRITING TO CONFIRM NEW LOCATION PRIOR TO RELOCATION OF <br />DEMOLITION REQUIRED TO COMPLETE THE WORK HEREIN. IF QUESTIONS ARISE AS TO THE REMOVAL OF ANY MATERIAL IN ACCORDANCE <br />FURNISH TWO PAIR HINGES PER LEAF, U.O.N. FURNISH HINGES WITH STAINLESS STEEL PINS AND CONCEALED BEARINGS. SIZE LISTED IN <br />DEVICES. <br />WITH THE CONTRACT DOCUMENTS, CLARIFY THE POINT IN QUESTION WITH THE ARCHITECT BEFORE PROCEEDING. <br />7. HOLLOW METAL DOORS <br />HARDWARE SETS INDICATE HEIGHT. <br />HOLLOW METAL DOORS SHALL BE FINISHED WITH SEMI -GLOSS PAINT. REFER TO FINISH SCHEDULE FOR ADDITIONAL INFORMATION. <br />23. ENGINEERING DOCUMENTS <br />22. STAIRWAYS <br />5. SILENCERS <br />REFER TO ENGINEERING PLANS FOR ADDITIONAL NOTES AND SPECIFICATIONS. <br />Drawn: TEAM Check: GWD Owner Approval: <br />STAIRWAYS MUST REMAIN ACCESSIBLE INCLUDING A CLEAR PATH OF EGRESS AT ALL TIMES DURING DEMOLITION. <br />8. EXIT CORRIDORS <br />FURNISH SILENCERS FOR ALL INTERIOR FRAMES: 3 FOR SINGLE DOORS, 4 FOR PAIR OF DOORS. OMIT WHERE SOUND OR LIGHT SEAL OCCURS. <br />DOORS OPENING INTO REQUIRED EXIT CORRIDORS DO NOT RESTRICT THE REQUIRED WIDTH WHEN OPENED IN ANY POSITION. <br />23. GRAPHICS <br />6. LOCKS <br />Job No:9900019.00 Scale: 1/8" = 1'-0" <br />REMOVE EXISTING SIGNAGE/GRAPHICS AND STORE FOR RE -USE WHERE APPLICABLE. <br />9. DOOR SWINGS <br />LOCK TO BE 38" FROM BOTTOM OF DOOR TO CENTER OF LEVER U.N.O. <br />ALL DOORS REQUIRED AS EXITS SHALL SWING IN THE DIRECTION OF TRAVEL. <br />24. FIRE AND LIFE SAFETY SYSTEM <br />INSTALLATION: <br />NO EXISTING SMOKE DETECTOR, PUBLIC ADDRESS SPEAKER, FIRE ALARM BOX, OR SIMILAR DEVICE, INCLUDING THE ASSOCIATED WIRING, <br />A. INSTALL EACH HARDWARE ITEM PER MANUFACTURERS INSTRUCTIONS AND RECOMMENDATIONS. DO NOT INSTALL SURFACE MOUNTED <br />SHALL BE DAMAGED DURING DEMOLITION AND SUBSEQUENT CONSTRUCTION. RELOCATION OF SMOKE DETECTORS, PUBLIC ADDRESS <br />10. WOOD SPECIES FOR DOOR FACINGS <br />ITEMS UNTIL FINISHES HAVE BEEN COMPLETED ON THE SUBSTRATE. SET UNITS LEVEL, PLUMB, AND TRUE TO LINE AND LOCATION. ADJUST <br />SPEAKERS, AND FIRE ALARM EQUIPMENT, NECESSITATED BY NEW CONSTRUCTION, SHALL BE ACCOMPLISHED AS A FIRST PRIORITY, AND PER <br />PROVIDE DOORS MADE WITH ADHESIVES AND COMPOSITE WOOD PRODUCTS WHERE POSSIBLE THAT DO NOT CONTAIN UREA <br />AND REINFORCE THE ATTACHMENT SUBSTRATE AS NECESSARY FOR PROPER INSTALLATION AND OPERATION. <br />THE PLANS. NO ACTIVE SMOKE DETECTOR SHALL BE COVERED OR OTHERWISE REMOVED OR USED FOR OTHER THAN ITS INTENDED <br />FORMALDEHYDE. <br />PURPOSE. <br />B. ADJUST AND CHECK EACH OPERATING ITEM OF HARDWARE AND EACH DOOR TO ENSURE PROPER OPERATION OR FUNCTION OF EVERY UNIT. <br />11. WOOD ORIGINS: <br />REPLACE UNITS WHICH CANNOT BE ADJUSTED TO OPERATE FREELY AND SMOOTHLY. <br />25. CONSTRUCTION WASTE MANAGEMENT: <br />ALL WOOD UTILIZED ON THE JOB (SOLID LUMBER AND TIMBER PANEL PRODUCTS PLUS FINISHED WOOD) SHOULD ORIGINATE FROM <br />REGIONAL SOURCES AND FROM CERTIFIED AND SUSTAINABLE SOURCES (SUCH AS SUSTAINABLE FORESTRY INITIATIVE, CSA, FORESTRY <br />7, FAILSAFE <br />G E N E RAL NOTES <br />WHERE LOCAL GREEN BUILDING ORDINANCE DOES NOT DICTATE TO THE CONTRARY AND LEED CERTIFICATION IS NOT REQUIRED BY THE <br />Title: <br />OWNER; <br />STEWARDSHIP COUNCIL, OR AMERICAN TREE FARM SYSTEMS). <br />ALL ELECTRONIC HARDWARE SHALL BE FAILSAFE AND TIED INTO THE LIFE SAFETY SYSTEM UNLESS OTHERWISE NOTED. SEE DOOR SCHEDULE, <br />• REDIRECT CONSTRUCTION, DEMOLITION & PACKAGING DEBRIS TO SOURCES OTHER THAN LANDFILL. <br />HARDWARE GROUPS AND SEQUENCE OF OPERATION FOR COMPLETE OPERATION. <br />• STRATEGIES MAY INCLUDE: <br />• REDIRECT PACKAGING DEBRIS BACK TO THE MANUFACTURER. <br />12. ADHESIVES & SEALANTS: <br />THE VOC CONTENT OF ADHESIVES AND SEALANTS USED SHALL BE LESS THAN THE CURRENT VOC CONTENT LIMITS OF SOUTH COAST AIR <br />8. USE BUILDING STANDARD HARDWARE. <br />• DONATE SALVAGEABLE MATERIALS TO A RECLAMATION SITE OR NON-PROFIT CHARITY SUCH AS HABITAT FOR HUMANITY. <br />QUALITY MANAGEMENT DISTRICT (SCAQMD) RULE #1168, AND ALL SEALANTS USED AS FILLERS SHALL MEET OR EXCEED THE <br />• DESIGNATE RECYCLING AREAS DURING DEMOLITION AND CONSTRUCTION. <br />REQUIREMENTS OF THE BAY AREA AIR QUALITY MANAGEMENT DISTRICT REGULATION 8, RULE 51. <br />Sheet: ■ <br />0 CONTACT A REGIONAL CARPET RECLAMATION FACILITY FOR SALVAGE OF CARPETING <br />