My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7780 Gall Blvd
Zephyrhills
>
Building Department
>
Building Plans
>
7780 Gall Blvd
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2025 11:49:16 AM
Creation date
1/21/2025 3:28:54 PM
Metadata
Fields
Template:
Building Plans
Street #
7780
Location
Gall Blvd
Contractor
Marand Builders
Building Plans - Permit #
14730
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 17, 2013 WELLS FARGO AGRIBOARD PANEL REPAIR 501-2717-033 <br />ZEPHYR COMMONS <br />Delete subparagraph 9.3.3 and substitute the following: <br />9.3.3 The Contractor warrants that title to all Work covered by an Application for Payment will pass <br />to the Owner no later than the time of payment. The Contractor further warrants that upon submittal <br />of an Application for Payment all Work for which Certificates for Payment have been issued and <br />payments received from the Owner shall, be free and clear of liens, claims, security interests or <br />encumbrances in favor of the Contractor, Subcontractors, material suppliers, or other persons or <br />entities making a claim by reason of having provided labor, material and equipment relating to the <br />Work. <br />9.6 Progress Payments <br />Delete subparagraph 9.6.4 and substitute the following: <br />9.6.4 Neither the Owner nor Architect shall have an obligation to pay or see to the payment of <br />money to a Subcontractor except as may otherwise be required by law. The Owner may pay <br />Subcontractors or Material Suppliers directly. <br />Add the following paragraph 9.11 to ARTICLE 9: <br />9.11 Liquidated Damages <br />9.11.1 The Contractor and the Contractor's surety, if any, shall be liable for and shall pay the Owner <br />the sums hereinafter stipulated as liquidated damages for each calendar day of delay until the Work <br />is substantially complete: Five Hundred Dollars ($ 500.00). <br />ARTICLE 10; PROTECTION OF PERSONS AND PROPERTY <br />10.2 Safety of Persons and Property <br />Add the following sub -subparagraph 10.2.4.1 to 10.2.4: <br />10.2.4.1 When use or storage of explosives or other hazardous materials or equipment or unusual <br />methods are necessary, the Contractor shall give the Owner reasonable advance notice. <br />ARTICLE 11; INSURANCE AND BONDS <br />11.1 Contractor's Liability Insurance <br />11.1.1.1 Delete the semicolon at the end of Clause 11.1.1.1 and add: <br />including private entities performing Work at the site and exempt from the coverage on account of <br />number of employees or occupation, which entities shall maintain voluntary compensation coverage <br />at the same limits specified for mandatory coverage for the duration of the Project; <br />11.1.1.2 Delete the semicolon at the end of Clause 11.1.1.2 and add: <br />or persons or entities excluded by statute from the requirements of Clause 11.1.1.1 but required by <br />the Contract Documents to provide the insurance required by that Clause; <br />SUPPLEMENTARY CONDITIONS 00800-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.