Laserfiche WebLink
September 17, 2013 WELLS FARGO AGRIBOARD PANEL REPAIR <br />ZEPHYR COMMONS <br />WELLS FARGO — ZEPHYR COMMONS <br />AGRIBOARD PANEL REPAIR <br />BID PACKAGE <br />ZEPHYR HILLS, FLORIDA <br />SECTION 01010 - SUMMARY OF WORK <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />501-2717-033 <br />A. Drawings and general provisions of the Contract, including General and <br />Supplementary Conditions and other Division 1 Specification Sections, apply to this <br />Section. <br />1.2 PROJECT DESCRIPTION <br />A. Project Identification: <br />1. Name of the Project: Wells Fargo Zephyr Hills Agriboard Panel Repair <br />2. Project Location: Zephyr Hills, FL <br />3. Owner: Wells Fargo <br />4. Architect/Engineer: Reynolds, Smith and Hills, Inc., Jacksonville, Florida. <br />5. Project Identifier/Number: 501-2717-033 <br />B. The Work will be constructed under a single prime contract. <br />C. The Work is divided into four phases: <br />1. Phase I: Preconstruction- Indoor Air Quality Controls <br />2. Phase II: Shoring of Existing Roof Panels <br />3. Phase III: Repair Agriboard Roof Panels <br />4. Phase IV: Repair Agriboard Wall Panels <br />D. Summary by Reference: The work can be summarized by reference to the <br />requirements of the various Contract Documents. These references can be <br />summarized but are not necessarily limited to the following: <br />1. The Executed Owner - Contractor Agreement (not bound herewith). <br />2. The General and Supplementary Conditions, which are bound herewith (in <br />this Project Manual). <br />3. The drawings, which are listed in a "Schedule of Drawings" as of the date of <br />these Contract Documents. <br />4. The specification sections, which are bound herewith and are listed in the <br />Table of Contents section bound herewith (in this Project Manual). <br />SUMMARY OF WORK 01010-1 <br />