Laserfiche WebLink
September 17, 2013 WELLS FARGO AGRIBOARD PANEL REPAIR 501-2717-033 <br />ZEPHYR COMMONS <br />5. The Addenda and Modifications to the Contract Documents, which have <br />been either bound herewith (in this Project Manual) or distributed by <br />transmittal subsequent to the binding hereof. <br />6. Work by the Owner, which is in connection with the project and is described <br />herein to the extent it is believed to have a significant relation with the work <br />of this Contract. <br />7. Governing regulations, which have a bearing on the performance of the <br />work; copies can be obtained from or reviewed at the local, state or federal <br />agency responsible for the regulation in each case. <br />8. Submittals (of any kind), copies of which are retained by the Contractor at the <br />site. <br />9. Miscellaneous element of information having a bearing on the performance <br />of the work, such as weather forecasts and reports of general trade union <br />negotiations; copies must be obtained by the Contractor through normal <br />information channels. <br />1.4 CONTRACTOR USE OF PREMISES <br />A. General: During the construction period the Contractor shall have full use of the <br />premises for construction operations, including use of the site. The Contractor's use <br />of the premises is limited only by the Owner's right to perform work or to retain other <br />contractors on portions of the Project. <br />B. Ownership of Property: Do not perform work, disturb or trespass upon properties not <br />possessed by the Owner. <br />PART 2 - PRODUCTS (Not Applicable) <br />PART 3 - EXECUTION <br />A. SCHEDULE OF PRODUCTS <br />1. Contractor is responsible for providing schedule for ordering owner -provided <br />products. <br />END OF SECTION 01010 <br />SUMMARY OF WORK 01010-2 <br />