_ 1- <br />j m <br />z uj 0 <br />Y F, <br />Lu <br />V <br />Z <br />cc 2 OC <br />� U a <br />REINFORCED CONCRETE <br />A. CLASSES OF CONCRETE <br />ALL CONCRETE SHALL CONFORM TO THE REQUIREMENTS AS SPECIFIED: 4,000 LBS 28-DAY <br />COMPRESSIVE STRENGTH, TYPE: NWT, 1" AGGREGATE SIZE. <br />B. REINFORCING STEEL <br />1. ALL REINFORCING STEEL SHALL BE ASTM A 615 GRADE 60 UNLESS NOTED OTHERWISE <br />ON THE DRAWINGS OR IN THESE NOTES. <br />2. SMOOTH WELDED WIRE REINFORCEMENT: ASTM A 185, YIELD STRENGTH 65,000 PSI. <br />C. REINFORCING STEEL COVERAGE <br />1. COVER IN STRUCTURAL MEMBERS NOT SPECIFIED IN THE DETAILS SHALL CONFORM TO <br />THE REQUIREMENTS OF ACI 318 UNLESS SPECIFIED OTHERWISE ON THE DRAWINGS. <br />SUBMITTALS <br />A. SUBMITTAL LIST AND SCHEDULE <br />1. THE GENERAL CONTRACTOR SHALL PREPARE A DETAILED LIST AND SCHEDULE OF <br />ALL SUBMITTAL ITEMS TO BE SENT TO THE STRUCTURAL ENGINEER PRIOR TO THE <br />START OF CONSTRUCTION. THIS LIST SHALL BE UPDATED AND REVISED AND KEPT <br />CURRENT AS THE JOB PROGRESSES. THE SUBMITTAL LIST SHALL BE ORGANIZED AS <br />SHOWN BELOW: <br />a. SHOP DRAWINGS <br />b. DESIGN CALCULATIONS <br />C. PRODUCT DATA, CERTIFICATES, REPORTS, AND OTHER LITERATURE <br />B. SUBMITTALS TO BE PROVIDED TO STRUCTURAL ENGINEER <br />1. STRUCTURAL SUBMITTALS: THE FOLLOWING SUBMITTALS SHALL BE PROVIDED: <br />a. CONCRETE MIX DESIGNS <br />b. REINFORCING STEEL <br />2. DEFERRED SUBMITTALS: <br />a. THE FOLLOWING ITEMS ARE CONSIDERED DEFERRED SUBMITTALS BY THE <br />REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE: <br />1) ITEMS ATTACHED TO THE STRUCTURAL FRAME FOR BUILDING <br />CLADDING ATTACHMENT OR FOR ATTACHMENT OF OTHER ITEMS <br />(REC) <br />NOTES: <br />(S&S) ITEMS MARKED THUS SHALL HAVE THE SHOP DRAWINGS AND DELEGATED <br />DESIGN SUBMITTALS (INCLUDING CALCULATIONS) SEALED PER THE PROJECT <br />SPECIFICATIONS BY AN ENGINEER REGISTERED INN THE STATE WHERE THE <br />PROJECT IS LOCATED. <br />(REC) ITEMS MARKED THUS SHALL BE SUBMITTED TO ENGINEER FOR RECORD ONLY <br />AND WILL NOT HAVE THE ENGINEER'S SHOP DRAWING STAMP AFFIXED. <br />3. SUBMITTAL REQUIREMENTS: <br />a. ALL SHOP DRAWINGS MUST BE REVIEWED AND ELECTRONICALLY STAMPED <br />BY THE GENERAL CONTRACTOR PRIOR TO SUBMITTAL. <br />b. CONTRACTOR SHALL PROVIDE THE SUBMITTAL IN ELECTRONIC POTABLE <br />DOCUMENT FORMAT (PDF) PER THE SPECIFICATIONS. <br />C. THE OMISSION FROM THE SHOP DRAWINGS OF ANY MATERIALS REQUIRED <br />BY THE CONTRACT DOCUMENTS TO BE FURNISHED SHALL NOT RELIEVE THE <br />CONTRACTOR OF THE RESPONSIBILITY OF FURNISHING AND INSTALLING <br />SUCH MATERIALS, REGARDLESS OF WHETHER THE SHOP DRAWINGS HAVE <br />BEEN REVIEWED AND APPROVED. <br />REPRODUCTION <br />1. THE USE OF ELECTRONIC FILES OR REPRODUCING OF THESE CONTRACT <br />DOCUMENTS BY ANY CONTRACTOR, SUBCONTRACTOR, ERECTOR, FABRICATOR, OR <br />MATERIAL SUPPLIER IN LIEU OF PREPARATION OF SHOP DRAWINGS SIGNIFIES THEIR <br />ACCEPTANCE OF ALL INFORMATION SHOWN HEREON AS CORRECT, AND OBLIGATES <br />THEMSELVES TO ANY JOB EXPENSE, REAL OR IMPLIED, ARISING DUE TO ANY <br />ERRORS THAT MAY OCCUR HEREON. <br />MISCELLANEOUS <br />A. CONTRACT DOCUMENTS <br />1. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO OBTAIN ALL <br />CONTRACT DOCUMENTS AND LATEST ADDENDA AND TO SUBMIT SUCH DOCUMENTS TO ALL <br />SUBCONTRACTORS AND MATERIAL SUPPLIERS PRIOR TO THE SUBMITTAL OF SHOP <br />DRAWINGS, FABRICATION OF ANY STRUCTURAL MEMBERS, AND ERECTION IN THE FIELD. <br />2. THE CONTRACT STRUCTURAL DRAWINGS AND SPECIFICATIONS REPRESENT THE <br />FINISHED STRUCTURE, AND, EXCEPT WHERE SPECIFICALLY SHOWN, DO NOT INDICATE THE <br />METHOD OR MEANS OF CONSTRUCTION. THE CONTRACTOR SHALL SUPERVISE AND DIRECT <br />THE WORK AND SHALL BE SOLELY RESPONSIBLE FOR ALL CONSTRUCTION MEANS, <br />METHODS, PROCEDURES, TECHNIQUES, AND SEQUENCE. <br />3. OPENINGS THROUGH FLOORS, ROOFS, AND WALLS FOR DUCTS, PIPING, AND/OR <br />CONDUIT SHALL BE COORDINATED BY THE CONTRACTOR. CONTRACTOR SHALL VERIFY <br />SIZES AND LOCATIONS OF HOLES AND OPENINGS WITH THE MECHANICAL, ELECTRICAL, <br />PLUMBING, AND FIRE PROTECTION DRAWINGS AND THE RESPECTIVE SUBCONTRACTORS. <br />4. REFER TO DRAWINGS OTHER THAN STRUCTURAL FOR COMPLETE INFORMATION <br />INCLUDING: TYPES OF FLOOR SLAB FINISHES AND THEIR LOCATIONS, FLOOR SLAB <br />DEPRESSIONS AND CURBS, OPENINGS IN STRUCTURAL WALLS, ROOFS AND FLOORS <br />REQUIRED BY ARCHITECTURAL AND MEP FEATURES, STAIRS, RAMPS, ETC. <br />5. WHERE MEMBER LOCATIONS ARE NOT SPECIFICALLY DIMENSIONED, MEMBERS ARE <br />EITHER LOCATED ON COLUMNS LINES OR ARE EQUALLY SPACED BETWEEN LOCATED <br />MEMBERS. <br />6. IF CERTAIN FEATURES ARE NOT FULLY SHOWN OR SPECIFIED ON THE DRAWINGS OR <br />IN THE SPECIFICATIONS, THEIR CONSTRUCTION SHALL BE OF THE SAME CHARACTER AS <br />SHOWN OR SPECIFIED IN SIMILAR CONDITIONS <br />B. DRAWING CONFLICTS <br />1) THE GENERAL CONTRACTOR SHALL COMPARE THE ARCHITECTURAL AND <br />STRUCTURAL DRAWINGS AND REPORT ANY DISCREPANCY BETWEEN EACH <br />SET OF DRAWINGS AND WITHIN EACH SET OF DRAWINGS TO THE ARCHITECT <br />AND ENGINEER PRIOR TO THE FABRICATION AND INSTALLATION OF ANY <br />STRUCTURAL MEMBERS. <br />C. CONFLICTS IN STRUCTURAL REQUIREMENTS <br />1) WHERE CONFLICT EXISTS AMONG THE VARIOUS PARTS OF THE <br />STRUCTURAL CONTRACT DOCUMENTS, STRUCTURAL DRAWINGS, GENERAL <br />NOTES, AND SPECIFICATIONS, THE STRICTEST REQUIREMENTS, AS <br />INDICATED BY THE ENGINEER, SHALL GOVERN. <br />D. EXISTING CONDITIONS <br />1) THE GENERAL CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND <br />CONDITIONS OF THE EXISTING BUILDING AT THE JOB SITE AND REPORT ANY <br />DISCREPANCIES FROM ASSUMED CONDITIONS SHOWN ON THE DRAWINGS <br />TO THE ARCHITECT AND ENGINEER PRIOR TO THE FABRICATION AND <br />ERECTION OF ANY MEMBERS. <br />MISCELLANEOUS <br />1) EXISTING CONSTRUCTION SHOWN ON THE DRAWINGS WAS OBTAINED FROM <br />EXISTING CONSTRUCTION DOCUMENTS AND LIMITED SITE OBSERVATION. <br />THESE DRAWINGS OF EXISTING CONSTRUCTION ARE AVAILABLE FOR <br />CONTRACTOR USE. HOWEVER, THE AVAILABLE DRAWINGS OF EXISTING <br />CONSTRUCTION ARE NOT NECESSARILY COMPLETE. THE CONTRACTOR <br />SHALL FIELD VERIFY ALL PERTINENT INFORMATION. <br />2) DEMOLITION, CUTTING, DRILLING, ETC. OF EXISTING WORK SHALL BE <br />PERFORMED WITH GREAT CARE SO AS NOT TO JEOPARDIZE THE <br />STRUCTURAL INTEGRITY OF THE EXISTING BUILDING. IF ANY <br />ARCHITECTURAL, STRUCTURAL, OR MEP MEMBERS NOT DESIGNATED FOR <br />REMOVAL INTERFERE WITH THE NEW WORK, THE ARCHITECT SHALL BE <br />NOTIFIED IMMEDIATELY AND APPROVAL OBTAINED PRIOR TO REMOVAL OF <br />THOSE MEMBERS. <br />3) THE CONTRACTOR SHALL SAFELY SHORE EXISTING CONSTRUCTION WHEREVER <br />EXISTING SUPPORTS ARE REMOVED TO ALLOW THE INSTALLATION OF NEW WORK. ALL <br />SHORING METHODS AND SEQUENCING OF DEMOLITION SHALL BE THE RESPONSIBILITY OF <br />THE CONTRACTOR AND HIS ENGINEER. <br />MATCHING CORNER 2 <br />4) THE CONTRACTOR SHALL VERIFY THE LOCATION OF EXISTING UTILITIES PRIOR TO BARS AT PERIMETER 2'-6" <br />THE START OF CONSTRUCTION AND TAKE CARE TO PROTECT EXISTING UTILITIES THAT ARE <br />TO REMAIN IN SERVICE. CONTINUOUS TURNDOWN AROUND PERIMETER CONCRETE SLAB ON -GRADE <br />REINFORCED WITH 8 - #8 BOTTOM REFER TO CIVIL PLAN <br />5) THE CONTRACTOR SHALL REPAIR ALL DAMAGE CAUSED DURING CONSTRUCTION WITH AND #6@ 12" TRANSVERSE FOR TOP ELEVATION <br />SIMILAR MATERIALS AND WORKMANSHIP TO RESTORE CONDITIONS TO LEVELS TOP REINFORCEMENT WITH <br />ACCEPTABLE TO THE ARCHITECT. <br />STANDARD HOOK AT END <br />E. RESPONSIBILITY OF THE CONTRACTOR FOR CONSTRUCTION LOADS <br />1) THE STRUCTURE HAS BEEN DESIGNED FOR THE LOADS IDENTIFIED WITHIN THESE%/\/ • .. • 2" TOP COVER <br />STRUCTURAL DRAWINGS THAT ARE ANTICIPATED TO BE APPLIED TO THE FINAL STRUCTURE <br />ONCE COMPLETED AND OCCUPIED. THE CONTRACTOR SHALL NOT OVERLOAD THE \ j\\"�\\//� • . j \ j�\/�\`�\ j\\/, \��\\�\\/\\\�% <br />STRUCTURE DURING CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR /\\// \// //�\//\\// //\\//\\ \\ AD <br />CHECKING THE ADEQUACY OF THE STRUCTURE TO SUPPORT ANY APPLIED CONSTRUCTION j\/ \\\ <br />LOADS, INCLUDING THOSE DUE TO CONSTRUCTION VEHICLES OR EQUIPMENT, MATERIAL\\/ <br />HANDLING OR STORAGE, SHORING OR RESHORING, OR ANY OTHER CONSTRUCTION \ \ \\//\\f\\\ /�`� �//�//.� /�X/�R <br />ACTIVITY. THE CONTRACTOR SHALL SUBMIT CALCULATIONS SIGNED AND SEALED BY AN //� //�/ / \ DIRECTLY BELOW PAD <br />ENGINEER LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED VERIFYING THE 1 8" STABILIZED SUBGRADE <br />ADEQUACY OF THE STRUCTURE FOR ANY PROPOSED CONSTRUCTION LOADS THAT ARE IN LBR 40 <br />EXCESS OF THE STATED DESIGN LOADS. THE STRUCTURAL ENGINEER IS NOT RESPONSIBLE <br />TO DESIGN OR CHECK THE STRUCTURE FOR LOADS APPLIED TO THE STRUCTURE FOR ANY CONSTRUCTION ACTIVITY. GENERATOR PAD TURNDOWN DETAIL <br />N.T.S. <br />F. CONTRACTOR SUBSTITUTIONS <br />1) ANY MATERIALS OR PRODUCTS SUBMITTED FOR APPROVAL THAT ARE DIFFERENT <br />FROM THE MATERIAL OR PRODUCTS SPECIFIED IN THE STRUCTURAL CONTRACT <br />DOCUMENTS WILL BE APPROVED ONLY IF THE FOLLOWING CRITERIA ARE SATISFIED: <br />a. A COST SAVINGS TO THE OWNER IS DOCUMENTED AND SUBMITTED WITH THE <br />REQUEST. <br />b. THE MATERIAL OR PRODUCT HAS BEEN APPROVED BY THE INTERNATIONAL CODE <br />COUNCIL (ICC) AND THE ICC REPORT IS SUBMITTED WITH THE REQUEST. <br />1. THE ICC ESR THAT IS SUBMITTED MUST REFERENCE THE BUILDING CODE <br />UNDER WHICH THE PROJECT IS PERMITTED. <br />2. ICC REPORTS THAT HAVE BEEN DISCONTINUED AT THE TIME OF PRODUCT <br />INSTALLATION WILL NOT BE ACCEPTED. <br />2) SUBMITTALS NOT SATISFYING THE ABOVE CRITERIA WILL NOT BE CONSIDERED. <br />G MECHANICAL EQUIPMENT WEIGHTS <br />DOWEL AND JOINT SPACING SCHEDULE <br />SLAB <br />DEPTH <br />DOWEL <br />SIZE <br />DOWEL <br />LENGTH <br />DOWEL <br />SPACING <br />MAXIMUM <br />JOINT <br />SPACING <br />5" <br />3/4" DIA. <br />16" <br />12" <br />13'-0" <br />6" <br />3/4" DIA. <br />16" <br />12" <br />14'-6" <br />7" <br />1" DIA. <br />18" <br />12" <br />16'-0" <br />8" <br />1" D IA. <br />18" <br />12" <br />17'-6" <br />1) THE GENERAL CONTRACTOR SHALL SUBMIT ACTUAL WEIGHTS OF EQUIPMENT TO BE <br />USED IN THE PROJECT TO THE STRUCTURAL ENGINEER FOR VERIFICATION OF LOADS USED <br />IN THE DESIGN AT LEAST THREE WEEKS PRIOR TO FABRICATION AND CONSTRUCTION OF WHERE JOINT FILLER IS SPECIFIED <br />THE SUPPORTING STRUCTURE. PREPARE EDGE OF EACH SIDE OF <br />JOINT WITH 1/8" RADIUS, SAWCUT <br />H. THE STRUCTURAL ENGINEER'S ROLE DURING CONSTRUCTION JOINT, AND PROVIDE JOINT FILLER <br />1) THE ENGINEER SHALL NOT HAVE CONTROL NOR CHARGE OF, AND SHALL NOT BE <br />RESPONSIBLE FOR, CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, OR <br />PROCEDURES, FOR SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE a , a ' ° -4 . • ' <br />WORK, FOR THE ACTS OR OMISSION OF THE CONTRACTOR, SUBCONTRACTOR, OR ANY d <br />OTHER PERSONS PERFORMING ANY OF THE WORK, OR FOR THE FAILURE OF ANY OF THEM • • .. d . <br />TO CARRY OUT THE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. CONSTRUCTION JOINT, <br />REFER TO NOTE 4 <br />2) PERIODIC SITE OBSERVATION BY FIELD REPRESENTATIVES OF WALTER P. MOORE <br />AND ASSOCIATES IS SOLELY FOR THE PURPOSE OF BECOMING GENERALLY FAMILIAR WITH DOWELS, REFER TO <br />THE PROGRESS AND QUALITY OF THE WORK COMPLETED AND DETERMINING, IN GENERAL, SCHEDULE AND <br />IF THE WORK OBSERVED IS BEING PERFORMED IN A MANNER INDICATING THAT THE WORK, NOTES 5 AND 6 <br />WHEN FULLY COMPLETED, WILL BE IN ACCORDANCE WITH THE STRUCTURAL CONTRACT CONSTRUCTION JOINT <br />DOCUMENTS. THIS LIMITED SITE OBSERVATION SHOULD NOT BE CONSTRUED AS <br />EXHAUSTIVE OR CONTINUOUS TO CHECK THE QUALITY OR QUANTITY OF THE WORK, BUT <br />RATHER PERIODIC IN AN EFFORT TO KEEP THE OWNER REASONABLY INFORMED ABOUT <br />THE PROGRESS AND QUALITY OF THE PORTION OF THE STRUCTURE COMPLETED. <br />I. MAINTENANCE STATEMENT <br />1) ALL STRUCTURES REQUIRE PERIODIC MAINTENANCE TO EXTEND LIFESPAN AND TO <br />ENSURE STRUCTURAL INTEGRITY FROM EXPOSURE TO THE ENVIRONMENT. A PLANNED <br />PROGRAM OF MAINTENANCE SHALL BE ESTABLISHED BY THE BUILDING OWNER. THIS <br />143 CONTINUOUS EACH <br />SIDE OF JOINT SUPPORTED <br />INDEPENDENTLY FROM <br />DOWEL BAR (TYP.) <br />. ,.del..,• ,. ..:... <br />• r d G <br />EQUAL <br />' P <br />STOP ALTERNATE <br />JOINT <br />SAWCUT DEPTH = T/4 PROVIDE JOINT FILLER <br />REFER TO SPECIFICATIONS ONLY IF SPECIFIED <br />FOR ADDITIONAL JOINT <br />REQUIREMENTS <br />l a <br />CONTRACTION (CONTROL) JOINT <br />PROGRAM SHALL INCLUDE SUCH ITEMS SUCH AS BUT NOT LIMITED PAINTING TYPICAL CONSTRUCTION AND CONTROL JOINTS I N SLAB ON -GRADE. <br />STRUCTURAL STEEL, PROTECTIVE COATING FOR CONCRETE, SEALANTS, CAULKEDD JOINTS, <br />EXPANSION JOINTS, CONTROL JOINTS, SPALLS AND CRACKS IN CONCRETE, AND PRESSURE N.T.S. <br />WASHING OF EXPOSED STRUCTURAL ELEMENTS EXPOSED TO A SALT ENVIRONMENT OR <br />OTHER HARSH CHEMICALS. <br />NOTES: <br />1. REFER TO PLAN FOR SLAB THICKNESS (T) AND <br />REINFORCEMENT. <br />2. SLAB REINFORCEMENT SHALL BE CHAIRED BY <br />SOIL SUPPORTED SLAB BOLSTERS. <br />3. LONG STRIP CONSTRUCTION METHOD SHALL BE <br />USED IN PLACING CONCRETE FOR ALL <br />SLABS -ON -GRADE UNLESS NOTED OTHERWISE. <br />REFER TO "TYPICAL LONG STRIP CONSTRUCTION <br />SCHEMATIC JOINT LAYOUT" FOR COMPLETE <br />PLACING SEQUENCE. AT CONTRACTOR'S OPTION, <br />LARGER SLAB AREAS MAY BE POURED PROVIDED <br />THE EARLY -ENTRY DRY -CUT METHOD OF <br />INSTALLING CONTRACTION JOINTS IS USED. <br />REFER TO THE SPECIFICATIONS. <br />4. AT CONSTRUCTION JOINTS, BREAK BOND <br />BETWEEN NEW AND PREVIOUSLY PLACED SLAB <br />BY SPRAYING OR PAINTING EXPOSED SIDES OF <br />JOINT WITH A CURING COMPOUND, <br />BONDBREAKER, OR FORM OIL. <br />5. DOWELS SHOULD BE SMOOTH, ALIGNED, AND <br />SUPPORTED SO THEY WILL REMAIN PARALLEL IN <br />BOTH THE HORIZONTAL AND VERTICAL PLANES. <br />6. TO PREVENT A BOND BETWEEN THE DOWEL AND <br />THE CONCRETE, LIGHTLY COAT THE EXPOSED <br />END OF THE DOWELS WITH A PARAFFIN -BASED <br />LUBRICANT, ASPHALT EMULSION, FORM OIL, OR <br />GREASE IMMEDIATELY BEFORE PLACING <br />CONCRETE ON THE SECOND SIDE OF THE JOINT. <br />ALTERNATIVELY, USE A PLASTIC OR METAL <br />SLEEVE SPECIFICALLY MANUFACTURED FOR <br />THIS PURPOSE. <br />7. AT CONTRACTION (CONTROL) JOINTS, MAKE SAW <br />CUT AS SOON AS SLAB IS ABLE TO SUPPORT <br />WEIGHT OF WORKERS AND SAWING EQUIPMENT <br />WITHOUT DAMAGE TO FINISH SURFACE OF SLAB. <br />REFER TO SPECIFICATIONS. <br />8. PROVIDE CONTRACTION OR CONSTRUCTION <br />JOINTS AT EVERY COLUMN LINE AND IN BETWEEN <br />THE COLUMN LINES SUCH THAT THE JOINT <br />SPACING DOES NOT EXCEED TABULATED <br />DISTANCES. <br />9. FOR SLAB THICKNESS IN BETWEEN TABULATED <br />VALUES, USE DOWEL INFORMATION FOR <br />THICKER SLAB. MAXIMUM JOINT SPACING SHALL <br />BEINTERPOLATED. <br />TO THE BEST OF THE ENGINEERS KNOWLEDGE, THE PLANS AND SPECIFICATIONS COMPLY WITH THE APPLICABLE MINIMUM BUILDING CODES AND THE APPLICABLE FIRE -SAFETY STANDARDS AS DETERMINED BY THE LOCAL AUTHORITY IN ACCORDANCE WITH CHAPTER 553.79 AND CHAPTER 633, FLORIDA STATUTES. <br />wl <br />Z <br />V <br />O <br />C <br />Z <br />•�OOU <br />� <br />v <br />z_ <br />O <br />to to <br />Ln <br />W0 <br />$ <br />t;o N <br />N <br />m,�^ <br />W <br />J <br />Z <br />~ <br />3 0LL <br />O <br />a <br />o <br />(55 <br />li <br />Z~ <br />W <br />cc <br />`" <br />LL <br />C7 <br />N <br />z <br />N <br />m <br />00 <br />cn <br />t <br />N <br />a <br />t <br />kD <br />O <br />Q <br />Z <br />M <br />U <br />(u <br />G <br />bo <br />L <br />_j <br />L j <br />O <br />W <br />Q <br />u- <br />JQ <br />C 4- <br />L <br />U <br />z <br />d <br />-J <br />_ <br />`L �' <br />3 <br />l <br />d 00 <br />tL <br />qt <br />4) <br />Q <br />U <br />V <br />Z <br />w <br />H <br />oo Eo <br />J <br />M m O M <br />(I)t7 <br />Z <br />cNn <br />o <br />CD <br />cn ti w <br />Z <br />_z <br />Z h�00 V <br />DC <br />+� 00 O +J <br />LLI <br />Z <br />�NYQ <br />4--1 ^ V 0 <br />P4 <br />N++N f°O <br />CD <br />wc0 <br />-p as r ca <br />3 <br />Y <br />N 41) <br />O <br />ctN 3J <br />ri LL <br />H <br />crf <br />Y <br />U <br />GO <br />a <br />W <br />N <br />W <br />N <br />I..L <br />D <br />O <br />O <br />Q/ <br />LL <br />Z <br />d� <br />w <br />Z <br />°` co <br />L1J <br />.a <br />cm <br />(� <br />a° <br />Lu <br />H <br />:c <br />LLJ <br />Z <br />Q <br />L <br />C) <br />� n <br />co N <br />ISSUE DATE: 10/19/2018 <br />PROJECT NUMBER: 2847 <br />REVISIONS: <br />NO. DATE DESCRIPTION <br />1 <br />02/19/19 <br />REVISED FOOTER DIM. <br />STRUCTURAL PLAN & <br />DETAILS <br />© 2019 APG ENGINEERING <br />