PACKAGED COOLING W/HEAT RECOVERY UNIT SCHEDULE
<br />COOLING SECTION
<br />ENERGY RECOVERY SECTION (ENTHALPY RECOVERY WHEEL, ERW)
<br />FILTERS
<br />SUPPLY FAN
<br />EXHAUST FAN
<br />HEATING
<br />ELECTRICAL
<br />DX COIL DATA
<br />REFRIGERATION
<br />FLOW
<br />SUMMER
<br />WINTER
<br />SUP
<br />EXH
<br />UNIT
<br />MAX
<br />ACCEPTABLE
<br />MANUFACTURERS
<br />REMARKS
<br />TOTAL
<br />TOTAL
<br />PYSCHROMETRIC DATA
<br />APP.
<br />HEAT
<br />TOTAL
<br />LEAVING
<br />SENS
<br />TOTAL
<br />SUPPLY SIDE
<br />EXH SIDE
<br />SUPPLY SIDE
<br />EXH
<br />MERV
<br />MERV
<br />OA DESIGN
<br />CRITERIA
<br />LVG AIR
<br />ENTAIR
<br />LVG AIR
<br />ENTAIR
<br />ENT AIR
<br />ENT
<br />NO.
<br />AIR
<br />ESP
<br />AIR
<br />ESP
<br />SENS
<br />TOTAL
<br />COOL.
<br />CAP.
<br />REFRIG
<br />EER
<br />PUMP
<br />CAP.
<br />TEMP
<br />MIN
<br />CAP.
<br />CAP.
<br />SENS
<br />UNIT
<br />AND MODELS
<br />FLOW
<br />BHP
<br />DRIVE
<br />FLOW
<br />BHP
<br />DRIVE
<br />CAP.
<br />CAP.
<br />SUP
<br />CAP.
<br />FLA
<br />VOLT
<br />MCA
<br />IN H2O
<br />IN H2O
<br />CAP.
<br />W/ ERW
<br />FLOW
<br />DB WB
<br />DB
<br />WB
<br />TYPE
<br />W/
<br />CAP.
<br />W/ ERW
<br />DB
<br />EXH
<br />MBH
<br />MBH
<br />DB WB
<br />DB
<br />WB
<br />DB
<br />WB
<br />DB
<br />DB
<br />DB
<br />WEIGHT
<br />RATING
<br />RATING
<br />CFM
<br />CFM
<br />MBH
<br />MBH
<br />MBH
<br />TONS
<br />MBH
<br />CFM
<br />DEG F DEG F
<br />DEG F
<br />1
<br />DEG F
<br />ERW
<br />MBH
<br />MBH
<br />DEG F
<br />MAX
<br />MAX
<br />DEG F DEG F
<br />DEG F
<br />DEG F
<br />DEG F
<br />DEG Fj
<br />DEG F
<br />DEG FI
<br />DEG F
<br />LBS
<br />AAON RN-013-3-0-E609-000
<br />NOTES #1
<br />RTU-1
<br />2000
<br />1.0
<br />1.17
<br />VFD
<br />1700
<br />0.5
<br />0.86
<br />VFD
<br />76.54
<br />139.84
<br />11.7
<br />177.35
<br />2000
<br />92.4 77.4
<br />49.94
<br />49.74
<br />R-410A
<br />13.7
<br />105.6
<br />132.2
<br />78.5
<br />2000
<br />970
<br />13.15
<br />37.51
<br />92.4 77.4
<br />86.46
<br />73.08
<br />75
<br />62
<br />23.64
<br />38
<br />30
<br />70
<br />2,437
<br />13
<br />7
<br />31
<br />460
<br />34
<br />ADDISON TRSA SIZE 160
<br />THROUGH #21
<br />NOTE: SCHEDULE VALUES ARE BASED ON AAON RN-013 UNIT
<br />MECHANICAL NOTES:
<br />1. ALL WORK SHALL BE DONE IN STRICT ACCORDANCE WITH WITH THE 2010 FLORIDA BUILDING CODE. THESE CODES SHALL BE FOLLOWED AS MINIMUM PROVIDING
<br />HIGHER GRADES OF MATERIAL AND WORKMANSHIP WHERE REQUIRED. THE BASE CODES FOR THE 2010 EDITION OF THE FLORIDA BUILDING CODE INCLUDE:
<br />THE INTERNATIONAL BUILDING CODE 2009 EDITION THE INTERNATIONAL EXISTING BUILDING CODE 2009 EDITION
<br />THE INTERNATIONAL PLUMBING CODE 2009 EDITION THE NATIONAL ELECTRICAL CODE 2008 EDITION
<br />INTERNATIONAL ENERGY CONSERVATION CODE 2009 EDITION ASHRAE STANDARD 90.1-2004/2007
<br />THE INTERNATIONAL MECHANICAL CODE 2009 EDITION
<br />2. THE DRAWINGS INDICATE DIAGRAMMATICALLY THE EXTENT, GENERAL CHARACTER AND LOCATION OF WORK INCLUDED. WORK INDICATED, BUT HAVING MINOR
<br />DETAILS OMITTED, SHALL BE PROVIDED INCLUDING THESE DETAILS AT NO ADDITIONAL COST TO
<br />OWNER. ALL DIMENSIONS SHALL BE FIELD VERIFIED.
<br />3. ALL PERMITS, LICENSES, APPROVALS AND OTHER ARRANGEMENTS FOR WORK SHALL BE SHALL BE OBTAINED BY THE CONTRACTOR AT HIS OWN EXPENSE.
<br />4. CONTRACTOR SHALL FURNISH ALL LABOR, MATERIAL, AND EQUIPMENT NECESSARY FOR THE WORK, COMPLETE AS SHOWN ON THE DRAWINGS AND AS SPECIFIED.
<br />5. PROVIDE ALL TESTS AS REQUIRED BY THE 2010 FLORIDA BUILDING CODE MECHANICAL, ENERGY CONSERVATION & PLUMBING CODES.
<br />6. CONTRACTOR SHALL IDENTIFY AND INCLUDE ALL ITEMS NECESSARY FOR PROPER OPERATION OF INDICATED MECHANICAL HVAC SYSTEMS.
<br />7. CONTRACTOR SHALL COORDINATE HIS WORK WITH THE WORK OF ALL OTHER TRADES.
<br />8. CONTRACTOR SHALL RELOCATE ANY MINOR INTERFERENCES, INCLUDING CONDUIT, HANGERS, ETC., AT NO ADDITIONAL COST TO OWNER.
<br />9. PROVIDE ALL CUTTING AND PATCHING OF BUILDING MATERIALS AS REQUIRED FOR INSTALLATION OF THIS WORK.
<br />10. ANY CUTTING AND PATCHING THRU RATED WALLS SHALL BE DONE AND COMPLETED AS REQUIRED TO COMPLY WITH U.L.
<br />11. PROVIDE ALL HOLES AND SLEEVES FOR INSTALLATION OF MECHANICAL WORK.
<br />12. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATION OF EQUIPMENT, PARTITIONS, WALLS AND GENERAL CONSTRUCTION.
<br />13. CONTRACTOR SHALL MOUNT PRESSURE CONTROLLER 48 INCHES A.F.F. COORDINATE EXACT LOCATION WITH ALL OTHER TRADES.
<br />14. THE CONTRACTOR SHALL REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT LOCATION OF GRILLES, REGISTERS, AND DIFFUSERS.
<br />15. COORDINATE FLOOR, WALL, ROOF PENETRATIONS, CURB LOCATIONS, ETC. WITH ARCHITECTURAL TRADE.
<br />16. CONTRACTOR SHALL PROVIDE SUPPLEMENTARY STEEL AS REQUIRED FOR SUPPORTS, ANCHORS, AND GUIDES. SUBMIT PROPOSED METHODS OF ANCHORING AND
<br />GUIDING TO STRUCTURAL ENGINEER FOR APPROVAL.
<br />17. CONTRACTOR SHALL PROVIDE ALL MISCELLANEOUS SUPPORTING STEEL, ETC. FOR THE PROPER INSTALLATION OF ALL MECHANICAL SYSTEMS.
<br />18. PROVIDE SPRING TYPE VIBRATION ISOLATORS FOR ALL SUSPENDED MECHANICAL EQUIPMENT.
<br />19. PROVIDE SHEAVES CHANGES AS REQUIRED TO MEET FINAL TEST AND BALANCE CONDITIONS AND OPERATE SYSTEMS IN A QUIET AND EFFICIENT MANNER.
<br />20. VOLTAGE FOR ALL EQUIPMENT IS TO BE VERIFIED BY MECHANICAL CONTRACTOR.
<br />21. PIPING AND DUCTWORK SHALL NOT BE LOCATED OVER ELECTRICAL EQUIPMENT/PANELS. PROVIDE REQUIRED CLEARANCE IN FRONT OF ELECTRICAL EQUIPMENT.
<br />PIPING AND DUCTWORK SHALL NOT INTERFERE WITH ELECTRICAL EQUIPMENT CLEARANCE.
<br />22. CONTRACTOR SHALL PROVIDE CONTROL WIRING FOR EQUIPMENT. WIRING SHALL BE IN CONDUIT. CONDUIT SHALL BE CONCEALED WITHIN BUILDING CONSTRUCTION.
<br />23. VENTILATION SYSTEMS SHALL BE BALANCED BY AN APPROVED METHOD. SUCH BALANCING SHALL VERIFY THAT THE BALANCED SYSTEM IS CAPABLE SUPPLYING THE
<br />AIRFLOW RATES REQUIRED BY 2010 FLORIDA MECHANICAL CODE, SECTION 403. PROVIDE A COPY OF THE BALANCE TEST REPORT PRIOR TO FINAL MECHANICAL
<br />INSPECTION.
<br />24. ALL PIPING AND DUCTS IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN FURRED CHASES OR SUSPENDED CEILING.
<br />25. ALL DUCTWORK SHALL BE SHEET METAL. 1ST FIGURE OF DUCT SIZE INDICATES DIMENSION OF FACE SHOWN.
<br />26. ACCESS PANELS IN SUSPENDED CEILING. ARE REQUIRED FOR ALL VALVES, TRAPS, DAMPERS, CLEANOUTS, CONTROLS, ETC., AND SHALL BE FURNISHED BY EACH
<br />TRADE INSTALLING VALVES, DAMPERS ETC. AND INSTALLED UNDER ARCHITECTURAL SPECIFICATIONS. VERIFY LOCATIONS WITH ARCHITECTURAL DRAWINGS.
<br />27. CEILING DIFFUSER SIZES SHOWN ON PLANS ARE NECK SIZES.
<br />28. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN FOR EXACT LOCATION OF CEILING DIFFUSERS, REGISTERS AND GRILLES.
<br />29. ALL FLEXIBLE DUCT CONNECTIONS SHALL BE 5'-0" MAXIMUM.
<br />30. CONSTRUCTION OF ALL DUCTS MUST BE IN ACCORDANCE WITH SMACNA HVAC DUCT CONSTRUCTION STANDARDS - METAL AND FLEXIBLE. DUCT COVERINGS AND
<br />LININGS SHALL NOT FLAME, GLOW, SMOLDER, OR SMOKE WHEN TESTED IN ACCORDANCE WITH ASTM C411 AND SECTION 604.3 OF THE MECHANICAL CODE. FLEXIBLE
<br />DUCTS AND CONNECTORS SHALL BE TESTED IN ACCORDANCE WITH UL 181 AND BE LABELED WITH FLEXIBLE CONNECTORS BEING LIMITED TO A MAXIMUM OF 5 FEET.
<br />DUCTS MUST BE SEALED IN ACCORDANCE WITH 2O09 INTERNATIONAL ENERGY CONSERVATION CODE. RIGID DUCTS MUST BE SUPPORTED AT INTERVALS NOT
<br />EXCEEDING 10 FEET. ALL AIR FILTERS SHALL BE LISTED AND LABELED AND MEET THE APPLICABLE STANDARD REFERENCE IN THE MECHANICAL CODE.
<br />31. SUPPORTS FOR MECHANICAL SYSTEM PIPING MUST MEET THE HORIZONTAL AND VERTICAL SPACING PROVISIONS IN THE RESPECTIVE MECHANICAL.
<br />32. ALL OUTSIDE AIR INTAKE OPENINGS ARE LOCATED A MINIMUM OF 10 FEET FROM PLUMBING VENTS OR EXHAUST FAN DISCHARGE.
<br />33. BALANCING DAMPER SHALL BE INSTALLED FOR EACH BRANCH AND DIFFUSER TAKEOFF.
<br />47. ALL RETURN SHALL BE DUCTED RETURN. CEILING CAVITY IS NOT USED AS PLENUM CHAMBER.
<br />48. FIRE DAMPERS SHALL BE INSTALLED AS REQUIRED BY CODE.
<br />49. ALL GRILLES AND REGISTERS SHALL BE COMPATIBLE WITH THE CEILING IN WHICH THEY ARE INSTALLED.
<br />50. PROVIDE PRESSURE CONTROLLER WITH THERMOSTAT AND RELATIVE HUMIDITY SENSOR. LOCATION OF CONTROLLER SHALL BE COORDINATED WITH THE ARCHITECT AND
<br />OWNER'S REPRESENTATIVE. THERMOSTAT SHALL BE 7-DAY PROGRAMMABLE TYPE.
<br />51. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS TO ARCHITECTS/ENGINEER FOR REVIEW AND APPROVAL. THESE DRAWINGS SHALL BE UPDATED AND REPRODUCIBLE OF
<br />EACH SUBMITTED OWNER FOR RECORD.
<br />52. REFRIGERANT LINES SHALL BE INSULATED. PROVIDE 1'0 PVC DRAIN LINE FROM COOLING COIL TO NEAREST ROOF DRAIN OR GUTTER.
<br />53. ALL DUCTWORK SHALL BE GALVANIZED SHEETMETAL AND SHALL BE AS PER SMACNA STANDARDS. ALL CONCEALED SUPPLY DUCTWORK SHALL BE INSULATED.
<br />54. ALL EXHAUST DISCHARGE POINTS SHALL BE MINIMUM 10'-0" AWAY FROM ANY FREASH AIR INTAKES OR WINDOWS.
<br />55. ALL REFRIGERANT LINES SHALL BE COPPER AND JOINTS SHALL BE BRAZED.
<br />56. NOISE LEVELS AT LOT LINES SHALL NOT EXCEED 55 DB.
<br />57. ALL WORK SHALL BE PERFORMED BY EXPERIENCED WELL TRAINED WORKERS COMPETENT TO COMPLETE THE WORK AS SPECIFIED AND WITHIN SCHEDULED TIME PERIOD.
<br />1. VARIABLE CAPACITY COMPRESSORS FOR UNLOADING DOWN TO 10%
<br />OF NOMINAL CIRCUIT TONNAGE.
<br />2. AIR SOURCE HEAT PUMP CONFIGURATION
<br />3. ENERGY RECOVERY WHEEL WITH WHEEL ROTATION DETECTION.
<br />4. FACTORY WIRED CONVENIENCE OUTLET AND DISCONNECT. OUTLET
<br />TO REMAIN ACTIVE WHEN DISCONNECT IS OFF.
<br />5. REMOTE START/STOP TERMINALS.
<br />6. SUPPLY FAN WITH VFD AND PREMIUM EFFICIENCY MOTOR.
<br />7. EXHAUST FAN WITH VFD AND PREMIUM EFFICIENCY MOTOR.
<br />8. 2' MERV 8 PRE -FILTER AND 4" MERV 13 FINAL FILTER.
<br />9. MODULATING HOT GAS REHEAT FOR HUMIDITY CONTROL TO 70F (ADJ.)
<br />DISCHARGE AIR TEMPERATURE.
<br />10. HEAD PRESSURE CONTROLLED VFD-DRNEN CONDENSER FANS.
<br />11. NON -FUSED DISCONNECT SWITCH.
<br />12. FACTORY MOUNTED RETURN AIR AND SUPPLY AIR SMOKE DETECTORS.
<br />13. PHASE AND BROWNOUT PROTECTION DEVICE.
<br />14. REMOTE SAFETY SHUTDOWN TERMINALS FOR LIFE SAFETY.
<br />15. MAKEUP AIR HEAT PUMP UNIT CONTROLLER.
<br />16. HOT GAS RE -HEAT COIL
<br />17. FACTORY PROVIDED CONTROLS - WITH BACNET COMMUNICATION
<br />INTERFACE
<br />18. 14" ROOF CURB
<br />19. PIPING VESTIBULE
<br />20. PROVIDE UNIT MOUNTED SMOKE DETECTORS - SUPPLY AND RETURN
<br />21. REMOTE CONTROL PANEL
<br />SUMMARY EXHAUST SCHEDULE
<br />SPACE INFORMATION
<br />CODE REQUIRED EXHAUST
<br />DESIGN CRITERIA
<br />PLAN REQUIREMENTS
<br />EXHAUST
<br />EXHAUST
<br />RATE
<br />EXHAUST
<br />EXHAUST
<br />EXHAUST
<br />EXHAUST
<br />SPACE
<br />AREA
<br />RATE
<br />(WC/UR/SH)
<br />FLOW
<br />RATE
<br />FLOW
<br />FLOW
<br />EXHAUST & MAKE
<br />MEETS
<br />NUMBER
<br />SPACE NAME
<br />SPACE OCCUPANCY
<br />[SF]
<br />[CFM/SF]
<br />[CFM]
<br />[CFM]
<br />[CFM/SF]
<br />[CFM]
<br />[CFM]
<br />UP AIR SYSTEM
<br />CODE YES
<br />MAIN LEVEL
<br />249
<br />MICROLAB
<br />LABORATORIES
<br />313 SF
<br />1
<br />0 CFM
<br />313 CFM
<br />1.33
<br />416 CFM
<br />960 CFM
<br />RTU-1
<br />Yes
<br />250
<br />QC LAB
<br />LABORATORIES
<br />775 SF
<br />1
<br />0 CFM
<br />775 CFM
<br />1.33
<br />1031 CFM
<br />1031 CFM
<br />RTU-1
<br />Yes
<br />EXHAUST FAN SCHEDULE
<br />TYPE
<br />MARK
<br />MARK
<br />SERVICE
<br />LOCATION
<br />FAN TYPE
<br />CFM
<br />ESP
<br />ELECTRICAL DATA
<br />WEIGHT
<br />BASIS OF
<br />DESIGN
<br />REMARKS
<br />MOTOR HP
<br />I VOLTAGE
<br />I PHASE
<br />EF
<br />1
<br />AUTOCLAVE HOOD
<br />ROOF MTD
<br />UPBLAST
<br />500 CFM
<br />0.6
<br />1/6
<br />120 V
<br />1
<br />132
<br />GREENHECK
<br />NOTE 1, 2
<br />CENTRIFUGAL
<br />CUE-090-VG
<br />EF
<br />EX
<br />CHEMICAL FUME HOOD
<br />MEZZANINE
<br />INLINE
<br />800 CFM
<br />-
<br />-
<br />120 V
<br />N/A
<br />EXISTING TO
<br />EXISTING, VERIFY IN FIELD FOR CAPACITY, INLET SIZE AND
<br />REMAIN
<br />CONFIGUARATION.
<br />1. PROVIDE W/ ECM MOTOR & MANUAL MOTOR SPEED CONTROL WITH AUTOMATIC SHUT-OFF TIMER. ECM
<br />MOTOR SHALL HAVE "0-10V CONTROL INPUTS" FOR COORDINATION WITH CONTROL CONTRACTOR.
<br />2. APPROVED EQUAL MANUFACTURERS: CARNES, PENN
<br />VENTILATION SCHEDULE
<br />SPACE
<br />IDENTIFICATION
<br />CODE OA REQUIREMENTS
<br />CODE
<br />REQUIRED OA
<br />PLAN REQUIREMENTS
<br />AREA
<br />PEOPLE
<br />OUTDOOR
<br />OUTDOOR
<br />BREATHING
<br />ZONE AIR
<br />ZONE
<br />ZONE
<br />AIR RATE,
<br />AIR RATE,
<br />ZONE
<br />ZONE OUTDOOR
<br />DISTRIB.
<br />OUTDOOR
<br />ACTUAL
<br />PRIMARY
<br />ZONE PRIMARY
<br />AREA, Az
<br />Ra
<br />Rp
<br />DENSITY
<br />POPULATION,
<br />AIR FLOW,
<br />EFFECTIVENESS,
<br />AIR FLOW,
<br />SUPPLY,
<br />AIR FLOW,
<br />AIR FRACTION,
<br />SYSTEM
<br />ZONE
<br />ZONE OCCUPANCY
<br />[SF]
<br />[CFM/SF]
<br />[CFM/PRS]
<br />PPL / 1 K SF
<br />PZ
<br />Vbz
<br />Ez
<br />VOz
<br />Vdzd
<br />VpZ
<br />Zp
<br />TAG
<br />MICROLAB
<br />LABORATORY
<br />313 SF
<br />1 0.18
<br />1 10
<br />1 6.3
<br />1 1.97
<br />76 CFM
<br />0.8
<br />95 CFM
<br />1040 CFM
<br />1040 CFM
<br />0.09
<br />RTU-1
<br />QC LAB
<br />LABORATORY
<br />775 SF
<br />1 0.18
<br />1 10
<br />1 5.14
<br />1 3.99
<br />179 CFM
<br />0.8
<br />224 CFM
<br />960 CFM
<br />960 CFM
<br />0.23
<br />RTU-1
<br />DIFFUSERS & GRILLES
<br />TYPE
<br />DESCRIPTION
<br />MATERIAL
<br />ACCESSORIES
<br />BASIS OF DESIGN
<br />REMAKRS
<br />R1
<br />AEROBLADE RETURN GRILLE 45 DEG DEFLECTION
<br />ALUMINUM
<br />TITUS 3F
<br />NOTE 1, 2
<br />S1
<br />24 INCH SQUARE PLAQUE CEILING SUPPLY
<br />ALUMINUM
<br />TITUS OMNI
<br />NOTE 1, 2
<br />S2
<br />24x48 INCH HIGH VOLUME, LOW VELICITY, 1-WAY PATTERN
<br />RADIAL AIR DIFFUSION
<br />ALUMINUM
<br />TITUS TRITEC
<br />NOTE 1, 2
<br />1. SEE DRAWINGS FOR INDIVIDUAL DIFFUSER NECK SIZES
<br />2. APPROVED EQUAL MANUFACTURERS: PRICE, NAILOR
<br />RETURN AIR FLOW CONTROL DAMPERS
<br />SYSTEM
<br />SIZE
<br />TYPE
<br />CONTROL
<br />TORQUE
<br />0 - 900
<br />TIME
<br />WATTS
<br />REMARKS
<br />RETURN I SEE PLAN OPOSED BLADE MOTORIZED 30 IN -LB 1.5 SEC 25 10 -10 VDC SIGNAL TO PRESSURE CONTROLLER
<br />PROVIDED WITH TSI FAST ACTING ELECTRIC ACTUATOR
<br />TERMINAL
<br />UNITS - SINGLE DUCT SCHEDULE
<br />TYPE
<br />MARK
<br />MARK
<br />SERVES
<br />AIR FLOW
<br />RATE
<br />CAPACITY
<br />DESIGN
<br />HTG COIL
<br />AIR FLOW
<br />ELECTRIC DATA
<br />CONTROL
<br />TYPE
<br />BASIS OF
<br />DESIGN
<br />REMARKS
<br />VOLTAGE
<br />REHEAT
<br />CAPACITY
<br />VAV
<br />1
<br />MICROLAB
<br />1040 CFM
<br />1040 CFM
<br />277 V
<br />6500 W
<br />SCR
<br />NAILOR D30HQE
<br />VAV
<br />2
<br />QC LAB
<br />960 CFM
<br />960 CFM
<br />277 V
<br />6500 W
<br />SCR
<br />NAILOR D30HQE
<br />AMBIENT NOISE CONTROL REQUIREMENTS:
<br />AMBIENT NOISE FROM MECHANICAL EQUIPMENT SHALL NOT
<br />EXCEED NOISE
<br />CRITERIA CURVE (NC) IN ACCORDANCE WITH ASHRAE
<br />FUNDAMENTALS
<br />OFFICE AND CONFERENCE ROOMS - NC35
<br />AUTOCLAVE EXHAUST HOOD
<br />MARK
<br />TYPE
<br />WIDTH
<br />[IN]
<br />LENGTH
<br />[IN]
<br />EXHAUST
<br />[CFM]
<br />VELOCITY
<br />[FPM]
<br />COLLAR
<br />SIZE
<br />SP
<br />[W.C.]
<br />WEIGHT
<br />[LBS]
<br />MFD & MODEL
<br />REMARKS
<br />HD-1 I TYPE II 1 36 1 40 1 500 1 500 1 12"X12" 1 0.04 1 100 1 GREENHECK GD2 I W/ SINGLE CONDENSATE BAFFLE AND END SKIRTS
<br />MEP / FP Engineer
<br />EPSTEIN
<br />600 West Fulton
<br />Chicago, IL 60661
<br />312.454.9100
<br />Design Architect
<br />EPSTEIN
<br />600 West Fulton
<br />Chicago, IL 60661
<br />312.454.9100
<br />Nestle Waters North America
<br />Nestle Waters North America
<br />4330 20th Street
<br />Zephyrhills, Florida 33542-6703
<br />972.462.3663
<br />[r/WoNr�e-s:t1ders
<br />� ®O
<br />s
<br />74241
<br />OF
<br />o •
<br />��A �ejlfa9�.beaaa�� ��
<br />4
<br />09.18.2013
<br />ISSUE FOR PERMIT
<br />3
<br />09.11.2013
<br />ISSUE FOR BIDS
<br />2
<br />09.03.2013
<br />CD REVIEW PACKAGE
<br />1
<br />08.16.2013
<br />DD REVIEW PACKAGE
<br />NO.
<br />DATE
<br />REVISIONS/ISSUANCES
<br />GiPSTEIN
<br />Architecture
<br />Chicago
<br />Interiors
<br />New York
<br />Engineering
<br />Bucharest
<br />Construction
<br />Warsaw
<br />600 W. Fulton Street
<br />Chicago, IL 60661-1259
<br />T 312.454.9100
<br />www.epsteingbbal.com
<br />PROJECT NUMBER: 12386
<br />PROJECT MANAGER: JK
<br />ARCH/ENG: LK
<br />SCALE: 1/8" = V-0"
<br />DRAWN BY: JK
<br />CHECKED BY: LK
<br />MECHANICAL
<br />NOTES & SCHEDULES
<br />M-1 02