Laserfiche WebLink
PACKAGED COOLING W/HEAT RECOVERY UNIT SCHEDULE <br />COOLING SECTION <br />ENERGY RECOVERY SECTION (ENTHALPY RECOVERY WHEEL, ERW) <br />FILTERS <br />SUPPLY FAN <br />EXHAUST FAN <br />HEATING <br />ELECTRICAL <br />DX COIL DATA <br />REFRIGERATION <br />FLOW <br />SUMMER <br />WINTER <br />SUP <br />EXH <br />UNIT <br />MAX <br />ACCEPTABLE <br />MANUFACTURERS <br />REMARKS <br />TOTAL <br />TOTAL <br />PYSCHROMETRIC DATA <br />APP. <br />HEAT <br />TOTAL <br />LEAVING <br />SENS <br />TOTAL <br />SUPPLY SIDE <br />EXH SIDE <br />SUPPLY SIDE <br />EXH <br />MERV <br />MERV <br />OA DESIGN <br />CRITERIA <br />LVG AIR <br />ENTAIR <br />LVG AIR <br />ENTAIR <br />ENT AIR <br />ENT <br />NO. <br />AIR <br />ESP <br />AIR <br />ESP <br />SENS <br />TOTAL <br />COOL. <br />CAP. <br />REFRIG <br />EER <br />PUMP <br />CAP. <br />TEMP <br />MIN <br />CAP. <br />CAP. <br />SENS <br />UNIT <br />AND MODELS <br />FLOW <br />BHP <br />DRIVE <br />FLOW <br />BHP <br />DRIVE <br />CAP. <br />CAP. <br />SUP <br />CAP. <br />FLA <br />VOLT <br />MCA <br />IN H2O <br />IN H2O <br />CAP. <br />W/ ERW <br />FLOW <br />DB WB <br />DB <br />WB <br />TYPE <br />W/ <br />CAP. <br />W/ ERW <br />DB <br />EXH <br />MBH <br />MBH <br />DB WB <br />DB <br />WB <br />DB <br />WB <br />DB <br />DB <br />DB <br />WEIGHT <br />RATING <br />RATING <br />CFM <br />CFM <br />MBH <br />MBH <br />MBH <br />TONS <br />MBH <br />CFM <br />DEG F DEG F <br />DEG F <br />1 <br />DEG F <br />ERW <br />MBH <br />MBH <br />DEG F <br />MAX <br />MAX <br />DEG F DEG F <br />DEG F <br />DEG F <br />DEG F <br />DEG Fj <br />DEG F <br />DEG FI <br />DEG F <br />LBS <br />AAON RN-013-3-0-E609-000 <br />NOTES #1 <br />RTU-1 <br />2000 <br />1.0 <br />1.17 <br />VFD <br />1700 <br />0.5 <br />0.86 <br />VFD <br />76.54 <br />139.84 <br />11.7 <br />177.35 <br />2000 <br />92.4 77.4 <br />49.94 <br />49.74 <br />R-410A <br />13.7 <br />105.6 <br />132.2 <br />78.5 <br />2000 <br />970 <br />13.15 <br />37.51 <br />92.4 77.4 <br />86.46 <br />73.08 <br />75 <br />62 <br />23.64 <br />38 <br />30 <br />70 <br />2,437 <br />13 <br />7 <br />31 <br />460 <br />34 <br />ADDISON TRSA SIZE 160 <br />THROUGH #21 <br />NOTE: SCHEDULE VALUES ARE BASED ON AAON RN-013 UNIT <br />MECHANICAL NOTES: <br />1. ALL WORK SHALL BE DONE IN STRICT ACCORDANCE WITH WITH THE 2010 FLORIDA BUILDING CODE. THESE CODES SHALL BE FOLLOWED AS MINIMUM PROVIDING <br />HIGHER GRADES OF MATERIAL AND WORKMANSHIP WHERE REQUIRED. THE BASE CODES FOR THE 2010 EDITION OF THE FLORIDA BUILDING CODE INCLUDE: <br />THE INTERNATIONAL BUILDING CODE 2009 EDITION THE INTERNATIONAL EXISTING BUILDING CODE 2009 EDITION <br />THE INTERNATIONAL PLUMBING CODE 2009 EDITION THE NATIONAL ELECTRICAL CODE 2008 EDITION <br />INTERNATIONAL ENERGY CONSERVATION CODE 2009 EDITION ASHRAE STANDARD 90.1-2004/2007 <br />THE INTERNATIONAL MECHANICAL CODE 2009 EDITION <br />2. THE DRAWINGS INDICATE DIAGRAMMATICALLY THE EXTENT, GENERAL CHARACTER AND LOCATION OF WORK INCLUDED. WORK INDICATED, BUT HAVING MINOR <br />DETAILS OMITTED, SHALL BE PROVIDED INCLUDING THESE DETAILS AT NO ADDITIONAL COST TO <br />OWNER. ALL DIMENSIONS SHALL BE FIELD VERIFIED. <br />3. ALL PERMITS, LICENSES, APPROVALS AND OTHER ARRANGEMENTS FOR WORK SHALL BE SHALL BE OBTAINED BY THE CONTRACTOR AT HIS OWN EXPENSE. <br />4. CONTRACTOR SHALL FURNISH ALL LABOR, MATERIAL, AND EQUIPMENT NECESSARY FOR THE WORK, COMPLETE AS SHOWN ON THE DRAWINGS AND AS SPECIFIED. <br />5. PROVIDE ALL TESTS AS REQUIRED BY THE 2010 FLORIDA BUILDING CODE MECHANICAL, ENERGY CONSERVATION & PLUMBING CODES. <br />6. CONTRACTOR SHALL IDENTIFY AND INCLUDE ALL ITEMS NECESSARY FOR PROPER OPERATION OF INDICATED MECHANICAL HVAC SYSTEMS. <br />7. CONTRACTOR SHALL COORDINATE HIS WORK WITH THE WORK OF ALL OTHER TRADES. <br />8. CONTRACTOR SHALL RELOCATE ANY MINOR INTERFERENCES, INCLUDING CONDUIT, HANGERS, ETC., AT NO ADDITIONAL COST TO OWNER. <br />9. PROVIDE ALL CUTTING AND PATCHING OF BUILDING MATERIALS AS REQUIRED FOR INSTALLATION OF THIS WORK. <br />10. ANY CUTTING AND PATCHING THRU RATED WALLS SHALL BE DONE AND COMPLETED AS REQUIRED TO COMPLY WITH U.L. <br />11. PROVIDE ALL HOLES AND SLEEVES FOR INSTALLATION OF MECHANICAL WORK. <br />12. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATION OF EQUIPMENT, PARTITIONS, WALLS AND GENERAL CONSTRUCTION. <br />13. CONTRACTOR SHALL MOUNT PRESSURE CONTROLLER 48 INCHES A.F.F. COORDINATE EXACT LOCATION WITH ALL OTHER TRADES. <br />14. THE CONTRACTOR SHALL REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT LOCATION OF GRILLES, REGISTERS, AND DIFFUSERS. <br />15. COORDINATE FLOOR, WALL, ROOF PENETRATIONS, CURB LOCATIONS, ETC. WITH ARCHITECTURAL TRADE. <br />16. CONTRACTOR SHALL PROVIDE SUPPLEMENTARY STEEL AS REQUIRED FOR SUPPORTS, ANCHORS, AND GUIDES. SUBMIT PROPOSED METHODS OF ANCHORING AND <br />GUIDING TO STRUCTURAL ENGINEER FOR APPROVAL. <br />17. CONTRACTOR SHALL PROVIDE ALL MISCELLANEOUS SUPPORTING STEEL, ETC. FOR THE PROPER INSTALLATION OF ALL MECHANICAL SYSTEMS. <br />18. PROVIDE SPRING TYPE VIBRATION ISOLATORS FOR ALL SUSPENDED MECHANICAL EQUIPMENT. <br />19. PROVIDE SHEAVES CHANGES AS REQUIRED TO MEET FINAL TEST AND BALANCE CONDITIONS AND OPERATE SYSTEMS IN A QUIET AND EFFICIENT MANNER. <br />20. VOLTAGE FOR ALL EQUIPMENT IS TO BE VERIFIED BY MECHANICAL CONTRACTOR. <br />21. PIPING AND DUCTWORK SHALL NOT BE LOCATED OVER ELECTRICAL EQUIPMENT/PANELS. PROVIDE REQUIRED CLEARANCE IN FRONT OF ELECTRICAL EQUIPMENT. <br />PIPING AND DUCTWORK SHALL NOT INTERFERE WITH ELECTRICAL EQUIPMENT CLEARANCE. <br />22. CONTRACTOR SHALL PROVIDE CONTROL WIRING FOR EQUIPMENT. WIRING SHALL BE IN CONDUIT. CONDUIT SHALL BE CONCEALED WITHIN BUILDING CONSTRUCTION. <br />23. VENTILATION SYSTEMS SHALL BE BALANCED BY AN APPROVED METHOD. SUCH BALANCING SHALL VERIFY THAT THE BALANCED SYSTEM IS CAPABLE SUPPLYING THE <br />AIRFLOW RATES REQUIRED BY 2010 FLORIDA MECHANICAL CODE, SECTION 403. PROVIDE A COPY OF THE BALANCE TEST REPORT PRIOR TO FINAL MECHANICAL <br />INSPECTION. <br />24. ALL PIPING AND DUCTS IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN FURRED CHASES OR SUSPENDED CEILING. <br />25. ALL DUCTWORK SHALL BE SHEET METAL. 1ST FIGURE OF DUCT SIZE INDICATES DIMENSION OF FACE SHOWN. <br />26. ACCESS PANELS IN SUSPENDED CEILING. ARE REQUIRED FOR ALL VALVES, TRAPS, DAMPERS, CLEANOUTS, CONTROLS, ETC., AND SHALL BE FURNISHED BY EACH <br />TRADE INSTALLING VALVES, DAMPERS ETC. AND INSTALLED UNDER ARCHITECTURAL SPECIFICATIONS. VERIFY LOCATIONS WITH ARCHITECTURAL DRAWINGS. <br />27. CEILING DIFFUSER SIZES SHOWN ON PLANS ARE NECK SIZES. <br />28. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN FOR EXACT LOCATION OF CEILING DIFFUSERS, REGISTERS AND GRILLES. <br />29. ALL FLEXIBLE DUCT CONNECTIONS SHALL BE 5'-0" MAXIMUM. <br />30. CONSTRUCTION OF ALL DUCTS MUST BE IN ACCORDANCE WITH SMACNA HVAC DUCT CONSTRUCTION STANDARDS - METAL AND FLEXIBLE. DUCT COVERINGS AND <br />LININGS SHALL NOT FLAME, GLOW, SMOLDER, OR SMOKE WHEN TESTED IN ACCORDANCE WITH ASTM C411 AND SECTION 604.3 OF THE MECHANICAL CODE. FLEXIBLE <br />DUCTS AND CONNECTORS SHALL BE TESTED IN ACCORDANCE WITH UL 181 AND BE LABELED WITH FLEXIBLE CONNECTORS BEING LIMITED TO A MAXIMUM OF 5 FEET. <br />DUCTS MUST BE SEALED IN ACCORDANCE WITH 2O09 INTERNATIONAL ENERGY CONSERVATION CODE. RIGID DUCTS MUST BE SUPPORTED AT INTERVALS NOT <br />EXCEEDING 10 FEET. ALL AIR FILTERS SHALL BE LISTED AND LABELED AND MEET THE APPLICABLE STANDARD REFERENCE IN THE MECHANICAL CODE. <br />31. SUPPORTS FOR MECHANICAL SYSTEM PIPING MUST MEET THE HORIZONTAL AND VERTICAL SPACING PROVISIONS IN THE RESPECTIVE MECHANICAL. <br />32. ALL OUTSIDE AIR INTAKE OPENINGS ARE LOCATED A MINIMUM OF 10 FEET FROM PLUMBING VENTS OR EXHAUST FAN DISCHARGE. <br />33. BALANCING DAMPER SHALL BE INSTALLED FOR EACH BRANCH AND DIFFUSER TAKEOFF. <br />47. ALL RETURN SHALL BE DUCTED RETURN. CEILING CAVITY IS NOT USED AS PLENUM CHAMBER. <br />48. FIRE DAMPERS SHALL BE INSTALLED AS REQUIRED BY CODE. <br />49. ALL GRILLES AND REGISTERS SHALL BE COMPATIBLE WITH THE CEILING IN WHICH THEY ARE INSTALLED. <br />50. PROVIDE PRESSURE CONTROLLER WITH THERMOSTAT AND RELATIVE HUMIDITY SENSOR. LOCATION OF CONTROLLER SHALL BE COORDINATED WITH THE ARCHITECT AND <br />OWNER'S REPRESENTATIVE. THERMOSTAT SHALL BE 7-DAY PROGRAMMABLE TYPE. <br />51. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS TO ARCHITECTS/ENGINEER FOR REVIEW AND APPROVAL. THESE DRAWINGS SHALL BE UPDATED AND REPRODUCIBLE OF <br />EACH SUBMITTED OWNER FOR RECORD. <br />52. REFRIGERANT LINES SHALL BE INSULATED. PROVIDE 1'0 PVC DRAIN LINE FROM COOLING COIL TO NEAREST ROOF DRAIN OR GUTTER. <br />53. ALL DUCTWORK SHALL BE GALVANIZED SHEETMETAL AND SHALL BE AS PER SMACNA STANDARDS. ALL CONCEALED SUPPLY DUCTWORK SHALL BE INSULATED. <br />54. ALL EXHAUST DISCHARGE POINTS SHALL BE MINIMUM 10'-0" AWAY FROM ANY FREASH AIR INTAKES OR WINDOWS. <br />55. ALL REFRIGERANT LINES SHALL BE COPPER AND JOINTS SHALL BE BRAZED. <br />56. NOISE LEVELS AT LOT LINES SHALL NOT EXCEED 55 DB. <br />57. ALL WORK SHALL BE PERFORMED BY EXPERIENCED WELL TRAINED WORKERS COMPETENT TO COMPLETE THE WORK AS SPECIFIED AND WITHIN SCHEDULED TIME PERIOD. <br />1. VARIABLE CAPACITY COMPRESSORS FOR UNLOADING DOWN TO 10% <br />OF NOMINAL CIRCUIT TONNAGE. <br />2. AIR SOURCE HEAT PUMP CONFIGURATION <br />3. ENERGY RECOVERY WHEEL WITH WHEEL ROTATION DETECTION. <br />4. FACTORY WIRED CONVENIENCE OUTLET AND DISCONNECT. OUTLET <br />TO REMAIN ACTIVE WHEN DISCONNECT IS OFF. <br />5. REMOTE START/STOP TERMINALS. <br />6. SUPPLY FAN WITH VFD AND PREMIUM EFFICIENCY MOTOR. <br />7. EXHAUST FAN WITH VFD AND PREMIUM EFFICIENCY MOTOR. <br />8. 2' MERV 8 PRE -FILTER AND 4" MERV 13 FINAL FILTER. <br />9. MODULATING HOT GAS REHEAT FOR HUMIDITY CONTROL TO 70F (ADJ.) <br />DISCHARGE AIR TEMPERATURE. <br />10. HEAD PRESSURE CONTROLLED VFD-DRNEN CONDENSER FANS. <br />11. NON -FUSED DISCONNECT SWITCH. <br />12. FACTORY MOUNTED RETURN AIR AND SUPPLY AIR SMOKE DETECTORS. <br />13. PHASE AND BROWNOUT PROTECTION DEVICE. <br />14. REMOTE SAFETY SHUTDOWN TERMINALS FOR LIFE SAFETY. <br />15. MAKEUP AIR HEAT PUMP UNIT CONTROLLER. <br />16. HOT GAS RE -HEAT COIL <br />17. FACTORY PROVIDED CONTROLS - WITH BACNET COMMUNICATION <br />INTERFACE <br />18. 14" ROOF CURB <br />19. PIPING VESTIBULE <br />20. PROVIDE UNIT MOUNTED SMOKE DETECTORS - SUPPLY AND RETURN <br />21. REMOTE CONTROL PANEL <br />SUMMARY EXHAUST SCHEDULE <br />SPACE INFORMATION <br />CODE REQUIRED EXHAUST <br />DESIGN CRITERIA <br />PLAN REQUIREMENTS <br />EXHAUST <br />EXHAUST <br />RATE <br />EXHAUST <br />EXHAUST <br />EXHAUST <br />EXHAUST <br />SPACE <br />AREA <br />RATE <br />(WC/UR/SH) <br />FLOW <br />RATE <br />FLOW <br />FLOW <br />EXHAUST & MAKE <br />MEETS <br />NUMBER <br />SPACE NAME <br />SPACE OCCUPANCY <br />[SF] <br />[CFM/SF] <br />[CFM] <br />[CFM] <br />[CFM/SF] <br />[CFM] <br />[CFM] <br />UP AIR SYSTEM <br />CODE YES <br />MAIN LEVEL <br />249 <br />MICROLAB <br />LABORATORIES <br />313 SF <br />1 <br />0 CFM <br />313 CFM <br />1.33 <br />416 CFM <br />960 CFM <br />RTU-1 <br />Yes <br />250 <br />QC LAB <br />LABORATORIES <br />775 SF <br />1 <br />0 CFM <br />775 CFM <br />1.33 <br />1031 CFM <br />1031 CFM <br />RTU-1 <br />Yes <br />EXHAUST FAN SCHEDULE <br />TYPE <br />MARK <br />MARK <br />SERVICE <br />LOCATION <br />FAN TYPE <br />CFM <br />ESP <br />ELECTRICAL DATA <br />WEIGHT <br />BASIS OF <br />DESIGN <br />REMARKS <br />MOTOR HP <br />I VOLTAGE <br />I PHASE <br />EF <br />1 <br />AUTOCLAVE HOOD <br />ROOF MTD <br />UPBLAST <br />500 CFM <br />0.6 <br />1/6 <br />120 V <br />1 <br />132 <br />GREENHECK <br />NOTE 1, 2 <br />CENTRIFUGAL <br />CUE-090-VG <br />EF <br />EX <br />CHEMICAL FUME HOOD <br />MEZZANINE <br />INLINE <br />800 CFM <br />- <br />- <br />120 V <br />N/A <br />EXISTING TO <br />EXISTING, VERIFY IN FIELD FOR CAPACITY, INLET SIZE AND <br />REMAIN <br />CONFIGUARATION. <br />1. PROVIDE W/ ECM MOTOR & MANUAL MOTOR SPEED CONTROL WITH AUTOMATIC SHUT-OFF TIMER. ECM <br />MOTOR SHALL HAVE "0-10V CONTROL INPUTS" FOR COORDINATION WITH CONTROL CONTRACTOR. <br />2. APPROVED EQUAL MANUFACTURERS: CARNES, PENN <br />VENTILATION SCHEDULE <br />SPACE <br />IDENTIFICATION <br />CODE OA REQUIREMENTS <br />CODE <br />REQUIRED OA <br />PLAN REQUIREMENTS <br />AREA <br />PEOPLE <br />OUTDOOR <br />OUTDOOR <br />BREATHING <br />ZONE AIR <br />ZONE <br />ZONE <br />AIR RATE, <br />AIR RATE, <br />ZONE <br />ZONE OUTDOOR <br />DISTRIB. <br />OUTDOOR <br />ACTUAL <br />PRIMARY <br />ZONE PRIMARY <br />AREA, Az <br />Ra <br />Rp <br />DENSITY <br />POPULATION, <br />AIR FLOW, <br />EFFECTIVENESS, <br />AIR FLOW, <br />SUPPLY, <br />AIR FLOW, <br />AIR FRACTION, <br />SYSTEM <br />ZONE <br />ZONE OCCUPANCY <br />[SF] <br />[CFM/SF] <br />[CFM/PRS] <br />PPL / 1 K SF <br />PZ <br />Vbz <br />Ez <br />VOz <br />Vdzd <br />VpZ <br />Zp <br />TAG <br />MICROLAB <br />LABORATORY <br />313 SF <br />1 0.18 <br />1 10 <br />1 6.3 <br />1 1.97 <br />76 CFM <br />0.8 <br />95 CFM <br />1040 CFM <br />1040 CFM <br />0.09 <br />RTU-1 <br />QC LAB <br />LABORATORY <br />775 SF <br />1 0.18 <br />1 10 <br />1 5.14 <br />1 3.99 <br />179 CFM <br />0.8 <br />224 CFM <br />960 CFM <br />960 CFM <br />0.23 <br />RTU-1 <br />DIFFUSERS & GRILLES <br />TYPE <br />DESCRIPTION <br />MATERIAL <br />ACCESSORIES <br />BASIS OF DESIGN <br />REMAKRS <br />R1 <br />AEROBLADE RETURN GRILLE 45 DEG DEFLECTION <br />ALUMINUM <br />TITUS 3F <br />NOTE 1, 2 <br />S1 <br />24 INCH SQUARE PLAQUE CEILING SUPPLY <br />ALUMINUM <br />TITUS OMNI <br />NOTE 1, 2 <br />S2 <br />24x48 INCH HIGH VOLUME, LOW VELICITY, 1-WAY PATTERN <br />RADIAL AIR DIFFUSION <br />ALUMINUM <br />TITUS TRITEC <br />NOTE 1, 2 <br />1. SEE DRAWINGS FOR INDIVIDUAL DIFFUSER NECK SIZES <br />2. APPROVED EQUAL MANUFACTURERS: PRICE, NAILOR <br />RETURN AIR FLOW CONTROL DAMPERS <br />SYSTEM <br />SIZE <br />TYPE <br />CONTROL <br />TORQUE <br />0 - 900 <br />TIME <br />WATTS <br />REMARKS <br />RETURN I SEE PLAN OPOSED BLADE MOTORIZED 30 IN -LB 1.5 SEC 25 10 -10 VDC SIGNAL TO PRESSURE CONTROLLER <br />PROVIDED WITH TSI FAST ACTING ELECTRIC ACTUATOR <br />TERMINAL <br />UNITS - SINGLE DUCT SCHEDULE <br />TYPE <br />MARK <br />MARK <br />SERVES <br />AIR FLOW <br />RATE <br />CAPACITY <br />DESIGN <br />HTG COIL <br />AIR FLOW <br />ELECTRIC DATA <br />CONTROL <br />TYPE <br />BASIS OF <br />DESIGN <br />REMARKS <br />VOLTAGE <br />REHEAT <br />CAPACITY <br />VAV <br />1 <br />MICROLAB <br />1040 CFM <br />1040 CFM <br />277 V <br />6500 W <br />SCR <br />NAILOR D30HQE <br />VAV <br />2 <br />QC LAB <br />960 CFM <br />960 CFM <br />277 V <br />6500 W <br />SCR <br />NAILOR D30HQE <br />AMBIENT NOISE CONTROL REQUIREMENTS: <br />AMBIENT NOISE FROM MECHANICAL EQUIPMENT SHALL NOT <br />EXCEED NOISE <br />CRITERIA CURVE (NC) IN ACCORDANCE WITH ASHRAE <br />FUNDAMENTALS <br />OFFICE AND CONFERENCE ROOMS - NC35 <br />AUTOCLAVE EXHAUST HOOD <br />MARK <br />TYPE <br />WIDTH <br />[IN] <br />LENGTH <br />[IN] <br />EXHAUST <br />[CFM] <br />VELOCITY <br />[FPM] <br />COLLAR <br />SIZE <br />SP <br />[W.C.] <br />WEIGHT <br />[LBS] <br />MFD & MODEL <br />REMARKS <br />HD-1 I TYPE II 1 36 1 40 1 500 1 500 1 12"X12" 1 0.04 1 100 1 GREENHECK GD2 I W/ SINGLE CONDENSATE BAFFLE AND END SKIRTS <br />MEP / FP Engineer <br />EPSTEIN <br />600 West Fulton <br />Chicago, IL 60661 <br />312.454.9100 <br />Design Architect <br />EPSTEIN <br />600 West Fulton <br />Chicago, IL 60661 <br />312.454.9100 <br />Nestle Waters North America <br />Nestle Waters North America <br />4330 20th Street <br />Zephyrhills, Florida 33542-6703 <br />972.462.3663 <br />[r/WoNr�e-s:t1ders <br />� ®O <br />s <br />74241 <br />OF <br />o • <br />��A �ejlfa9�.beaaa�� �� <br />4 <br />09.18.2013 <br />ISSUE FOR PERMIT <br />3 <br />09.11.2013 <br />ISSUE FOR BIDS <br />2 <br />09.03.2013 <br />CD REVIEW PACKAGE <br />1 <br />08.16.2013 <br />DD REVIEW PACKAGE <br />NO. <br />DATE <br />REVISIONS/ISSUANCES <br />GiPSTEIN <br />Architecture <br />Chicago <br />Interiors <br />New York <br />Engineering <br />Bucharest <br />Construction <br />Warsaw <br />600 W. Fulton Street <br />Chicago, IL 60661-1259 <br />T 312.454.9100 <br />www.epsteingbbal.com <br />PROJECT NUMBER: 12386 <br />PROJECT MANAGER: JK <br />ARCH/ENG: LK <br />SCALE: 1/8" = V-0" <br />DRAWN BY: JK <br />CHECKED BY: LK <br />MECHANICAL <br />NOTES & SCHEDULES <br />M-1 02 <br />2 .te <br />A. Epstein and Sons IMem flDnal, Inc. Ail rWb reserved. <br />