Laserfiche WebLink
Modulating Modulating <br />Bypass Valve ,� Reheat valve <br />Digital <br />Compressor <br />00 <br />0 <br />y 0 <br />v 4 0 0 <br />a = 10 <br />0 <br />Iz 00 <br />Varlspeed Controller <br />Condenser <br />Fan <br />e (N.C.) <br />o — _ Subcoolin <br />t) 8 0 Solenoid <br />o` 01 '50 (N,O.) <br />w o d <br />0� I cn ¢F1 <br />Filter Drier <br />4 Lj Strainer <br />Reheat Solenoid <br />strictor Check Valve <br />TX Valve <br />Sightglass <br />Accumulator <br />MODULATING REHEAT PLUS SUBCOOLING WITH DIGITAL SCROLL COMPRESSOR <br />AA )WALE. N.T.S. <br />MECHANICAL DEMOLITION NOTES: <br />1. BIDDERS ARE TO VISIT THE SITE AND FAMILIARIZE THEMSELVES WITH THE EXISTING CONDITIONS AND SATISFY <br />THEMSELVES AS TO THE NATURE AND SCOPE OF THE WORK. THE SUBMISSION OF A BID WILL BE EVIDENCE THAT <br />SUCH AN EXAMINATION HAS BEEN MADE. LATER CLAIMS FOR LABOR EQUIPMENT OR MATERIALS REQUIRED OR FOR <br />DIFFICULTIES ENCOUTNERED WHICH COULD HAVE BEEN FORSEEN HAD AN EXAMINATION BEEN MADE, WILL NOT BE <br />ALLOWED. LOCATION OF EXISTING EQUIPMENT, DUCTWORK, AND PIPE ROUTES MAY DEVIATE SLIGHTLY FROM WHAT <br />IS SHOWN ON THE DRAWINGS. <br />2. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE CONDITION OF ALL EXISTING EQUIPMENT, EXACT <br />SIZES OF EXISTING DUCT AND PIPING, ETC. BEFORE DEMOLITION WORK IS BEGUN. REPORT ANY DISCREPANCIES <br />BETWEEN PLANS AND ACTUAL FIELD CONDITIONS TO ARCHITECT AND ENGINEER PRIOR TO THE COMMENCEMENT OF <br />DEMOLITION WORK. <br />3. COORDINATE WITH OTHER TRADES FOR ITEMS IN THEIR SCOPE OF WORK WHICH WOULD REQUIRE ELECTRICAL <br />WORK (DISCONNECTION/RECONNECTION, ETC.) AND ARE NOT INDICATED ON THE ELECTRICAL PLANS. <br />4. THE CONTRACTOR SHALL NOT BE RESPONSIBLE FOR FIXING EXISTING DEFICIENCIES, BUT THESE SHALL BE <br />BROUGHT TO THE OWNER'S ATTENTION AND RECORDED PRIOR TO STARTING THE WORK. FAILURE TO DO THIS WILL <br />MAKE THE CONTRACTOR RESPONSIBLE TO REMEDY ALL DEFICIENCIES TO THE OWNER'S SATISFACTION. <br />5. CONTRACTOR SHALL TAKE AIR FLOW READINGS ON EACH EXHAUST FAN INLET, DIFFUSER/GRILLE, AND AIR <br />HANDLING UNIT PRIOR TO DEMOLITION WORK. RECORD AND SUBMIT TO ARCHITECT/ENGINEER. <br />6. REMOVE THE INDICATED HVAC ITEMS AS SHOWN ON PLANS. THIS INCLUDES ALL EQUIPMENT, DUCTWORK, <br />CONTROLS, HANGERS, STRAPS AND RELATED MATERIAL. AS DIRECTED FROM OWNER, THIS MATERIAL SHALL BE <br />REMOVED FROM THE SITE OR TURNED OVER TO THE OWNER. <br />7. CAP AND SEAL AIR TIGHT ALL POINTS AT WHICH DUCTWORK IS REMOVED FROM DUCTWORK THAT WILL REMAIN. <br />RE -INSULATE REMAINING DUCTWORK TO MAINTAIN VAPOR BARRIER. <br />8. CONTRACTOR SHALL DO ANY AND ALL CUTTING AND PATCHING REQUIRED FOR THIS SCOPE OF WORK, RESTORING <br />ALL SURFACES TO THEIR ORIGINAL CONDITION TO MATCH SURROUNDING FINISHES. PATCH AND REINFORCE <br />OPENINGS IN WALLS TO MAINTAIN THE INTEGRITY OF THE WALL AND FLOORS WHERE DEVICES HAVE BEEN <br />REMOVED. ALTERATIONS TO ANY STRUCTURAL MEMBER, EITHER STEEL OR CONCRETE, SHALL REQUIRED THE PRIOR <br />APPROVAL OF THE OWNER. <br />9. CONTRACTOR SHALL VERIFY CLEARANCE REQUIREMENTS AND INDICATE ROUTING OF NEW DUCTWORK BEFORE <br />FABRICATION BEGINS AS RISES AND DROPS MAY BE NECESSARY DUE TO EXISTING FIELD CONDITIONS. <br />10. WHERE EQUIPMENT, DUCTS AND PIPES, CONTROL DEVICES, CONDUITS, CABLES, AND WIRING ARE DISCONNECTED <br />FOR THE REMOVAL OR RELOCATION OF EQUIPMENT OR BECAUSE OF BUILDING ALTERATIONS, THEY SHALL BE <br />RECONNECTED, TESTED, AND MADE OPERATIONAL PRIOR TO HANDOVER. <br />11. WITH OWNER'S APPROVAL, THE CONTRACTOR SHALL REMOVE ALL SUPPORTING FACILITIES NO LONGER NEEDED OR <br />MADE OBSOLETE BY THE NEW EQUIPMENT AND MATERIALS FURNISHED UNDER THIS SCOPE OF WORK. SUCH <br />REMOVAL INCLUDES, BUT IS NOT LIMITED TO, EXPOSED CONDUIT RUNS AND WIRING BACK TO SOURCE AND <br />SUPPORT BRACKETS AND ATTACHMENTS, FRAMES AND BASES, EXISTING LIGHTING FIXTURES, SWITCHES, AND <br />CONTROLS. REMOVAL OF PIPING SHALL INCLUDE ASSOCIATED VALVES. <br />12. WHERE EQUIPMENT IS SHOWN TO BE REMOVED, IT SHALL BE REMOVED COMPLETE WITH ASSOCIATED PIPING, <br />DUCTWORK, CONTROLS AND ASSOCIATED WIRING, CONDUITS AND WIRING, PNEMATIC AIR TUBING, ELECTRICAL <br />DEVICES, ETC., BACK TO THE POINT WHERE THESE CONNECT TO THE DISTRIBUTION SYSTEMS. CAP AND TERMINATE <br />PIPING, DUCTWORK, AND POWER SUPPLIES IN LEAK -TIGHT, SAFE MANNER AT THESE POINTS. <br />13. BEFORE REMOVING ANY EXISTING WORK ISOLATE IT FROM OPERATING SYSTEMS BY CLOSING SHUT-OFF VALVES OR <br />CAPPING. OBSERVE EFFECT ON ADJACENT AREAS AND FACILITY OPERATIONS. COORDINATE WITH OWNER, IF <br />NECESSARY, SCHEDULE THE WORK IN LIAISON WITH THE BUILDING ENGINEER TO SUIT FACILITY OPERATIONS. <br />14. EXISTING WALLS, FLOORS, PIPING, DUCTS, ETC., IN THE AREA OF WORK SHALL BE PROTECTED FROM DAMAGE; <br />CEILINGS REMOVED FOR ACCESS SHALL BE REPLACED TO MATCH SURROUNDING, COMPLETE WITH TEES, <br />UNSCRATCHED, CONTINUOUS IN A NEAT MANNER. <br />15. THE CONTRACTOR SHALL NOTE THE LABELS OF ANY EXISTING VALVES TO BE REPLACED AND RECORD THEM ON THE <br />DRAWINGS AND KEEP FOR INSTALLATION ON NEW VALVES. PRIOR TO ANY DEMOLITION, MARK-UP A COPY OF THE <br />CONSTRUCTION DOCUMENTS WITH EXISTING VALVE TAG DATA. THIS COPY SHALL BE KEPT ON SITE AT ALL TIMES <br />DURING CONSTRUCTION AND HANDED OVER TO OWNER AT HANDOVER. <br />16. UNLESS OTHERWISE NOTES, ALL MATERIALS AND EQUIPMENT SHOWN OR SPECIFIED TO BE REMOVED SHALL BE <br />PROPERTY OF THE CONTRACTOR AND SHALL BE REMOVED FROM THE PROJECT SITE AND DISPOSED OF IN <br />ACCORDANCE WITH THE REGULATION OF THE GOVERNING AUTHORITIES. EQUIPMENT REQUIRED BY OWNER TO BE <br />SALVAGED SHALL BE REMOVED AND STORED, UNDAMGED, BY THE CONTRACTOR AS DIRECTED BY OWNER. ANY <br />DAMAGE CAUSED SHALL BE REPAIRED OR REPLACED WITHOUT EXTRA COST TO THE CONTRACT. <br />17. VACCUM AND KEEP CLEAN ALL AREAS ON THE BUILDING DURING CONSTRUCTION. WORK SHALL BE DONE WITHOUT <br />CAUSING UNREASONABLE DUST AND NOISE NUISANCE IN ADJACENT OCCUPIED SPACES. <br />MAIN DUCT <br />FLEXIBLE DUCT <br />TO TROFFER <br />OR DIFFUSER <br />SHEET METAL <br />AS REQUIRED <br />5 \CIRCULAR BRANCH CONNECTION <br />�1 O SCALE. N.T.S. <br />tio <br />DRAIN PAN <br />DRAIN PAN CONNECTION (38.1mm FPT) <br />NIPPLE <br />TEE <br />CLEANOUT PLUG <br />+ NIPPLE <br />DROP - SEE NOTE — PITCH <br />UNION <br />NIPPLE <br />'Y'+25.4mm=LEG <br />DISCHARGE MUST BE <br />BELOW LEVEL OF DRAIN <br />PAN. <br />RETURN BEND <br />Y= DISCHARGE PRESSURE OF FAN <br />(POSITIVE INTERNAL S.P.) <br />NOTE <br />APPLICABLE TO BLOW-THRU COIL ARRANGEMENTS <br />25.4mm MIN. DROP REQUIRED, USE OF STANDARD FITTINGS SHOWN <br />EXCEEDS THIS MINIMUM. <br />GALVANIZED SHEET METAL COUNTERFLASHING 6 CONDENSATE DRAIN TRAP FOR COIL DRAIN PAN <br />BY ROOFING CONTRACTOR <br />SPONGE COMPRESSIBLE <br />FILLER BY HVAC CONTRACTOR <br />TOP/CURB <br />ELEVANOIT= LEVEL <br />LINED TAPERED PRE-FAB CURB WITH <br />40mm RIGID INSULATION, BY HVAC <br />CONTRACTOR. (SEE HVAC DETAIL) <br />CURB HEIGHT VARIES <br />(SITS ON DECK & PITCHES WITH <br />o ROOF. TOP/CURB TO BE LEVEL) <br />18 GA. GALV. STEEL LINER & 20mm0 <br />TYP. ROOF CONSTRUCTION BURGLER BARS AT 200mm O.C. BOTH <br />WAYS FOR OPENINGS 300mmx300mm OR <br />LARGER BY HVAC CONTRACTOR <br />STEEL ANGLE FRAME - <br />SEE STRUCTURAL DWGS. <br />ATTACH DECK TO ANGLE <br />CURB TO SIT ON METAL DECK <br />(TYPICAL 4 SIDES) <br />/ 2 \ROOF CURB EQUIPMENT SUPPORT DETAIL <br />-� AIR FLOW <br />4 TYPICAL BRANCH DUCT TAKE -OFF DETAIL <br />-1 O SCALE. N.T.S. <br />SQUARE OR RECTANGULAR DUCT <br />AIR <br />FLOW <br />FLEX MASTER, SPIN -IN COLLAR <br />WITH EXTRACTOR. FITTING OR <br />APPROVED EQUAL. <br />BALANCING DAMPER <br />SEAL WITH MASTIC AND DUCT TAPE <br />ROUND RIGID OR FLEXIBLE DUCT <br />AS SHOWN ON PLAN <br />ri� <br />TYPICAL ROUND TAKE -OFF DETAIL <br />10 <br />�SCALE: N.T.S. <br />MECHANICAL <br />EQUIPMENT BY HVAC <br />CONTRACTOR <br />0 <br />M _104N SCALE. N.T.S. <br />ROOF CURB DESIGN GUIDELINES: <br />CONTRACTOR TO PROVIDE PREFABRICATED ROOF CURBS BY LM CURBS <br />OR EQUAL, AS APPROVED BY ARCHITECT. NEW CURBS TO BE COMPATIBLE <br />WITH SPECIFIED RTU AND EXISTING ROOF SYSTEM. CURBS TO <br />ACCOMMODATE ROOF SLOPE SO THAT RTU IS LEVEL. PROVIDE INTEGRAL <br />CRICKET FOR ROOF DRAINAGE ON HIGH SIDE OF OPENINGS. CURBS TO BE <br />DESIGNED AND ANCHORED USING THE PROVISIONS OF THE 2010 FLORIDA <br />BUILDING CODE, WITH AN ULTIMATE DESIGN WIND VELOCITY OF 140MPH. <br />INSTALL CURBS PER MANUFACTURERS' RECOMMENDATIONS AS WELL AS <br />SMACNA MANUAL GUIDELINES. DO NOT VOID ANY EXISTING ROOF <br />WARRANTIES DUE TO INSTALLATION OF NEW ROOF PENETRATION. <br />SCALE: N.T.S. <br />FACTORY <br />INSTALLED <br />DISCONNECT <br />EXTEND DUCT <br />UP TO FAN <br />FAN CONTROL ROOF CUJRB�i <br />RELAY/STARTER ROOF <br />POWER <br />FEEDER <br />CONTROL R MOTORIZED DAMPER <br />FEEDER <br />FRAME OPENING AS REQ'D FOR FAN EXHAUST DUCT. SEE <br />INSTALLATION. AVOID CUTTING PLANS FOR SIZE. <br />STRUCTURAL MEMBERS <br />7 EXHAUST FAN DETAIL <br />L10 SCALE N.T.S. <br />MEP / FP Engineer <br />EPSTEIN <br />600 West Fulton <br />Chicago, IL 60661 <br />312.454.9100 <br />FULL RADIUS <br />WHERE POSSIBLE <br />(R = W) <br />W <br />F__R <br />UCT CONSTRUCTION <br />LS FOR CONNECTIONS <br />20 DEGREES MAXIMUM <br />ON DIVERGING FLOW 30 DEGREES MAXIMUM <br /><_ ON CONVERGING FLOW <br />AIR FLOW AIR FLOW <br />IF W1 DOES NOT EQUAL W2 <br />SPECIAL PROVISIONS MUST BE <br />MADE IN VANE SHAPE OR <br />ANGLE OF ENTRY AND EXIT <br />THIS APPLIES TO ALL <br />TYPES OF VANES. <br />STANDARD RADIUS ELBOW <br />R=W <br />SPIN IN BELLMOUTH FITTING <br />WITH VOLUME DAMPER. TYPICAL <br />FOR TAKE OFF TO DIFFUSERS <br />(r T <br />r� W1 <br />rr <br />I`-- W2 <br />STRAIGHT TAP <br />CLINCH LOCK <br />SET SCREW <br />SUB BRANCH R=3/4W A X D1 <br />AIR o R=A+3/4W <br />FLOW x <br />MAIN BRANCH <br />SUB BRANCH <br />FLEXIBLE DUCT <br />45 DEGREE CLINCH COLLAR - <br />SPLITTERS ARE NOT USED <br />AT THIS TYPE OF ENTRY <br />i� <br />r( <br />r( <br />ACCESS DOOR <br />)ME DAMPER <br />45 DEGRE <br />r9' <br />CONSTRUCTION DETAILS <br />zjo <br />SCNE N.T.S. <br />MANUAL OPPOSED BLADE DAMPER <br />(OMIT ON VAV TERMINALS). <br />INSULATED FLEX <br />DUCT -FULL SIZE, <br />MAX. LENGTH 5'-0" <br />2 <br />U_ <br />o <br />VOLUME DAMPER <br />(TYPICAL) <br />FLAT ON BOTTOM <br />AIR <br />FLOW <br />200 MAXIMUM <br />VERTICAL RETURN DUCT <br />= 1/4 W, 100mm MIN. <br />ENTRY <br />G <br />A I l.iV RI V CRJ <br />ROUND DUCT <br />LAY -IN DIFFUSER OR LOUVER FACE, W/ ROUND, <br />SQUARE, OR RECTANGULAR NECK AS CALLED LAY -IN CEILING TILE <br />FOR, THROW AS CALLED FOR, INSULATED <br />OVER IN UNCONDITIONED SPACES AND NON <br />RETURN AIR CEILINGS. <br />MAIN DUCT TO DIFFUSER CONNECTION <br />Design Architect <br />EPSTEIN <br />600 West Fulton <br />Chicago, IL 60661 <br />312.454.9100 <br />N.T.S. <br />Nestle Waters North America <br />Nestle Waters North America <br />4330 20th Street <br />Zephyrhills, Florida 33542-6703 <br />972.462.3663 <br />estle <br />Waters <br />CORNER <br />FILLER <br />PIECE <br />OR USE <br />GASKET <br />HINGE OR R <br />MAIN BRANC <br />SPUTTER MAY <br />BE USED <br />INSULATED DUCT -FULL <br />SIZE AS CALLED FOR <br />4 <br />09.18.2013 <br />ISSUE FOR PERMIT <br />3 <br />09.11.2013 <br />ISSUE FOR BIDS <br />2 <br />09-03.2013 <br />CD REVIEW PACKAGE <br />1 <br />08.16.2013 <br />DD REVIEW PACKAGE <br />NO. <br />DATE <br />REVISIONS/ISSUANCES <br />�PSTEIN <br />Architecture <br />Chicago <br />Interiors <br />New York <br />Engineering <br />Bucharest <br />Construction <br />Warsaw <br />600 W. Fulton Street <br />Chicago, IL 60661-1259 <br />T 312.454.9100 <br />www.epsteinglobal.com <br />PROJECT NUMBER: <br />12386 <br />PROJECT MANAGER: <br />JK <br />ARCH/ENG: <br />LK <br />SCALE: <br />1/8" =1'-0" <br />DRAWN BY: <br />JK <br />CHECKED BY: <br />LK <br />MECHANICAL DETAILS <br />M-1 04 <br />A. Epstein and Sons Intematbnal, Inc. All rights reserved. <br />