1 1 11 1 1 J_ <br />Lr. 1 . _ _ _ _ _. <br />SECTION 01000 - GENERAL REQUIREMENTS <br />1. DRAWINGS AND GENERAL PROVISIONS OF THE CONSTRUCTION CONTRACT <br />INCLUDE THE NESTLE WATERS NORTH AMERICA TERMS AND CONDITIONS, <br />WHICH APPLY TO THIS PROJECT AND TAKE PRECEDENCE OVER ANY <br />CONDITIONS CONTAINED HEREIN. <br />2. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH ALL LOCAL <br />GOVERNING BUILDING CODES, OTHER APPLICABLE ORDINANCES, AND <br />GOVERNING AUTHORITIES HAVING JURISDICTION. THE CONTRACTOR SHALL <br />PERFORM ALL WORK IN CONFORMANCE WITH FEDERAL, STATE AND LOCAL <br />JOB SITE SAFETY ORDINANCES, INCLUDING BUT NOT LIMITED TO OSHA <br />REGULATIONS. <br />3. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE AMERICAN WITH <br />DISABILITIES ACT (ADA). CONTRACTOR SHALL VERIFY AND IMMEDIATELY <br />REPORT ANY DISCREPANCIES BETWEEN THE WORK TO BE PERFORMED AND <br />ADA REQUIREMENTS TO THE ARCHITECT BEFORE PROCEEDING WITH WORK <br />AFFECTED BY SUCH CONDITIONS. <br />4. THE CONTRACTOR SHALL OBTAIN ALL REQUIRED PERMITS. <br />5. CONTRACTOR SHALL CARY, AND HAVE IN FORCE, ALL LABOR AND OTHER <br />LIABILITY INSURANCE COVERAGE NECESSARY TO HOLD THE OWNER, <br />ARCHITECT AND ARCHITECTS CONSULTING ENGINEERS HARMLESS SHOULD <br />A CLAIM FOR DAMAGES OCCUR IN THE PART OF AN EMPLOYED CONTRACTOR, <br />OR OTHER THIRD PARTY CLAIMS. ALL MINIMUM COVERAGE AS REQUIRED BY <br />OWNER, FOR EACH OCCURRENCE OF THE ABOVE CATEGORIES, WILL BE <br />SUBSTANTIATED BY PROVIDING THE OWNER AND THE ARCHITECT WITH <br />CERTIFICATE OF INSURANCE PRIOR TO COMMENCEMENT OF WORK. <br />6. THE CONTRACTOR SHALL VISIT THE SITE AND FAMILIARIZE HIMSELF WITH THE <br />EXISTING CONDITIONS. CONTRACTOR SHALL VERIFY AND IMMEDIATELY <br />REPORT ANY DISCREPANCIES BETWEEN THE FIELD CONDITIONS AND THE <br />CONSTRUCTION DOCUMENTS TO THE ARCHITECT PRIOR TO PROCEEDING <br />WITH WORK AFFECTED BY SUCH CONDITION. THE CONTRACTOR SHALL BE <br />SOLELY RESPONSIBLE FOR INSTALLING WORK WHERE SUCH A DISCREPANCY <br />EXISTS, IF IT HAS NOT BEEN APPROVED BY THE OWNER. <br />7. DO NOT SCALE DRAWINGS. NUMERICAL DIMENSIONS GOVERN AND SHOULD <br />BE VERIFIED AND/OR ESTABLISHED PRIOR TO INSTALLING THE WORK. LARGE <br />SCALE DRAWINGS AND DIMENSIONS GOVERN OVER SMALL SCALE DRAWINGS <br />AND DIMENSIONS. <br />8. CONTRACTOR SHALL MAKE NO SUBSTITUTIONS OF ANY KIND RELATED TO <br />MATERIALS, COLORS, PRODUCTS, MANUFACTURERS, ETC. WITHOUT FIRST A <br />WRITTEN REQUEST, AND OBTAINING THEN A WRITTEN APPROVAL FROM THE <br />OWNER AND ARCHITECT. <br />9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COST OF REPAIR OR <br />REPLACE MENT OF EXISTING WALLS, CEILINGS, LIGHTING, ETC. AFFECTED IN <br />OTHER AREAS OF THE BUILDING AS A RESULT OF THE CONTRACTOR NOT <br />PROTECTING SAME DURING THE COURSE OF HIS WORK, AT NO ADDITIONAL <br />COST TO THE OWNER. <br />10. THE CONTRACTOR SHALL ARRANGE AND BE RESPONSIBLE FOR <br />COORDINATING ACCESS TO THE BUILDING THROUGH THE OWNER, AND SHALL <br />COORDINATE ANY SPECIAL USE OF EQUIPMENT, SUCH AT TIMES AND DATES <br />OF ACCESS FOR DELIVERY AND REMOVAL OF MATERIALS. <br />11. THE CONTRACTOR SHALL REMOVE ALL DEBRIS FROM THE BUILDING AT HIS <br />OWN EXPENSE AND SHALL MAKE ARRANGEMENTS FOR THE USE OF THE <br />LOADING DOCK THROUGH THE OWNER. AT THE END OF THE PROJECT, THE <br />CONTRACTOR WILL REMOVE ALL CONSTRUCTION MATERIALS AND CLEAN ALL <br />SURFACES OF DIRT, DUST AND STAINS BEFORE VACATING THE WORK AREA. <br />12. WORK IS TO BE OF FIRST CLASS QUALITY CONSTRUCTION. THE <br />CONTRACTORS, SUBCONTRACTORS, AND MATERIAL SUPPLIERS SHALL BE <br />RESPONSIBLE FOR THE PROVISION OF ALL MATERIALS AND LABOR REQUIRED <br />TO PERFORM INSTALLATIONS OF ALL ITEMS DESCRIBED, INDICATED, OR <br />REASONABLY IMPLIED, AND TO DUPLICATE MATERIALS, DETAILS, ETC. TO <br />MATCH EXISTING CONDITIONS AS NECESSARY. <br />13. EVERY CONTRACTOR AND SUBCONTRACTOR SHALL VERIFY IN FIELD (VIF) ALL <br />EXISTING DIMENSIONS AND CONDITIONS, AND BRING DISCREPANCIES TO THE <br />ATTENTION OF THE OWNER AND THE ARCHITECT. <br />14. CONTRACTOR TO PROVIDE DUST -PROOF ENCLOSURE OF WORK AREA WITH <br />NEGATIVE AIR PRESSURE WITHIN ENCLOSURE DURING CONSTRUCTION TO <br />MINIMIZE DUST MIGRATION INTO ADJACENT AREAS. <br />15. ALL MATERIAL SCHEDULED TO BE DEMOLISHED IS TO BE REMOVED THROUGH <br />WINDOW OPENINGS SUBSEQUENT TO WINDOW UNIT REMOVAL, AND NOT <br />THROUGH ADJACENT SPACES. <br />16. GENERAL CONTRACTOR TO PROVIDE POWER, WATER AND SANITARY <br />CONNECTIONS TO TEMPORARY TRAILER FURNISHED BY OWNER. <br />17. ALL EXISTING SURFACES THAT ARE WITHIN THE SCOPE OF THE NEW WORK <br />SHALL BE EXAMINED FOR CRACKS, WAVES, IMPERFECTIONS AND <br />IRREGULARITIES. ALL SUCH SURFACES SHALL BE PATCHED AND REPAIRED AS <br />SPECIFIED HEREIN. <br />18. ALL WORK SHALL BE PERFORMED IN A WORKMAN -LIKE MANNER. <br />CONTRACTOR SHALL GUARANTEE FOR A PERIOD OF ONE (1) YEAR, UPON <br />ACCEPTANCE OF THE WORK, THAT ALL WORK PERFORMED SHALL BE FREE <br />FROM ANY DEFECTS AND FAULTY WORKMANSHIP, AND THAT ANY DEFECTIVE <br />MATERIAL AND/OR WORK SHALL BE PROMPTLY REPAIRED OR REPLACED <br />WITHOUT ANY ADDITIONAL COST TO OWNER. <br />19. THE CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION OPERATIONS <br />UNDER THIS CONTRACT THAT ARE DEPENDENT UPON EACH OTHER FOR <br />PROPER INSTALLATION, CONNECTION AND OPERATION, REGARDLESS OF <br />WHERE ULTIMATE RESPONSIBILITY OF THE PARTICULAR CONSTRUCTION <br />OPERATION LIES. <br />20. THE CONTRACTOR SHALL REQUIRE THE INSTALLER OF EACH MAJOR <br />COMPONENT TO INSPECT BOTH THE SUBSTRATE AND CONDITION UNDER <br />WHICH WORK IS TO BE INSTALLED. INSTALLATION SHALL NOT PROCEED UNTIL <br />UNSATISFACTORY AREAS HAVE BEEN CORRECTED IN AN ACCEPTABLE <br />MANNER. <br />21. INSTALLATION SHALL FOLLOW IN ORDER OF PRECEDENCE: <br />a. INSTRUCTIONS CONTAINED IN INDIVIDUAL SPECIFICATION SECTIONS. <br />b. MANUFACTURER'S WRITTEN INSTRUCTIONS. <br />c. INDUSTRY ASSOCIATION STANDARDS. <br />19. THESE DRAWINGS HAVE BEEN COMPETED WITH THE UNDERSTANDING THAT <br />ALL WORK REQUIRED FOR THE FULL PERFORMANCE OR COMPLETION OF ANY <br />TRADE AND/OR SYSTEM SHALL BE INCLUDED AS PART OF THE PROJECT <br />SCOPE, WHETHER EXPRESSLY INDICATED OR GENERALLY IMPLIED. <br />20. CARE MUST BE TAKEN WHEN WORK IS PERFORMED NEAR OR IN CONNECTION <br />WITH THE SPRINKLER SYSTEM. IT WILL BE THE CONTRACTOR'S <br />RESPONSIBILITY FOR REPAIR OF ANY DAMAGE DONE TO THE PROPERTY. <br />SECTION 01000 - GENERAL REQUIREMENTS (CONTD) <br />21. WHEREVER THE TERM 'CONTRACTOR' IS USED, IT REFERS TO THE GENERAL <br />CONTRACTOR. <br />22. AT THE CONCLUSION OF THE WORK, THE CONTRACTOR SHALL PROVIDE THE <br />OWNER WITH AN UPDATED (MARKED IN RED) SET OF AS -BUILT DRAWINGS <br />FOR MECHANICAL, PLUMBING, FIRE PROTECTION AND POWER/LIGHTING <br />SYSTEMS. SEE ENGINEERING DRAWINGS FOR SPECIFIC REQUIREMENTS FOR <br />EACH DIVISION OF THE WORK. <br />23. CONTRACTOR WILL BE REQUIRED TO SUPPLY WARRANTEES FOR ALL <br />EQUIPMENT AND WORKMANSHIP FOR A PERIOD OF ONE YEAR AFTER <br />SUBSTANTIAL COMPLETION, OR FOR DURATION SPECIFIED. <br />24. THE TERM 'PROVIDE' SHALL MEAN TO FURNISH AND INSTALL. <br />SECTION 01045 - CUTTING AND PATCHING <br />1. REQUIREMENTS OF THIS SECTION APPLY TO ALL ASPECTS OF THE WORK, <br />INCLUDING MECHANICAL AND ELECTRICAL INSTALLATIONS. REFER TO <br />DIVISION 15 AND DIVISION 16 SECTIONS FOR OTHER REQUIREMENTS AND <br />LIMITATIONS APPLICABLE TO CUTTING AND PATCHING MECHANICAL AND <br />ELECTRICAL INSTALLATIONS. <br />2. WHERE CUTTING AND PATCHING INVOLVES ADDITION OF REINFORCEMENT TO <br />STRUCTURAL ELEMENTS, SUBMIT DETAILS AND ENGINEERING CALCULATIONS <br />TO SHOW HOW REINFORCEMENT IS INTEGRATED WITH THE ORIGINAL <br />STRUCTURE. <br />3. APPROVAL BY THE ARCHITECT TO PROCEED WITH CUTTING AND PATCHING <br />DOES NOT WAIVE THE ARCHITECTS RIGHT TO LATER REQUIRE COMPLETE <br />REMOVAL AND REPLACEMENT OF A PART OF THE WORK FOUND TO BE <br />UNSATISFACTORY. <br />4. DO NOT CUT AND PATCH STRUCTURAL ELEMENTS IN A MANNER THAT WOULD <br />REDUCE THE LOAD -CARRYING CAPACITY OR LOAD -DEFLECTION RATION. <br />OBTAIN APPROVAL OF THE CUTTING AND PATCHING PROPOSAL BEFORE <br />CUTTING STRUCTURAL ELEMENTS, INCLUDING EQUIPMENT SUPPORTS. <br />5. THE CONTRACTOR SHALL REPAIR OR PATCH ALL AREAS WHERE DEMOLITION, <br />ALTERATIONS OR CUTTING IS REQUIRED TO MAKE WORK FIT, AT NO INCREASE <br />TO THE CONTRACT AMOUNT. DO NOT CUT AND PATCH OPERATING ELEMENTS <br />OR SAFETY RELATED COMPONENTS IN A MANNER THAT WOULD RESULT IN <br />REDUCING THEIR CAPACITY TO PERFORM AS INTENDED, OR RESULT IN <br />INCREASED MAINTENANCE, OR DECREASED OPERATIONAL LIFE OR SAFETY. <br />OBTAIN APPROVAL OF THE CUTTING AND PATCHING PROPOSAL BEFORE <br />CUTTING AND PATCHING FOLLOWING OPERATING ELEMENTS OR SAFETY <br />RELATED SYSTEMS: <br />a. SHORING, BRACING AND SHEETING <br />b. PRIMARY OPERATIONAL SYSTEMS AND EQUIPMENT <br />c. AIR OR SMOKE BARRIERS <br />d. WATER, MOISTURE OR VAPOR BARRIERS <br />e. MEMBRANES AND FLASHINGS <br />f. FIRE PROTECTION SYSTEMS <br />g. NOISE AND VIBRATION CONTROL ELEMENTS AND SYSTEMS <br />h. CONTROL SYSTEMS <br />i. COMMUNICATION SYSTEMS <br />j. CONVEYING SYSTEMS <br />k. ELECTRICAL WIRING SYSTEMS <br />7. USE MATERIALS THAT ARE IDENTICAL TO EXISTING MATERIALS. IF IDENTICAL <br />MATERIALS ARE NOT AVAILABLE OR CANNOT BE USED WHERE EXPOSED <br />SURFACES ARE INVOLVED, USE MATERIALS THAT MATCH EXISTING ADJACENT <br />SURFACES TO THE FULLEST EXTENT POSSIBLE WITH REGARD TO VISUAL <br />EFFECT. USE MATERIALS WHOSE INSTALLED PERFORMANCE WILL EQUAL OR <br />SURPASS THAT OF EXISTING MATERIALS. <br />8. VISUAL REQUIREMENTS: DO NOT CUT AND PATCH CONSTRUCTION EXPOSED <br />ON THE EXTERIOR OR IN OCCUPIED SPACES, IN A MANNER THAT WOULD, IN <br />THE ARCHITECTS OPINION, REDUCE THE BUILDING'S AESTHETIC QUALITIES, <br />OR RESULT IN VISUAL EVIDENCE OF CUTTING AND PATCHING. REMOVE AND <br />REPLACE WORK CUT AND PATCHED IN A VISUALLY UNSATISFACTORY <br />MANNER. <br />9. PROTECTION: PROTECT EXISTING CONSTRUCTION DURING CUTTING AND <br />PATCHING TO PREVENT DAMAGE. <br />10. TAKE ALL PRECAUTIONS NECESSARY TO AVOID CUTTING OF EXISTING PIPE, <br />CONDUIT OR DUCTWORK SERVING THE BUILDING, BUT SCHEDULED TO BE <br />REMOVED OR RELOCATED UNTIL PROVISIONS HAVE BEEN MADE TO BYPASS <br />THEM. <br />11. CUTTING: CUT EXISTING CONSTRUCTION USING METHODS LEAST LIKELY TO <br />DAMAGE ELEMENTS TO BE RETAINED OR ADJOINING CONSTRUCTION. WHERE <br />POSSIBLE, REVIEW PROPOSED PROCEDURES WITH THE ORIGINAL INSTALLER. <br />COMPLY WITH THE ORIGINAL INSTALLER'S RECOMMENDATIONS. <br />12. PATCHING: PATCH WITH DURABLE SEAMS THAT ARE AS INVISIBLE AS <br />POSSIBLE. <br />a. RESTORE EXPOSED FINISHES OF PATCHED AREAS AND EXTEND FINISH <br />RESTORATION INTO RETAINED ADJOINING CONSTRUCTION IN A MANNER <br />THAT WILL ELIMINATE EVIDENCE OF PATCHING AND REFINISHING. <br />b. WHERE REMOVAL OF WALLS OR PARTITIONS EXTENDS ONE FINISHES <br />AREA INTO ANOTHER, PATCH AND REPAIR FLOOR AND WALL SURFACES <br />IN THE NEW SPACE TO PROVIDE AN EVEN SURFACE OF UNIFORM COLOR <br />AND APPEARANCE. REMOVE EXISTING FLOOR AND WALL COVERINGS <br />AND REPLACE WITH NEW MATERIALS, IF NECESSARY, TO ACHIEVE <br />UNIFORM COLOR AND APPEARANCE. <br />c. WHERE PATCHING OCCURS IN A SMOOTH PAINTED SURFACE, EXTEND <br />FINAL PAINT COAT OVER THE ENTIRE UNBROKEN SURFACE CONTAINING <br />THE PATCH, AFTER THE PATCHED AREA HAS RECEIVED PRIMER AND <br />SECOND COAT. <br />d. PATCH, REPAIR OR REHANG EXISTING CEILINGS AS NECESSARY TO <br />PROVIDE AN EVEN PLANE SURFACE OR UNIFORM APPEARANCE. <br />13. CLEANING: THOROUGHLY CLEAN AREAS AND SPACES WHERE CUTTING AND <br />PATCHING IS PERFORMED OR USED AS ACCESS. REMOVED COMPLETELY <br />PAINT, MORTAR, OILS, PUTTY AND ITEMS OF SIMILAR NATURE. THOROUGHLY <br />CLEAN PIPING, CONDUIT AND SIMILAR FEATURES BEFORE PAINTING OR <br />OTHER FINISHING IS APPLIED. RESTORE DAMAGED PIPE COVERING AND <br />STRUCTURAL STEEL FIRE -STEEL INSULATION TO ITS ORIGINAL CONDITION. <br />SECTION 01340 - SHOP DRAWINGS, SAMPLES AND PRODUCT <br />DATA SUBMITTALS <br />1. PRIOR TO COMMENCING WORK, CONTRACTOR SHALL PREPARE AND SUBMIT <br />FOR APPROVAL REVIEW BY ARCHITECT, A SCHEDULE FOR SUBMITTALS, <br />BROKEN DOWN BY DIVISION, ALLOWING 5 DAY ARCHITECTURAL REVIEW <br />PERIOD, AND INDICATING LEAD TIMES AND DATES BY WHICH MATERIALS ARE <br />REQUIRED ON SITE. <br />2. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS, SAMPLES AND PRODUCT <br />DATA AS SPECIFIED IN RELATED SECTIONS. CONTRACTOR SHALL REVIEW ALL <br />SHOP DRAWINGS, SAMPLES AND PRODUCT DATA BEFORE SUBMITTAL AND <br />STAMP EACH ITEM AS REVIEWED AND COORDINATED WITH THE <br />REQUIREMENTS OF THE CONTRACT DOCUMENTS AND SITE CONDITIONS. <br />SUBMITTALS NOT REVIEWED BY THE CONTRACTOR WILL BE REJECTED UPON <br />RECEIPT. CONTRACTOR SHALL COORDINATE SUBMITTALS OF INTERRELATED <br />WORK SO THAT SUBMITTALS WILL NOT BE DELAYED AS A RESULT OF TIME <br />REQUIRED TO PROPERLY PROCESS SUBMITTALS, INCLUDING TIME FOR <br />RESUBMITTALS IF NECESSARY. <br />3. SHOP DRAWINGS AND PRODUCT DATA SHALL BE SUBMITTED IN THE FORM OF <br />2 PRINTS AND 1 REPRODUCIBLE COPY OF COMPLETE SHOP DRAWINGS, <br />INSTALLATION AND PRODUCT DATA TO THE ARCHITECT FOR REVIEW. THE <br />SHOP DRAWINGS SHALL INDICATE THE FILED VERIFICATIONS, DIMENSIONS, <br />ANCHORS AND ACCESSORIES NECESSARY FOR A COMPLETE INSTALLATIONS, <br />AND SHALL SHOW THE RELATIONSHIP TO ADJACENT MATERIALS, EXISTING OR <br />BY OTHER TRADES. <br />4. SAMPLES SHALL BE SUBMITTED IN PIECES NO SMALLER THAN 12" x 12", OR IN <br />FULL UNITS OF MATERIALS THAT CANNOT BE CUT (SUCH AS HARDWARE) TO <br />THE ARCHITECT FOR REVIEW, IN TRIPLICATE. <br />5. IN SCHEDULING THE PROJECT, THE CONTRACTOR SHALL ALLOW 5 WORKING <br />DAYS FOR REVIEW OF SHOP DRAWINGS, SAMPLES AND PRODUCT DATA, AND <br />FOR ANY ADDITIONAL REVIEWS OF RESUBMITTALS. <br />SECTION 06100 - ROUGH CARPENTRY <br />1. PROVIDE WOOD FOR SUPPORT OR ATTACHMENT OF OTHER WORK. PROVIDE <br />LUMBER OF SIZES INDICATED, WORKED INTO SHAPES SHOWN. <br />2. MOISTURE CONTENT: 19 PERCENT MAXIMUM FOR LUMBER ITEMS, INCLUDING <br />ITEMS TO RECEIVE WOOD PRESERVATIVE TREATMENT OR FIRE RETARDANT <br />TREATMENT. <br />3. GRADE: STANDARD GRADE LIGHT FRAMING SIZE LUMBER OF ANY SPECIES OR <br />BOARD SIZE LUMBER AS REQUIRED. NO.3 COMMON OR STANDARD GRADE <br />BOARDS PER SPIB, WCLIB OR WWPA RULES APPLICABLE TO AGENCY UNDER <br />WHICH LUMBER IS GRADED. <br />4. PLYWOOD BACKING PANELS: FOR MOUNTING ELECTRICAL OR TELEPHONE <br />EQUIPMENT, PROVIDE FIRE -RETARDANT TREATED PLYWOOD PANELS WITH <br />GRADE DESIGNATION, APA-B-C PLUGGED INTERIOR WITH EXTERIOR GLUE, IN <br />THICKNESS NOT LESS THAN 3/4-INCH. <br />5. FIRE -RETARDANT TREATED LUMBER AND PLYWOOD BY PRESSURE PROCESS: <br />PRODUCTS WITH A FLAME SPREAD INDEX OF 25 OR LESS WHEN TESTED <br />ACCORDING TO ASTM E 84, AND WITH NO EVIDENCE OF SIGNIFICANT <br />PROGRESSIVE COMBUSTION WHEN THE TEST IS EXTENDED AN ADDITIONAL 2C <br />MINUTES, AND WITH THE FLAME FRONT NOT EXTENDING MORE THAN 10.5 <br />FEET BEYOND THE CENTERLINE OF THE BURNERS AT ANY TIME DURING THE <br />TEST. <br />6. WOOD BLOCKING, FURRING AND SHIMS ARE NOT TO BE INSTALLED WITHIN <br />PARTITION RATED GREATER THAN 1 HOUR. <br />SECTION 07900 - FIRE STOPPING AND SEALANTS <br />1. PROJECT CONDITIONS: DO NOT PROCEED WITH INSTALLATION OF JOINT <br />SEALERS UNDER THE FOLLOWING CONDITIONS: WHEN AMBIENT AND <br />SUBSTRATE TEMPERATURE CONDITIONS ARE OUTSIDE THE LIMITS <br />PERMITTED BY JOINT SEALER MANUFACTURER OR BELOW 40 DEG. F OR 5 <br />DEG. C, WHEN JOINT SUBSTRATES ARE WET DUE TO RAIN, FROST, <br />CONDENSATION, OR OTHER CAUSES, OR WHEN JOINT WIDTHS ARE LESS <br />THAN THOSE ALLOWED BY THE JOINT -SEALANT MANUFACTURER FOR <br />APPLICATIONS INDICATED. <br />2. JOINT SUBSTRATE CONDITIONS: <br />a. DO NOT PROCEED WITH INSTALLATION OF JOINT SEALERS UNTIL ALL <br />CONTAMINANTS CAPABLE OF INTERFERING WITH THEIR ADHESION ARE <br />REMOVED FROM JOINT SUBSTRATES. <br />b. INSTALL BACKER ROD OR BOND BREAKER TAPE, CONSISTENT WITH <br />MANUFACTURER'S SPECIFICATIONS, TO ENSURE THAT SEALANTS WILL <br />PERFORM PROPERLY. <br />4. COMPATIBILITY: PROVIDE JOINT SEALERS, JOINT FILLERS AND OTHER <br />RELATED MATERIALS THAT ARE COMPATIBLE WITH ONE ANOTHER AND WITH <br />JOINT SUBSTRATES UNDER CONDITIONS OF SERVICE AND APPLICATION, AS <br />DEMONSTRATED BY SEALANT MANUFACTURER BASED ON TESTING AND FIELD <br />EXPERIENCE. <br />5. CONTENT: PROVIDE SEALANTS AND SEALANT PRIMERS FOR USE INSIDE THE <br />WEATHERPROOFING SYSTEM WITH LOWEST VOC CONTENT POSSIBLE. <br />6. SUBMITTALS: PROVIDE TO THE ARCHITECT FOR REVIEW PRODUCT DATA AND <br />SAMPLES FOR EACH TYPE AND COLOR TO BE INSTALLED ON THE PROJECT. <br />7. COLORS: PROVIDE COLORS OF EXPOSED JOINT SEALERS FOR REVIEW BY THE <br />ARCHITECT, FROM THE MANUFACTURER'S STANDARD COLORS. <br />8. ACOUSTICAL SEALANT FOR CONCEALED JOINTS: MANUFACTURER'S <br />STANDARD, NONDRYING, NONHARDENING, NONSKINING, NONSTAINING, <br />GUNNABLE, SYNTHETIC RUBBER SEALANT RECOMMENDED FOR SEALING <br />INTERIOR CONCEALED JOINTS TO REDUCE TRANSMISSION OF AIRBORNE <br />SOUND. <br />SECTION 07900 - FIRE STOPPING AND SEALANTS (CONT'D) <br />SECTION 08710 - DOOR HARDWARE <br />9. FIRE-RESISTANT JOINT SEALERS: PROVIDE MANUFACTURER'S STANDARD <br />1. <br />SUBMIT PRODUCT DATA, HARDWARE AND FINISH SAMPLES FOR REVIEW. <br />FIRE -STOPPING SEALANT HAVING FIRE -RESISTANCE RATINGS INDICATED AS <br />2 <br />PROVIDE COMMERCIAL DOOR HARDWARE FOR OPENINGS INDICATED IN THE <br />ESTABLISHED BY TESTING IDENTICAL ASSEMBLIES PER ASTM E 814 BY <br />DOOR SCHEDULE. <br />UNDERWRITERS LABORATORY INC. FOR USE IN THROUGH PENETRATION <br />FIRE -STOP SYSTEM FOR FILLING OPENINGS AROUND CABLES, CONDUIT, PIPES <br />3. <br />ACCESSIBILITY REQUIREMENTS: COMPLY WITH ADA-ABA ACCESSIBILITY <br />AND SIMILAR PENETRATIONS THROUGH FIRE RATED WALLS, ALL FLOORS, AND <br />GUIDELINES AND ICC/ANSI All 17.1. <br />AS NOTED ON DRAWINGS. PROVIDE FORMING, JOINT FILLERS, PACKING AND <br />4. <br />COORDINATION: OBTAIN AND DISTRIBUTE, TO THE PARTIES INVOLVED, <br />OTHER ACCESSORY MATERIALS REQUIRED FOR INSTALLATION OF <br />TEMPLATES FOR DOORS, FRAMES AND OTHER WORK SPECIFIED TO BE <br />FIRE -STOPPING SEALANTS AS APPLICABLE TO INSTALLATION CONDITIONS. <br />FACTORY PREPARED FOR INSTALLING DOOR HARDWARE. <br />10. CLEANING: CLEAN OFF EXCESS SEALANTS OR SEALANT SMEARS ADJACENT <br />5. <br />COORDINATE DOOR HARDWARE WITH OTHER WORK. FURNISH SHOP <br />TO JOINTS AS WORK PROGRESSES BY METHODS AND WITH CLEANING <br />DRAWINGS OF OTHER WORK WHERE REQUIRED OR REQUESTED TO <br />MATERIALS APPROVED BY MANUFACTURERS OF JOINT SEALERS AND OF <br />COORDINATE INSTALLATION. <br />PRODUCTS IN WHICH JOINTS OCCUR. <br />6. <br />PREPARE DOOR HARDWARE SCHEDULE UNDER THE SUPERVISION OF <br />11. PROTECTION: PROTECT JOINT SEALERS DURING AND AFTER CURING PERIOD <br />SUPPLIER, DETAILING FABRICATION AND ASSEMBLY OF DOOR HARDWARE, AS <br />FROM CONTACT WITH CONTAMINATING SUBSTANCES OR FROM DAMAGE <br />WELL AS PROCEDURES AND DIAGRAMS. COORDINATE THE FINAL DOOR <br />RESULTING FROM CONSTRUCTION OPERATIONS OR OTHER CAUSES, SO THAT <br />HARDWARE SCHEDULE WITH DOORS, FRAMES AND RELATED WORK TO <br />THEY ARE WITHOUT DETERIORATION OR DAMAGE AT TIME OF SUBSTANTIAL <br />ENSURE PROPER SIZE, THICKNESS, HAND, FUNCTION AND FINISH OF DOOR <br />COMPLETION. IF DAMAGE OR DETERIORATION OCCURS, CUT OUT AND <br />HARDWARE. <br />REMOVE DAMAGED OR DETERIORATED JOINT SEALERS IMMEDIATELY AND <br />RESEAL JOINTS WITH NEW MATERIAL TO PRODUCE JOINT SEALER <br />a. <br />FORMAT: COMPLY WITH SCHEDULING SEQUENCE AND VERTICAL <br />INSTALLATIONS WITH REPAIRED AREAS INDISTINGUISHABLE FROM ORIGINAL <br />FORMAT IN DOOR HARDWARE INSTITUTE'S "SEQUENCE AND FORMAT FOR <br />THE HARDWARE SCHEDULE." <br />WORK. <br />b. <br />ORGANIZATION: ORGANIZE THE DOOR HARDWARE SCHEDULE INTO <br />DOOR HARDWARE SETS INDICATING COMPLETE DESIGNATIONS OF <br />EVERY ITEM REQUIRED FOR EACH DOOR OR OPENING. <br />SECTION 08100 - DOORS AND FRAMES <br />C. <br />PROVIDE COMPLETE HARDWARE SETS FOR ALL OPENINGS SHOWN, IN <br />COMPLIANCE WITH LOCAL CODES AND INDUSTRY STANDARDS. <br />d <br />WHERE REQUIRED TO MATCH EXISTING BUILDING ITEMS PROVIDE <br />1. SUBMITTALS: <br />a. SCHEDULE PREPARED BY OR UNDER THE SUPERVISION OF SUPPLIER <br />USING SAME REFERENCE NUMBERS FOR DETAILS AND OPENINGS AS <br />THOSE ON DRAWINGS <br />b. PRODUCT DATA FOR EACH TYPE OF DOOR AND FRAME REQUIRED, <br />INCLUDING ANY REQUIRED ACCESSORIES. <br />c. SUBMIT SHOP DRAWINGS SHOWING LOCATION IN PLAN OF EACH DOOR <br />TYPE, ELEVATION OF EACH DOOR TYPE, DOOR EDGE DETAILS, FRAME <br />PROFILES, METAL THICKNESSES, PREPARATIONS FOR HARDWARE, ANY <br />OTHER KEY DETAILS. <br />d. SAMPLES FOR VERIFICATION FOR EACH TYPE OF EXPOSED FINISH <br />REQUIRED. <br />3. ALL DOORS, FRAMES, AND HARDWARE SHALL BE INSTALLED SO AS TO <br />PROVIDE A COMPLETE INSTALLATION, IN CONFORMANCE WITH ALL <br />APPLICABLE CODES AND ORDINANCES. <br />4. EXTENT OF STANDARD STEEL AND WOOD DOORS AND FRAMES ARE <br />INDICATED AND SCHEDULED ON THE DRAWINGS. <br />5. PROVIDE METAL DOORS AND FRAMES WHICH COMPLY WITH STEEL DOOR <br />INSTITUTE'RECOMMENDED SPECIFICATIONS: STANDARD STEEL DOORS AND <br />FRAMES' (SDI-100) AND AS HEREIN SPECIFIED. <br />6. FIRE -RATED DOOR ASSEMBLIES: WHERE FIRE -RATED DOOR ASSEMBLIES ARE <br />INDICATED OR REQUIRED, PROVIDE FIRE -RATED DOOR AND FRAME <br />ASSEMBLIES THAT COMPLY WITH NFPA 80'STANDARD FOR FIRE DOORS AND <br />WINDOWS', AND HAVE BEEN TESTED, LISTED, AND LABELED IN ACCORDANCE <br />WITH ASTM E 152 'STANDARD METHODS OF FIRE TESTS OF DOOR <br />ASSEMBLIES' BY A NATIONALLY RECOGNIZED INDEPENDENT TESTING AND <br />INSPECTION AGENCY ACCEPTABLE TO AUTHORITIES HAVING JURISDICTION. <br />7. STANDARD HOLLOW METAL DOORS: COMPLY WITH ANSI/SDI A250.4 FOR <br />PHYSICAL PERFORMANCE LEVEL. PROVIDE DOORS WITH DESIGN AS <br />INDICATED ON DRAWINGS. CORE CONSTRUCTED OF MANUFACTURER'S <br />STANDARD KRAFT PAPER HONEYCOMB, POLYSTYRENE, POLYURETHANE, <br />POLYICOSYANURATE, MINERAL BOARD, OR VERTICAL STEEL -STIFFENER <br />CORE. FACE SHEETS FABRICATED FROM COLD -ROLLED STEEL SHEET. <br />8. STANDARD HOLLOW METAL FRAMES: COMPLY WITH ANSI/SDI A250.8 AND WITH <br />DETAILS INDICATED FOR TYPES AND PROFILE, FABRICATED FROM <br />COLD -ROLLED STEEL SHEET. <br />9. VERIFY ACTUAL DIMENSIONS OF OPENINGS BY FIELD MEASUREMENTS <br />BEFORE FABRICATION. <br />10. KEYING OF ALL DOORS SHALL BE COORDINATED WITH THE BUILDING <br />ENGINEER. <br />11. CONTRACTOR SHALL SUBMIT A COMPLETE DOOR AND HARDWARE SCHEDULE <br />FOR REVIEW BY THE ARCHITECT. <br />MEP / FP Engineer <br />EPSTEIN <br />600 West Fulton <br />Chicago, IL 60661 <br />312.454.9100 <br />MANUFACTURERS AND PRODUCTS THAT MATCH BUILDING STANDARDS. <br />e. COORDINATE DOOR FUNCTION AND KEYING WITH TENANT/OWNER. <br />8. FIRE -RATED DOOR ASSEMBLIES: PROVIDE DOOR HARDWARE RATED FOR USE <br />IN ASSEMBLIES COMPLYING WITH NFPA 80 THAT ARE LISTED AND LABELED BY <br />UNDERWRITERS' LABORATORIES FOR FIRE -RATINGS INDICATED, BASED ON <br />TESTING AT POSITIVE PRESSURE ACCORDING TO NFPA 252 OR UL 10C. <br />9. ELECTRIFIED DOOR HARDWARE: LISTED AND LABELED AS DEFINED IN NFPA <br />70, ARTICLE 100, BY A TESTING AGENCY ACCEPTABLE TO THE AUTHORITIES <br />HAVING JURISDICTION OVER THE PROJECT. <br />10. PROVIDE FINISHES COMPLYING WITH BHMA A156.18 AS INDICATED IN DOOR <br />HARDWARE SCHEDULE, <br />11. INSTALLATION: INSTALL EACH DOOR HARDWARE ITEM TO COMPLY WITH <br />MANUFACTURER'S WRITTEN INSTRUCTIONS. PROVIDE DOOR REINFORCING <br />AND BLOCKING FOR INSTALLATION OF DOOR HARDWARE WITHOUT <br />THRU-BOLTS. DO NOT INSTALL SURFACE MOUNTED ITEMS UNTIL FINISHES <br />HAVE BEEN COMPLETED ON SUBSTRATES INVOLVED. SET UNITS LEVEL, <br />PLUMB, AND TRUE TO LINE AND LOCATION. ADJUST AND REINFORCE <br />ATTACHMENT SUBSTRATES AS NECESSARY FOR PROPER INSTALLATION AND <br />OPERATION. <br />a. STEEL DOORS AND FRAMES: FOR SURFACE APPLIED DOOR HARDWARE, <br />DRILL AND TAP DOORS AND FRAMES ACCORDING TO ANSI/SDI A250.6. <br />b. WOOD DOORS: COMPLY WITH DHI/WDHS.5 "RECOMMENDED HARDWARE <br />REINFORCEMENT LOCATIONS FOR MINERAL CORE WOOD FLUSH DOORS." <br />12. WARRANTIES <br />a. GENERAL: 3 YEARS FROM SUBSTANTIAL COMPLETION <br />b. CLOSERS: 10 YEARS FROM SUBSTANTIAL COMPLETION <br />C. FLOOR CLOSERS: 5 YEARS FROM SUBSTANTIAL COMPLETION. <br />SECTION 08800 - INTERIOR GLASS AND GLAZING <br />1. INTERIOR GLAZING SHALL BE AS SCHEDULED AND SHALL COMPLY WITH ANSI <br />Z 97.1 AND TESTING REQUIREMENTS OF 16 CFR PART 1201 FOR CATEGORY II <br />MATERIALS. <br />2. SUBMITTALS: PROVIDE TO THE ARCHITECT THE FOLLOWING FOR EACH TYPE <br />OF GLASS: <br />a. PRODUCT DATA <br />b. SHOW DRAWINGS INDICATING LAYOUT AND DETAILS FOR REVIEW <br />c. FINISH SAMPLES. <br />3. GLAZING: COMPLY WITH COMBINED PRINTED RECOMMENDATIONS OF GLASS <br />MANUFACTURERS, OF MANUFACTURERS OF SEALANTS, GASKETS AND OTHER <br />GLAZING MATERIALS, EXCEPT WHERE MORE STRINGENT REQUIREMENTS ARE <br />INDICATED, INCLUDING THOSE OF REFERENCED GLAZING STANDARDS. <br />4. PROVIDE GLAZING SEALANTS WITH THE LOWEST VOC CONTENT POSSIBLE. <br />5. ENVIRONMENTAL CONDITIONS: DO NOT PROCEED WITH GLAZING WHEN <br />AMBIENT AND SUBSTRATE TEMPERATURE CONDITIONS ARE OUTSIDE THE <br />LIMITS PERMITTED BY GLAZING MATERIAL MANUFACTURER OR WHEN JOINT <br />SUBSTRATES ARE WET. <br />6. REMOVE AND REPLACE GLASS WHICH IS BROKEN, CHIPPED, CRACKED, <br />ABRADED OR DAMAGED IN OTHER WAYS DURING CONSTRUCTION PERIOD, <br />INCLUDING NATURAL CAUSES, ACCIDENTS AND VANDALISM. <br />7. WASH GLASS BY METHOD RECOMMENDED BY GLASS MANUFACTURER. <br />Design Architect <br />EPSTEIN <br />600 West Fulton <br />Chicago, IL 60661 <br />312.454.9100 <br />Nestle Waters North America <br />Nestle Waters North America <br />4330 20th Street <br />Zephyrhills, Florida 33542-6703 <br />972.462.3663 <br />SECTION 09250 - GYPSUM PARTITIONS <br />1. QUALITY CONTROL: NOTIFY ARCHITECT UPON COMPLETION OF THE <br />FOLLOWING; ARCHITECT RESERVES THE RIGHT TO REVIEW BOTH IN FILED <br />PRIOR TO COMMENCING NEXT STAGE: <br />a. WALL LAYOUT. <br />b. UTILITY ROUGH -IN PRIOR TO GYPSUM INSTALL. <br />2. INSTALLATIONS, UNLESS OTHERWISE INDICATED: PROVIDE STUDS 0.0179 IN, <br />MINIMUM THICKNESS, UNLESS OTHERWISE NOTED, FOR PARTITIONS HAVING <br />THE SAME MATERIAL AND THE SAME MATERIAL THICKNESS ON BOTH SIDES <br />OF FULL HEIGHT. SUSPENDED CEILINGS ARE NOT CONSIDERED LATERAL <br />SUPPORT FOR PARTITIONS. <br />3. GYPSUM BOARD INSTALLATION: COMPLY WITH ASTM C840 UNLESS <br />OTHERWISE NOTED. INSTALL CONTROL JOINTS IN PARTITION, WALL AND WALL <br />FURRING RUNS EXCEEDING 30 FT. FULL HEIGHT. DOOR FRAMES MAY BE <br />CONSIDERED A CONTROL JOINT. BACK-UP CONTROL JOINTS IN FIRE -RATED <br />PARTITIONS WITH 2-LAYERS OF TYPE X FIRE -RESISTIVE GYPSUM BOARD OR <br />SAFING INSULATION IN ACCORDANCE WITH MANUFACTURER'S FIRE -RATED <br />CONTROL JOINT DETAILS. <br />4. GYPSUM BOARD MATERIALS: 'WATER RESISTANT' PER ASTM C1396, SECTION <br />7. <br />5. PROVIDE GYPSUM BOARD PANELS IN MAXIMUM LENGTHS AND WIDTHS <br />AVAILABLE THAT WILL MINIMIZE JOINTS IN EACH AREA AND THAT <br />CORRESPOND WITH SUPPORT SYSTEM INDICATED. <br />6. ACOUSTICAL INSULATION: COMPLY WITH FS HH-1-521F. SEAL CONSTRUCTION <br />AT PERIMETERS, CONTROL AND EXPANSION JOINTS, OPENINGS AND <br />PENETRATIONS WITH A CONTINUOUS BEAD OF ACOUSTICAL SEALANT <br />INCLUDING A BEAD AT BOTH FACES OF PARTITIONS. COMPLY ALSO WITH <br />ASTM C 919 AND MANUFACTURER'S RECOMMENDATIONS FOR LOCATION OF <br />EDGE TRIM, AND CLOSE OFF SOUND -FLANKING PATHS AROUND TO THROUGH <br />CONSTRUCTION, INCLUDING SEALING OF PARTITIONS ABOVE ACOUSTICAL <br />CEILINGS. <br />7. ACOUSTICAL SEALANT: COMPLY WITH ASTM C 919, NON -OXIDIZING, <br />SKINNABLE, PAINTABLE, GUNNABLE SEALANT FOR EXPOSED APPLICATIONS. <br />8. GYPSUM BOARD PARTITION TRIM: <br />a. PROVIDE CASING BEAD WHERE DRYWALL ABUTS MASONRY AND <br />CONCRETE WALLS. <br />b. PROVIDE PARTITION CAP WHERE PARTITIONS ABUT WINDOW FRAMES. <br />c. PROVIDE CORNER BEAD AT EXTERNAL CORNERS. COMPLY WITH ASTM C <br />1047. <br />9. BLOCKING/REINFORCEMENT: PROVIDE METAL OR WOOD BLOCK <br />REINFORCEMENT BEHIND GYPSUM BOARD FOR ANCHORAGE AND SUPPORT <br />OF DOOR HARDWARE, WALL STOPS, WASHROOM ACCESSORIES, AND <br />MISCELLANEOUS ITEMS AS NECESSARY. <br />10. PROVIDE METAL STUD PARTITIONS CAPABLE OF CARRYING A TRANSVERSE <br />LOAD OF 5 PSF WITHOUT EXCEEDING A DEFLECTION OF L/120; DO NOT <br />EXCEED ALLOWABLE STRESS OF STUD UNDER A 5 PSF TRANSVERSE LOAD. <br />11. METAL STUD MATERIALS AND INSTALLATION: COMPLY WITH ASTM C 754 AND <br />WITH ASTM C 840 REQUIREMENTS THAT APPLY TO FRAMING. <br />SECTION 09510 - SUSPENDED CEILING SYSTEMS <br />1. THE CEILING SYSTEM SHALL BE INSTALLED IN ACCORDANCE WITH <br />MANUFACTURER'S INSTRUCTIONS. <br />2. CONTRACTOR SHALL COORDINATE THE WORK OF ALL OTHER TRADES WITH <br />THE INSTALLATION OF THE CEILING SYSTEM. <br />3. CONTRACTOR IS RESPONSIBLE FOR THE INSTALLATION OF A COMPLETE <br />CEILING SYSTEM INCLUDING ALL GRIDS, TIES, STRUCTURAL SYSTEMS, <br />ACCESSORIES, ETC. AS NOTED ON DRAWINGS AND AS REQUIRED BY <br />MANUFACTURER. <br />4. CONTRACTOR SHALL PROVIDE CEILING GRID AND ALL NECESSARY <br />ACCESSORIES FOR INSTALLATION OF APPROVED CEILING DEVICES SUCH AS <br />SLOT DIFFUSERS, HVAC GRILLES AND REGISTERS, AND LIGHT FIXTURES. <br />CONTRACTOR SHALL COORDINATE THE WORK OF ALL OTHER TRADES WITH <br />THE INSTALLATION OF THE CEILING SYSTEM. <br />5. SURFACE BURNING CHARACTERISTICS SHALL COMPLY WITH ASTM E 1264 AND <br />AS NOTED. CEILING FLAME SPREAD RATING SHALL NOT EXCEED 75 (25 WITHIN <br />STAIRWAYS, CORRIDORS AND LOBBIES). MAXIMUM SMOKE SPREAD SHALL <br />NOT EXCEED 200. <br />6. FOR CUTTING AND PATCHING WORK MATCH EXISTING CEILING <br />SYSTEM UNLESS THE EXISTING CEILING DOES NOT COMPLY WITH <br />CURRENT SURFACE BURNING REQUIREMENTS OR OTHERWISE NOTED. ALSO <br />REFER TO SECTION 01045 - CUTTING AND PATCHING. <br />7. CEILING GRID SHALL BE SECURED TO THE STRUCTURAL FRAMING ALONE. NO <br />CONNECTIONS TO FLOOR OR ROOF DECK ABOVE WILL BE PERMITTED. <br />8. EXTRA MATERIALS: FURNISH QUANTITY OF FULL SIZE UNITS OF ACOUSTIC <br />CEILINGS AND EXPOSED SUSPENSION SYSTEM EQUAL TO 2 PERCENT OF THE <br />AMOUNT INSTALLED TO THE TENANT. <br />9. CLEANING: CLEAN EXPOSED SURFACES OF ACOUSTICAL TILE CEILINGS, <br />INCLUDING TRIM AND EDGE MOLDINGS. COMPLY WITH MANUFACTURER'S <br />WRITTEN INSTRUCTIONS FOR CLEANING AND TOUCH-UP OF MINOR FINISH <br />DAMAGE. REMOVE AND REPLACE TILES AND OTHER CEILING COMPONENTS <br />THAT CANNOT BE SUCCESSFULLY CLEANED AND REPAIRED TO PERMANENTLY <br />ELIMINATE EVIDENCE OF DAMAGE. <br />10. SUBMITTALS: SUBMIT PRODUCT DATA FOR EACH TYPE OF SYSTEM SPECIFIED, <br />INCLUDING MANUFACTURER'S DETAILS FOR FASTENING, ATTACHMENT, <br />SPLICING, TRIMS AND MOLDINGS. SUBMIT SHOP DRAWINGS THAT INCLUDE <br />EDGE LOCATIONS AND TYPES, CUTOUTS, MECHANICAL/ELECTRICAL WORK <br />LOCATIONS, TILE PATTERN, CENTERLINES, AND WORKPOINTS. <br />71'N-etliders <br />4 <br />3 <br />09.18.2013 <br />09.11.2013 <br />ISSUE FOR PERMIT <br />ISSUE FOR BIDS <br />2 <br />1 <br />NO. <br />09.03.2013 <br />08.16.2013 <br />DATE <br />CD REVIEW PACKAGE <br />DID REVIEW PACKAGE <br />REVISIONS/ISSUANCES <br />�PSTEIN <br />Architecture <br />Chicago <br />Interiors <br />New York <br />Engineering <br />Bucharest <br />Construction <br />Warsaw <br />600 W. Fulton Street <br />Chicago, IL 60661-1259 <br />T 312.454.9100 <br />www.epsteinglobal.com <br />PROJECT NUMBER: 12386 <br />PROJECT MANAGER: JK <br />ARCH/ENG: LK <br />SCALE: 1 /32" =1'-0" <br />DRAWN BY: JK <br />CHECKED BY: LK <br />INTERIOR OUTLINE <br />SPECIFICATONS <br />NORTH AMERICA <br />SEAT_ <br />f <br />CA-003 <br />A. Epstein and Sons International, Inc. All rights reserved. <br />