Laserfiche WebLink
SECTION 102600 - WALL AND DOOR PROTECTION <br />PART 1- GENERAL <br />1.1 PRODUCTS <br />A. WALL GUARDS <br />1. PLASTIC CRASH RAIL WITH RETAINER CLIPS <br />a. SURFACE MOUNTED <br />2. MANUFACTURER: <br />a. CONSTRUCTION SPECIALTIES: SCR-50 ACROVYN 4000 CRASH <br />RAIL. INSTALLED PER MANUFACTURER'S <br />RECOMMENDATIONS. COLOR: AS SPECIFIED ON <br />DRAWINGS. <br />CORNER GUARDS <br />1. SURFACE MOUNTED, RESILIENT, PLASTIC TYPE: 4 FEET HIGH, <br />USING RETAINER CLIPS. <br />2. MANUFACTURER: <br />a. CONSTRUCTION SPECIALTIES: VA-250 ACROVYN 4000 CORNER GUARD. <br />ACROVYN 4000 CRASH RAIL, INSTALLED PER MANUFACTURER'S <br />RECOMMENDATIONS. COLOR: AS SPECIFIED ON DRAWINGS. <br />B. CART STOP <br />1. MANUFACTURER: <br />a. MCCUE CORPORATION, CART STOP SP (SUPER); PRODUCT <br />#CSS-(LENGTH)-A-401. INSTALLED PER MANUFACTURER'S <br />RECOMMENDATIONS. LENGTH AS INDICATED ON DRAWINGS. COLOR: <br />AS SPECIFIED ON DRAWINGS. <br />C. CART CARAL <br />1. MANUFACTURER: <br />a. MCCUE CORPORATION, CART STOP GR (GUIDANCE RAIL); INSTALLED <br />PER MANUFACTURER'S RECOMMENDATIONS. LENGTH AS INDICATED <br />ON DRAWINGS. <br />END OF SECTION <br />SECTION 102800 - TOILET, BATH AND LAUNDRY ACCESSORIES <br />PART 1 GENERAL <br />1.01 SECTION INCLUDES <br />A. GRAB BARS. <br />1.02 RELATED SECTIONS <br />A. SECTION 061000-FIRE RETARDANT WOOD BLOCKING AND CURBING: <br />CONCEALED SUPPORTS FOR ACCESSORIES, INCLUDING IN WALL <br />FRAMING AND PLATES. <br />1.03 REFERENCES <br />1.04 SUBMITTALS <br />A. SEE SECTION 013000 - ADMINISTRATIVE REQUIREMENTS, FOR <br />SUBMITTAL PROCEDURES. <br />B. PRODUCT DATA: PROVIDE DATA ON ACCESSORIES DESCRIBING SIZE, <br />FINISH, DETAILS OF FUNCTION, ATTACHMENT METHODS. <br />1.05 COORDINATION <br />A. COORDINATE THE WORK WITH THE PLACEMENT OF INTERNAL WALL <br />REINFORCEMENT TO RECEIVE ANCHOR ATTACHMENTS. <br />PART 2 PRODUCTS <br />2.01 MANUFACTURERS <br />A. REFER TO SCHEDULE ON DRAWINGS. <br />B. OTHER ACCEPTABLE MANUFACTURERS: <br />1. SUBSTITUTIONS: SECTION 016000 - PRODUCT REQUIREMENTS. <br />PART 3 EXECUTION <br />3.01 EXAMINATION <br />A. VERIFY EXISTING CONDITIONS BEFORE STARTING WORK. <br />B. VERIFY EXACT LOCATION OF ACCESSORIES FOR INSTALLATION. <br />C. VERIFY THAT FIELD MEASUREMENTS ARE AS INDICATED ON <br />DRAWINGS. <br />3.02 PREPARATION <br />A. DELIVER INSERTS AND ROUGH -IN FRAMES TO SITE FOR TIMELY <br />INSTALLATION. <br />B. PROVIDE TEMPLATES AND ROUGH -IN MEASUREMENTS AS REQUIRED. <br />3.03 INSTALLATION <br />A. INSTALL ACCESSORIES IN ACCORDANCE WITH MANUFACTURERS' <br />INSTRUCTIONS. <br />B. INSTALL PLUMB AND LEVEL, SECURELY AND RIGIDLY ANCHORED TO <br />SUBSTRATE. <br />C. MOUNTING HEIGHTS AND LOCATIONS: AS REQUIRED BY <br />ACCESSIBILITY REGULATIONS AND AS INDICATED ON DRAWINGS <br />END OF SECTION <br />SECTION 104416 - FIRE EXTINGUISHERS <br />PART 1- GENERAL <br />1.1 SUMMARY <br />A. SECTION INCLUDES PORTABLE, HAND -CARRIED FIRE EXTINGUISHERS <br />AND MOUNTING BRACKETS FOR FIRE EXTINGUISHERS. <br />1.2 QUALITY ASSURANCE <br />A. NFPA COMPLIANCE: FABRICATE AND LABEL FIRE EXTINGUISHERS TO <br />COMPLY WITH NFPA 10, "PORTABLE FIRE EXTINGUISHERS." <br />B. FIRE EXTINGUISHERS: LISTED AND LABELED FOR TYPE, RATING, AND <br />CLASSIFICATION BY AN INDEPENDENT TESTING AGENCY ACCEPTABLE <br />TO AUTHORITIES HAVING JURISDICTION. <br />1.3 WARRANTY <br />A. SPECIAL WARRANTY: MANUFACTURER'S STANDARD FORM IN WHICH <br />MANUFACTURER AGREES TO REPAIR OR REPLACE FIRE <br />EXTINGUISHERS THAT FAIL IN MATERIALS OR WORKMANSHIP WITHIN <br />SPECIFIED WARRANTY PERIOD. <br />1. FAILURES INCLUDE, BUT ARE NOT LIMITED TO, THE FOLLOWING: <br />a. FAILURE OF HYDROSTATIC TEST ACCORDING TO NFPA 10. <br />b. FAULTY OPERATION OF VALVES OR RELEASE LEVERS. <br />2. WARRANTY PERIOD: MANUFACTURER'S STANDARD FORM AND <br />TERM. <br />PART 2 - PRODUCTS <br />2.1 PORTABLE, HAND -CARRIED FIRE EXTINGUISHERS <br />A. FIRE EXTINGUISHERS: TYPE, SIZE, AND CAPACITY FOR EACH <br />MOUNTING BRACKET INDICATED. <br />1. MANUFACTURERS: SUBJECT TO COMPLIANCE WITH <br />REQUIREMENTS, AVAILABLE MANUFACTURERS OFFERING <br />PRODUCTS THAT MAY BE INCORPORATED INTO THE WORK <br />INCLUDE, BUT ARE NOT LIMITED TO, THE FOLLOWING: <br />a. ANSUL INCORPORATED, TYCO INTERNATIONAL LTD. <br />b. BUCKEYE FIRE EQUIPMENT COMPANY. <br />c. LARSEN'S MANUFACTURING COMPANY. <br />d. MOON-AMERICAN. <br />e. PYRO-CHEM, TYCO SAFETY PRODUCTS. <br />2. INSTRUCTION LABELS: INCLUDE PICTORIAL MARKING SYSTEM <br />COMPLYING WITH NFPA 10, APPENDIX B. <br />B. DRY -CHEMICAL TYPE: UL-RATED 10 LB. ABC, WITH MONOAMMONIUM <br />PHOSPHATE BASED CHEMICAL IN STAINLESS -STEEL CONTAINER, WITH <br />PRESSURE -INDICATING GAGE. <br />2.2 MOUNTING BRACKETS <br />A. MOUNTING BRACKETS: MANUFACTURER'S STANDARD GALVANIZED <br />STEEL, DESIGNED TO SECURE FIRE EXTINGUISHER TO WALL OR <br />STRUCTURE, OF SIZES REQUIRED FOR TYPES AND CAPACITIES OF <br />FIRE EXTINGUISHERS INDICATED, WITH PLATED OR RED <br />BAKED -ENAMEL FINISH. <br />B. IDENTIFICATION: LETTERING COMPLYING WITH AUTHORITIES HAVING <br />JURISDICTION FOR LETTER STYLE, SIZE, SPACING, AND LOCATION. <br />LOCATE AS INDICATED BY ARCHITECT. <br />1. IDENTIFY BRACKET -MOUNTED FIRE EXTINGUISHERS WITH THE <br />WORDS "FIRE EXTINGUISHER" IN RED LETTER DECALS APPLIED <br />TO MOUNTING SURFACE. <br />a. ORIENTATION: VERTICAL. <br />PART 3 - EXECUTION <br />3.1 INSTALLATION <br />A. EXAMINE FIRE EXTINGUISHERS FOR PROPER CHARGING AND <br />TAGGING. <br />1. REMOVE AND REPLACE DAMAGED, DEFECTIVE, OR <br />UNDERCHARGED FIRE EXTINGUISHERS. <br />B. INSTALL FIRE EXTINGUISHERS AND MOUNTING BRACKETS IN <br />LOCATIONS INDICATED AND IN COMPLIANCE WITH REQUIREMENTS OF <br />ZAUTHORITIES HAVING JURISDICTION. <br />1. MOUNTING BRACKETS: 54 INCHES (1372 MM) ABOVE FINISHED <br />FLOOR TO TOP OF FIRE EXTINGUISHER. <br />C. MOUNTING BRACKETS: FASTEN MOUNTING BRACKZETS TO <br />SURFACES, SQUARE AND PLUMB, AT LOCATIONS INDICATED. <br />END OF SECTION <br />SECTION 124813 - CARPET TILING <br />PART1- GENERAL <br />1.01 SUMMARY <br />A. SECTION INCLUDES: CARPET TILING <br />1.02 REFERENCES <br />A. STANDARDS LISTED BY REFERENCE, INCLUDING REVISIONS BY <br />ISSUING AUTHORITY, FORM A PART OF THIS SPECIFICATION SECTION <br />TO EXTENT INDICATED. THE STANDARDS LISTED HERE ARE <br />IDENTIFIED WITH A DESIGNATION NUMBER, TITLE OR OTHER <br />DESIGNATION ESTABLISHED BY THE ISSUING AUTHORITY. <br />B. AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM): <br />1. ASTM C1028 STATIC COEFFICIENT OF FRICTION <br />1.03 SYSTEM DESCRIPTION <br />A. PERFORMANCE REQUIREMENTS: PROVIDE CARPET TILES, WHICH HAS <br />BEEN MANUFACTURED AND INSTALLED TO MAINTAIN PERFORMANCE <br />CRITERIA STATED BY MANUFACTURER WITHOUT DEFECTS, DAMAGE <br />OR FAILURE. <br />1.04 SUBMITTALS <br />A. GENERAL: SUBMIT LISTED SUBMITTALS IN ACCORDANCE WITH THE <br />CONDITIONS OF THE CONTRACT AND DIVISION 1 SUBMITTAL <br />PROCEDURES SECTION. <br />B. PRODUCT DATA: SUBMIT PRODUCT DATA, INCLUDING <br />MANUFACTURER'S SPECIFICATION SHEET AND INSTALLATION <br />INSTRUCTIONS FOR SPECIFIED PRODUCTS. INCLUDE METHODS OF <br />INSTALLATION AND SUBSTRATE PREPARATION FOR EACH TYPE OF <br />SUBSTRATE. <br />C. SHOP DRAWINGS: SUBMIT SHOP DRAWINGS SHOWING LAYOUT, <br />ACCESSORIES, FINISH COLORS, PATTERNS AND TEXTURES. <br />D. SAMPLES: SUBMIT SAMPLES FOR EACH TYPE AND COLOR OF <br />EXPOSED CARPET TILE, THRESHOLD FRAME REDUCERS AND <br />ACCESSORIES REQUIRED. <br />E. CLOSEOUT SUBMITTALS: (1) CLEANING & MAINTENANCE DATA <br />(INCLUDE METHODS FOR MAINTAINING INSTALLED PRODUCTS AND <br />PRECAUTIONS AGAINST CLEANING MATERIALS AND METHODS <br />DETRIMENTAL TO FINISHES AND PERFORMANCE), AND (2) WARRANTY. <br />1.05 QUALITY ASSURANCE <br />A. INSTALLER: INSTALLER SHOULD BE HIGHLY EXPERIENCED IN <br />PERFORMING WORK OF THIS SECTION, HAVING PREVIOUSLY DONE <br />WORK SIMILAR TO THAT REQUIRED FOR THIS PROJECT. <br />1.06 SEQUENCING/SCHEDULING <br />A. ORDERING: COMPLY WITH MANUFACTURER'S ORDERING <br />INSTRUCTIONS AND LEAD-TIME REQUIREMENTS TO AVOID <br />CONSTRUCTION DELAYS. <br />B. DELIVERY: DELIVER MATERIALS IN MANUFACTURER'S ORIGINAL, <br />UNOPENED, UNDAMAGED PACKAGING. <br />C. STORAGE: STORE MATERIALS AT TEMPERATURE AND IN HUMIDITY <br />CONDITIONS RECOMMENDED BY MANUFACTURER AND PROTECT <br />FROM EXPOSURE TO HARMFUL WEATHER CONDITIONS. <br />D. INSTALLATION: EXCEPT AS OTHERWISE INDICATED HEREIN, <br />SEQUENCING OR SCHEDULING FOR PERFORMANCE OF WORK OF THIS <br />SECTION IN RELATION WITH OTHER WORK IS CONTRACTOR'S OPTION. <br />DELAY INSTALLATION OF MATS UNTIL NEAR TIME OF SUBSTANTIAL <br />COMPLETION FOR THE PROJECT. <br />1.07 PROJECT CONDITIONS <br />A. TEMPERATURE: MAINTAIN TEMPERATURE WHERE PRODUCTS WILL BE <br />INSTALLED BEFORE, DURING AND AFTER INSTALLATION AS <br />RECOMMENDED BY MANUFACTURER. <br />PART 2 - PRODUCTS <br />2.01 CONSTRUCTION SPECIALTIES <br />A. DESIGN STEP ENTRANCE CARPET: <br />B. PATTERN: AS NOTED ON DRAWINGS. <br />C. COLOR: AS NOTED ON DRAWINGS. <br />2.02 MATERIALS <br />A. SURFACE MOUNTED APPLICATION WITH J" GLUE DOWN REDUCER. <br />AS SPECIFIED ON DRAWINGS. <br />2.03 PRODUCT SUBSTITUTIONS <br />A. SUBSTITUTIONS: NO SUBSTITUTIONS PERMITTED. <br />PART 3 - EXECUTION <br />3.01 SUBSTRATE PREPARATION <br />A. EXAMINE SUBSTRATES AND CONDITIONS WHERE CARPET TILES WILL <br />BE INSTALLED. DO NOT PROCEED WITH INSTALLATION UNTIL <br />UNSATISFACTORY CONDITIONS ARE CORRECTED. SUB FLOOR SHALL <br />BE CLEAN AND DRY, AND WITHIN ACCEPTABLE TOLERANCES. <br />3.02 INSTALLATION <br />A. ACCESSORIES: THRESHOLD FRAME OR REDUCER AS RECOMMENDED <br />BY MANUFACTURES. AS NOTED ON DRAWINGS TO MEET ADA <br />STANDARDS. <br />C. GENERAL: STRICTLY COMPLY WITH MANUFACTURER'S INSTALLATION <br />INSTRUCTIONS AND RECOMMENDATIONS. COORDINATE <br />INSTALLATION WITH ADJACENT WORK TO ENSURE PROPER <br />CLEARANCES AND TO PREVENT TRIPPING HAZARDS. <br />3.03 CLEANING AND PROTECTION <br />A. GENERAL CLEANING: REFER TO MANUFACTURER'S CLEANING AND <br />MAINTENANCE INSTRUCTIONS. <br />B. OWNER'S PERSONNEL: INSTRUCT OWNER'S PERSONNEL IN PROPER <br />MAINTENANCE PROCEDURES. <br />C. PROTECTION: PROTECT INSTALLED PRODUCT AND FINISH SURFACES <br />FROM DAMAGE DURING CONSTRUCTION AND UNTIL ACCEPTANCE. <br />END OF SECTION <br />SECTION 033543 - SEALED AND POLISHED/DYED CONCRETE FINISHING <br />PART 1 - GENERAL <br />1.01 SUMMARY <br />A. SECTION INCLUDES: <br />1. GRINDING OF THE SLAB SURFACE TO RECEIVE CLEAR REACTIVE, <br />PENETRATING LIQUID HARDENER/DENSIFIER. <br />2. APPLICATION OF CLEAR REACTIVE, PENETRATING LIQUID <br />HARDENER AND CONCRETE DYE. <br />3. PROGRESSIVELY POLISHING AND BURNISHING OF THE SLAB <br />SURFACE TO ACHIEVE FINISH REQUIREMENTS. <br />4. APPLICATION OF STAIN RESISTANT SURFACE TREATMENT. <br />B. RELATED REQUIREMENTS <br />1. SECTION 014000- QUALTITY REQUIREMENTS. <br />2. SECTIZN 016000- PRODUCT REQUIREMENTS. <br />3. SECTION 017300- EXECUTION. <br />4. SECTION 017700- CLOSEOUT SUBMITTALS. <br />5. SECTION 033000- CAST -IN -PLACE CONCRETE. <br />6. SECTION 079200- JOINT SEALANTS <br />1.02 REFERENCES <br />A. THE DATE OF THE STANDARD IS THAT IN EFFECT AS THE DATE OF <br />RECEIPT OF BIDS FOR THE PROJECT. <br />B. LIVING BUILDING CHALLENGE (LBC). <br />C. SCIENTIFIC CERTIFICATION SYSTEM (SCS) INDOOR AIR QUALITY GOLD <br />CERTIFICATION. <br />D. NSF INTERNATIONAL/NONFOOD COMPOUND REGISTRATION. <br />E. AMERICAN NATIONAL STANDARD INSTITUTE / NATIONAL FLOOR SAFETY <br />INSTITUTE ANSI/NSFI B101.1 TEST METHOD FOR MEASURING WET SCOF <br />OF COMMON HARD -SURFACE FLOOR MATERIALS <br />F. ASTM INTERNATIONAL (ASTM): <br />1. C1028 - STANDARD TEST METHOD FOR DETERMINING THE STATIC <br />COEFFICIENT OF FRICTION OF CERAMIC TILE AND OTHER LIKE <br />SURFACES BY THE HORIZONTAL DYNAMOMETER PULL -METER <br />METHOD. <br />2. C1353 - STANDARD TEST METHOD FOR ABRASION RESISTANCE OF <br />DIMENSION STONE SUBJECTED TO FOOT TRAFFIC USING A ROTARY <br />PLATFORM, DOUBLE -HEAD ABRASER <br />3. D523- STANDARD TEST METHOD FOR SPECULAR GLOSS. <br />4. D1308 - STANDARD TEST METHOD FOR EFFECT OF HOUSEHOLD <br />CHEMICALS ON CLEAR AND PIGMENTED ORGANIC FINISHES. <br />5. D4541 - STANDARD TEST METHOD FOR PULL -OFF STRENGTH OF <br />COATINGS USING PORTABLE ADHESION TESTERS. <br />6. E96/96M METHOD B (WATER METHOD) - STANDARD TEST METHODS <br />FOR WATER VAPOR TRANSMISSZION OF MATERIALS. <br />7. G154 -STANDARD PRACTICE FOR OPERATING FLUORESCENT <br />ULTRAVIOLET (UV) LAMP APPARATUS FOR EXPOSURE OF <br />NONMETALLIC MATERIALS. <br />1.03 ADMINISTRATIVE REQUIREMENTS <br />A. PRE -INSTALLATION MEETING: CONVENE BEFORE THE START OF WORK <br />ON NEW CONCRETE SLABS, PATCHING OF EXISTING CONCRETE SLABS <br />AND START OF APPLICATION OF CONCRETE FINISH SYSTEM. <br />1. REQUIRE ATTENDANCE OF PARTIES DIRECTLY AFFECTING WORK <br />OF THIS SECTION, INCLUDING THE OWNER'S REPRESENTATIVE, <br />CONTRACTOR, ARCHITECT, CONCRETE INSTALLER, AND <br />APPLICATOR. MEETING SHOULD ONLY CONVENE WHEN REQUIRED <br />PARTIES ARE PRESENT. <br />2. REVIEW THE FOLLOWING: <br />a. PHYSICAL REQUIREMENTS OF COMPLETED CZONCRETE SLAB AND <br />SLAB FINISH. <br />b. LOCATIONS AND TIME OF TEST AREAS. <br />c. PROTECTION OF SURFACES NOT SCHEDULED FOR FINISH <br />APPLICATION. <br />d. SURFACE PREPARATION. <br />e. APPLICATION PROCEDURE. <br />f. FINAL APPEARANCE OF DYED CONCRETE. <br />g. QUALITY CONTROL. <br />h. CLEANING. <br />I. PROTECTION OF FINISH SYSTEM. <br />j. COORDINATION WITH OTHER WORK. <br />3. PRIOR TO ANY WORK, CONTRACTOR MUST CONDUCT A RH <br />MOISTURE TEST. <br />1.04 SUBMITTALS <br />A. PRODUCT DATA: <br />1. SUBMIT MANUFACTURER'S PRODUCT DATA SHEETS AND TESTED <br />PHYSICAL AND PERFORMANCE PROPERTIES ON PRODUCTS TO BE <br />USED FOR THE WORK. <br />B. VOC CERTIFICATION: SUBMIT CERTIFICATION THAT PRODUCTS <br />FURNISHED COMPLY WITH REGULATIONS CONTROLLING USE OF <br />VOLATILE ORGANIC COMPOUNDS (VOC). <br />C. CERTIFICATES: <br />1. CERTIFICATES BY MANUFACTURER STATING THAT INSTALLER IS <br />LISTED APPLICATOR OF SPECIAL CONCRETE FINISHES, AND HAS <br />COMPLETED THE NECESSARY TRAINING PROGRAMS. <br />D. FLOOR PROTECTION PLAN. <br />E. PROVIDE DOCUMENTATION STATING CONCRETE MOISTURE CONTENT <br />MEETS MANUFACTURER'S REQUIREMENTS. <br />1.05 QUALITY ASSURANCE <br />A. INSTALLER QUALIFICATIONS: <br />1. APPLICATOR TO BE FAMILIAR WITH THE SPECIFIED <br />REQUIREMENTS AND THE METHODS NEEDED FOR PROPER <br />PERFORMANCE OF WORK OF THIS SECTION. APPLICATOR MUST <br />HAVE AVAILABILITY OF PROPER EQUIPMENT TO PERFORM WORK <br />WITHIN SCOPE OF THIS PROJECT ON A TIMELY BASIS. <br />APPLICATOR SHOULD HAVE SUCCESSFULLY PERFORMED A <br />MINIMUM OF 20 PROJECTS OF SIMILAR SCOPE AND COMPLEXITY. <br />B. MOCK-UP: ON SITE, PRIOR TO THE START OF THE POLISHED <br />CONCRETE FINISHING PROCESS. <br />1. REQUIRE ATTENDANCE OF PARTIES DIRECTLY AFFECTING <br />WORK OF THIS SECTION, INCLUDING THE CONTRACTOR, <br />ARCHITECT, APPLICATOR, AND OWNER'S REPRESENTATIVE. <br />2. NOTIFY THE ABOVE PARTIES ONE WEEK IN ADVANCE OF DATE <br />AND TIME WHEN MOCK-UP WILL BE COMPLETED. <br />3. DEMONSTRATE THE MATERIALS, EQUIPMENT AND APPLICATION <br />METHODS TO BE USED FOR WORK SPECIFIED HEREIN IN <br />PRE -APPROVED LOCATION APPROXIMATELY 50 SQ. FT. IN AREA <br />OR AS DIRECTED BY THE ARCHITECT OR OWNER'S <br />REPRESENTATIVE. <br />4. RETAIN APPROVED MOCK-UP DURING CONSTRUCTION AS A <br />STANDARD FOR JUDGING THE COMPLETED WORK. AREAS MAY <br />REMAIN AS PART OF THE COMPLETED WORK. <br />1.02 DELIVERY, STORAGE AND HANDLING <br />A. DELIVER MATERIALS IN ORIGINAL CONTAINERS, WITH SEALS <br />UNBROKEN, BEARING MANUFACTURER LABELS INDICATING BRAND <br />NAME AND DIRECTIONS FOR STORAGE. <br />B. STORE CONCRETE HARDENER/DENSIFIER AND SURFACE <br />PROTECTANT TREATMENT IN ENVIRONMENT RECOMMENDED ON <br />PUBLISHED MANUFACTURER'S PRODUCT DATA SHEETS. <br />1. STORE CONTAINERS UPRIGHT IN A COOL, DRY, <br />WELL -VENTILATED PLACE, OUT OF THE SUN WITH <br />TEMPERATURE BETWEEN 40 AND 100 DEGREES F (4 AND 38 <br />DEGREES C). <br />2. PROTECT FROM FREEZING. <br />3. STORE AWAY FROM OTHER CHEMICALS AND POTENTIAL <br />SOURCES OF CONTAMINATION. <br />4. KEEP LIGHTS, FIRE, SPARKS AND HEAT AWAY FROM <br />CONTAINERS. <br />5. DO NOT DROP CONTAINERS OR SLIDE ACROSS SHARP OBJECTS. <br />6. DO NOT STACK PALLETS MORE THAN THREE HIGH. <br />7. KEEP CONTAINERS TIGHTLY CLOSED WHEN NOT IN USE. <br />1.07 FIELD CONDITIONS <br />A. ENVIRONMENTAL LIMITATIONS: <br />1. COMPLY WITH MANUFACTURER'S WRITTEN INSTRUCTIONS FOR <br />SUBSTRATE TEMPERATURE AND MOISTURE CONTENT, AMBIENT <br />TEMPERATURE AND HUMIDITY, VENTILATION, AND OTHER <br />CONDITIONS AFFECTING PERFORMANCE AND FINISHING <br />REQUIREMENTS. <br />B. CLOSE AREAS TO TRAFFIC DURING FLOOR APPLICATION AND AFTER <br />APPLICATION FOR TIME PERIOD RECOMMENDED IN WRITING BY <br />MANUFACTURER. <br />C. PROTECT THE COMPLETED SLAB TO PREVENT DAMAGE BY THE <br />OTHER TRADES DURING FLOOR COMPLETION. <br />D. TEMPERATURE LIMITATIONS: PER MANUFACTURER'S REQUIREMENTS. <br />E. APPLY WHEN AIR CONDITIONS ARE CALM TO MINIMIZE SURFACE <br />TREATMENT CONTACTING SURFACE NOT INTENDED TO BE FINISHED. <br />F. DO NOT APPLY TO FROZEN SUBSTRATE. ALLOW ADEQUATE TIME FOR <br />SUBSTRATE TO THAW, IF FREEZING CONDITIONS EXIST BEFORE <br />APPLICATION. <br />G. TEMPORARY HEAT: PER MANUFACTURER'S REQUIREMENTS. <br />H. VENTILATION: PROVIDE ADEQUATE VENTILATION IN CONFINED OR <br />ENCLOSED AREAS IN ACCORDANCE WITH MANUFACTURER'S <br />INSTRUCTIONS. <br />PART2-PRODUCTS <br />2.01 MANUFACTURERS: <br />A. LATICRETE INTERNATIONAL, INC. <br />B. PROSOCO <br />C. FLOROCK <br />D. METZER / MCGUIRE <br />2.02 FLOOR FINISH FT-1: LATICRETE L & M AQUAPEL <br />A. GRIND FLOOR USING PLANETARY GRINDING MACHINE TO REMOVE ANY <br />RESIDUAL FOREIGN MATERIALS THAT MAY BE PRESENT FROM <br />PREVIOUS FLOOR FINISHES. <br />B. IF NEW CONCRETE IS PRESENT, THEN NO GRINDING WILL BE <br />REQUIRED, APPLY SEALER AS SPECIFIED. <br />C. ONLY MINOR PREP WILL BE REQUIRED; FILLING DEEP CRACKS, <br />GRINDING ANY LEADING EDGES IF ANY ARE EXPOSED OR PRESENT. <br />D. PREPARE SURFACE PER MANUFACTURER'S SPECIFICATION. <br />2.03 FLOOR FINISH FT-2: PROSOCO CONSOLIDECK SYSTEM <br />A. GRIND SURFACE WITH #50-80 METAL BOND <br />B. TOOLING PROGRESS TO #150 HYBRID <br />C. TRANSITION INTO RESIN TOOLING FOR HONING STARTING AT #80 <br />RESIN, PROGRESS TO #100 RESIN, THEN #200 RESIN <br />D. APPLY PROSOCO GEMTONE STAIN. COLOR AS SPECIFIED IN FINISH <br />SCHEDULE. <br />1. ONCE PROFILE HAS BEEN ESTABLISHED APPLY PROSOCO <br />GEMTONE LIQUID DYE MIXING ONE (1) 12-OUNCE COLOR PACKET <br />PER HALF- GALLON OF WATER USING A HVLP SPRAYER AT 500 SF <br />PER GALLON. <br />E. APPLY PROSOCO LS DENSIFIER UNTIL REJECTION AT AN AVERAGE <br />RATE OF 650 SF PER GALLON, MAINTAIN A WET FLOOR FOR NO LESS <br />THAN 15 MINUTES. ALLOW PRODUCT TO DRY BEFORE CONTINUING. <br />F. CONTINUE SURFACE HONING WITH #400 RESIN, END POLISH WITH #800 <br />RESIN. <br />G. APPLY PROSOCO LS GUARD SEALER AT A RATE OF 2,000 - 3,000 SF A <br />GALLON <br />H. APPLY SECOND COAT AS NEEDED AFTER FIRST COAT IS TACK FREE. <br />I. HIGH SPEED BURNISH WITH 1500 GRIT DIAMOND IMPREGNATED PAD OR <br />AUTO SCRUB WITH WHITE PAD TO REMOVE HAZE <br />J. LIGHT GRIND 250 SQUARE FEET FOLLOWED BY APPLYING PER <br />PENETRATING CONCRETE SEALER WITH A HVLP SPRAYER <br />K. ALL FLOOR PATCH TO BE COMPLETED WITH RAPID REFLOOR XP RHINO <br />GRAY <br />L CPAA RATING: CLASS C LEVEL 3 <br />2.04 FLOOR FINISH FT-3: PROSOCO FLOROCK HYBRID SYSTEM <br />A. PROJECT CONDITIONS: <br />1. MAINTAIN AMBIENT TEMPERATURE REQUIRED BY <br />MANUFACTURER 3 DAYS DURING, PRIOR, AND FOR 24 HOURS <br />AFTER INSTALLATION. <br />2. APPLICATION MAY PROCEED WHILE AIR, MATERIAL AND <br />SUBSTRATE TEMPERATURES ARE BETWEEN 60 F AND 90 F <br />PROVIDING THE SUBSTRATE TEMP IS ABOVE THE DEW POINT. <br />3. THE RH (RELATIVE HUMIDITY) IN THIS SPECIFIC LOCATION OF <br />THE APPLICATION SHALL BE LESS THAN 75% AND THE SURFACE <br />TEMPERATURE SHALL BE AT LEAST 5 F ABOVE THE DEW POINT. <br />4. THE APPLICATOR SHALL BE SUPPLIED WITH ADEQUATE <br />LIGHTING EQUAL TO THE FINAL LIGHTING LEVEL DURING THE <br />PREPARATION AND INSTALLATION OF THE SYSTEM. <br />B. INSTALLATION PROCESS: SEE SPECIFICATION FOR APPLICATION <br />INSTRUCTIONS. NOTE EPDXY FINISH WILL BE CLEAR SO THAT THE <br />STAIN PREVIOUSLY APPLIED PER THE SPECIFICATION WILL TRANSFER <br />THROUGH. FT-3 CONTAINS THE SAME PRODUCTS AS FT-2 WITH THE <br />ADDITION OF THE FLOROCK FLOROSPARTIC ZERO (AND #60 ALUM <br />OXIDE / SHARKSKIN GRIP). <br />1. GRIND EXISTING -NEW CONCRETE WITH METAL BOND DIAMONDS <br />#40 USING A PLANETARY GRINDER <br />2. COMPLETE ANY MINOR PREP; SPALLING, DIVOTS, AND SMALL <br />CRACKS USING 100% SOLIDS MIXED WITH CABOSIL AND TINTED <br />TO MATCH COLOR AS SCHEDULED. <br />a. AS A SUBSTITUTE, A STRUCTURAL REPAIR PRODUCT WITH VERY HIGH <br />ADHESIVE AND TENSILE PROPERTIES SUCH AS METZER / MCGUIRE <br />RAPID REFLOOR MAY BE USED. <br />3. ONCE PROFILE HAS BEEN ESTABLISHED APPLY PROSOCO <br />GEMTONE LIQUID DYE MIXING ONE (1) 12-OUNCE COLOR PACKET <br />PER 1/2 GALLON OF WATER (COLOR AS SCHEDULED) USING A <br />HVLP SPRAYER AT 500 SF PER GALLON. <br />4. START COATINGS ONCE DYE HAS COMPLETELY DRIED: <br />a. MIX AND APPLY FLOROSPARTIC ZERO CLEAR (BASECOAT) WITH A <br />FLAT OR 1/8" NOTCHED SQUEEGEE AND ROLL OUT AT 200-300 SF/GAL <br />b. MIX AND APPLY FLOROSPARTIC ZERO CLEAR (TOPCOAT) WITH A FLAT <br />OR 1/8" NOTCHED SQUEEGEE AND ROLL OUT AT 200-300 SF/GAL <br />c. WHILE STILL WET, BROADCAST SIZE #46 ALUMINUM OXIDE AND <br />SHARKSKIN AT A RATIO OF 1:1 FOR ADDED SLIP RESISTANCE <br />C. WET AREA COATING APPLICATION PROJECT CONDITIONS: <br />1. MAINTAIN AMBIENT TEMPERATURE REQUIRED BY <br />MANUFACTURER 3 DAYS DURING, PRIOR, AND FOR 24 HOURS <br />AFTER INSTALLATION <br />2. APPLICATION MAY PROCEED WHILE AIR, MATERIAL AND <br />SUBSTRATE TEMPERATURES ARE BETWEEN 60 F AND 90 F <br />PROVIDING THE SUBSTRATE TEMP IS ABOVE THE DEW POINT <br />3. THE RH (RELATIVE HUMIDITY) IN THIS SPECIFIC LOCATION OF <br />THE APPLICATION SHALL BE LESS THAN 75% AND THE SURFACE <br />TEMPERATURE SHALL BE AT LEAST 5 F ABOVE THE DEW POINT. <br />4. THE APPLICATOR SHALL BE SUPPLIED WITH ADEQUATE <br />LIGHTING EQUAL TO THE FINAL LIGHTING LEVEL DURING THE <br />PREPARATION AND INSTALLATION OF THE SYSTEM. <br />D. SAFETY REQUIREMENTS: <br />1. NON -RELATED PERSONNEL IN THE WORK AREA SHALL BE KEPT TO A <br />MINIMUM. <br />2.05 CONTROL JOINTS <br />A. CLEAN AND HONOR ALL CONTROL JOINTS THROUGHOUT WITH METZER <br />SPAL-PRO RS 88 POLYURIA JOINT FILLER (COLOR TO MATCH FLOORING <br />AS SCHEDULED). <br />B. JOINTS WILL BE FILLED IN ONE PASS, FILLING FROM BOTTOM TO TOP, <br />SLIGHTLY OVERFILLING THE JOINT TO LEAVE A CROWNED PROFILE <br />THEN ALLOWED TO CURE. <br />C. SHAVE OR RAZOR OFF ALL EXCESS NO SOONER THAN 2 HOURS AND <br />NO LATER THAN 24 HOURS AFTER INSTALLATION. <br />PART 3 EXECUTION <br />3.01 EXAMINATION <br />A. EXAMINE SUBSTRATE WITH INSTALLER PRESENT FOR CONDITIONS <br />AFFECTING PERFORMANCE OF FINISH. CORRECT CONDITIONS <br />DETRIMENTAL TO TIMELY AND PROPER WORK. NOTIFY THE <br />ARCHITECT AND OWNER'S REPRESENTATIVE IN WRITING OF <br />CONDITIONS DETRIMENTAL TO THE PROPER AND TIMELY COMPLETION <br />OF THE WORK. <br />B. DO NOT BEGIN INSTALLATION UNTIL UNSATISFACTORY CONDITIONS <br />ARE RESOLVED. BEGINNING WORK CONSTITUTES ACCEPTANCE OF <br />SITE CONDITIONS AND RESPONSIBILITY FOR DEFECTIVE <br />INSTALLATION CAUSED BY PRIOR OBSERVABLE CONDITIONS. <br />3.02 PREPARATION <br />A. CLEAN DIRT, DUST, OIL, GREASE AND OTHER CONTAMINANTS THAT <br />INTERFERE WITH PENETRATION OR PERFORMANCE OF SPECIFIED <br />PRODUCT FROM SURFACES. USE APPROPRIATE CONCRETE <br />CLEANERS APPROVED BY THE CONCRETE SURFACE TREATMENT <br />MANUFACTURER WHERE NECESSARY. RINSE THOROUGHLY USING <br />PRESSURE WATER SPRAY TO REMOVE CLEANER RESIDUES. ALLOW <br />SURFACES TO DRY COMPLETELY BEFORE APPLICATION OF PRODUCT. <br />B. REPAIR, PATCH AND FILL CRACKS, VOIDS, DEFECTS AND DAMAGED <br />AREAS IN SURFACE AS APPROVED BY THE MANUFACTURER. ALLOW <br />REPAIR MATERIALS TO CURE COMPLETELY BEFORE APPLICATION OF <br />PRODUCT. <br />C. VARIATIONS IN SUBSTRATE TEXTURE AND COLOR WILL AFFECT FINAL <br />APPEARANCE AND SHOULD BE CORRECTED PRIOR TO APPLICATION <br />OF SEALER/HARDENER SYSTEM AND THE POLISHING STEPS. <br />D. PROTECT SURROUNDING AREAS PRIOR TO APPLICATION. IF PRODUCT <br />IS ACCIDENTALLY MISAPPLIED TO ADJACENT SURFACES, FLUSH WITH <br />WATER IMMEDIATELY BEFORE MATERIAL DRIES. <br />E. AVOID CONTACT IN AREAS NOT TO BE TREATED. AVOID CONTACT <br />WITH METAL, GLASS AND PAINTED SURFACES. <br />F. APPLY SPECIFIED SEALANTS AND CAULKING AND ALLOW COMPLETE <br />CURING BEFORE APPLICATION OF PENETRATING CONCRETE <br />HARDENER/DENSIFIER. <br />G. DO NOT PROCEED UNTIL UNSATISFACTORY CONDITIONS HAVE BEEN <br />CORRECTED. <br />3.03 SLAB PROTECTION <br />A. PROTECT FINISHED FLOORS TO PREVENT DAMAGE INCLUDING <br />STAINING, GOUGES AND SCRATCHING BY CONSTRUCTION TRAFFIC <br />AND ACTIVITIES UNTIL POSSESSION. <br />B. DO NOT DRAG OR DROP EQUIPMENT OR MATERIAL ACROSS THE SLAB <br />WHICH WILL SCRATCH OR CHIP IT. <br />C. INSPECT TIRES FOR DEBRIS PRIOR TO USE ON SLAB. REMOVE <br />EMBEDDED ITEMS WHICH MAY CAUSE DAMAGE TO FLOOR SLAB. <br />D. CLEAN UP SPILLS ON SLAB IMMEDIATELY. PROVIDE CLEANING <br />CHEMICALS AND ABSORPTIVE MATERIALS. <br />E. DEVELOP A CONCRETE PROTECTION PROCEDURE WHICH ADDRESSES <br />THE FOLLOWING PROCEDURES: <br />1. COMMUNICATION OF PROTECTION PLAN TO SUBCONTRACTORS <br />AND VENDORS. <br />2. PROCEDURES FOR CLEANING UP SLAB SPILLS, INCLUDING USE <br />OF AND AVAILABILITY OF CLEANING CHEMICALS AND <br />ABSORPTIVE MATERIALS AT SITE. <br />F. PROVIDE A CLEAN SLAB USING CONCRETE MAINTENANCE CLEANER <br />WITHIN AN AUTO SCRUBBER, EQUIPPED WITH SOFT NYLON BRUSHES, <br />IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. <br />3.04 WARRANTIES: <br />A. FURNISH MANUFACTURERS STANDARD WARRANTY PROVIDING <br />COVERAGE AGAINST FLOORING DELAMINATION FROM SUBSTRATE AND <br />DEGRADATION OF SURFACE FINISH. <br />END OF SECTION <br />N <br />f <br />K <br />E <br />• <br />N <br />�a0 <br />q <br />� <br />N <br />o <br />N N <br />E <br />b <br />14 <br />b <br />d Lg <br />Z <br />0 <br />a <br />U <br />W <br />0 <br />W <br />Q <br />w <br />st� • <br />ISSUED FOR: <br />PERMIT <br />03.14.19 <br />BID <br />03.14.19 <br />CONSTRUCTION <br />00.00.00 <br />REVIEW SET <br />03.14.19 <br />PROJECT MANAGER DESIGNER <br />SS SS <br />JOB NO. <br />18390 <br />AS1 07 <br />