SECTION 011000 - SUMMARY
<br />PART 1 GENERAL
<br />1.01 PROJECT
<br />A. PROJECT NAME: PET SUPPLIES PLUS - ZEPHYRHILLS, FL.
<br />B. THE PROJECT CONSISTS OF RENOVATIONS TO AN EXISTING VACANT
<br />BUILDING AND SITE FOR A NEW PET SUPPLIES RETAIL STORE.
<br />1.02 CONTRACT DESCRIPTION
<br />A. CONTRACT TYPE: A SINGLE PRIME CONTRACT BASED ON A
<br />STIPULATED PRICE AS DESCRIBED IN AIA OWNER - CONTRACTOR
<br />AGREEMENT.
<br />1.03 DESCRIPTION OF ALTERATIONS WORK
<br />A. SCOPE OF DEMOLITION AND REMOVAL WORK IS SHOWN ON
<br />DRAWINGS.
<br />B. RENOVATE THE ENTIRE SPACE, COMPLETE AS INDICATED ON THE
<br />DRAWINGS AND SPECIFIED HEREIN:
<br />1.04 WORK BY OWNER
<br />A. THE OWNER HAS AWARDED CONTRACTS FOR THE SUPPLY,
<br />INSTALLATION OR THE SUPPLY AND INSTALLATION OF ITEMS
<br />SCHEDULED ON THE DRAWINGS, WHICH WILL COMMENCE ON DATES
<br />PRIOR TO TURNOVER FOR OWNER OCCUPANCY.
<br />1.05 OWNER OCCUPANCY
<br />A. THE OWNER INTENDS TO OCCUPY PORTIONS OF THE BUILDING PRIOR
<br />TO THE COMPLETION DATE FOR INSTALLATION OF OWNER PROVIDED
<br />MATERIALS.
<br />B. SCHEDULE THE WORK TO ACCOMMODATE THE OWNER AND THE
<br />OWNERS CONTRACTORS OCCUPANCY.
<br />1.06 CONTRACTOR USE OF SITE
<br />A. CONSTRUCTION OPERATIONS: LIMITED TO AREAS NOTED ON
<br />DRAWINGS.
<br />B. ARRANGE USE OF SITE TO ALLOW:
<br />1. WORK BY OTHERS.
<br />C. PROVIDE ACCESS TO AND FROM SITE AS REQUIRED BY LAW AND BY
<br />THE OWNER:
<br />1. EMERGENCY BUILDING EXITS DURING CONSTRUCTION: KEEP
<br />ALL EXITS AT ADJACENT BUILDING OPERATING TENANTS AND
<br />AS REQUIRED BY CODE OPEN DURING CONSTRUCTION PERIOD,
<br />PROVIDE TEMPORARY EXIT SIGNS IF EXIT ROUTES ARE
<br />TEMPORARILY ALTERED.
<br />2. DO NOT OBSTRUCT ROADWAYS, SIDEWALKS, OR OTHER
<br />PUBLIC WAYS WITHOUT PERMIT.
<br />3. MAINTAIN ACCESS TO ADJACENT PROPERTY, COORDINATE
<br />WITH CONSTRUCTION LIMITS ACCESS.
<br />D. EXISTING BUILDING SPACES MAY NOT BE USED FOR STORAGE.
<br />1.07 WORK SEQUENCE
<br />A. COORDINATE CONSTRUCTION SCHEDULE AND OPERATIONS WITH THE
<br />ARCHITECTS.
<br />PART 2 PRODUCTS - NOT USED
<br />PART 3 EXECUTION - NOT USED
<br />END OF SECTION
<br />SECTION 013000 - ADMINISTRATIVE REQUIREMENTS
<br />PART 1 GENERAL
<br />1.01 SECTION INCLUDES
<br />A.
<br />PROGRESS REPORTING.
<br />B.
<br />CONSTRUCTION PROGRESS SCHEDULE.
<br />C.
<br />PROGRESS PHOTOGRAPHS.
<br />D.
<br />COORDINATION DRAWINGS.
<br />E.
<br />SUBMITTALS FOR REVIEW, INFORMATION, AND PROJECT CLOSEOUT.
<br />F.
<br />SUBMITTAL PROCEDURES.
<br />PART 2 PRODUCTS - NOT USED
<br />PART 3 EXECUTION
<br />3.01 PROGRESS REPORTING
<br />A.
<br />SCHEDULE AND ADMINISTER REPORTING THROUGHOUT PROGRESS
<br />OF THE WORK AT MAXIMUM WEEKLY INTERVALS OR AS REQUESTED
<br />BY PET SUPPLIES PLUS REPRESENTATIVES.
<br />B.
<br />REPORT ITEMS:
<br />1. REVIEW OF WORK PROGRESS.
<br />2. FIELD OBSERVATIONS, PROBLEMS, AND DECISIONS.
<br />3. IDENTIFICATION OF PROBLEMS WHICH IMPEDE PLANNED
<br />PROGRESS.
<br />4. REVIEW OF SUBMITTALS SCHEDULE AND STATUS OF
<br />SUBMITTALS.
<br />5. REVIEW OF OFF -SITE FABRICATION, OWNER PROVIDED ITEMS
<br />AND DELIVERY SCHEDULES.
<br />6. MAINTENANCE OF PROGRESS SCHEDULE.
<br />7. CORRECTIVE MEASURES TO REGAIN PROJECTED SCHEDULES.
<br />8. PLANNED PROGRESS DURING SUCCEEDING WORK PERIOD.
<br />9. MAINTENANCE OF QUALITY AND WORK STANDARDS.
<br />10. EFFECT OF PROPOSED CHANGES ON PROGRESS SCHEDULE
<br />AND COORDINATION.
<br />11. PROGRESS PHOTOS, REFER TO REQUIREMENTS BELOW.
<br />12. OTHER BUSINESS RELATING TO WORK.
<br />C.
<br />PREPARE REPORT AND DISTRIBUTE VIA EMAIL ON THURSDAY
<br />MORNING OF EACH WEEK. DISTRIBUTION TO INCLUDE OWNER,
<br />ARCHITECT.
<br />3.02 CONSTRUCTION PROGRESS SCHEDULE
<br />A.
<br />CONSTRUCTION SCHEDULE SHALL BE ORGANIZED IN BAR CHART
<br />FORMAT WITH SEPARATE BAR FOR EACH SUBSTRATE CATEGORY OF
<br />WORK, ORGANIZE IN CHRONOLOGICAL ORDER ACCORDING TO THE
<br />START DATE FOR EACH ACTIVITY OF WORK. IDENTIFY EACH ACTIVITY
<br />BY APPLICABLE SPECIFICATION REFERENCE NUMBER.
<br />B.
<br />WITHIN 3 DAYS AFTER DATE ESTABLISHED IN NOTICE TO PROCEED,
<br />SUBMIT PRELIMINARY SCHEDULE FOR CONSTRUCTION OPERATIONS
<br />FOR THE DURATION OF THE PROJECT. INCLUDE SCHEDULE FOR
<br />ORDERING AND DELIVERY OF OWNER SUPPLIED ITEMS.
<br />C.
<br />IF PRELIMINARY SCHEDULE REQUIRES REVISION AFTER REVIEW,
<br />SUBMIT REVISED SCHEDULE WITHIN 2 DAYS.
<br />D.
<br />WITHIN 10 DAYS AFTER JOINT REVIEW, SUBMIT COMPLETE SCHEDULE.
<br />E.
<br />SUBMIT UPDATED SCHEDULE WITH EACH APPLICATION FOR PAYMENT.
<br />3.03 PROGRESS PHOTOGRAPHS
<br />A.
<br />PROVIDE PHOTOGRAPHS OF SITE AND CONSTRUCTION THROUGHOUT
<br />PROGRESS OF WORK PRODUCED BY AN EXPERIENCED
<br />PHOTOGRAPHER, ACCEPTABLE TO PET SUPPLIES PLUS AND
<br />ARCHITECT.
<br />B.
<br />PHOTOS SHALL BE DIGITAL .JPG IMAGES ASSEMBLED IN .ZIP FILE AND
<br />EMAILED WITH WEEKLY PROGRESS REPORT.
<br />C.
<br />TAKE PHOTOGRAPHS FOR SUBMITTAL WITH WEEKLY PROGRESS
<br />REPORT OF MINIMUM ITEMS AS FOLLOWS AND APPLICABLE TO
<br />WORKSCOPE OF PROJECT:
<br />1. DEMOLITION
<br />2. EXCAVATION AND UNDERGROUND PLUMBING
<br />3. ROUGH FRAMING INCLUDING ALL CONCEALED BLOCKING
<br />4. PLUMBING WALL ROUGH IN
<br />5. ELECTRICAL WALL ROUGH IN
<br />6. HVAC ROUGH IN
<br />7. ELECTRICAL OVERHEAD
<br />8. WALLS PRIOR TO GYPSUM BOARD
<br />9. WALLS AFTER GYPSUM BOARD
<br />10. CEILING GRID INSTALLATION
<br />11. FLOOR TILE
<br />12. OWNER SUPPLIED CABINETRY AND KITCHEN EQUIPMENT AT
<br />DELIVERY
<br />13. OWNER SUPPED CABINETRY AND KITCHEN EQUIPMENT AT
<br />INSTALLATION
<br />14. PAINTING
<br />15. INTERIOR FINISHES AND DECOR
<br />16. EXTERIOR DRIVE THRU RELATED WORK
<br />17. EXTERIOR LIFT, LOADING AREA AND RELATED WORK
<br />18. ADDITIONAL ITEMS AS REQUESTED BY OWNER, ARCHITECT
<br />AND PET SUPPLIES PLUS
<br />3.04 COORDINATION
<br />DRAWINGS AND FIELD DIMENSIONS
<br />A.
<br />PROVIDE INFORMATION REQUIRED BY OWNER, ARCHITECT OR PET
<br />SUPPLIES PLUS VENDOR FOR PREPARATION OF COORDINATION
<br />DRAWINGS.
<br />3.05 SUBMITTALS FOR REVIEW
<br />A.
<br />WHEN THE FOLLOWING ARE SPECIFIED IN INDIVIDUAL SECTIONS,
<br />SUBMIT THEM FOR REVIEW:
<br />1. PRODUCT DATA.
<br />2. SHOP DRAWINGS.
<br />3. SAMPLES FOR SELECTION.
<br />4. SAMPLES FOR VERIFICATION.
<br />B.
<br />SUBMIT TO ARCHITECT FOR REVIEW FOR THE LIMITED PURPOSE OF
<br />CHECKING FOR CONFORMANCE WITH INFORMATION GIVEN AND THE
<br />DESIGN CONCEPT EXPRESSED IN THE CONTRACT DOCUMENTS.
<br />C.
<br />SAMPLES WILL BE REVIEWED ONLY FOR AESTHETIC, COLOR, OR
<br />FINISH SELECTION.
<br />D.
<br />AFTER REVIEW, PROVIDE COPIES AND DISTRIBUTE IN ACCORDANCE
<br />WITH SUBMITTAL PROCEDURES ARTICLE BELOW AND FOR RECORD
<br />DOCUMENTS PURPOSES DESCRIBED IN SECTION 017700 - CLOSEOUT
<br />SUBMITTALS.
<br />3.06 SUBMITTALS FOR INFORMATION
<br />A.
<br />WHEN THE FOLLOWING ARE SPECIFIED IN INDIVIDUAL SECTIONS,
<br />SUBMIT THEM FOR INFORMATION:
<br />1. DESIGN DATA.
<br />2. CERTIFICATES.
<br />3. TEST REPORTS.
<br />4. INSPECTION REPORTS.
<br />5. MANUFACTURER'S INSTRUCTIONS.
<br />6. MANUFACTURER'S FIELD REPORTS.
<br />7. OTHER TYPES INDICATED.
<br />B.
<br />SUBMIT FOR ARCHITECTS KNOWLEDGE AS CONTRACT
<br />ADMINISTRATOR OR FOR OWNER. NO ACTION WILL BE TAKEN.
<br />3.07 SUBMITTALS FOR PROJECT CLOSEOUT
<br />A.
<br />WHEN THE FOLLOWING ARE SPECIFIED IN INDIVIDUAL SECTIONS,
<br />SUBMIT THEM AT PROJECT CLOSEOUT:
<br />1. PROJECT RECORD DOCUMENTS.
<br />2. OPERATION AND MAINTENANCE DATA.
<br />3. WARRANTIES.
<br />4. OTHER TYPES AS INDICATED.
<br />B.
<br />SUBMIT FOR OWNER'S BENEFIT DURING AND AFTER PROJECT
<br />COMPLETION.
<br />END OF SECTION
<br />SECTION 014000 - QUALITY REQUIREMENTS
<br />PART 1 GENERAL.
<br />1.01 REFERENCES AND STANDARDS
<br />A.
<br />FOR PRODUCTS AND WORKMANSHIP SPECIFIED BY REFERENCE TO A
<br />DOCUMENT OR DOCUMENTS NOT INCLUDED IN THE PROJECT MANUAL,
<br />ALSO REFERRED TO AS REFERENCE STANDARDS, COMPLY WITH
<br />REQUIREMENTS OF THE STANDARD, EXCEPT WHEN MORE RIGID
<br />REQUIREMENTS ARE SPECIFIED OR ARE REQUIRED BY APPLICABLE
<br />CODES.
<br />B.
<br />CONFORM TO REFERENCE STANDARD OF DATE OF ISSUE CURRENT
<br />ON DATE OF CONTRACT DOCUMENTS, EXCEPT WHERE A SPECIFIC
<br />DATE IS ESTABLISHED BY APPLICABLE CODE.
<br />C.
<br />OBTAIN COPIES OF STANDARDS WHERE REQUIRED BY PRODUCT
<br />SPECIFICATION SECTIONS.
<br />D.
<br />MAINTAIN COPY AT PROJECT SITE DURING SUBMITTALS, PLANNING,
<br />AND PROGRESS OF THE SPECIFIC WORK, UNTIL SUBSTANTIAL
<br />COMPLETION.
<br />E.
<br />SHOULD SPECIFIED REFERENCE STANDARDS CONFLICT WITH
<br />CONTRACT DOCUMENTS, REQUEST CLARIFICATION FROM THE
<br />ARCHITECTS BEFORE PROCEEDING.
<br />F.
<br />NEITHER THE CONTRACTUAL RELATIONSHIPS, DUTIES, OR
<br />RESPONSIBILITIES OF THE PARTIES IN CONTRACT NOR THOSE OF THE
<br />ARCHITECTS SHALL BE ALTERED FROM THE CONTRACT DOCUMENTS
<br />BY MENTION OR INFERENCE OTHERWISE IN ANY REFERENCE
<br />DOCUMENT.
<br />PART 2 PRODUCTS - NOT USED
<br />PART 3 EXECUTION
<br />3.01 CONTROL OF INSTALLATION
<br />A.
<br />MONITOR QUALITY CONTROL OVER SUPPLIERS, MANUFACTURERS,
<br />PRODUCTS, SERVICES, SITE CONDITIONS, AND WORKMANSHIP, TO
<br />PRODUCE WORK OF SPECIFIED QUALITY.
<br />B.
<br />COMPLY WITH MANUFACTURERS' INSTRUCTIONS, INCLUDING EACH
<br />STEP IN SEQUENCE.
<br />C.
<br />SHOULD MANUFACTURERS' INSTRUCTIONS CONFLICT WITH
<br />CONTRACT DOCUMENTS, REQUEST CLARIFICATION FROM THE
<br />ARCHITECTS BEFORE PROCEEDING.
<br />D.
<br />COMPLY WITH SPECIFIED STANDARDS AS MINIMUM QUALITY FOR THE
<br />WORK EXCEPT WHERE MORE STRINGENT TOLERANCES, CODES, OR
<br />SPECIFIED REQUIREMENTS INDICATE HIGHER STANDARDS OR MORE
<br />PRECISE WORKMANSHIP.
<br />E.
<br />HAVE WORK PERFORMED BY PERSONS QUALIFIED TO PRODUCE
<br />REQUIRED AND SPECIFIED QUALITY.
<br />F.
<br />VERIFY THAT FIELD MEASUREMENTS ARE AS INDICATED ON SHOP
<br />DRAWINGS OR AS INSTRUCTED BY THE MANUFACTURER.
<br />G.
<br />SECURE PRODUCTS IN PLACE WITH POSITIVE ANCHORAGE DEVICES
<br />DESIGNED AND SIZED TO WITHSTAND STRESSES, VIBRATION,
<br />PHYSICAL DISTORTION, AND DISFIGUREMENT.
<br />3.02 TOLERANCES
<br />A.
<br />MONITOR FABRICATION AND INSTALLATION TOLERANCE CONTROL OF
<br />PRODUCTS TO PRODUCE ACCEPTABLE WORK. DO NOT PERMIT
<br />TOLERANCES TO ACCUMULATE.
<br />B.
<br />COMPLY WITH MANUFACTURERS' TOLERANCES. SHOULD
<br />MANUFACTURERS' TOLERANCES CONFLICT WITH CONTRACT
<br />DOCUMENTS, REQUEST CLARIFICATION FROM THE ARCHITECTS
<br />BEFORE PROCEEDING.
<br />C.
<br />ADJUST PRODUCTS TO APPROPRIATE DIMENSIONS, POSITION BEFORE
<br />SECURING PRODUCTS IN PLACE.
<br />3.03 DEFECT ASSESSMENT
<br />A.
<br />REPLACE WORK OR PORTIONS OF THE WORK NOT CONFORMING TO
<br />SPECIFIED REQUIREMENTS.
<br />B.
<br />IF, IN THE OPINION OF THE ARCHITECTS, IT IS NOT PRACTICAL TO
<br />REMOVE AND REPLACE THE WORK, THE ARCHITECTS WILL DIRECT AN
<br />APPROPRIATE REMEDY OR ADJUST PAYMENT.
<br />END OF SECTION
<br />SECTION 015000 - TEMPORARY FACILITIES AND CONTROLS
<br />PART 1 GENERAL
<br />1.01 TEMPORARY UTILITIES
<br />A. USE TRIGGER -OPERATED NOZZLES FOR WATER HOSES, TO AVOID
<br />WASTE OF WATER.
<br />1.02 TEMPORARY SANITARY FACILITIES
<br />A. PROVIDE AND MAINTAIN REQUIRED FACILITIES AND ENCLOSURES.
<br />PROVIDE AT TIME OF PROJECT MOBILIZATION.
<br />B. USE OF EXISTING FACILITIES IS PERMITTED.
<br />C. MAINTAIN DAILY IN CLEAN AND SANITARY CONDITION.
<br />1.03 BARRIERS
<br />A. PROVIDE BARRIERS TO PREVENT UNAUTHORIZED ENTRY TO
<br />CONSTRUCTION AREAS, TO ALLOW FOR OWNER'S USE OF SITE AND
<br />TO PROTECT EXISTING FACILITIES AND ADJACENT PROPERTIES FROM
<br />DAMAGE FROM CONSTRUCTION OPERATIONS AND DEMOLITION.
<br />B. PROVIDE BARRICADES AND COVERED WALKWAYS REQUIRED BY
<br />GOVERNING AUTHORITIES FOR PUBLIC RIGHTS -OF -WAY AND FOR
<br />PUBLIC ACCESS TO EXISTING BUILDING.
<br />C. PROTECT NON -OWNED VEHICULAR TRAFFIC, STORED MATERIALS,
<br />SITE, AND STRUCTURES FROM DAMAGE.
<br />1.04 EXTERIOR ENCLOSURES
<br />A. PROVIDE TEMPORARY INSULATED WEATHER TIGHT CLOSURE OF
<br />EXTERIOR OPENINGS TO ACCOMMODATE ACCEPTABLE WORKING
<br />CONDITIONS AND PROTECTION FOR PRODUCTS, TO ALLOW FOR
<br />TEMPORARY HEATING AND MAINTENANCE OF REQUIRED AMBIENT
<br />TEMPERATURES IDENTIFIED IN INDIVIDUAL SPECIFICATION SECTIONS,
<br />AND TO PREVENT ENTRY OF UNAUTHORIZED PERSONS. PROVIDE
<br />ACCESS DOORS WITH SELF -CLOSING HARDWARE AND LOCKS.
<br />1.05 SECURITY
<br />A. PROVIDE SECURITY AND FACILITIES TO PROTECT WORK, EXISTING
<br />FACILITIES, AND THE OWNER'S OPERATIONS FROM UNAUTHORIZED
<br />ENTRY, VANDALISM, OR THEFT.
<br />1.06 VEHICULAR ACCESS AND PARKING
<br />A. COORDINATE ACCESS AND HAUL ROUTES WITH GOVERNING
<br />AUTHORITIES AND THE OWNER.
<br />B. PROVIDE AND MAINTAIN ACCESS TO FIRE HYDRANTS, FREE OF
<br />OBSTRUCTIONS.
<br />C. PROVIDE MEANS OF REMOVING MUD FROM VEHICLE WHEELS BEFORE
<br />ENTERING STREETS.
<br />D. PROVIDE TEMPORARY PARKING AREAS TO ACCOMMODATE
<br />CONSTRUCTION PERSONNEL. WHEN SITE SPACE IS NOT ADEQUATE,
<br />PROVIDE ADDITIONAL OFF -SITE PARKING.
<br />1.07 WASTE REMOVAL
<br />A. PROVIDE WASTE REMOVAL FACILITIES AND SERVICES AS REQUIRED
<br />TO MAINTAIN THE SITE IN CLEAN AND ORDERLY CONDITION.
<br />B. PROVIDE CONTAINERS WITH LIDS. REMOVE TRASH FROM SITE
<br />PERIODICALLY.
<br />C. IF MATERIALS TO BE RECYCLED OR RE -USED ON THE PROJECT MUST
<br />BE STORED ON -SITE, PROVIDE SUITABLE NON-COMBUSTIBLE
<br />CONTAINERS, LOCATE CONTAINERS HOLDING FLAMMABLE MATERIAL
<br />OUTSIDE THE STRUCTURE UNLESS OTHERWISE APPROVED BY THE
<br />AUTHORITIES HAVING JURISDICTION.
<br />D. OPEN FREE -FALL CHUTES ARE NOT PERMITTED. TERMINATE CLOSED
<br />CHUTES INTO APPROPRIATE CONTAINERS WITH LIDS.
<br />1.08 REMOVAL OF UTILITIES, FACILITIES, AND CONTROLS
<br />A. REMOVE TEMPORARY UTILITIES, EQUIPMENT, FACILITIES, MATERIALS,
<br />PRIOR TO SUBSTANTIAL COMPLETION INSPECTION.
<br />B. REMOVE UNDERGROUND INSTALLATIONS TO A MINIMUM DEPTH OF 2
<br />FEET (600 MM) OR AS INDICATED ON DRAWINGS. GRADE SITE AS
<br />INDICATED.
<br />C. CLEAN AND REPAIR DAMAGE CAUSED BY INSTALLATION OR USE OF
<br />TEMPORARY WORK.
<br />D. RESTORE EXISTING FACILITIES USED DURING CONSTRUCTION TO
<br />ORIGINAL CONDITION.
<br />PART 2 PRODUCTS - NOT USED
<br />PART 3 EXECUTION - NOT USED
<br />END OF SECTION
<br />SECTION 016000 - PRODUCT REQUIREMENTS
<br />PART 1 GENERAL
<br />1.01 REFERENCES
<br />A.
<br />NFPA 70 - NATIONAL ELECTRICAL CODE, NATIONAL FIRE PROTECTION
<br />ASSOCIATION, 2002.
<br />1.02 SUBMITTALS
<br />A.
<br />PROPOSED PRODUCTS LIST: SUBMIT LIST OF MAJOR PRODUCTS
<br />PROPOSED FOR USE, WITH NAME OF MANUFACTURER, TRADE NAME,
<br />AND MODEL NUMBER OF EACH PRODUCT.
<br />1. SUBMIT WITHIN 15 DAYS AFTER DATE OF AGREEMENT.
<br />B.
<br />PRODUCT DATA SUBMITTALS: SUBMIT MANUFACTURER'S STANDARD
<br />PUBLISHED DATA. MARK EACH COPY TO IDENTIFY APPLICABLE
<br />PRODUCTS, MODELS, OPTIONS, AND OTHER DATA. SUPPLEMENT
<br />MANUFACTURERS' STANDARD DATA TO PROVIDE INFORMATION
<br />SPECIFIC TO THIS PROJECT.
<br />C.
<br />SHOP DRAWING SUBMITTALS: PREPARED SPECIFICALLY FOR THIS
<br />PROJECT.
<br />D.
<br />SAMPLE SUBMITTALS: ILLUSTRATE FUNCTIONAL AND AESTHETIC
<br />CHARACTERISTICS OF THE PRODUCT, WITH INTEGRAL PARTS AND
<br />ATTACHMENT DEVICES. COORDINATE SAMPLE SUBMITTALS FOR
<br />INTERFACING WORK.
<br />1. FOR SELECTION FROM STANDARD FINISHES, SUBMIT SAMPLES
<br />OF THE FULL RANGE OF THE MANUFACTURER'S STANDARD
<br />COLORS, TEXTURES, AND PATTERNS.
<br />E.
<br />INDICATE UTILITY AND ELECTRICAL CHARACTERISTICS, UTILITY
<br />CONNECTION REQUIREMENTS, AND LOCATION OF UTILITY OUTLETS
<br />FOR SERVICE FOR FUNCTIONAL EQUIPMENT AND APPLIANCES.
<br />PART 2 PRODUCTS
<br />2.01 EXISTING PRODUCTS
<br />A.
<br />EXISTING MATERIALS AND EQUIPMENT INDICATED TO BE REMOVED,
<br />BUT NOT TO BE RE -USED, RELOCATED, REINSTALLED, DELIVERED TO
<br />THE THE OWNER, OR OTHERWISE INDICATED AS TO REMAIN THE
<br />PROPERTY OF THE THE OWNER, BECOME THE PROPERTY OF THE,
<br />REMOVE FROM SITE.
<br />2.02 NEW
<br />PRODUCTS
<br />A.
<br />PROVIDE NEW PRODUCTS UNLESS SPECIFICALLY REQUIRED OR
<br />PERMITTED BY THE CONTRACT DOCUMENTS.
<br />B.
<br />DO NOT USE PRODUCTS HAVING ANY OF THE FOLLOWING
<br />CHARACTERISTICS:
<br />1. MADE USING OR CONTAINING CFC'S OR HCFC'S.
<br />2.03 PRODUCT OPTIONS
<br />A.
<br />PRODUCTS SPECIFIED BY REFERENCE STANDARDS OR BY
<br />DESCRIPTION ONLY: USE ANY PRODUCT MEETING THOSE
<br />STANDARDS OR DESCRIPTION.
<br />B.
<br />PRODUCTS SPECIFIED BY NAMING ONE OR MORE MANUFACTURERS:
<br />USE A PRODUCT OF ONE OF THE MANUFACTURERS NAMED AND
<br />MEETING SPECIFICATIONS, NO OPTIONS OR SUBSTITUTIONS
<br />ALLOWED.
<br />C.
<br />PRODUCTS SPECIFIED BY NAMING ONE OR MORE MANUFACTURERS
<br />WITH A PROVISION FOR SUBSTITUTIONS: SUBMIT A REQUEST FOR
<br />SUBSTITUTION FOR ANY MANUFACTURER NOT NAMED.
<br />2.04 SPARE PARTS AND MAINTENANCE PRODUCTS
<br />A.
<br />PROVIDE SPARE PARTS, MAINTENANCE, AND EXTRA PRODUCTS OF
<br />TYPES AND IN QUANTITIES SPECIFIED IN INDIVIDUAL SPECIFICATION
<br />SECTIONS.
<br />B.
<br />DELIVER TO PROJECT SITE, OBTAIN RECEIPT PRIOR TO FINAL
<br />PAYMENT.
<br />PART 3 EXECUTION
<br />3.01 SUBSTITUTION PROCEDURES
<br />A.
<br />INSTRUCTIONS TO BIDDERS SPECIFY TIME RESTRICTIONS FOR
<br />SUBMITTING REQUESTS FOR SUBSTITUTIONS DURING THE BIDDING
<br />PERIOD. COMPLY WITH REQUIREMENTS SPECIFIED IN THIS SECTION.
<br />B.
<br />THE ARCHITECTS AND THE OWNER WILL CONSIDER REQUESTS FOR
<br />SUBSTITUTIONS ONLY WITHIN 15 DAYS AFTER DATE OF AGREEMENT.
<br />C.
<br />SUBSTITUTIONS WILL NOT BE CONSIDERED WHEN A PRODUCT
<br />BECOMES UNAVAILABLE THROUGH NO FAULT OF THE OWNER.
<br />D.
<br />DOCUMENT EACH REQUEST WITH COMPLETE DATA SUBSTANTIATING
<br />COMPLIANCE OF PROPOSED SUBSTITUTION WITH CONTRACT
<br />DOCUMENTS.
<br />E.
<br />A REQUEST FOR SUBSTITUTION CONSTITUTES A REPRESENTATION
<br />THAT THE SUBMITTER:
<br />1. HAS INVESTIGATED PROPOSED PRODUCT AND DETERMINED
<br />THAT IT MEETS OR EXCEEDS THE QUALITY LEVEL OF THE
<br />SPECIFIED PRODUCT.
<br />2. WILL PROVIDE THE SAME WARRANTY FOR THE SUBSTITUTION
<br />AS FOR THE SPECIFIED PRODUCT.
<br />3. WILL COORDINATE INSTALLATION AND MAKE CHANGES TO
<br />OTHER WORK, WHICH MAY BE REQUIRED FOR THE WORK TO
<br />BE COMPLETE WITH NO ADDITIONAL COST TO THE OWNER.
<br />4. WAIVES CLAIMS FOR ADDITIONAL COSTS OR TIME EXTENSION,
<br />WHICH MAY SUBSEQUENTLY BECOME APPARENT.
<br />5. WILL REIMBURSE THE OWNER AND THE ARCHITECTS FOR
<br />REVIEW OR REDESIGN SERVICES ASSOCIATED WITH
<br />RE -APPROVAL BY AUTHORITIES.
<br />F.
<br />SUBSTITUTIONS WILL NOT BE CONSIDERED WHEN THEY ARE
<br />INDICATED OR IMPLIED ON SHOP DRAWING OR PRODUCT DATA
<br />SUBMITTALS, WITHOUT SEPARATE WRITTEN REQUEST, OR WHEN
<br />ACCEPTANCE WILL REQUIRE REVISION TO THE CONTRACT
<br />DOCUMENTS.
<br />G.
<br />SUBSTITUTION SUBMITTAL PROCEDURE:
<br />1. SUBMIT THREE COPIES OF REQUEST FOR SUBSTITUTION FOR
<br />CONSIDERATION. LIMIT EACH REQUEST TO ONE PROPOSED
<br />SUBSTITUTION.
<br />2. SUBMIT SHOP DRAWINGS, PRODUCT DATA, AND CERTIFIED
<br />TEST RESULTS ATTESTING TO THE PROPOSED PRODUCT
<br />EQUIVALENCE. BURDEN OF PROOF IS ON PROPOSER.
<br />3. THE ARCHITECTS WILL NOTIFY IN WRITING OF DECISION TO
<br />ACCEPT OR REJECT REQUEST.
<br />3.02 OWNER -SUPPLIED PRODUCTS
<br />A.
<br />REFER TO DRAWINGS FOR IDENTIFICATION OF OWNER -SUPPLIED
<br />PRODUCTS.
<br />B.
<br />OWNER'S RESPONSIBILITIES:
<br />1. ARRANGE FOR AND DELIVER APPLICABLE OWNER REVIEWED
<br />SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES, TO
<br />CONTRACTOR.
<br />2. ARRANGE AND PAY FOR PRODUCT DELIVERY TO SITE.
<br />3. ARRANGE FOR MANUFACTURERS' WARRANTIES, INSPECTIONS,
<br />AND SERVICE.
<br />C.
<br />CONTRACTOR'S RESPONSIBILITIES:
<br />1. REVIEW OWNER REVIEWED SHOP DRAWINGS, PRODUCT DATA,
<br />AND SAMPLES.
<br />2. RECEIVE AND UNLOAD PRODUCTS AT SITE, INSPECT FOR
<br />COMPLETENESS OR DAMAGE. ALL DAMAGED OR MISSING
<br />MATERIALS SHALL BE DOCUMENTED TO OWNER & SUPPLIER
<br />WITHIN THREE DAYS OF RECEIVING DELIVERY OF MATERIALS.
<br />DAMAGED OR MISSING MATERIALS IDENTIFIED AFTER THREE
<br />DAYS FROM DELIVERY ARE THE CONTRACTORS
<br />RESPONSIBILITY TO REPLACE AT CONTRACTORS COST FOR
<br />MATERIAL AND SHIPPING. COORDINATE REPLACEMENT WITH
<br />OWNER AND SUPPLIER.
<br />3. ALL MATERIALS SHALL BE STORED IN A SECURE LOCATION,
<br />PROTECT FROM DAMAGE & THEFT.
<br />4. HANDLE, STORE, INSTALL AND FINISH PRODUCTS.
<br />3.03 TRANSPORTATION AND HANDLING
<br />A.
<br />COORDINATE SCHEDULE OF PRODUCT DELIVERY TO DESIGNATED
<br />PREPARED AREAS IN ORDER TO MINIMIZE SITE STORAGE TIME AND
<br />POTENTIAL DAMAGE TO STORED MATERIALS.
<br />B.
<br />TRANSPORT AND HANDLE PRODUCTS IN ACCORDANCE WITH
<br />MANUFACTURER'S INSTRUCTIONS.
<br />C.
<br />TRANSPORT MATERIALS IN COVERED TRUCKS TO PREVENT
<br />CONTAMINATION OF PRODUCT AND LITTERING OF SURROUNDING
<br />AREAS.
<br />D.
<br />PROMPTLY INSPECT SHIPMENTS TO ENSURE THAT PRODUCTS
<br />COMPLY WITH REQUIREMENTS, QUANTITIES ARE CORRECT, AND
<br />PRODUCTS ARE UNDAMAGED.
<br />E.
<br />PROVIDE EQUIPMENT AND PERSONNEL TO HANDLE PRODUCTS BY
<br />METHODS TO PREVENT SOILING, DISFIGUREMENT, OR DAMAGE.
<br />F.
<br />ARRANGE FOR THE RETURN OF PACKING MATERIALS, SUCH AS WOOD
<br />PALLETS, WHERE ECONOMICALLY FEASIBLE.
<br />3.04 STORAGE AND PROTECTION
<br />A.
<br />DESIGNATE RECEIVING/STORAGE AREAS FOR INCOMING PRODUCTS
<br />SO THAT THEY ARE DELIVERED ACCORDING TO INSTALLATION
<br />SCHEDULE AND PLACED CONVENIENT TO WORK AREA IN ORDER TO
<br />MINIMIZE WASTE DUE TO EXCESSIVE MATERIALS HANDLING AND
<br />MISAPPLICATION.
<br />B.
<br />STORE AND PROTECT PRODUCTS IN ACCORDANCE WITH
<br />MANUFACTURERS' INSTRUCTIONS.
<br />C.
<br />STORE WITH SEALS AND LABELS INTACT AND LEGIBLE.
<br />D.
<br />STORE SENSITIVE PRODUCTS IN WEATHER TIGHT, CLIMATE
<br />CONTROLLED, ENCLOSURES IN AN ENVIRONMENT FAVORABLE TO
<br />PRODUCT.
<br />E.
<br />FOR EXTERIOR STORAGE OF FABRICATED PRODUCTS, PLACE ON
<br />SLOPED SUPPORTS ABOVE GROUND.
<br />F.
<br />COVER PRODUCTS SUBJECT TO DETERIORATION WITH IMPERVIOUS
<br />SHEET COVERING. PROVIDE VENTILATION TO PREVENT
<br />CONDENSATION AND DEGRADATION OF PRODUCTS.
<br />G.
<br />PREVENT CONTACT WITH MATERIAL THAT MAY CAUSE CORROSION,
<br />DISCOLORATION, OR STAINING.
<br />H.
<br />PROVIDE EQUIPMENT AND PERSONNEL TO STORE PRODUCTS BY
<br />METHODS TO PREVENT SOILING, DISFIGUREMENT, OR DAMAGE.
<br />I.
<br />ARRANGE STORAGE OF PRODUCTS TO PERMIT ACCESS FOR
<br />INSPECTION. PERIODICALLY INSPECT TO VERIFY PRODUCTS ARE
<br />UNDAMAGED AND ARE MAINTAINED IN ACCEPTABLE CONDITION.
<br />END OF SECTION
<br />Z
<br />0
<br />0
<br />W
<br />Q
<br />W
<br />ce-
<br />II01.4fe,,,.Ills OFr
<br />,0.
<br />J (n
<br />Z
<br />D0
<br />UQ
<br />WV
<br />F_ LL
<br />=U
<br />UW
<br />w♦♦�
<br />VJ
<br />ISSUED FOR:
<br />PERMIT
<br />03.14.19
<br />BID
<br />03.14.19
<br />CONSTRUCTION
<br />00.00.00
<br />REVIEW SET
<br />03.14.19
<br />JOB NO.
<br />18390
<br />AS1 00
<br />
|