SECTION 017300 - EXECUTION
<br />PART 1 GENERAL
<br />1.01 SUBMITTALS
<br />A.
<br />SEE SECTION 013000 -ADMINISTRATIVE REQUIREMENTS, FOR
<br />3•04
<br />SUBMITTAL PROCEDURES.
<br />B.
<br />SURVEY WORK: SUBMIT NAME, ADDRESS, AND TELEPHONE NUMBER
<br />OF SURVEYOR BEFORE STARTING SURVEY WORK.
<br />1. ON REQUEST, SUBMIT DOCUMENTATION VERIFYING
<br />ACCURACY OF SURVEY WORK.
<br />2. SUBMIT A COPY OF SITE DRAWING SIGNED BY THE LAND
<br />SURVEYOR THAT THE ELEVATIONS AND LOCATIONS OF THE
<br />WORK ARE IN CONFORMANCE WITH CONTRACT DOCUMENTS.
<br />3. SUBMIT SURVEYS AND SURVEY LOGS FOR THE PROJECT
<br />RECORD.
<br />C.
<br />DEMOLITION PLAN: SUBMIT DEMOLITION PLAN AS SPECIFIED BY EPA,
<br />OSHA AND GOVERNING AUTHORITIES.
<br />1. INDICATE EXTENT OF DEMOLITION, REMOVAL SEQUENCE,
<br />BRACING AND SHORING, AND LOCATION AND CONSTRUCTION
<br />OF BARRICADES AND FENCES.
<br />2. IDENTIFY DEMOLITION FIRM AND SUBMIT QUALIFICATIONS.
<br />3. INCLUDE A SUMMARY OF SAFETY PROCEDURES.
<br />4. INCLUDE SUMMARY OF DEMOLITION AND REMOVAL OF
<br />ASBESTOS MATERIALS.
<br />D.
<br />CUTTING AND PATCHING: SUBMIT WRITTEN REQUEST IN ADVANCE OF
<br />CUTTING OR ALTERATION, WHICH AFFECTS:
<br />1. STRUCTURAL INTEGRITY OF ANY ELEMENT OF PROJECT.
<br />2. INTEGRITY OF WEATHER EXPOSED OR MOISTURE RESISTANT
<br />ELEMENT.
<br />3. EFFICIENCY, MAINTENANCE, OR SAFETY OF ANY OPERATIONAL
<br />ELEMENT.
<br />4. VISUAL QUALITIES OF SIGHT EXPOSED ELEMENTS.
<br />5. WORK OF THE OWNER OR SEPARATE CONTRACTOR.
<br />E.
<br />PROJECT RECORD DOCUMENTS: ACCURATELY RECORD ACTUAL
<br />LOCATIONS OF CAPPED AND ACTIVE UTILITIES.
<br />1.02 QUALIFICATIONS
<br />A.
<br />FOR SURVEY WORK, EMPLOY A LAND SURVEYOR REGISTERED IN AND
<br />ACCEPTABLE TO THE OWNER. SUBMIT EVIDENCE OF SURVEYOR'S
<br />ERRORS AND OMISSIONS INSURANCE COVERAGE IN THE FORM OF AN
<br />INSURANCE CERTIFICATE.
<br />1.03 PROJECT CONDITIONS
<br />A.
<br />PROTECT SITE FROM PUDDLING OR RUNNING WATER. PROVIDE
<br />WATER BARRIERS AS REQUIRED TO PROTECT SITE FROM SOIL
<br />EROSION.
<br />B.
<br />VENTILATE ENCLOSED AREAS TO ASSIST CURE OF MATERIALS, TO
<br />DISSIPATE HUMIDITY, AND TO PREVENT ACCUMULATION OF DUST,
<br />FUMES, VAPORS, OR GASES.
<br />C.
<br />DUST CONTROL: EXECUTE WORK BY METHODS TO MINIMIZE RAISING
<br />DUST FROM CONSTRUCTION OPERATIONS. PROVIDE POSITIVE MEANS
<br />TO PREVENT AIR -BORNE DUST FROM DISPERSING INTO ATMOSPHERE.
<br />D.
<br />EROSION AND SEDIMENT CONTROL: PLAN AND EXECUTE WORK BY
<br />METHODS TO CONTROL SURFACE DRAINAGE FROM CUTS AND FILLS,
<br />FROM BORROW AND WASTE DISPOSAL AREAS. PREVENT EROSION
<br />AND SEDIMENTATION.
<br />E.
<br />PEST CONTROL: PROVIDE METHODS, MEANS, AND FACILITIES TO
<br />PREVENT PESTS AND INSECTS FROM DAMAGING THE WORK.
<br />F.
<br />RODENT CONTROL: PROVIDE METHODS, MEANS, AND FACILITIES TO
<br />PREVENT RODENTS FROM ACCESSING OR INVADING PREMISES.
<br />G.
<br />POLLUTION CONTROL: PROVIDE METHODS, MEANS, AND FACILITIES
<br />TO PREVENT CONTAMINATION OF SOIL, WATER, AND ATMOSPHERE
<br />FROM DISCHARGE OF NOXIOUS, TOXIC SUBSTANCES, AND
<br />POLLUTANTS PRODUCED BY CONSTRUCTION OPERATIONS.
<br />1.04 COORDINATION
<br />A.
<br />COORDINATE SCHEDULING, SUBMITTALS, AND WORK OF THE VARIOUS
<br />SECTIONS OF THE PROJECT MANUAL TO ENSURE EFFICIENT AND
<br />ORDERLY SEQUENCE OF INSTALLATION OF INTERDEPENDENT
<br />CONSTRUCTION ELEMENTS, WITH PROVISIONS FOR ACCOMMODATING
<br />ITEMS INSTALLED LATER.
<br />B.
<br />NOTIFY AFFECTED UTILITY COMPANIES AND COMPLY WITH THEIR
<br />REQUIREMENTS.
<br />C.
<br />VERIFY THAT UTILITY REQUIREMENTS AND CHARACTERISTICS OF NEW
<br />OPERATING EQUIPMENT ARE COMPATIBLE WITH BUILDING UTILITIES.
<br />COORDINATE WORK OF VARIOUS SECTIONS HAVING
<br />INTERDEPENDENT RESPONSIBILITIES FOR INSTALLING, CONNECTING
<br />TO, AND PLACING IN SERVICE, SUCH EQUIPMENT.
<br />D.
<br />COORDINATE SPACE REQUIREMENTS, SUPPORTS, AND INSTALLATION
<br />OF MECHANICAL AND ELECTRICAL WORK WHICH ARE INDICATED
<br />DIAGRAMMATICALLY ON DRAWINGS. FOLLOW ROUTING SHOWN FOR
<br />PIPES, DUCTS, AND CONDUIT, AS CLOSELY AS PRACTICABLE, PLACE
<br />RUNS PARALLEL WITH LINES OF BUILDING. UTILIZE SPACES
<br />EFFICIENTLY TO MAXIMIZE ACCESSIBILITY FOR OTHER
<br />3.05
<br />INSTALLATIONS, FOR MAINTENANCE, AND FOR REPAIRS.
<br />E.
<br />IN FINISHED AREAS EXCEPT AS OTHERWISE INDICATED, CONCEAL
<br />PIPES, DUCTS, AND WIRING WITHIN THE CONSTRUCTION.
<br />COORDINATE LOCATIONS OF FIXTURES AND OUTLETS WITH FINISH
<br />ELEMENTS.
<br />F.
<br />COORDINATE COMPLETION AND CLEAN UP OF WORK OF SEPARATE
<br />SECTIONS.
<br />G.
<br />AFTER THE OWNER OCCUPANCY OF PREMISES, COORDINATE ACCESS
<br />TO SITE FOR CORRECTION OF DEFECTIVE WORK AND WORK NOT IN
<br />ACCORDANCE WITH CONTRACT DOCUMENTS, TO MINIMIZE
<br />DISRUPTION OF THE OWNER'S ACTIVITIES.
<br />PART 2 PRODUCTS
<br />2.01 PATCHING MATERIALS
<br />A.
<br />NEW MATERIALS: AS SPECIFIED IN PRODUCT SECTIONS, MATCH
<br />EXISTING PRODUCTS AND WORK FOR PATCHING AND EXTENDING
<br />WORK.
<br />B.
<br />TYPE AND QUALITY OF EXISTING PRODUCTS: DETERMINE BY
<br />INSPECTING AND TESTING PRODUCTS WHERE NECESSARY,
<br />REFERRING TO EXISTING WORK AS A STANDARD.
<br />C.
<br />PRODUCT SUBSTITUTION: FOR ANY PROPOSED CHANGE IN
<br />MATERIALS, SUBMIT REQUEST FOR SUBSTITUTION DESCRIBED IN
<br />SECTION 016000.
<br />PART 3 EXECUTION
<br />3.01 EXAMINATION
<br />A.
<br />VERIFY THAT EXISTING SITE CONDITIONS AND SUBSTRATE SURFACES
<br />ARE ACCEPTABLE FOR SUBSEQUENT WORK. START OF WORK MEANS
<br />ACCEPTANCE OF EXISTING CONDITIONS.
<br />B.
<br />VERIFY THAT EXISTING SUBSTRATE IS CAPABLE OF STRUCTURAL
<br />SUPPORT OR ATTACHMENT OF NEW WORK BEING APPLIED OR
<br />3.06
<br />ATTACHED.
<br />C.
<br />EXAMINE AND VERIFY SPECIFIC CONDITIONS DESCRIBED IN
<br />INDIVIDUAL SPECIFICATION SECTIONS.
<br />D.
<br />TAKE FIELD MEASUREMENTS BEFORE CONFIRMING PRODUCT
<br />ORDERS OR BEGINNING FABRICATION, TO MINIMIZE WASTE DUE TO
<br />OVER -ORDERING OR MIS -FABRICATION.
<br />E.
<br />VERIFY THAT UTILITY SERVICES ARE AVAILABLE, OF THE CORRECT
<br />CHARACTERISTICS, AND IN THE CORRECT LOCATIONS.
<br />F.
<br />PRIOR TO CUTTING: EXAMINE EXISTING CONDITIONS PRIOR TO
<br />COMMENCING WORK, INCLUDING ELEMENTS SUBJECT TO DAMAGE OR
<br />MOVEMENT DURING CUTTING AND PATCHING. AFTER UNCOVERING
<br />3.07
<br />EXISTING WORK, ASSESS CONDITIONS AFFECTING PERFORMANCE OF
<br />WORK. BEGINNING OF CUTTING OR PATCHING MEANS ACCEPTANCE
<br />OF EXISTING CONDITIONS.
<br />3.02 PREPARATION
<br />A.
<br />CLEAN SUBSTRATE SURFACES PRIOR TO APPLYING NEXT MATERIAL
<br />OR SUBSTANCE.
<br />B.
<br />SEAL CRACKS OR OPENINGS OF SUBSTRATE PRIOR TO APPLYING
<br />NEXT MATERIAL OR SUBSTANCE.
<br />C.
<br />APPLY MANUFACTURER REQUIRED OR RECOMMENDED SUBSTRATE
<br />PRIMER, SEALER, OR CONDITIONER PRIOR TO APPLYING ANY NEW
<br />MATERIAL OR SUBSTANCE IN CONTACT OR BOND.
<br />3.03 GENERAL
<br />INSTALLATION REQUIREMENTS
<br />A.
<br />INSTALL PRODUCTS AS SPECIFIED IN INDIVIDUAL SECTIONS, IN
<br />ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS AND
<br />RECOMMENDATIONS, AND SO AS TO AVOID WASTE DUE TO
<br />NECESSITY FOR REPLACEMENT.
<br />B.
<br />MAKE VERTICAL ELEMENTS PLUMB AND HORIZONTAL ELEMENTS
<br />LEVEL, UNLESS OTHERWISE INDICATED.
<br />C.
<br />INSTALL EQUIPMENT AND FITTINGS PLUMB AND LEVEL, NEATLY
<br />3.08
<br />ALIGNED WITH ADJACENT VERTICAL AND HORIZONTAL LINES, UNLESS
<br />OTHERWISE INDICATED.
<br />D. MAKE CONSISTENT TEXTURE ON SURFACES, WITH SEAMLESS
<br />TRANSITIONS, UNLESS OTHERWISE INDICATED.
<br />E. MAKE NEAT TRANSITIONS BETWEEN DIFFERENT SURFACES,
<br />MAINTAINING TEXTURE AND APPEARANCE.
<br />ALTERATIONS
<br />A. DRAWINGS SHOWING EXISTING CONSTRUCTION AND UTILITIES ARE
<br />BASED ON EXISTING RECORD DOCUMENTS ONLY, EXISTING
<br />CONSTRUCTION CONDITIONS HAVE NOT BEEN FIELD VERIFIED.
<br />1. VERIFY THAT CONSTRUCTION AND UTILITY ARRANGEMENTS
<br />ARE AS SHOWN.
<br />2. REPORT DISCREPANCIES TO THE ARCHITECTS BEFORE
<br />DISTURBING EXISTING INSTALLATION.
<br />3. BEGINNING OF ALTERATIONS WORK CONSTITUTES
<br />ACCEPTANCE OF EXISTING CONDITIONS.
<br />B. MAINTAIN WEATHERPROOF EXTERIOR BUILDING ENCLOSURE EXCEPT
<br />FOR INTERRUPTIONS REQUIRED FOR REPLACEMENT OR
<br />MODIFICATIONS, TAKE CARE TO PREVENT WATER AND HUMIDITY
<br />DAMAGE.
<br />1. WHERE OPENINGS IN EXTERIOR ENCLOSURE EXIST, PROVIDE
<br />CONSTRUCTION TO MAKE EXTERIOR ENCLOSURE
<br />WEATHERPROOF.
<br />2. INSULATE EXISTING DUCTS OR PIPES THAT ARE EXPOSED TO
<br />OUTDOOR AMBIENT TEMPERATURES BY ALTERATIONS WORK.
<br />C. REMOVE EXISTING WORK AS INDICATED AND AS REQUIRED TO
<br />ACCOMPLISH NEW WORK.
<br />1. REMOVE ROTTED WOOD, CORRODED METALS, AND
<br />DETERIORATED MASONRY AND CONCRETE, REPLACE WITH
<br />NEW CONSTRUCTION SPECIFIED.
<br />2. REMOVE ITEMS INDICATED ON DRAWINGS.
<br />3. RELOCATE ITEMS INDICATED ON DRAWINGS.
<br />4. WHERE NEW SURFACE FINISHES ARE TO BE APPLIED TO
<br />EXISTING WORK, PERFORM REMOVALS, PATCH, AND PREPARE
<br />EXISTING SURFACES AS REQUIRED TO RECEIVE NEW FINISH,
<br />REMOVE EXISTING FINISH IF NECESSARY FOR SUCCESSFUL
<br />APPLICATION OF NEW FINISH.
<br />5. WHERE NEW SURFACE FINISHES ARE NOT SPECIFIED OR
<br />INDICATED, PATCH HOLES AND DAMAGED SURFACES TO
<br />MATCH ADJACENT FINISHED SURFACES AS CLOSELY AS
<br />POSSIBLE.
<br />D. SERVICES (INCLUDING BUT NOT LIMITED TO HVAC, PLUMBING,
<br />ELECTRICAL, AND TELECOMMUNICATIONS): REMOVE, RELOCATE, AND
<br />EXTEND EXISTING SYSTEMS TO ACCOMMODATE NEW CONSTRUCTION.
<br />1. MAINTAIN EXISTING ACTIVE SYSTEMS THAT ARE TO REMAIN IN
<br />OPERATION, MAINTAIN ACCESS TO EQUIPMENT AND
<br />OPERATIONAL COMPONENTS, IF NECESSARY, MODIFY
<br />INSTALLATION TO ALLOW ACCESS OR PROVIDE ACCESS PANEL.
<br />2. WHERE EXISTING SYSTEMS OR EQUIPMENT ARE NOT ACTIVE
<br />AND CONTRACT DOCUMENTS REQUIRE REACTIVATION, PUT
<br />BACK INTO OPERATIONAL CONDITION, REPAIR SUPPLY,
<br />DISTRIBUTION, AND EQUIPMENT AS REQUIRED.
<br />3. WHERE EXISTING ACTIVE SYSTEMS SERVE OCCUPIED
<br />FACILITIES BUT ARE TO BE REPLACED WITH NEW SERVICES,
<br />MAINTAIN EXISTING SYSTEMS IN SERVICE UNTIL NEW SYSTEMS
<br />ARE COMPLETE AND READY FOR SERVICE.
<br />a. DISABLE EXISTING SYSTEMS ONLY TO MAKE
<br />SWITCHOVERS AND CONNECTIONS, MINIMIZE DURATION
<br />OF OUTAGES.
<br />b. PROVIDE TEMPORARY CONNECTIONS AS REQUIRED TO
<br />MAINTAIN EXISTING SYSTEMS IN SERVICE.
<br />4. VERIFY THAT ABANDONED SERVICES SERVE ONLY
<br />ABANDONED FACILITIES.
<br />5. REMOVE ABANDONED PIPE, DUCTS, CONDUITS, AND
<br />EQUIPMENT, REMOVE BACK TO SOURCE OF SUPPLY WHERE
<br />POSSIBLE, OTHERWISE CAP STUB AND TAG WITH
<br />IDENTIFICATION, PATCH HOLES LEFT BY REMOVAL USING
<br />MATERIALS SPECIFIED FOR NEW CONSTRUCTION.
<br />E. PROTECT EXISTING WORK TO REMAIN.
<br />1. PREVENT MOVEMENT OF STRUCTURE, PROVIDE SHORING AND
<br />BRACING IF NECESSARY.
<br />2. PERFORM CUTTING TO ACCOMPLISH REMOVALS NEATLY AND
<br />AS SPECIFIED FOR CUTTING NEW WORK.
<br />3. REPAIR ADJACENT CONSTRUCTION AND FINISHES DAMAGED
<br />DURING REMOVAL WORK.
<br />4. PATCH AS SPECIFIED FOR PATCHING NEW WORK.
<br />F. ADAPT EXISTING WORK TO FIT NEW WORK:
<br />1. WHEN EXISTING FINISHED SURFACES ARE CUT SO THAT A
<br />SMOOTH TRANSITION WITH NEW WORK IS NOT POSSIBLE,
<br />TERMINATE EXISTING SURFACE ALONG A STRAIGHT LINE AT A
<br />NATURAL LINE OF DIVISION AND MAKE RECOMMENDATION TO
<br />THE ARCHITECTS.
<br />CUTTING AND PATCHING
<br />A. EXECUTE CUTTING AND PATCHING INCLUDING EXCAVATION AND FILL
<br />TO COMPLETE THE WORK TO UNCOVER WORK IN ORDE
<br />R TO INSTALL
<br />IMPROPERLY SEQUENCED WORK, TO REMOVE AND REPLACE
<br />DEFECTIVE OR NON -CONFORMING WORK, TO REMOVE SAMPLES OF
<br />INSTALLED WORK FOR TESTING WHEN REQUESTED, TO PROVIDE
<br />OPENINGS IN THE WORK FOR PENETRATION OF MECHANICAL AND
<br />ELECTRICAL WORK, TO EXECUTE PATCHING TO COMPLEMENT
<br />ADJACENT WORK, AND TO FIT PRODUCTS TOGETHER TO INTEGRATE
<br />WITH OTHER WORK.
<br />B. EXECUTE WORK BY METHODS TO AVOID DAMAGE TO OTHER WORK,
<br />AND WHICH WILL PROVIDE APPROPRIATE SURFACES TO RECEIVE
<br />PATCHING AND FINISHING. IN EXISTING WORK, MINIMIZE DAMAGE AND
<br />RESTORE TO ORIGINAL CONDITION.
<br />C. EMPLOY ORIGINAL INSTALLER TO PERFORM CUTTING FOR WEATHER
<br />EXPOSED AND MOISTURE RESISTANT ELEMENTS, AND SIGHT
<br />EXPOSED SURFACES.
<br />D. CUT RIGID MATERIALS USING MASONRY SAW OR CORE DRILL.
<br />PNEUMATIC TOOLS NOT ALLOWED WITHOUT PRIOR APPROVAL.
<br />E. RESTORE WORK WITH NEW PRODUCTS IN ACCORDANCE WITH
<br />REQUIREMENTS OF CONTRACT DOCUMENTS.
<br />F. FIT WORK AIR TIGHT TO PIPES, SLEEVES, DUCTS, CONDUIT, AND
<br />OTHER PENETRATIONS THROUGH SURFACES.
<br />G. REFINISH SURFACES TO MATCH ADJACENT FINISH. FOR CONTINUOUS
<br />SURFACES, REFINISH TO NEAREST INTERSECTION OR NATURAL
<br />BREAK. FOR AN ASSEMBLY, REFINISH ENTIRE UNIT.
<br />H. MAKE NEAT TRANSITIONS. PATCH WORK TO MATCH ADJACENT WORK
<br />IN TEXTURE AND APPEARANCE. WHERE NEW WORK ABUTS OR
<br />ALIGNS WITH EXISTING, PERFORM A SMOOTH AND EVEN TRANSITION.
<br />PROGRESS CLEANING
<br />A. MAINTAIN AREAS FREE OF WASTE MATERIALS, DEBRIS, AND RUBBISH.
<br />MAINTAIN SITE IN A CLEAN AND ORDERLY CONDITION.
<br />B. REMOVE DEBRIS AND RUBBISH FROM PIPE CHASES, PLENUMS,
<br />ATTICS, CRAWL SPACES, AND OTHER CLOSED OR REMOTE SPACES,
<br />PRIOR TO ENCLOSING THE SPACE.
<br />C. BROOM AND VACUUM CLEAN INTERIOR AREAS PRIOR TO START OF
<br />SURFACE FINISHING, AND CONTINUE CLEANING TO ELIMINATE DUST.
<br />D. COLLECT AND REMOVE WASTE MATERIALS, DEBRIS, AND
<br />TRASH/RUBBISH FROM SITE PERIODICALLY AND DISPOSE OFF -SITE,
<br />DO NOT BURN OR BURY.
<br />PROTECTION OF INSTALLED WORK
<br />A. PROTECT INSTALLED WORK FROM DAMAGE BY CONSTRUCTION
<br />OPERATIONS.
<br />B. PROVIDE SPECIAL PROTECTION WHERE SPECIFIED IN INDIVIDUAL
<br />SPECIFICATION SECTIONS.
<br />C. PROVIDE TEMPORARY AND REMOVABLE PROTECTION FOR INSTALLED
<br />PRODUCTS. CONTROL ACTIVITY IN IMMEDIATE WORK AREA TO
<br />PREVENT DAMAGE.
<br />D. PROVIDE PROTECTIVE COVERINGS AT WALLS, PROJECTIONS, JAMBS,
<br />SILLS, AND SOFFITS OF OPENINGS.
<br />E. PROTECT FINISHED FLOORS, STAIRS, AND OTHER SURFACES FROM
<br />TRAFFIC, DIRT, WEAR, DAMAGE, OR MOVEMENT OF HEAVY OBJECTS,
<br />BY PROTECTING WITH DURABLE SHEET MATERIALS.
<br />F. PROHIBIT TRAFFIC OR STORAGE UPON WATERPROOFED OR ROOFED
<br />SURFACES. IF TRAFFIC OR ACTIVITY IS NECESSARY, OBTAIN
<br />RECOMMENDATIONS FOR PROTECTION FROM WATERPROOFING OR
<br />ROOFING MATERIAL MANUFACTURER.
<br />G. REMOVE PROTECTIVE COVERINGS WHEN NO LONGER NEEDED,
<br />REUSE OR RECYCLE PLASTIC COVERINGS IF POSSIBLE.
<br />STARTING SYSTEMS
<br />A. COORDINATE SCHEDULE FOR START-UP OF VARIOUS EQUIPMENT AND
<br />SYSTEMS.
<br />B.
<br />VERIFY THAT EACH PIECE OF EQUIPMENT OR SYSTEM HAS BEEN
<br />CHECKED FOR PROPER LUBRICATION, DRIVE ROTATION, BELT
<br />TENSION, CONTROL SEQUENCE, AND FOR CONDITIONS WHICH MAY
<br />CAUSE DAMAGE.
<br />C.
<br />VERIFY TESTS, METER READINGS, AND SPECIFIED ELECTRICAL
<br />CHARACTERISTICS AGREE WITH THOSE REQUIRED BY THE
<br />EQUIPMENT OR SYSTEM MANUFACTURER.
<br />D.
<br />VERIFY THAT WIRING AND SUPPORT COMPONENTS FOR EQUIPMENT
<br />ARE COMPLETE AND TESTED.
<br />E.
<br />EXECUTE START-UP UNDER SUPERVISION OF APPLICABLE
<br />PERSONNEL AND MANUFACTURER'S REPRESENTATIVE IN
<br />ACCORDANCE WITH MANUFACTURERS' INSTRUCTIONS.
<br />F.
<br />SUBMIT A WRITTEN REPORT THAT EQUIPMENT OR SYSTEM HAS BEEN
<br />PROPERLY INSTALLED AND IS FUNCTIONING CORRECTLY.
<br />3.09 DEMONSTRATION AND INSTRUCTION
<br />A.
<br />DEMONSTRATE START-UP, OPERATION, CONTROL, ADJUSTMENT,
<br />TROUBLE -SHOOTING, SERVICING, MAINTENANCE, AND SHUTDOWN OF
<br />EACH ITEM OF EQUIPMENT AT SCHEDULED TIME, AT EQUIPMENT
<br />LOCATION.
<br />B.
<br />FOR EQUIPMENT OR SYSTEMS REQUIRING SEASONAL OPERATION,
<br />PERFORM DEMONSTRATION FOR OTHER SEASON WITHIN SIX MONTHS.
<br />C.
<br />PROVIDE A QUALIFIED PERSON WHO IS KNOWLEDGEABLE ABOUT THE
<br />PROJECT TO PERFORM DEMONSTRATION AND INSTRUCTION OF
<br />OWNER PERSONNEL.
<br />3.10 ADJUSTING
<br />A.
<br />ADJUST OPERATING PRODUCTS AND EQUIPMENT TO ENSURE
<br />SMOOTH AND UNHINDERED OPERATION.
<br />3.11 FINAL CLEANING
<br />A.
<br />EXECUTE FINAL CLEAN UP PRIOR TO SUBSTANTIAL COMPLETION.
<br />CLEANUP SHALL INCLUDE BUILDING AREA, CONSTRUCTION AREA
<br />WITHIN WORK LIMITS AND CONSTRUCTION ACCESS ROUTES.
<br />B.
<br />USE CLEANING MATERIALS THAT ARE NON -HAZARDOUS.
<br />C.
<br />CLEAN INTERIOR AND EXTERIOR GLASS, SURFACES EXPOSED TO
<br />VIEW, REMOVE TEMPORARY LABELS, STAINS AND FOREIGN
<br />SUBSTANCES, POLISH TRANSPARENT AND GLOSSY SURFACES, WIPE
<br />GYPSUM BOARD WALLS READY FOR TENANT PAINT FINISH, BROOM
<br />CLEAN INTERIOR FLOOR SLAB
<br />D.
<br />CLEAN EQUIPMENT AND FIXTURES TO A SANITARY CONDITION WITH
<br />CLEANING MATERIALS APPROPRIATE TO THE SURFACE AND MATERIAL
<br />BEING CLEANED.
<br />E.
<br />CLEAN FILTERS OF OPERATING EQUIPMENT.
<br />F.
<br />CLEAN DEBRIS FROM ROOFS, DOWNSPOUTS, AND DRAINAGE
<br />SYSTEMS.
<br />G.
<br />CLEAN SITE, SWEEP PAVED AREAS, RAKE CLEAN LANDSCAPED
<br />SURFACES.
<br />H.
<br />REMOVE WASTE, SURPLUS MATERIALS, TRASH/RUBBISH, AND
<br />CONSTRUCTION FACILITIES FROM THE SITE, DISPOSE OF IN LEGAL
<br />MANNER, DO NOT BURN OR BURY.
<br />3.12 CLOSEOUT PROCEDURES
<br />A.
<br />MAKE SUBMITTALS THAT ARE REQUIRED BY GOVERNING OR OTHER
<br />AUTHORITIES.
<br />1. PROVIDE COPIES TO THE ARCHITECTS AND THE OWNER.
<br />B.
<br />NOTIFY THE ARCHITECTS AND THE OWNER WHEN WORK IS
<br />CONSIDERED READY FOR SUBSTANTIAL COMPLETION.
<br />C.
<br />SUBMIT WRITTEN CERTIFICATION THAT CONTRACT DOCUMENTS HAVE
<br />BEEN REVIEWED, WORK HAS BEEN INSPECTED, AND THAT WORK IS
<br />COMPLETE IN ACCORDANCE WITH CONTRACT DOCUMENTS AND
<br />READY FOR THE ARCHITECTS'S AND THE OWNER'S REVIEW.
<br />D.
<br />CORRECT ITEMS OF WORK LISTED IN EXECUTED CERTIFICATES OF
<br />SUBSTANTIAL COMPLETION AND COMPLY WITH REQUIREMENTS FOR
<br />ACCESS TO THE OWNER -OCCUPIED AREAS.
<br />E.
<br />NOTIFY THE ARCHITECTS AND THE OWNER WHEN WORK IS
<br />CONSIDERED FINALLY COMPLETE.
<br />F.
<br />COMPLETE ITEMS OF WORK DETERMINED BY THE ARCHITECTS'S AND
<br />THE OWNER'S FINAL INSPECTION.
<br />END OF SECTION
<br />SECTION 017700 - CLOSEOUT SUBMITTALS
<br />PART 1 GENERAL
<br />1.01 SECTION INCLUDES
<br />A.
<br />PROJECT RECORD DOCUMENTS.
<br />B.
<br />OPERATION AND MAINTENANCE DATA.
<br />C.
<br />WARRANTIES AND BONDS.
<br />1.02 RELATED SECTIONS
<br />A.
<br />SECTION 013000 - ADMINISTRATIVE REQUIREMENTS: SUBMITTALS
<br />PROCEDURES, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
<br />B.
<br />INDIVIDUAL PRODUCT SECTIONS: SPECIFIC REQUIREMENTS FOR
<br />OPERATION AND MAINTENANCE DATA.
<br />C.
<br />INDIVIDUAL PRODUCT SECTIONS: WARRANTIES REQUIRED FOR
<br />SPECIFIC PRODUCTS OR WORK.
<br />1.03 SUBMITTALS
<br />A.
<br />PROJECT RECORD DOCUMENTS: SUBMIT DOCUMENTS TO THE
<br />ARCHITECTS WITH CLAIM FOR FINAL APPLICATION FOR PAYMENT.
<br />B.
<br />OPERATION AND MAINTENANCE DATA:
<br />1. SUBMIT TWO COPIES OF PRELIMINARY DRAFT OR PROPOSED
<br />FORMATS AND OUTLINES OF CONTENTS BEFORE START OF
<br />WORK. THE ARCHITECTS WILL REVIEW DRAFT AND RETURN
<br />ONE COPY WITH COMMENTS.
<br />2. SUBMIT 1 COPY OF COMPLETED DOCUMENTS 15 DAYS PRIOR
<br />TO FINAL INSPECTION. THIS COPY WILL BE REVIEWED AND
<br />RETURNED AFTER FINAL INSPECTION, WITH THE ARCHITECTS
<br />COMMENTS. REVISE CONTENT OF ALL DOCUMENT SETS AS
<br />REQUIRED PRIOR TO FINAL SUBMISSION.
<br />3. SUBMIT TWO SETS OF REVISED FINAL DOCUMENTS IN FINAL
<br />FORM WITHIN 10 DAYS AFTER FINAL INSPECTION.
<br />C.
<br />WARRANTIES AND BONDS:
<br />1. FOR EQUIPMENT OR COMPONENT PARTS OF EQUIPMENT PUT
<br />INTO SERVICE DURING CONSTRUCTION WITH THE OWNER'S
<br />PERMISSION, SUBMIT DOCUMENTS WITHIN TEN DAYS AFTER
<br />ACCEPTANCE.
<br />2. MAKE OTHER SUBMITTALS WITHIN TEN DAYS AFTER DATE OF
<br />SUBSTANTIAL COMPLETION, PRIOR TO FINAL APPLICATION FOR
<br />PAYMENT.
<br />3. FOR ITEMS OF WORK FOR WHICH ACCEPTANCE IS DELAYED
<br />BEYOND DATE OF SUBSTANTIAL COMPLETION, SUBMIT WITHIN
<br />TEN DAYS AFTER ACCEPTANCE, LISTING THE DATE OF
<br />ACCEPTANCE AS THE BEGINNING OF THE WARRANTY PERIOD.
<br />PART 3 EXECUTION
<br />3.01 PROJECT RECORD DOCUMENTS
<br />A.
<br />MAINTAIN ON SITE ONE SET OF THE FOLLOWING RECORD
<br />DOCUMENTS, RECORD ACTUAL REVISIONS TO THE WORK:
<br />1. DRAWINGS.
<br />2. SPECIFICATIONS.
<br />3. ADDENDA.
<br />4. CHANGE ORDERS AND OTHER MODIFICATIONS TO THE
<br />CONTRACT.
<br />5. REVIEWED SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
<br />6. MANUFACTURER'S INSTRUCTION FOR ASSEMBLY,
<br />INSTALLATION, AND ADJUSTING.
<br />B.
<br />ENSURE ENTRIES ARE COMPLETE AND ACCURATE, ENABLING FUTURE
<br />REFERENCE BY THE OWNER.
<br />C.
<br />STORE RECORD DOCUMENTS SEPARATE FROM DOCUMENTS USED
<br />FOR CONSTRUCTION.
<br />D.
<br />RECORD INFORMATION CONCURRENT WITH CONSTRUCTION
<br />PROGRESS.
<br />E.
<br />SPECIFICATIONS: LEGIBLY MARK AND RECORD AT EACH PRODUCT
<br />SECTION DESCRIPTION OF ACTUAL PRODUCTS INSTALLED, INCLUDING
<br />THE FOLLOWING:
<br />1. MANUFACTURER'S NAME AND PRODUCT MODEL AND NUMBER.
<br />2. PRODUCT SUBSTITUTIONS OR ALTERNATES UTILIZED.
<br />3. CHANGES MADE BY ADDENDA AND MODIFICATIONS.
<br />F.
<br />RECORD DRAWINGS AND SHOP DRAWINGS: LEGIBLY MARK EACH ITEM
<br />TO RECORD ACTUAL CONSTRUCTION INCLUDING:
<br />1. MEASURED DEPTHS OF FOUNDATIONS IN RELATION TO FINISH
<br />FIRST FLOOR DATUM.
<br />2. MEASURED HORIZONTAL AND VERTICAL LOCATIONS OF
<br />UNDERGROUND UTILITIES AND APPURTENANCES,
<br />REFERENCED TO PERMANENT SURFACE IMPROVEMENTS.
<br />3. MEASURED LOCATIONS OF INTERNAL UTILITIES AND
<br />APPURTENANCES CONCEALED IN CONSTRUCTION,
<br />REFERENCED TO VISIBLE AND ACCESSIBLE FEATURES OF THE
<br />WORK.
<br />4. FIELD CHANGES OF DIMENSION AND DETAIL.
<br />5. DETAILS NOT ON ORIGINAL CONTRACT DRAWINGS.
<br />3.02 OPERATION AND MAINTENANCE DATA
<br />A.
<br />FOR EACH PRODUCT OR SYSTEM: LIST NAMES, ADDRESSES AND
<br />TELEPHONE NUMBERS OF SUBCONTRACTORS AND SUPPLIERS,
<br />INCLUDING LOCAL SOURCE OF SUPPLIES AND REPLACEMENT PARTS.
<br />B.
<br />TYPED TEXT: AS REQUIRED TO SUPPLEMENT PRODUCT DATA.
<br />PROVIDE LOGICAL SEQUENCE OF INSTRUCTIONS FOR EACH
<br />PROCEDURE, INCORPORATING MANUFACTURER'S INSTRUCTIONS.
<br />3.03 OPERATION AND MAINTENANCE DATA FOR EQUIPMENT AND SYSTEMS
<br />A.
<br />FOR EACH ITEM OF EQUIPMENT AND EACH SYSTEM:
<br />1. DESCRIPTION OF UNIT OR SYSTEM, AND COMPONENT PARTS.
<br />2. IDENTIFY FUNCTION, NORMAL OPERATING CHARACTERISTICS,
<br />AND LIMITING CONDITIONS.
<br />3. INCLUDE PERFORMANCE CURVES, WITH ENGINEERING DATA
<br />AND TESTS.
<br />4. COMPLETE NOMENCLATURE AND MODEL NUMBER OF
<br />REPLACEABLE PARTS.
<br />B.
<br />OPERATING PROCEDURES: INCLUDE START-UP, BREAK-IN, AND
<br />ROUTINE NORMAL OPERATING INSTRUCTIONS AND SEQUENCES.
<br />INCLUDE REGULATION, CONTROL, STOPPING, SHUT -DOWN, AND
<br />EMERGENCY INSTRUCTIONS. INCLUDE SUMMER, WINTER, AND ANY
<br />SPECIAL OPERATING INSTRUCTIONS.
<br />C.
<br />MAINTENANCE REQUIREMENTS: INCLUDE ROUTINE PROCEDURES
<br />AND GUIDE FOR PREVENTATIVE MAINTENANCE AND TROUBLE
<br />SHOOTING, DISASSEMBLY, REPAIR, AND REASSEMBLY INSTRUCTIONS,
<br />AND ALIGNMENT, ADJUSTING, BALANCING, AND CHECKING
<br />INSTRUCTIONS.
<br />D.
<br />PROVIDE SERVICING AND LUBRICATION SCHEDULE, AND LIST OF
<br />LUBRICANTS REQUIRED.
<br />E.
<br />INCLUDE MANUFACTURER'S PRINTED OPERATION AND MAINTENANCE
<br />INSTRUCTIONS.
<br />F.
<br />INCLUDE SEQUENCE OF OPERATION BY CONTROLS MANUFACTURER.
<br />G.
<br />PROVIDE ORIGINAL MANUFACTURER'S PARTS LIST, ILLUSTRATIONS,
<br />ASSEMBLY DRAWINGS, AND DIAGRAMS REQUIRED FOR MAINTENANCE.
<br />H.
<br />ADDITIONAL REQUIREMENTS: AS SPECIFIED IN INDIVIDUAL PRODUCT
<br />SPECIFICATION SECTIONS.
<br />3.04 OPERATION AND MAINTENANCE MANUALS
<br />A.
<br />PREPARE INSTRUCTIONS AND DATA BY PERSONNEL EXPERIENCED IN
<br />MAINTENANCE AND OPERATION OF DESCRIBED PRODUCTS.
<br />B.
<br />PREPARE DATA IN THE FORM OF AN INSTRUCTIONAL MANUAL.
<br />C.
<br />BINDERS: COMMERCIAL QUALITY, 8-1/2 X 11 INCH (216 X 280 MM)
<br />THREE D SIDE RING BINDERS WITH DURABLE PLASTIC COVERS, 2 INCH
<br />(50 MM) MAXIMUM RING SIZE. WHEN MULTIPLE BINDERS ARE USED,
<br />CORRELATE DATA INTO RELATED CONSISTENT GROUPINGS. ,
<br />D.
<br />PROVIDE TABBED DIVIDERS FOR EACH SEPARATE PRODUCT AND
<br />SYSTEM, WITH TYPED DESCRIPTION OF PRODUCT AND MAJOR
<br />COMPONENT PARTS OF EQUIPMENT.
<br />3.05 WARRANTIES AND BONDS
<br />A.
<br />OBTAIN WARRANTIES AND BONDS, EXECUTED IN DUPLICATE BY
<br />RESPONSIBLE SUBCONTRACTORS, SUPPLIERS, AND
<br />MANUFACTURERS, WITHIN TEN DAYS AFTER COMPLETION OF THE
<br />APPLICABLE ITEM OF WORK. EXCEPT FOR ITEMS PUT INTO USE WITH
<br />THE OWNER'S PERMISSION, LEAVE DATE OF BEGINNING OF TIME OF
<br />WARRANTY UNTIL THE DATE OF SUBSTANTIAL COMPLETION IS
<br />DETERMINED.
<br />B.
<br />VERIFY THAT DOCUMENTS ARE IN PROPER FORM, CONTAIN FULL
<br />INFORMATION, AND ARE NOTARIZED.
<br />C.
<br />CO -EXECUTE SUBMITTALS WHEN REQUIRED.
<br />D.
<br />RETAIN WARRANTIES AND BONDS UNTIL TIME SPECIFIED FOR
<br />SUBMITTAL.
<br />END OF SECTION
<br />SECTION 022000 - SITE PREPARATION
<br />PART 1 GENERAL
<br />1.01 SECTION INCLUDES
<br />A. BUILDING DEMOLITION.
<br />B. SELECTIVE DEMOLITION OF BUILT SITE ELEMENTS.
<br />C. ABANDONMENT AND REMOVAL OF EXISTING UTILITIES AND UTILITY
<br />STRUCTURES.
<br />1.02 REFERENCES
<br />A. 29 CFR 1926 - U.S. OCCUPATIONAL SAFETY AND HEALTH STANDARDS,
<br />CURRENT EDITION.
<br />B. NFPA 241 - STANDARD FOR SAFEGUARDING CONSTRUCTION,
<br />ALTERATION, AND DEMOLITION OPERATIONS, 2000.
<br />1.03 SUBMITTALS
<br />A. SEE SECTION 013000 - ADMINISTRATIVE REQUIREMENTS, FOR
<br />SUBMITTAL PROCEDURES.
<br />B. PROJECT RECORD DOCUMENTS: ACCURATELY RECORD ACTUAL
<br />LOCATIONS OF CAPPED AND ACTIVE UTILITIES AND SUBSURFACE
<br />CONSTRUCTION.
<br />1.04 PROJECT CONDITIONS
<br />A. MINIMIZE PRODUCTION OF DUST DUE TO DEMOLITION OPERATIONS,
<br />DO NOT USE WATER IF THAT WILL RESULT IN ICE, FLOODING,
<br />SEDIMENTATION OF PUBLIC WATERWAYS OR STORM SEWERS, OR
<br />OTHER POLLUTION.
<br />B. COMPLY WITH OTHER REQUIREMENTS SPECIFIED IN SECTION 017300.
<br />PART 2 PRODUCTS
<br />2.01 MATERIALS
<br />A. FILL MATERIAL: AS SPECIFIED IN SECTION 02315 -FILL AND BACKFILL
<br />PART 3 EXECUTION
<br />3.01 EXISTING UTILITIES
<br />A. COORDINATE WORK WITH UTILITY COMPANIES, NOTIFY BEFORE
<br />STARTING WORK AND COMPLY WITH THEIR REQUIREMENTS, OBTAIN
<br />REQUIRED PERMITS.
<br />B. PROTECT EXISTING UTILITIES TO REMAIN FROM DAMAGE.
<br />C. DO NOT DISRUPT PUBLIC UTILITIES WITHOUT PERMIT FROM
<br />AUTHORITY HAVING JURISDICTION.
<br />D. DO NOT CLOSE, SHUT OFF, OR DISRUPT EXISTING LIFE SAFETY
<br />SYSTEMS THAT ARE IN USE WITHOUT PRIOR WRITTEN NOTIFICATION
<br />TO THE OWNER.
<br />E. DO NOT CLOSE, SHUT OFF, OR DISRUPT EXISTING UTILITY BRANCHES
<br />OR TAKE -OFFS THAT ARE IN USE WITHOUT PRIOR WRITTEN
<br />NOTIFICATION TO THE OWNER.
<br />F. LOCATE AND MARK UTILITIES TO REMAIN, MARK USING HIGHLY
<br />VISIBLE TAGS OR FLAGS, WITH IDENTIFICATION OF UTILITY TYPE,
<br />PROTECT FROM DAMAGE DUE TO SUBSEQUENT CONSTRUCTION,
<br />USING SUBSTANTIAL BARRICADES IF NECESSARY.
<br />G. REMOVE EXPOSED PIPING, VALVES, METERS, EQUIPMENT, SUPPORTS,
<br />AND FOUNDATIONS OF DISCONNECTED AND ABANDONED UTILITIES.
<br />H. PREPARE BUILDING DEMOLITION AREAS BY DISCONNECTING AND
<br />CAPPING UTILITIES OUTSIDE THE DEMOLITION ZONE, IDENTIFY AND
<br />MARK UTILITIES TO BE SUBSEQUENTLY RECONNECTED, IN SAME
<br />MANNER AS OTHER UTILITIES TO REMAIN.
<br />3.02 EXISTING BUILT ELEMENTS
<br />A. SCOPE:
<br />1. REMOVE THE BUILDING CONSTRUCTION WHERE REQUIRED TO
<br />ACCOMMODATE NEW BUILDING CONSTRUCTION.
<br />2. REMOVE OTHER ITEMS INDICATED, FOR SALVAGE AND REUSE
<br />AND REINSTALLATION.
<br />3. FILL EXCAVATIONS, OPEN PITS, AND HOLES IN GROUND AREAS
<br />GENERATED AS RESULT OF REMOVALS, USING SPECIFIED FILL,
<br />COMPACT FILL AS REQUIRED SO THAT REQUIRED ROUGH
<br />GRADE ELEVATIONS DO NOT SUBSIDE WITHIN ONE YEAR
<br />AFTER COMPLETION.
<br />B. COMPLY WITH APPLICABLE CODES AND REGULATIONS FOR
<br />DEMOLITION OPERATIONS AND SAFETY OF ADJACENT STRUCTURES
<br />AND THE PUBLIC.
<br />1. OBTAIN REQUIRED PERMITS.
<br />2. COMPLY WITH APPLICABLE REQUIREMENTS OF NFPA 241.
<br />3. USE OF EXPLOSIVES IS NOT PERMITTED.
<br />4. TAKE PRECAUTIONS TO PREVENT CATASTROPHIC OR
<br />UNCONTROLLED COLLAPSE OF STRUCTURES TO BE REMOVED,
<br />DO NOT ALLOW WORKER OR PUBLIC ACCESS WITHIN RANGE
<br />OF POTENTIAL COLLAPSE OF UNSTABLE STRUCTURES.
<br />5. PROVIDE, ERECT, AND MAINTAIN TEMPORARY BARRIERS AND
<br />SECURITY DEVICES.
<br />6. USE PHYSICAL BARRIERS TO PREVENT ACCESS TO AREAS
<br />THAT COULD BE HAZARDOUS TO WORKERS OR THE PUBLIC.
<br />7. CONDUCT OPERATIONS TO MINIMIZE EFFECTS ON AND
<br />INTERFERENCE WITH ADJACENT STRUCTURES AND
<br />OCCUPANTS.
<br />8. DO NOT CLOSE OR OBSTRUCT ROADWAYS OR SIDEWALKS
<br />WITHOUT PERMIT.
<br />9. CONDUCT OPERATIONS TO MINIMIZE OBSTRUCTION OF PUBLIC
<br />AND PRIVATE ENTRANCES AND EXITS, DO NOT OBSTRUCT
<br />REQUIRED EXITS AT ANY TIME, PROTECT PERSONS USING
<br />ENTRANCES AND EXITS FROM REMOVAL OPERATIONS.
<br />10. OBTAIN WRITTEN PERMISSION FROM OWNERS OF ADJACENT
<br />PROPERTIES WHEN DEMOLITION EQUIPMENT WILL TRAVERSE,
<br />INFRINGE UPON OR LIMIT ACCESS TO THEIR PROPERTY.
<br />C.
<br />PROTECT EXISTING STRUCTURES AND OTHER ELEMENTS THAT ARE
<br />NOT TO BE REMOVED.
<br />1. PROVIDE BRACING AND SHORING.
<br />2. PREVENT MOVEMENT OR SETTLEMENT OF ADJACENT
<br />STRUCTURES.
<br />3. STOP WORK IMMEDIATELY IF ADJACENT STRUCTURES APPEAR
<br />TO BE IN DANGER.
<br />D.
<br />IF HAZARDOUS MATERIALS ARE DISCOVERED DURING REMOVAL
<br />OPERATIONS, STOP WORK AND NOTIFY THE ARCHITECTS AND THE
<br />OWNER, HAZARDOUS MATERIALS INCLUDE REGULATED ASBESTOS
<br />CONTAINING MATERIALS, LEAD, PCB'S, AND MERCURY.
<br />E.
<br />PARTIAL REMOVAL OF PAVING AND CURBS: NEATLY SAW CUT AT
<br />RIGHT ANGLE TO SURFACE.
<br />3.03 DEBRIS
<br />A.
<br />REMOVE DEBRIS, JUNK, AND TRASH FROM SITE.
<br />3.04 WASTE REMOVAL
<br />A.
<br />REMOVE FROM SITE ALL MATERIALS NOT TO BE REUSED ON SITE, DO
<br />NOT BURN OR BURY.
<br />B.
<br />LEAVE SITE IN CLEAN CONDITION, READY FOR SUBSEQUENT WORK.
<br />C.
<br />CLEAN UP SPILLAGE AND WIND-BLOWN DEBRIS FROM PUBLIC AND
<br />PRIVATE LANDS.
<br />END OF SECTION
<br />SECTION 02315 - FILL AND BACKFILL
<br />PART 1 GENERAL
<br />1.01 SECTION INCLUDES
<br />A. APPROPRIATE BACKFILL AND FILL MATERIAL FOR SITE PREPARATION
<br />PART 2 PRODUCTS
<br />2.01 BACKFILL
<br />A. SUITABLE MATERIAL SHALL BE FREE OF LARGE LUMPS OR CLODS,
<br />WHICH WILL NOT READILY BREAK DOWN UNDER COMPACTION.
<br />B. SHALL BE FREE OF VEGETATION OR OTHER EXTRANEOUS MATERIAL.
<br />C. MAY BE SUBJECT TO APPROVAL BY THE ENGINEER
<br />2.02 TOPSOIL
<br />D. TOP 3" OF FINISH EARTH GRADE SHALL BE TOPSOIL WITH NO
<br />EXCESSIVE CLODS.
<br />END OF SECTION
<br />SECTION 024100 - DEMOLITION
<br />PART 1 GENERAL
<br />1.01 DESCRIPTION
<br />A. THIS SECTION SPECIFIES DEMOLITION AND REMOVAL OF WALK,
<br />CURBS, SLABS, PORTIONS OF BUILDINGS, UTILITIES, OTHER
<br />STRUCTURES FROM BUILDING
<br />1.02 PROTECTION
<br />A.
<br />PERFORM DEMOLITION IN SUCH MANNER AS TO ELIMINATE HAZARDS
<br />TO PERSONS AND PROPERTY; TO MINIMIZE INTERFERENCE WITH USE
<br />OF ADJACENT AREAS, UTILITIES AND STRUCTURES OR INTERRUPTION
<br />OF USE OF SUCH UTILITIES; AND TO PROVIDE FREE PASSAGE TO AND
<br />FROM SUCH ADJACENT AREAS OF STRUCTURES. COMPLY WITH
<br />REQUIREMENTS OF GENERAL CONDITIONS ARTICLE, ACCIDENT
<br />PREVENTION.
<br />B.
<br />PROVIDE SAFEGUARDS, INCLUDING WARNING SIGNS, BARRICADES,
<br />TEMPORARY FENCES, WARNING LIGHTS, AND OTHER SIMILAR ITEMS
<br />THAT ARE REQUIRED FOR PROTECTION OF ALL PERSONNEL DURING
<br />DEMOLITION AND REMOVAL OPERATIONS.
<br />C.
<br />MAINTAIN FENCES, BARRICADES, LIGHTS, AND OTHER SIMILAR ITEMS
<br />AROUND EXPOSED EXCAVATIONS UNTIL SUCH EXCAVATIONS HAVE
<br />BEEN COMPLETELY FILLED.
<br />D.
<br />PREVENT SPREAD OF FLYING PARTICLES AND DUST. KEEP DUST TO A
<br />MINIMUM.
<br />E.
<br />LOCAL FIRE AND SAFETY RULES TO BE OBSERVED IN PERFORMANCE
<br />OF WORK, INCLUDE FOLLOWING:
<br />1. WHEREVER A CUTTING TORCH OR OTHER EQUIPMENT THAT
<br />MIGHT CAUSE A FIRE IS USED, PROVIDE AND MAINTAIN FIRE
<br />EXTINGUISHERS NEARBY READY FOR IMMEDIATE USE.
<br />INSTRUCT ALL POSSIBLE USERS IN USE OF FIRE
<br />EXTINGUISHERS.
<br />2. KEEP HYDRANTS CLEAR AND ACCESSIBLE AT ALL TIMES.
<br />PROHIBIT DEBRIS FROM ACCUMULATING WITHIN A RADIUS OF
<br />4500 MM (15 FEET) OF FIRE HYDRANTS.
<br />F.
<br />BEFORE BEGINNING ANY DEMOLITION WORK, THE CONTRACTOR
<br />SHALL SURVEY THE SITE AND EXAMINE THE DRAWINGS AND
<br />SPECIFICATIONS TO DETERMINE THE EXTENT OF THE WORK. THE
<br />CONTRACTOR SHALL TAKE NECESSARY PRECAUTIONS TO AVOID
<br />DAMAGES TO EXISTING ITEMS TO REMAIN IN PLACE, TO BE REUSED,
<br />OR TO REMAIN THE PROPERTY OF THE TENANT OR LANDLORD. THE
<br />CONTRACTOR SHALL COORDINATE THE WORK OF THIS SECTION WITH
<br />ALL OTHER WORK AND SHALL CONSTRUCT AND MAINTAIN SHORING,
<br />BRACING, AND SUPPORTS AS REQUIRED. THE CONTRACTOR SHALL
<br />ENSURE THAT STRUCTURAL ELEMENTS ARE NOT OVERLOADED AND
<br />SHALL BE RESPONSIBLE FOR INCREASING STRUCTURAL SUPPORTS
<br />OR ADDING NEW SUPPORTS AS MAY BE REQUIRED AS A RESULT OF
<br />ANY CUTTING, REMOVAL, OR DEMOLITION WORK PERFORMED UNDER
<br />THIS CONTRACT. DO NOT OVERLOAD STRUCTURAL ELEMENTS.
<br />PROVIDE NEW SUPPORTS AND REINFORCEMENT FOR EXISTING
<br />CONSTRUCTION WEAKENED BY DEMOLITION OR REMOVAL WORKS.
<br />REPAIRS, REINFORCEMENT, OR STRUCTURAL REPLACEMENT MUST
<br />HAVE RESIDENT ENGINEER'S APPROVAL.
<br />1.03 UTILITY
<br />SERVICES
<br />A.
<br />DEMOLISH AND REMOVE OUTSIDE UTILITY SERVICE LINES SHOWN TO
<br />BE REMOVED.
<br />B.
<br />REMOVE ABANDONED UTILITY LINES THAT WOULD INTERFERE WITH
<br />INSTALLATION OF NEW UTILITY LINES AND NEW CONSTRUCTION.
<br />PART 2 PRODUCTS (NOT USED)
<br />PART 3 EXECUTION
<br />3.01 DEMOLITION
<br />A. DEBRIS, INCLUDING BRICK, CONCRETE, STONE, METALS AND SIMILAR
<br />MATERIALS SHALL BECOME PROPERTY OF CONTRACTOR AND SHALL
<br />BE DISPOSED OF BY HIM DAILY TO AVOID ACCUMULATION AT THE
<br />DEMOLITION SITE. MATERIALS THAT CANNOT BE REMOVED DAILY
<br />SHALL BE STORED IN AREAS SPECIFIED BY LANDLORD. BREAK UP
<br />CONCRETE SLABS BELOW GRADE THAT DO NOT REQUIRE REMOVAL
<br />FROM PRESENT LOCATION INTO PIECES NOT EXCEEDING 600 MM (24
<br />INCHES) SQUARE TO PERMIT DRAINAGE. CONTRACTOR SHALL
<br />DISPOSE DEBRIS IN COMPLIANCE WITH APPLICABLE FEDERAL, STATE
<br />OR LOCAL PERMITS, RULES AND/OR REGULATIONS.
<br />B. REMOVE AND LEGALLY DISPOSE OF ALL MATERIALS, FROM ANY
<br />TRASH DUMPS ON SITE. MATERIALS REMOVED SHALL BECOME
<br />PROPERTY OF CONTRACTOR AND SHALL BE DISPOSED OF IN
<br />COMPLIANCE WITH APPLICABLE FEDERAL, STATE OR LOCAL PERMITS,
<br />RULES AND/OR REGULATIONS.
<br />3.02 CLEANUP
<br />A. ON COMPLETION OF WORK OF THIS SECTION AND AFTER REMOVAL OF
<br />ALL DEBRIS, LEAVE SITE IN CLEAN CONDITION SATISFACTORY TO
<br />START CONSTRUCTION OF TENANT PROPERTY.
<br />Z
<br />0
<br />IL
<br />EE
<br />W
<br />W
<br />Q
<br />W
<br />IY
<br />'!'
<br />UN•*�• YSM•"•• • +�
<br />ISSUED FOR:
<br />PERMIT