Laserfiche WebLink
_ , +_.B, 11 11 ' RA11111 _l. _LEI, <br />1I <br />SECTION 017700 - CLOSEOUT PROCEDURES <br />1.1 SUBSTANTIAL COMPLETION: BEFORE REQUESTING INSPECTION, COMPLETE THE FOLLOWING. <br />A. OWNER ADViSED OF PENDING INSURANCE CHANGEOVER. <br />B. TOOLS, SPARE PARTS, AND EXTRA. MATERIALS DELIVERED <br />C. FINAL CHANGEOVER OF LOCKS PERFORMED. <br />D. STARTUP TESTING COMPLETED. <br />E. TEST/ADJUST/BALANCE RECORDS SUBMITTED. <br />F. TEMPORARY FACILITIES REMOVED. <br />G. CHANGEOVER INFORMATION FOR USE, OPERATION. AND MAINTENANCE SUBMITTED. <br />H. OWNER'S PERSONNEL INSTRUCTED IN OPERATION, ADJUSTMENT. AND MAINTENANCE OF EQUIPMENT AND SYSTEMS <br />I. FINAL CLEANING PERFORMED. <br />J. TOUCH-UP PERFORMED. <br />1.2 FINAL COMPLETION: BEFORE REQUESTING FINAL INSPECTION, COMPLETE THE FOLLOWING: <br />A. FINAL APPLICATION FOR PAYMENT SUBMITTED. <br />B. LIST OF INCOMPLETE ITEMS (PUNCH LIST) COMPLETED OR OTHERWISE RESOLVED FOR ACCEPTANCE. <br />C. PROJECT RECORD DOCUMENTS SUBMIT TIED, <br />0. WARRANTIES, MAINTENANCE SERVICE AGREEMENTS, AND SIMILAR DOCUMENTS SUBMITTED. <br />E. RELEASES, OCCUPANCY PERMITS, AND OPERATING CERTIFICATES SUBMITTED, <br />F. EVIDENCE OF CONTINUING INSURANCE COVERAGE SUBMITTED. <br />G. OWNER ADVISED OF HEAT AND UTILITY CHANGEOVER <br />H. FINAL PEST -CONTROL INSPECTION REPORT AND WARRANTY SUBMITTED. <br />1.3 SUBMITTAL OF PROJECT WARRANTIES <br />A. PARTIAL OCCUPANCY: SUBMIT WARRANTIES WITHIN 15 DAYS OF COMPLETION OF DESIGNATED PORTIONS OF THE WORK THAT <br />ARE OCCUPIED OR USED BY OWNER. <br />B. ORGANIZE WARRANTY DOCUMENTS INTO AN ORDERLY SEQUENCE BASED ON THE TABLE OF CONTENTS OF THE PROJECT <br />MANUAL. <br />C. WARRANTY ELECTRONIC FILE: SCAN WARRANTIES AND BONDS AND ASSEMBLE COMPLETE WARRANTY AND BOND SUBMITTAL <br />P INDEXED ELECTRONIC PDF FILE WITH LINKS ENABLING NAVIGATION TO EACH ITEM. PROVIDE <br />PACKAGE INTO A SINGLE <br />BOOKMARKED TABLE OF CONTENTS AT BEGINNING OF DOCUMENT. <br />D. PROVIDE ADDITIONAL COPIES OF EACH WARRANTY TO INCLUDE IN OPERATION AND MAINTENANCE MANUALS. <br />1.4 FINAL CLEANING <br />A. CLEANING AGENTS: COMPLY WITH GREEN SEAL'S GS-37 AND CALIFORNIA CODE OF REGULATIONS MAXIMUM ALLOWABLE VOC <br />LEVELS. <br />B. CLEAN EACH SURFACE OR UNIT TO CONDITION EXPECTED IN AN AVERAGE COMMERCIAL BUILDING CLEANING AND <br />MAINTENANCE PROGRAM. <br />C. REPLACE DISPOSABLE AIR FILTERS AND CLEAN PERMANENT AIR FILTERS. <br />D. CLEAN DUCTS, BLOWERS, AND COILS IF UNITS WERE OPERATED WITHOUT FILTERS DURING CONSTRUCTION. <br />E. CLEAN HVAC SYSTEM IN COMPLIANCE WITH NADCA. STANDARD 1992-01. <br />1.5 REPAIR OF THE WORK <br />A. REPAIR OR REMOVE AND REPLACE DEFECTIVE CONSTRUCTION, WHERE DAMAGED OR WORN ITEMS CANNOT BE REPAIRED OR <br />RESTORED, PROVIDE REPLACEMENTS. RESTORE DAMAGED CONSTRUCTION AND PERMANENT FACILITIES USED DURING <br />CONSTRUCTION TO SPECIFIED CONDITION. <br />SECTION 017823.OPERATION AND MAINTENANCE DATA <br />1.1 SUMMARY: EMERGENCY, OPERA. TION.AND MAINTENANCE MANUALS <br />1.2 FORMAT <br />A. PDF ELECTRONIC FILES WITH COMPOSITE ELECTRONIC INDEX ON DIG!TAL MEDIA ACCci"TAI.E TO ARCHITECT. INCLUDE A <br />COMPLETE ELECTRONICALLY LINKED OPERATION AND MAINTENANCE ^DIRECTORY. <br />B. DIRECTORY: PREPARE A SIN 7LE, COMPREH 4SWE DIRECTORY OF EMERGENCY, CPERATiON, AND MAINTENANCE DATA AND <br />MATERIALS, LISTING ITEMS AND THEIR LOCATION TO FACILITATE READY ACCESS TO DESIRED INFORMATION. <br />C. ORGANIZATION: UNLESS OTHERWISE INDICATED, ORGANIZE EACH MANUAL INTO A SEPARATE SECTION FOR EACH SYSTEM AND <br />SUBSYSTEM, AND A SEPARATE SECTION FOR EACH PIECE OF EQUIPMENT NOT PART OF A SYSTEM. EACH MANUAL SHALL CONTAIN <br />A TITLE PAGE, TABLE OF CONTENTS AND MANUAL CONTENTS, IN THE ORDER LISTED. <br />1.3 EMERGENCY MANUALS: TYPES OF EMERGENCIES, EMERGENCY INSTRUCTIONS, AND EMERGENCY PROCEDURES. <br />1.4 OPERATION MANUALS. SYSTEM, SUBSYSTEM, AND EQUIPMENT DESCRIPTIONS, OPERATING PROCEDURES, WIRING DIAGRAMS, <br />CONTROL DIAGRAMS AND SEQUENCE OF OPERATION. AND PIPED SYSTEM DIAGRAMS. <br />1.5 PRODUCT MvtAINTENANGE (MANUALS: SOURCE INFORMA, ION, PRODUCT INFORMATION, MAINTENANCE PROCEDURES, REPAIR <br />MATERIALS AND SOURCES, AND WARRANTIES AND BONDS. <br />1.6 SYSTEMS AND EQUIPMENT MAINTENANCE MANUALS: SOURCE INFORMATION; MANUFACTURERS' MAINTENANCE <br />DOCUMENTATION, MAINTENANCE PROCEDURES, MAINTENANCE AND SERVICE SCHEDULES, SPARE PARTS LIST AND SOURCE <br />INFORMATION, MAINTENANCE SERVICE CONTRACTS, AND WARRANTIES AND BONDS. <br />SECTION 017839 - PROJECT RECORD DOCUMENTS <br />1.1 RECORD DRAWINGS: <br />A. ONE SET(S) OF MARKED -UP RECORD PRINTS. <br />1. SUBMITTAL: PDF ELECTRONIC FILES OF SCANNED CORRECTED DIGITAL RECORD PRINTS. ARCHITECT WILL INDICATE WHETHER <br />GENERAL SCOPE OF CHANGES, ADDITIONAL INFORMATION RECORDED, AND QUALITY OF DRAFTING ARE ACCEPTABLE. <br />2. FORMAT: ANNOTATED PDF ELECTRONIC FILE WITH COMMENT FUNCTION ENABLED. <br />3. ONE SET OF PAPER COPIES OF CONTRACT DOCUMENTS AND SHOP DRAWINGS, MARKED TO SHOW ACTUAL INSTALLATION. <br />1.2 RECORD SPECIFICATIONS: ANNOTATED PDF ELECTRONIC FILES. <br />1.3 RECORD PRODUCT DATA: ANNOTATED PDF ELECTRONIC FILES AND DIRECTORIES. <br />SECTION 017900. DEMONSTRATION AND TRAINING <br />1.1 INSTRUCTION PROGRAM <br />1. PROGRAM STRUCTURE: TRAINING FOR EACH SYSTEM AND FOR EQUIPMENT NOT PART OF A SYSTEM, INCLUDING <br />BASIS OF SYSTEM DESIGN, OPERATIONAL REQUIREMENTS AND CRITERIA, DOCUMENTATION, EMERGENCIES, <br />ADJUSTMENTS, TROUBLESHOOTING, MAINTENANCE, REPAIRS. <br />A FACILITATOR TO PREPARE INSTRUCTION PROGRAM ANC TRAINING MODULES AND TO COORDINATE INSTRUCTORS. <br />B. EVALUATION: DEMONSTRATION PERFORMANCE -BASED TEST. <br />SECTION 024119 - SELECTIVE DEEMCLITION <br />1.1 SUMMARY: DEMOL ITION AND REMOVAL OF SELECTED PORTIONS OF BUILDING OR STRUCTURE, INCLUDING SALVAGE OF <br />EXISTING ITEMS TO BE RECYCLED. <br />1.2 MATERIALS OWNERSHIP: UNLESS OTHER'JvISE INDICATED, DEMOLITIONWASTE BECOMES PROPERTY OF CONTRACTOR. <br />1.3 INFORMATIONAL SUBMITTALS: STATEMENT OF REFRIGERA.N T RECOVERY: SIGNED BY REFRIGERANT REG'0'JtRY TECHNICIAN. <br />1A QUALITY ASSURANCE: REFRIGERANT RECOVERY TECHNICIAN QUALFICAT'IONS: CERTIFIED BY AN EPA -APPROVED <br />CERTIFICATION PROGRAM. <br />1.5 FIELD CONDITIONS <br />A. ADJACENT TENANTS WILL OCCUPY PORTIONS OF BUILDING IMMEDIATELY ADJACENT TO AREAS OF SELECTIVE DEMCUTION <br />AREA. CONDUCT SELECTIVE DEMOLITION SO OTHER TENANTS OPERATIONS WILL NOT BE DISRUPTED. <br />B. CONDITIONS EXISTING AT TIME OF INSPECTION FORBIDDING PURPOSE WILL BE MAINTAINED BY OWNER AS FAR AS PRACTICAL <br />C. NOTIFY ARCHITECT OF DISCREPANCIES BETWEEN EXISTING CONDITIONS AND DRAWINGS BEFORE PROCEEDING WITH <br />SELECTIVE DEMOLITION. <br />D. HAZARDOUS hATERIALS: IT IS NOT EXPECTED THAT HAZARDOUS MATERIALS WILL BE ENCOUNTERED IN THE WORK. <br />1. ANY KNOWN HAZARDOUS MATERIALS WILL BE REMOVED BY OWNER BEFORE START OF THE WORK. <br />2. IF SUSPECTED HAZARDOUS MATERIALS ARE ENCOUNTERED; DO NOT DISTURB; IMMEDIATELY NOTIFY ARCHITECT AND OWNER. <br />HAZARDOUS MATERIALS WILL BE REMOVED BY OWNER UNDER A SEPARATE CONTRACT. <br />E. STORAGE OR SALE OF REMOVED ITEMS OR MATERIALS ON -SITE IS NOT PERMITTED. <br />F. UTILITY SERVICE: MAINTAIN EXiSTiNG UTILITIES INDICATED TO REMAIN IN SERVICE AND PROTECT THEM AGAINST DAMAGE <br />DURING SELECTIVE DEMOLITION OPERATIONS. <br />1. MAINTAIN FIRE -PROTECTION FACILITIES IN SERVICE DURING SELECTIVE DEMOLITION OPERATIONS, <br />1.6 PERFORMANCE REQUIREMENTS <br />A. REGULATORY REQUIREMENTS: COMPLY WITH GOVERNING EPA NOTIFICATION REGULATIONS BEFORE BEGINNING SELECTIVE <br />DEMOLITION. COMPLY WITH HAULING AND LEGAL DISPOSAL REGULATIONS OF AUTHORITIES HAVING JURISDICTION. <br />G. STANDARDS: COMPLY WITH ASSE A10.6 AND NFPA 241. <br />1.7 EXAMINATION <br />A. VERIFY THAT UTILITIES HAVE BEEN DISCONNECTED AND CAPPED BEFORE STARTING SELECTIVE DEMOLITION OPERATIONS, <br />B. PERFORM AND/OR ENGAGE A PROFESSIONAL ENGINEER TO PERFORM AN ENGINEERING SURVEY OF CONDITION OF BUILDING <br />TO DETERMINE WHETHER REMOVING ANY ELEMENT MIGHT RESULT IN STRUCTURAL DEFICIENCY OR UNPLANNED COLLAPSE OF <br />ANY PORTION OF STRUCTURE OR ADJACENT STRUCTURES DURING SELECTIVE BUILDING DEMOLITION OPERATIONS. <br />C. REFRIGERANT: BEFORE STARTING DEMOLITION, REMOVE REFRIGERANT FROM MECHANICAL EQUIPMENT ACCORDING TO <br />40 CFR 82 AND REGULATIONS OF AUTHORITIES HAVING JURISDICTION. <br />SECTION 033000 E CASTEINoPLACE CONCRETE (CONTINUED) <br />1.9 INSTALLATION <br />A. USE AIR -ENTRAINED CONCRETE FOR ALL SIDEWALKS, PAVING, PLATFORMS, CURBS AND OTHER EXTERIOR WORK EXPOSED TO <br />THE WEATHER. <br />B STEP ALL FOOTINGS AT A RATIO OF( ' 2) HORIZONTAL TO (1) VERTICAL. <br />C. ALL FOOTINGS TO REST ON UNDISTRBED SOIL. <br />D. EXTEND ,ALL REINFORCING AROUND CORNERS FOR CONTINUITY, MiNIMUMA LAP TO BE 24". HOOK ALL REAM BARS AT <br />DISCONTINUOUS ENDS. <br />E. ALL WELDED'AIIRE FABRIC SHALL BESET IN PLACE ON BAR CHAIRS 48" O C. BOTH WAYS. <br />F ALL REINFORCING STEEL- SHALL BE PLACED AND PROPERLY TIED IN PLACE SUFFICIENTLY AHEAD OF PLACING CONCRETE TO <br />ALLOW INSPECTION ,AND CORRECTION IF NECESSARY, WITHOUT DELAYING THE INSTALLATION OF THE CONCRETE. <br />G. CONCRETE PLACEMENT: <br />1. COMPLY WITH .ACI-304 AND AS HEREIN SPECIFIED. <br />2. DEPOSIT CONCRETE CONTINUOUSLY OR !N LAYERS OF SUCH THICKNESS THAT NO CONCRETE WILL BE PLACED ON CONCRETE <br />THAT HAS HARDENED SUFFICIENTLY TO CAUSE THE FORMATION OF COLD JOINTS OR PLANES OF WEAKNESS THROUGH THE <br />SECTION. DEPOSIT CONCRETE AS NEARLY AS PRACTICAL TO ITS FINAL LOCATION TO AVOID SEGREGATION DUE TO REHANDLING <br />OR FLOWING. <br />3. CONSOLODATE PLACED CONCRETE BY MECHANICAL VIBRATING EQUIPMENT SUPPLEMENTED BY HAND -SPADING, RAKING OR <br />TAMPING. LIMIT THE DURATION OF VIBRATING TO THE TIME NECESSARY TO CONSOLIDATE THE CONCRETE AND COMPLETE <br />IMBEDMENT OF REINFORCEMENT AND OTHER EMBEDDED ITEMS WITHOUT CAUSING SEGREGATION OF THE MIX. DEPOSIT AND <br />CONSOLIDATE CONCRETE SLABS IN A CONTINUOUS OPERATION, WITHIN THE LIMITS OF CONSTRUCTION JOINTS, UNTIL THE <br />PLACING OF A PANEL OR SECTION IS COMPLETED. CONSOLIDATE CONCRETE DURING PLACING OPERATION SO THAT CONCRETE IS <br />THOROUGHLY WORKED AROUND REINFORCEMENT AND OTHER IMBEDDED ITEMS AND INTO CORNERS. BRING SLAB SURFACES TO <br />THE CORRECT LEVEL WITH A STRAIGHT EDGE AND STRIKE OFF. USE BULL FLOATS OR DERBIES TO SMOOTH THE SURFACE. <br />H. CONCRETE CURING AND PROTECTION: <br />1. PROTECT FRESHLY PLACED CONCRETE FROM PREMATURE DRYING AND EXCESSIVE COLD OR HOT TEMPERATURE, AND <br />MAINTAIN DRYING AT A RELATIVELY CONSTANT TEMPERATURE FOR A PERIOD OF TIME NECESSARY FOR HYDRATION OF CEMENT <br />AND PROPER HARDENING. <br />2. START !NITIAL CURING AS SOON AS FREE WATER HAS DISAPPEARED FROM CONCRETE SURFACE AFTER PLACING AND <br />FINISHING. WEATHER PERMITTING, KEEP CONTINUOUSLY MOIST FOR NOT LESS THAN 72 HOURS. <br />3. CURING METHODS: PERFORM CURING OF CONCRETE BY MOIST CURING, BY MOISTURE -RETAINING COVER CURING OR BY <br />MEMBRANE CURING AS REQUIRED ACCORDING TO THE RECOMMENDATIONS OF THE ACI FOR THE PARTICULAR WORK, <br />I. FINISHING <br />1, GENERAL: COMPLY WITH RECOMMENDATIONS IN ACI 302.1R FOR SCREEDING, RESTRAIGHTENING, AND FINISHING OPERATIONS <br />FOR CONCRETE SURFACES. DO NOT WET CONCRETE SURFACES. <br />2. SCRATCH FINISH: WHILE STILL PLASTIC, TEXTURE CONCRETE SURFACE THAT HAS BEEN SCREEDED AND BULLFLOATED OR <br />DARBIED. USE STIFF BRUSHES, BROOMS, OR RAKES. <br />a. APPLY SCRATCH FINISH TO SURFACES INDICATED AND TO SURFACES TO RECEIVE CONCRETE FLOOR TOPPING OR MORTAR <br />SETTING BEDS FOR CERAMIC OR QUARRY TILE, PORTLAND CEMENT TERRAllO, AND OTHER BONDED CEMENTITIOUS FLOOR <br />FINISHES. <br />3. TROWEL FINISH: AFTER APPLYING FLOAT FINISH APPLY FIRST TROWEL FINISH AND CONSOLIDATE CONCRETE BY HAND OR <br />POWEREDRIVEN TROWEL. CONTINUE TROWELING PASSES AND RESTRAIGHTEN UNTIL SURFACE IS FREE OF TROWEL MARKS AND <br />UNIFORM IN TEXTURE AND APPEARANCE. GRIND SMOOTH ANY SURFACE DEFECTS THAT WOULD TELEGRAPH THROUGH APPLIED <br />COATINGS OR FLOOR COVERINGS. <br />a, APPLY A TROWEL FINISH TO SURFACES INDICATED AND TO FLOOR AND SLAB SURFACES EXPOSED TO VIEW OR TO BE COVERED <br />WITH RESILIENT FLOORING, CARPET, CERAMIC OR QUARRY TILE SET OVER A CLEAVAGE MEMBRANE, PAINT, OR ANOTHER THIN <br />FILMEFINISH COATING SYSTEM <br />b. FINISH SURFACES TO THE FOLLOWING TOLERANCES, MEASURED WITHIN 24 HOURS ACCORDING TO ASTM E 1155/E 1155M FOR A <br />RANDOMLY TRAFFICKED FLOOR SURFACE: <br />I. SPECIFIED OVERALL VALUES OF FLATNESS, F(F) 35; AND LEVELNESS, F(L) 25; WITH MINIMUM LOCAL VALUES OF FLATNESS, F(F) <br />24; AND LEVELNESS, F(L)17; FOR SLABS EONEGRADE. <br />4. BROOM FINISH: APPLY A BROOM FINISH TO EXTERIOR CONCRETE PLATFORMS, STEPS, AND RAMPS, AND ELSEWHERE AS <br />INDICATED. <br />a, IMMEDIATELY AFTER FLOAT FINISHING, SLIGHTLY ROUGHEN TRAFFICKED SURFACE BY BROOMING WITH FIBER EBRISTLE BROOM <br />PERPENDICULAR TO MAIN TRAFFIC ROUTE. COORDINATE REQUIRED FINAL FINISH WITH ARCHITECT BEFORE APPLICATION. <br />J. TESTING <br />1. TESTING AGENCY: CONTRACTOR TO ENGAGE A QUALIFIED INDEPENDENT TESTING AND INSPECTING AGENCY TO PERFORM <br />TESTING AND INSPECTION ITEMS AS DEFINED IN SECTION 014010 STRUCTURAL TESTS AND SPECIAL INSPECTIONS. CONTRACTOR <br />IS REQUIRED TO COOPERATE WITH THE INDEPENDENT AGENCY FOR THE TESTS AND INSPECTIONS LISTED IN SECTION 014010 E <br />STRUCTURAL TESTS AND SPECIAL! NSPECTIONS AND NOT FOR COMPLETING THOSE REQUIREMENTS. <br />SECTION 055000 -METAL FABRICATIONS <br />1 1 SUMMARY <br />A. SECTION INCLUDES: <br />1. MISCELLANEOUS STEEL FRAMING AND SUPPORTS. <br />2, METAL LADDERS. <br />3. METAL BOLLARDS. <br />4. LOOSE BEARING AND LEVELING PLATES, <br />5. STEEL PIPE HANDRAILS AND GUARDRAILS. <br />B. PRODUCTS FURNISHED, BUT NOT INSTALLED, UNDER THIS SECTION INCLUDE THE FOLLOWING: <br />1. LOOSE STEEL LINTELS. <br />2. ANCHOR BOLTS, STEEL PIPE SLEEVES, SLOTTED -CHANNEL INSERTS, AND WEDGE -TYPE INSERTS INDICATED TO BE CAST INTO <br />CONCRETE OR BUILT INTO UNIT MASONRY. <br />1.2 ACTION SUBMITTALS <br />A. REFER TO THE REQUIRED SUBMITTAL LOGIN SECTION 013300 -SUBMITTAL PROCEDURES. <br />B. SHOP DRAWINGS: SHOW FABRICATION AND INSTALLATION DETAILS. INCLUDE PLANS, ELEVATIONS, SECTIONS, AND DETAILS OF <br />METAL FABRICATIONS AND THEIR CONNECTIONS. SHOW ANCHORAGE AND ACCESSORY ITEMS. <br />C. DELEGATED -DESIGN SUBMITTAL: FOR LADDERS, HANDRAILS, AND GUARDRAILS, INCLUDING ANALYSIS DATA SIGNED AND <br />SEALED BY THE QUALIFIED PROFESSIONAL ENGINEER RESPONSIBLE FOR THEIR PREPARATION. <br />1.3 METALS <br />A. METAL SURFACES, GENERAL: PROVIDE MATERIALS WITH SMOOTH, FLAT SURFACES UNLESS OTHERWISE INDICATED. FOR <br />METAL FABRICATIONS EXPOSED TO VIEW IN THE COMPLETED WORK, PROVIDE MATERIALS WITHOUT SEAM MARKS, ROLLER MARKS, <br />ROLLED TRADE NAMES, OR BLEMISHES. <br />B. STEEL PLATES, SHAPES, AND BARS: ASTM A 36/A 36M. <br />C. STAINLESS -STEEL BARS AND SHAPES: ASTM A 276, TYPE 304 TYPICAL, TYPE 316L IN CORROSIVE ENVIRONMENTS <br />D. STEEL TUBING: ASTM A 500/A 500M, COLD -FORMED STEEL TUBING. <br />E. STEEL PIPE: ASTM A 53/A 53M, STANDARD WEIGHT (SCHEDULE 40) UNLESS OTHERWISE INDICATED. <br />F. SLOTTED CHANNEL FRAMING: COLD -FORMED METAL BOX CHANNELS (STRUTS) COMPLYING WITH MFMA4. <br />1. SIZE OF CHANNELS: 1-5/8 BY 1-5/8 INCHES, OR AS INDICATED IN DRAWINGS. <br />2. MATERIAL: GALVANIZED STEEL, ASTM A 653/A 653M, STRUCTURAL STEEL, GRADE 33, WITH G90 COATING; 0.064-INCH MINIMUM <br />NOMINAL THICKNESS. <br />3. MATERIAL: COLD -ROLLED STEEL, ASTM A 1008/A 1008M, STRUCTURAL STEEL, GRADE 33, 0.0528-INCH MINIMUM THICKNESS; <br />4. FINISH: REFER TO DRAWINGS. <br />G. ALUMINUM EXTRUSIONS: ASTM B 221, ALLOY 6063-T6. <br />H. ALUMINUM CASTINGS: ASTM B 26/B 26M, ALLOY 443.0-F. <br />1.4 MISCELLANEOUS MATERIALS <br />A. SHOP PRIMERS: PRIMER FORMULATED FOR EXTERIOR USE OVER ZINC -COATED METAL AND COMPATIBLE WITH FINISH PAINT <br />SYSTEMS INDICATED. <br />B. GALVANIZING REPAIR PAINT: HIGH -ZINC -DUST -CONTENT PAINT COMPLYING WITH SSPC-PAINT 20 AND COMPATIBLE WITH PAINTS <br />SPECIFIED TO BE USED OVER IT. <br />1.5 FABRICATION, GENERAL <br />A. SHOP ASSEMBLY: PRE -ASSEMBLE ITEMS IN THE SHOP TO GREATEST EXTENT POSSIBLE, USE CONNECTIONS THAT MAINTAIN <br />STRUCTURAL VALUE OF JOINED PIECES. <br />B. OUT, DRILL, AND PUNCH METALS CLEANLY AND ACCURATELY. REMOVE BURRS AND EASE EDGES. REMOVE SHARP OR ROUGH <br />AREAS ON EXPOSED SURFACES. <br />C. WELD CORNERS AND SEAMS CONTINUOUSLY TO COMPLY WITH THE FOLLOWING: <br />1. USE MATERIALS AND METHODS THAT MINIMIZE DISTORTION AND DEVELOP STRENGTH AND CORROSION RESISTANCE OF BASE <br />METALS. <br />2. OBTAIN FUSION WITHOUT UNDERCUT OR OVERLAP. <br />3. REMOV'E'WELDING FLUX IMMEDIATELY. <br />4. AT EXPOSED CONNECTIONS, FINISH EXPOSED WELDS AND SURFACES SMOOTH AND BLENDED. <br />D. FORM EXPOSED CONNECTIONS WITH HAIRLINE JOINTS, FLUSH AND SMOOTH, USING CONCEALED FASTENERS OR WELDS <br />WHERE POSSIBLE. LOCATE JOINTS WHERE LEAST CONSPICUOUS. <br />E. FABRICATE SEAMS AND OTHER CONNECTIONS THAT ARE EXPOSED TO WEATHER IN A MANNER TO EXCLUDE WATER. PROVIDE <br />WEEP HOLES WHERE WATER MAY ACCUMULATE. <br />F. WHERE UNITS ARE INDICATED TO BE CAST INTO CONCRETE OR BUILT INTO MASONRY, EQUIP WITH INTEGRALLY WELDED STEEL <br />STRAP ANCHORS NOT LESS THAN 8 INCHES FROM ENDS AND CORNERS OF UNITS AND 24 INCHES O.C. <br />1.6 MISCELLANEOUS FRAMING AND SUPPORTS <br />A. GENERAL: PROVIDE STEEL FRAMING AND SUPPORTS NOT SPECIFIED IN OTHER SECTIONS AS NEEDED TO COMPLETE THE <br />WORK. <br />B. FABRICATE UNITS FROM STEEL SHAPES, PLATES, AND BARS OF WELDED CONSTRUCTION UNLESS OTHERWISE INDICATED. <br />FABRICATE TO SIZES, SHAPES, AND PROFILES INDICATED AND AS NECESSARY TO RECEIVE ADJACENT CONSTRUCTION. <br />1. WHERE WOOD NAILERS ARE ATTACHED TO GIRDERS WITH BOLTS OR LAG SCREWS, DRILL OR PUNCH HOLES AT 24 INCHES O.C. <br />1.7 METAL LADDERS <br />A, GENERAL: <br />1. COMPLY WITH ANSI A14.3. <br />B. STEEL LADDERS: <br />1. SPACE SIDERAILS 18 INCHES APART UNLESS OTHERWISE INDICATED. <br />2. SIDERAILS: CONTINUOUS, 3/8-BY-2-1/2-INCH STEEL FLAT BARS, WITH EASED EDGES. <br />3. RUNGS: 3/4-INCH-DIAMETER STEEL BARS. <br />4. FIT RUNGS IN CENTERLINE OF SIDERAILS; PLUG -WELD AND GRIND SMOOTH ON OUTER RAIL FACES. <br />5. PROVIDE NONSLIP SURFACES ON TOP OF EACH RUNG. <br />6. PRIME EXTERIOR LADDERS, INCLUDING BRACKETS AND FASTENERS, WITH ZINC -RICH PRIMER. <br />SECTION 024119 - SELECTIVE DEMOLITION <br />1.1 SUMMARY: DEMOLITION AND REMOVAL OF SELECTED PORTIONS OF BUILDING OR STRUCTURE, INCLUDING SALVAGE OF <br />EXISTING ITEMS TO BE <br />RECYCLED. <br />1.2 MATERIALS OWNERSHIP; UNLESS OTHERWISE INDICATED, DEMOLITION WASTE BECOMES PROPERTY OF CONTRACTOR. <br />1.3 INFORMATIONAL SUBMITTALS; STATEMENTS OF REGFRIGERANT RECOVERY; SIGNED BY REFRIGERANT RECOVERY TECHNICIAN. <br />1.4 QUALITY ASSURANCE: REFRIGERANT RECOVERY TECHNICIAN QUALIFICATIONS; CERTIFIED BY AN EPA- APPROVED <br />CERTIFICA.T!ON <br />PROGRAM. <br />1.5 FIELD CONDITIONS <br />A. ,ADJACENT TENANTS WILL OCCUPY PORTIONS OF BUILDING IMMEDIATELY ADJACENT TO ARES OF SELECTIVE DEMOLITION AREA. <br />CONDUCT SELECTIVE DEMOLITION SO OTHER TENANT'S OPERATIONS WILL NOT BE <br />DISRUPTED. <br />B. CONDITICNS EXISTING AT TIME OF INSPECTION FOR BIDDING PURPOSE WILL BE MAINTAINED BY OWNER AS FAR AS PRACTICAL. <br />C. NOTIFY ARCHITECT OF DISCREPANCIES BETWEEN EXISTING CONDITIONS AND DRAWINGS BEFORE PROCEEDING WITH SELECTIVE <br />DEMOLITION. <br />D. HAZARDOUS MATERIALS; IT IS NOT EXPECTED THAT HAZARDOUS MATERIALS WILL BE ENCOUNTERED IN THE WORK. <br />1. ANY KNOWN HAZARDOUS MATERIALS WILL BE REMOVED BY OWNER BEFORE START OF THE WORK. <br />2. IF SUSPECTED HAZARDOUS MATERIALS ARE ENCOUNTERED, DO NOT DISTURB; IMMEDIATELY NOTIFY ARCHITECT AND OWNER. <br />HAZARDOUS MATERIALS WILL BE REMOVED BY OWNER UNDER A SEPARATE <br />CONTRACT. <br />E. STORAGE OR SALE OF REMOVED ITEMS OR MATERIALS ON -SITE IS NOT PERMITTED. <br />F. UTILITY SERVICE: MAINTAIN EXISTING UTILITIES INDICATED TO REMAIN IN SERVICE AND PROTECT THEM AGAINST DAMAGE DURING <br />SELECTIVE DEMOLITION <br />OPERATIONS. <br />1. MAINTAIN FIRE -PROTECTION FACILITIES IN SERVICE DURING SELECTIVE DEMOLITION OPERATIONS <br />1.6 PERFORMANCE REQUIREMENTS <br />A. REGULATORY REQUIREMENTS: COMPLY WITH GOVERNING EPA NOTIFICATION REGULATIONS BEFORE BEGINNING SELECTIVE <br />DEMOLITION. COMPLY WITH HAULING AND LEGAL DISPOSAL REGULATIONS OF AUTHORITIES HAVING <br />JURISDICTION. <br />G. STANDARDS: COMPLY WITH ASSE A10.6 AND NFPA 241, <br />1.7 EXAMINATION <br />A. VERIFY THAT UTILITIES HAVE BEEN DISCONNECTED AND CAPPED BEFORE STARTING SELECTIVE DEMOLITION OPERATIONS. <br />B. PERFORM AND/OR ENGAGE A PROFESSIONAL ENGINEER TO PERFORM AN ENGINEERING SURVEY OF CONDITION OF BUILDING TO <br />DETERMINE WHETHER REMOVING ANY ELEMENT MIGHT RESULT IN STRUCTURAL DEFICIENCY OR UNPLANNED COLLAPSE OF ANY PORTION <br />OF STRUCTURE OR ADJACENT STRUCTURES DURING SELECTIVE BUILDING DEMOLITION <br />OPERATIONS. <br />C. REFRIGERANT: BEFORE STARTING DEMOLITION, REMOVE REFRIGERANT FROM MECHANICAL EQUIPMENT ACCORDING TO 40 CFR 82 AND <br />REGULATIONS OF AUTHORITIES HAVING JURISDICTION. <br />1.8 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS <br />A. EXISTING SERVICES/SYSTEMS TO REMAIN: MAINTAIN SERVICES/SYSTEMS INDICATED TO REMAIN AND PROTECT THEM AGAINST <br />DAMAGE. <br />B. EXISTING SERVICES/SYSTEMS TO BE REMOVED, RELOCATED, OR ABANDONED: LOCATE, IDENTIFY, DISCONNECT, AND SEAL OR <br />CAP OFF UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS SERVING AREAS TO BE SELECTIVELY DEMOLISHED. <br />1. ARRANGE TO SHUT OFF UTILITIES WITH UTILITY COMPANIES, BUT ONLY WHEN APPLICABLE. <br />2. IF SERVICES/SYSTEMS ARE REQUIRED TO BE REMOVED, RELOCATED, OR ABANDONED, PROVIDE TEMPORARY <br />SERVICES/SYSTEMS THAT BYPASS AREA OF SELECTIVE DEMOLITION AND THAT MAINTAIN CONTINUITY OF SERVICES/SYSTEMS TO <br />OTHER PARTS OF BUILDING. <br />3. DISCONNECT, DEMOLISH, AND REMOVE FIRE -SUPPRESSION SYSTEMS, PLUMBING, AND HVAC SYSTEMS, EQUIPMENT, AND <br />COMPONENTS INDICATED ON DRAWINGS TO BE REMOVED. <br />C. PIPING TO BE REMOVED: REMOVE PORTION OF PIPING INDICATED TO BE REMOVED AND CAP OR PLUG REMAINING PIPING WITH <br />SAME OR COMPATIBLE PIPING MATERIAL. <br />D. PIPING TO BE ABANDONED IN PLACE: DRAIN PIPING AND CAP OR PLUG PIPING WITH SAME OR COMPATIBLE PIPING MATERIAL <br />AND LEAVE IN PLACE. <br />E, EQUIPMENT TO BE REMOVED: DISCONNECT AND CAP SERVICES AND REMOVE EQUIPMENT. <br />F. EQUIPMENT TO BE REMOVED AND REINSTALLED: DISCONNECT AND CAP SERVICES AND REMOVE, CLEAN, AND STORE <br />EQUIPMENT; WHEN APPROPRIATE, REINSTALL, RECONNECT, AND MAKE EQUIPMENT OPERATIONAL. <br />G. DUCTS TO BE REMOVED: REMOVE PORTION OF DUCTS INDICATED TO BE REMOVED AND PLUG REMAINING DUCTS WITH SAME <br />OR COMPATIBLE DUCTWORK MATERIAL. <br />1.9 PROTECTION <br />A. TEMPORARY PROTECTION: PROVIDE TEMPORARY BARRICADES AND OTHER PROTECTION REQUIRED TO PREVENT INJURY TO <br />PEOFLE AND DAMAGE TO ADJACENT TENANT'S AND FACILITIES TO REMAIN. <br />B. TEMPORARY SHORING: DESIGN, PROVIDE, AND MAINTAIN SHORING, BRACING, AND STRUCTURAL SUPPORTS AS REQUIRED TO <br />PRESERVE STA.BIL!TY AND PREVENT MOVEMENT, SETTLEMENT, OR COLLAPSE OF CONSTRUCTION AND FINISHES TO REMAIN, AND <br />TO PREVENT UNEXPECTED OR UNCONTROLLED MOVEMENT OR COLLAPSE OF CONSTRUCTION BEING DEMOLISHED. <br />1.10 SELECTIVE DEMOLITION <br />A. GENERAL.: DEMOLISH AND REMOVE EXISTING CONSTRUCTION ONLY TO THE EXTENT REQUIRED BY NEW CONSTRUCTION AND <br />AS INDICATED. USE METHODS REQUIRED TO COMPLETE THE WORK WITHIN LIMITATIONS OF GOVERNING REGULATIONS AND AS <br />FOLLOWS: <br />1. NEATLY CUT OPENINGS AND HOLES PLUMB, SQUARE, AND TRUE TO DIMENSIONS REQUIRED, USE CUTTING METHODS LEAST <br />LIKELY TO DAMAGE CONSTRUCTION TO REMAIN OR ADJOINING CONSTRUCTION. USE HAND TOOLS OR SMALL POWER TOOLS <br />DESIGNED FOR SAWING OR GRINDING, NOT HAMMERING AND CHOPPING. TEMPORARILY COVER OPENINGS TO REMAIN. <br />2. CUT OR DRILL FROM THE EXPOSED OR FINISHED SIDE INTO CONCEALED SURFACES TO AVOID MARRING EXISTING FINISHED <br />SURFACES. <br />3, DO NOT USE CUTTING TORCHES UNTIL WORK AREA IS CLEARED OF FLAMMABLE MATERIALS. AT CONCEALED SPACES, SUCH AS <br />DUCT AND PIPE INTERIORS, VERIFY CONDITION AND CONTENTS OF HIDDEN SPACE BEFORE STARTING FLAME -CUTTING <br />OPERATIONS. MAINTAIN PORTABLE FIRE -SUPPRESSION DEVICES DURING FLAME -CUTTING OPERATIONS, <br />4. MAINTAIN FIRE WATCH DURING AND FOR AT LEAST ONE HOUR AFTER FLAME -CUTTING OPERATIONS. <br />5. LOCATE SELECTIVE DEMOLITION EQUIPMENT AND REMOVE DEBRIS AND MATERIALS SO AS NOT TO IMPOSE EXCESSIVE LOADS <br />ON SUPPORTING WALLS, FLOORS, OR FRAMING, <br />6. DISPOSE OF DEMOLISHED ITEMS AND MATERIALS PROMPTLY. COMPLY WITH REQUIREMENTS IN SECTION 017419 <br />"CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL." i <br />B. SITE ACCESS AND TEMPORARY CONTROLS: CONDUCT SELECTIVE DEMOLITION AND DEBRIS -REMOVAL OPERATIONS TO <br />ENSURE MINIMUM INTERFERENCE WITH ROADS, STREETS, WALKS, WALKWAYS, AND OTHER ADJACENT OCCUPIED AND USED <br />FACILITIES. <br />C. REMOVED AND REINSTALLED ITEMS: <br />1. CLEAN AND REPAIR ITEMS TO FUNCTIONAL CONDITION ADEQUATE FOR INTENDED REUSE. <br />2, PACK OR CRATE ITEMS AFTER CLEANING AND REPAIRING. IDENTIFY CONTENTS OF CONTAINERS, <br />D. EXISTING ITEMS TO REMAIN: PROTECT CONSTRUCTION INDICATED TO REMAIN AGAINST DAMAGE AND SOILING DURING <br />SELECTIVE DEMOLITION. WHEN PERMITTED BY ARCHITECT, ITEMS MAY BE REMOVED TO A SUITABLE, PROTECTED STORAGE <br />LOCATION DURING SELECTIVE DEMOLITION AND CLEANED AND REINSTALLED IN THEIR ORIGINAL LOCATIONS AFTER SELECTIVE <br />DEMOLITION OPERATIONS ARE COMPLETE. <br />1.11 CLEANING <br />A. REMOVE DEMOLITION WASTE MATERIALS FROM PROJECT SITE AND RECYCLE OR DISPOSE OF THEM LAWFULLY, <br />B. CLEAN ADJACENT STRUCTURES AND IMPROVEMENTS OF DUST, DIRT, AND DEBRIS CAUSED BY SELECTIVE DEMOLITION <br />OPERATIONS. RETURN ADJACENT AREAS TO CONDITION EXISTING BEFORE SELECTIVE DEMOLITION OPERATIONS BEGAN. <br />SECTION 033000 E CAST] 1WPLACE CONCRETE <br />1.1 GENERAL NOTES: <br />A. MEASURING, MIXING AND PLACING OF CONCRETE SHALL BE IN ACCORDANCE WITH ACI 304. <br />B. PROTECTION AND CURING OF CONCRETE SHALL BE IN ACCORDANCE WITH ACi 305,306 AND 308 <br />C. ALL PERTINENT SECTIONS OF ACI 318 SHALL APPLY. <br />1.2 STEEL REINFORCEMENT: <br />A. REINFORCING BARS: ASTM A 615, GRADE 60, DEFORMED, <br />B. PLAIW,STEEL WELDED WIPE FABRIC: ASTM A 185, FABRICATED FROM AS EDRAWN STEEL WIRE INTO FLAT SHEETS <br />C. REINFORCING STEEL SHALL BE FABRICATED AND PLACED IN ACCORDANCE WITH THE ACI 315. <br />1.3 CONCRETE MATERIALS: <br />A. PORTLAND CEMENT: ASTM C 150, TYPE I/11. <br />1. FLY ASH: ASTM C 618, CLASS C OR F. <br />2. GROUND GRANULATED BLAST 6FURN.ACE SLAG: ASTM C 989, GRADE 100 OR 120. <br />B. BLENDED HYDRAULIC CEMENT: ASTM C 595, TYPE IS, PORTLAND BLAST EFURNACE SLAG CEMENT. <br />C. SILICA FUME: ASTM C 1240 AMORPHOUS SILICA. <br />D. NORMALEWEIGHT AGGREGATE: ASTM C 33, UNIFORMLY GRADED, AND AS FOLLOWS: <br />1. CLASS: SEVERE WEATHERING REGION, BUT NOT LESS THAN 3S TYPICAL EXCEPT NOT LESS THAN 4S FOR CONCRETE <br />PAVEMENTS, BRIDGE DECKS, DRIVEWAYS AND CURBS, WALKS, PATIOS, GARAGE FLOORS, EXPOSED FLOORS AND PORCHES, OR <br />WATERFRONT STRUCTURES EXPOSED TO FREQUENT WETTING OR NOT LESS THAN 5S FOR EXPOSED ARCHITECTURAL CONCRETE. <br />2. NOMINAL MAXIMUM AGGREGATE SIZE: 1 INCH. <br />E. WATER: POTABLE AND COMPLYING WITH ASTM C 94. <br />1.4 CONCRETE MIXES <br />A. FOUNDATION WALL AND INTERIOR CONCRETE: <br />1. COMPRESSIVE STRNEGTH: 3,500 PSI AT 28 DAYS <br />2. SLUMP: 2 TO 4 INCHES <br />B. CONCRETE EXPOSED TO WEATHER: <br />1. COMPRESSIVE STRNEGTH: 4,500 PSI AT 28 DAYS <br />2, SLUMP: 2 TO 3 INCHES <br />C. INTERIOR FLOOR SLABS: 4,000 PSI AT 28 DAYS. <br />1. COMPRESSIVE STRNEGTH: 4,000 PSI AT 28 DAYS <br />2. SLUMP: 2 TO 4 INCHES <br />1.5 ADMIXTURES <br />A. GENERAL: ADMIXTURES CERTIFIED BY MANUFACTURER TO CONTAIN NOT MORE THAN PA PERCENT WATER SOLUBLE <br />CHLORIDE IONS BY MASS OF CEMENTITIOUS MATERIAL AND TO BE COMPATIBLE WITH OTHER ADMIXTURES AND CEMENTITIOUS <br />MATERIALS. DO NOT USE ADMIXTURES CONTAINING CALCIUM CHLORIDE. <br />B. AIREENTRAINING ADMIXTURE: ASTM C 260. <br />C. WATEREREDUCING ADMIXTURE: ASTM C 494, TYPE A. <br />D. HIGHCRANGE, WATER EREDUCING ADMIXTURE: ASTM C 494, TYPE F. � <br />E. WATEREREDUCING AND ACCELERATING ADMIXTURE: ASTM C 494, TYPE E. <br />F. WATEREREDUCING AND RETARDING ADMIXTURE: ASTM C 494, TYPE D. <br />.6 FIBER REINFORCEMENT <br />A. SYNTHETIC FIBER: FIBRILLATED POLYPROPYLENE FIBERS ENGINEERED AND DESIGNED FOR USE IN CONCRETE, COMPLYING <br />WITH ASTM C 1116, TYPE Ill, 112 E TO I A/21LNCHES LONG. <br />1.7 REPAIR MATERIALS <br />A. REPAIR UNDERLAYMENT: CEMENT Li BASED, POLYMER. 0MODIFIED, SELF C LEVELING PRODUCT THAT CAN BE APPLIED IN <br />THICKNESSES FROM 118 INCH AND THAT CAN BE FEATHERED AT EDGES TO MATCH ADJACENT FLOOR ELEVATIONS, <br />1. CEMENT BINDER: ASTM C 150, PORTLAND CEMENT OR HYDRAULIC OR BLENDED HYDRAULIC CEMENT AS DEFINED IN ASTM C <br />219. <br />2. PRIMER: PRODUCT OF UNDERLAYMENT MANUFACTURER RECOMMENDED FOR SUBSTRATE, CONDITIONS, AND APPLICATION. <br />3. AGGREGATE: WELL oGRADED, WASHED GRAVEL, 1/8 C TO 1/4ANCH OR COARSE SAND AS RECOMMENDED BY UNDERLAYMENT <br />MANUFACTURER. <br />4. COMPRESSIVE STRENGTH: NOT LESS THAN 4100 PSI AT 28 DAYS WHEN TESTED ACCORDING TO ASTM C 109/C 109M. <br />B. REPAIR T OPPING: TRAFFIC EBEARING, CEMENTuBASED, POLY1%oiER SiMODiFLEC', SELF; LEVELING PRODUCT THAT CAN UE APPLIED <br />IN THICKNESSES FROM 1/4 CINCH. <br />CEMENT BINDER: ASTM C 150, PORTLAND CEMENT OR HYDRAULIC OR BLENDED HYDRAULIC CEMENT AS DEFINED IN ASTM C <br />219. <br />2. PRIMER: PRODUCT OF TOPPING MANUFACTURER RECOMMENDED FOR SUBSTRATE. CONDI T IONS, AND APPLICATION. <br />3. AGGREGATE: WELL °GRADED, WASHED GRAVEL, 1r8 E TO 1/4CI1J.CH OR COARSE SAND AS RECCM4MENDED BY rOPPING <br />MANUFACTURER. <br />4. COMPRESSIVE STRENGTH: NOT LESS THAN 5700 PSI AT 28 DAYS WHEN TESTED A,,CORDIMdG TO ASTM C 108rC i,19M. <br />1.8 VAPOR BARRIER <br />A. PLASTIC VAPOR BARRIER: ASTM E 1745, CLASS A, NOT LESS THAN 15 MILS THICK; INCLUDE MANUFACTURER'S RECOMMENDED <br />ADHESIVE OR PRESSURE ESENSITIVE TAPE. <br />B. VAPOR BARRIER SHALL COMPLY WITH THE FOLLOWING QUALITIES- <br />Q. PERMEANCE OF LESS THAN 0.01 PERMS PER ASTM F 1249 OR ASTM E 96. <br />a. MAINTAIN PERMEANCE OF LESS THAN 0.01 PERMS AFTER. MANDATORY COiND!TIONING TESTS PER ASTH E 15A SECTIONS 8, 11, <br />12, AND 13. <br />SECTION 055000 - METAL FABRICATIONS (CONTINUED) <br />1.8 LADDER SAFETY CAGES <br />A. PROVIDE SAFETY CAGES FOR LADDERS LONGER THAN 20 FEET PER OSHA. <br />B. FABRICATE LADDER SAFETY CAGES TO COMPLY WITH ANSI A14.3. ASSEMBLE BY WELDING OR VV! T H STAINLESS -STEEL <br />FASTENERS. <br />C. PROVIDE PRIMARY HOOPS AT TOPS AND BOTTOMS OF CAGES AND SPACED NOT MORE THAN 20 FEET O.C. PROVIDE <br />SECONDARY INTERMEDIATE HOOPS SPACED NOT MORE THAN 48 INCHES O.0 BETWEEN PRIMARY HOOPS. <br />D. PRIME STEEL LADDER SAFETY CAGES, INCLUDING BRACKETS AND FASTENERS, WITH ZINC -RICH PRIMER. <br />1.9 METAL BOLLARDS <br />A. FABRICATE METAL BOLLARDS FROM SCHEDULE 40 STEEL PIPE. <br />B. SIZE: 6 INCHES NOMINAL DIAMETER UNLESS INDICATED OT <br />HERWISE ON DRAWINGS, <br />C. FILL STEEL PIPE WITH CONCRETE TO TOP AND PROVIDE 1 INCH CROWN. <br />D. PRIME BOLLARDS WITH ZINC -RICH PRIMER, <br />E. FINISH PAINT "SAFETY YELLOW" UNLESS INDICATED OTHERWISE. <br />1.10 LOOSE BEARING AND LEVELING PLATES <br />A. PROVIDE LOOSE BEARING AND LEVELING PLATES FOR STEEL ITEMS BEARING ON MASONRY OR CONCRETE CONSTRUCTION. <br />DRILL PLATES TO RECEIVE ANCHOR BOLTS AND FOR GROUTING. <br />1.11 EXTERIOR STEEL PIPE HANDRAILS AND GUARDRAILS <br />A. DELEGATED DESIGN: ENGAGE A QUALIFIED PROFESSIONAL ENGINEER. AS DEFINED iN SECT;CN G140G0 "QUALI I'Y <br />REQUIREMENTS," TO DESIGN RAILINGS, INCLUDING ATTACHMENT TO BUILDING CONSTRUCTION. <br />B. STRUCTURAL PERFORMANCE: RAILINGS, INCLUDING ATTACHMENT T O BI iiLDING CONSTRUCTOOM,:. SHALL'W:T. Si AND I .- <br />EFFECTS OF GRAVITY LOADS .AND THE FOLLOWING LOADS AND S REUSES'WITHIN LIMITS AND UNDER r ONDIT!UNS INUIC.A i ED, <br />HANDRAILS AND TOP RAILS OF GUARDS: <br />a. UNIFORM LOAD OF 50 LBF/ FT APPLIED IN ANY DIRECTION. <br />b. CONCENTRATED LOAD OF 200 LBF APPLIED IN ANY DIRECTION. <br />UNIFORM AND CONCENTRATED LOADS NEED NOT BE ASSUME) T O r+CT CONCURREN i+_Y. <br />2. INFILL OF GUARDS: <br />a. CONCENTRATED LOAD OF 50 LB/FT APPLIED HORIZ0NT,4L Y ON AN ARE4 OF 1 SQ FT. <br />b. INFILL LOAD AND OTHER LOADS NEED NOT BE ASSUMED T 0 ACT CONC,'URRENTLY. <br />C. <br />C. PIPE: ASTM A 53/A 53M, TYPE F OR TYPE S, GRADE A. STANDARD WEIGHT ;SCHEDULE 401, UNLESS ANOTHER GRADE AND <br />WEIGHT ARE REQUIRED BY STRUCTURAL LOADS, <br />SIZE: <br />a. HANDRAIL: 1-1/2 INCH OUTSIDE DIAMETER. <br />b. GUARDRAILS, POSTS, AND INFILL MEMBERS: 1-1/2 INCH OUTSIDE DiAMcTER, T+P!CPI <br />D. 2 INCHES WHERE REQUIRED STRUCTURAL LOAD CONDITIONS, <br />E PRIME STEEL PIPE HANDRAILS AND GUARDRAILS, INCLUDING POSTS AND INFILL MEMSERS, WITH ZINC -RICH PRIMER. <br />E. FINISH: AS INDICATED IN DRAWINGS. <br />G. FABRICATION: <br />CUT, DRILL, AND PUNCH METALS CLEANLY AND ACCURATELY. REMOVE BURRS AND EASE EDGES TO A RADIUS OF <br />APPROXIMATELY 1/32 INCH UNLESS OTHERWISE INDICATED. REMOVE SHARP OR ROUGH AREAS ON EXPOSED SURFACES. <br />2. WELDED CONNECTIONS: COPE COMPONENTS AT CONNECTIONS TO PROVIDE CLOSE FT, OR USE FITTINGS DESIGNED FOR <br />THIS PURPOSE, WELD ALL AROUND AT CONNECTIONS, INCLUDING AT FITTINGS. <br />3, FORM CHANGES IN DIRECTION BY BENDING. <br />4. FOR CHANGES INDIRECTION MADE BY BENDING, USE JIGS TO PRODUCE UNIFORVi %LiRVATURE FOE! EACH REPETITIVE <br />CONFIGURATION REQUIRED. MAINTAIN CROSS SECTION OF MEMBER THROUGHOUT ENTIRE BEND'WITHOU T BUCKLING, <br />TWISTING, CRACKING, OR OTHERWISE DEFORN41NG EXPOSED SURFACES OF COMPONENTS, <br />5. WELD CAPS TO EXPOSED ENDS OF HANDRAILS OR GUARDRAILS WITH 1/8 INCH MINIMUM STEEL PLATE AND GRIND SMOOTH. <br />6. PROVIDE WALL RETURNS AT ENDS OF WALL -MOUNTED HANDRAILS UNLESS OTHERWISE INDICATED. <br />7. BRACKETS, FLANGES, FITTINGS, AND ANCHORS: PROVIDE WALL BRACKETS, FLANGES, MISCELLANEOUS FITTINGS, AND <br />ANCHORS TO INTERCONNECT RAILING MEMBERS TO OTHER WORK UNLESS OTHERWISE INDICATED. <br />1.12 LOOSE STEEL LINTELS <br />A. FABRICATE LOOSE STEEL LINTELS FROM STEEL ANGLES AND SHAPES OF SIZE INDICATED FOR OPENINGS AND RECESSES IN <br />MASONRY WALLS AND PARTITIONS AT LOCATIONS INDICATED, <br />B. GALVANIZE LOOSE STEEL LINTELS LOCATED IN EXTERIOR WALLS, UNLESS NOTED OTHERWISE. <br />C. PRIME LOOSE STEEL LINTELS LOCATED IN EXTERIOR WALLS WITH ZINC -RICH PRIMER WHERE INDICATED. <br />1.13 FINISHES, GENERAL <br />A. FINISH METAL FABRICATIONS AFTER ASSEMBLY, <br />1,14 STEEL ANDIRON FINISHES <br />A. GALVANIZING: HOT -DIP GALVANIZE ITEMS AS INDICATED TO COMPLY WITH AG v' A 15+/A 153M FOR STEEL AND IRON <br />HARDWARE AND WITH ASTM A 123/A 123M FOR OTHER STEEL .AND IRON PRODUCTS <br />B. SHOP PRIME IRON AND STEEL ITEMS NOT INDICATED TO BE GALVANIZED UNLESS THEY ARE I U SE EMBEDDED IMv COM` CRATE, <br />SPRAYED -ON FIREPROOFING, OR MASONRY, OR UNLESS OTHERWISE INi7!CATED <br />SHOP PRIME WITH UNIVERSAL SHOP PRIMER UNLESS PRIMERS SPECIFIED IN SECTION !)95 -Yj "H,41. J ;',ZE I'"iDI'1'1 TE^. <br />C. PREPARATION FOR SHOP PRIMING: PREPARE SURFACES TO COMPLY WIT;; REOU!REM-EN T S ii',001!;' I=D 6ELC`W- <br />EXTERIOR ITEMS: SSPC-SP 6/NACE NO 3, "COMMERC!Ai. BLAST CLFAN! ":G." <br />2. ITEMS INDICATED TO RECEIVE ZINC -RICH PRIMER: SSPC-SP 51NACE NO.3,' COid MERC!AL BLAST CLEA.-,!iNG." <br />3, ITEMS INDICATED TO RECEIVE PRIMERS SPECIFIED IN SECTION 099100 "PAINT": SSPC-SP S/NACE NO 3, CMMM6ER.CiA'_ EL4S? <br />CLEANING." <br />4. OTHER ITEMS: SSPC-SP 3, "POWER TOOL CLEANING." <br />D. SHOP PRIMING: APPLY SHOP PRIMER TO COMPLY WITH SGPC-PA 1, "PAINT APPLICATiON SPECIFICATION NO. 1: SHOP, FIELD, <br />AND MAINTENANCE PAINTING OF STEEL,' FOR SHOP PAINI I`vG. <br />1.15 INSTALLATION, GENERAL <br />A. CUTTING, FITTING, AND PLACEMENT: PERFORM CUTTING. DRILLING. AND FITTING REQUIRED FOR INSTALLING METAL <br />FABRICATIONS. SET METAL FABRICATIONS ACCURATELY IN LOCATION. ALIGNMENT, AND ELEVATION; WITH EDGES AND <br />SURFACES LEVEL, PLUMB, TRUE, AND FREE OF RACK: AND MEASURED FR'IM ESTACUSHED LNES ANDLEVELS. <br />B. FIT EXPOSE CONNECTIONS ACCURATELY TOGETHER TC FORM HAIRLINE JOINTS. WELD CONNECTIONS THAT ARE NOT TO <br />BE LEFT AS EXPOSED JOINTS BUT CANNOT BE SHOP VVELDED 6ECAUSE (:,F SH!FP!NG SI::c LUA:TAT10NS. CC) NOT WELD; CU `' OP, <br />ABRADE SURFACES OF EXTERIOR UNITS THAT HAVE BEEN HOT-D!P GAL`VA.!NIZEI� AFTER FASR.!CA.Tir0N Air, ERE FGR Bl:'LT: EC OR <br />SCREWED FIELD CONNECTIONS. <br />C. FIELD WELDING: COMPLY WITH THE FOLLOWING REQUIREMENTS: <br />USE MATERIALS AND METHODS THAT MINIMIZE DISTORTION AND DEVELOP STRENGTH AND CORROSION RESISTANCE OF <br />BASE METALS. <br />2. OBTAIN FUSION WITHOUT UNDERCUT OR OVERLAP. <br />3. REMOVE WELDING FLUX IMMEDIATELY. <br />4. AT EXPOSED CONNECTIONS, FINISH EXPOSED WELDS AND SURFACES SMOOTH AND BLENDED SO NO ROUGHNESS SHOWS <br />AFTER FINISHING AND CONTOUR OF WELDED SURFACE h'LATrHES THAT OF ADJArEntT SURFACE. <br />D FASTENING TO IN -PLACE CONSTRUCTION: PROVIDE ANCHORAGE DEVir;ES AND FASTENEPS WHERE METAI FABRICATIONS <br />ARE REQUIRED TO BE FASTENED TO IN -PLACE CONSTRUCTION. <br />E. PROVIDE TEMPORARY BRACING OR ANCHORS IN FORIMWORK FOR ITEMS THAT ARE TO BE BUILT INTO CONCRETE, MASONRY, <br />OR SIMILAR CONSTRUCTION. <br />1.16 ADJUSTING AND CLEANING <br />A. TOUCHUP PAINTING: IMMEDIATELY AFTER ERECTION, CLEAN FIELD WELDS, BOLTED CONNECTIONS. AND ABRADED AREAS. <br />PAINT UNCOATED AND ABRADED AREAS WITH THE SAME MATERIAL AS USE FOR SHOP PAINTING TO COi✓PLY WITH SSPC,-PA 1 <br />FOR TOUCHING UP SHOP -PAINTED SURFACES. <br />B. GALVANIZED SURFACES: C�•EAN FIELD WELDS, BOLTED CONNECTIONS, AND ABRADED AREAS AND REPAIR GALVANIZING TO <br />COMPLY WITH ASTM A 780/A 780M. <br />SECTION 061053 MISCELLANEOUS ROUGH CARPENTRY <br />1.1 GENERAL: PROVIDE MISCELLANEOUS ROUGH CARPENTRY. <br />A. STANDARDS: COMPLY WITH REQUIREMENTS OF AMERICAN PLYWOOD ASSOCIATION (APA) AND OTHER APPLICABLE CODE <br />REQUIREMENTS. <br />B. PLYWOOD: PROVIDE MINIMUM APA C-D EXTERIOR (CDX) PLYWOOD; STRESS RATED WHERE SPANNING SUPPORTING <br />MEMBERS; FIRE -RETARDANT TREATED; MINIMUM 3/4" THICK UNLESS OTHERWISE INDICAT ED. <br />PLYWOOD STANDARD: COMPLY WITH PS1 (ANSI A199.1). <br />2. PLYWOOD PANEL BOARDS: PROVIDE PANEL BOARDS FOR ELECTRICAL AND COMMUNICATION PANEL BOARDS; APA <br />PLUGGED, INTERIOR TYPE PLYWOOD WITH EXTERIOR GLUE, FIRE -RETARDANT TREATED; MINIMUM,1.12" TRICK. <br />3. PLYWOOD BACKING PANELS: DOC PS 1, EXPOSURE 1, C-D PLUGGED, F!Rr RE-TI RDAN T TREAl EO NO- LESS THAN, :;Z <br />THICKNESS. <br />C. FASTENERS: PROVIDE FASTENERS AS REQUIRED FOR C01;PLETE, SECURE INSTAi. A,TiOIN OF crilS';:LLANE IS ;it i:: H <br />CARPENTRY; <br />D. GALVANIZED AT EXTERIOR LOCATIONS AND WHEN LIFD VVITH PRES UR'c;TREr?TED'vJ:;00: SIZE ANU TYPE TO SUIT <br />APPLICATION; PROVIDE <br />E. WASHERS FOR NUTS AND BOLTS. <br />1.2 INSTALLATION: COMPLY WITH REFERENCED STANDARCS AND APPL!CABLh CODE REOUIREIMENTS. <br />A. PLYWOOD: COMPLY WITH APA RECOMMENDATIONS FOR FABRICATION AND INSTALLATION. <br />B. PLACE MISCELLANEOUS ROUGH CARPENTRY TRUE TO LINES AND LE'V ELS. <br />C. COORDINATE LOCATION SO ATTACHED WORK WILL COMPLY WITH DESIC--,N REQUIREMENT AND BE PROPERLY LOCATEr,. <br />D. CONSTRUCT MEMBERS OF CONTINUOUS PIECES OF LONGEST POSSIBLE LENGTHS. <br />E. FIT CARPENTRY WORK. TO OTHER WORK; SCRIBE AND COPE AS REQUIRED FOR ACCURATE FIT. <br />F. SECURELY ATTACH CARPENTRY WORK TO SUBSTRATES BY ANCHORING AND FAST EEING AS REQUIRES BY RECOGNIZED <br />STANDARDS, <br />G. PROVIDE WASHERS UNDER BOLT HEADS AND NUTS IN CCNTAC•T'0!t'rH, 'ffi")0D <br />17038 F-C)jUlr►;bus Drive <br />Tampa, Fr>ric--i 31 460 <br />All reproduction & intellectual property <br />rights reserved 2017 <br />Project <br />✓ ---- -1"" <br />A,. <br />�,* <br />D.. <br />DMG (!=L) - <br />EPHYHILL <br />5,93.5 7th Street ZephyrlhillIs, <br />FI_ 33542- <br />Dicpdred for <br />DAVI T A MEDINCAL (3ROUP' <br />In Association %mith: <br />.EFS & ASSOCIATES, ES, ii ,-' <br />'. t, T. "'ra, Hr <br />��;d,P.G;. �,.,I_ _r.G <br />13C1 j7i 1 T <br />SARASOTI A. FL ,44231E <br />PHONE: 941.955.4555 <br />GENESIS ENGINEER GROUP, LLC <br />CONTACT: MIKE HANEY <br />1000 N. ASHLEY DR. #900 <br />TAiv11FA. FL <br />PHONE: 813.54`16A�5 <br />GENESIS ENGINEER GROUP, LLC <br />CONTACT: MIKE HAKE`,' <br />1000 N. ASHLEY DR #900 <br />TAMPA, FL <br />PHONE: 813 523.655 <br />.:. <br />��. <br />Professiagai Sean ;; �. <br />. . +1. ,r --!. <br />e t. <br />11 <br />i:,n <br />s• <br />.T " _ <br />, , ,_ <br />.-- <br />7 .1 <br />6 J '� <br />I%-'�, ., <br />n, <br />- w n 1 2211 r`I f' <br />'I 5805 i i :'?2'-41 AI'v1 <br />No. Revision Description Date <br />1 PERMTT AND BID SET 12,110/2018 <br />-------------- <br />No. Ravin ,.n Descrlgacn Date <br />Draw-, Sy: IhIi C'herked BY: SRS <br />Project Number: 18190 <br />Sheet Title <br />SPECIFICATION <br />G!f.a:,Jlzvvna3S-:4v,� .r <br />i{J,I,-,t',(,.T <br />,!,F.ie conizinL3 OT'iob„;ri. <br />Shee: NLwnber <br />