My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
5935 Gall Blvd
Zephyrhills
>
Building Department
>
Building Plans
>
5935 Gall Blvd
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2025 12:19:46 PM
Creation date
2/18/2025 3:24:28 PM
Metadata
Fields
Template:
Building Plans
Street #
5935
Location
Gall Blvd
Contractor
CW Hayes Construction
Building Plans - Permit #
17157
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S-2 <br />300-16X10 <br />ii <br />.. ............ <br />�CHANICA <br />1 /8" = 1 '-0" <br />S-2 <br />200-14X10 <br />14X14 <br />14X14 <br />r, <br />R_2 <br />12X12 <br />14X14 DROPS TO <br />BELOW LOW ROOF <br />R-2 DECK <br />5X16 - 30X22 <br />rn <br />S-2 b ON TOP OF DUCT <br />600-16X10 RTU-1 0 <br />K^^ 14X14 <br />V/ <br />0 <br />R=1 <br />10"0 <br />S <br />506--1 X10 � 50016X10 500---16X10 <br />16X16 <br />PROVIDE CONCENTRIC DIFFUSER, SEE <br />DETAIL. RUSKIN CDS-60 48X48 MILL <br />FINISH, FULL SIZE ROUND SUPPLY <br />AND RETURN TO CONCENTRIC <br />DIFFUSER CONNECTIONS <br />1 0111 <br />1 Oil <br />2 <br />RTU-2 <br />10 <br />x <br />PROVIDE CONCENTRIC DIFFUSER. SEE <br />DETAIL. RUSKIN CDS-60 48X48 MILL <br />FINISH, FULL SIZE ROUND SUPPLY <br />AND RETURN TO CONCENTRIC <br />DIFFUSER CONNECTIONS <br />If If <br />III Oil <br />RTU-4 <br />12"0 <br />S-1 <br />500 <br />OOR PLAN—. <br />R_1 <br />20"0 <br />(TYP. 3 <br />72X18 <br />N <br />N <br />12"0 x <br />co <br />N <br />S-1 " <br />500 <br />12"0 <br />RTU-6 <br />S-1 S-1 <br />600 <br />R-1 <br />S-1 <br />F-1, F-2- COOK r 125 F_2 <br />GC -SERIES CEILING <br />MOUNTED EXHUAST FAN <br />TIED TO LIGHT SWITCH ~, j_ __. <br />200 CFM- .375" SP ...._...._._ ......... <br />120/1 PHASE APPX 100 W <br />RTU-3 <br />PROVIDE CONCENTRIC DIFFUSER. SEE <br />_ <br />jl <br />DETAIL. RUSKIN CDS-60 48X48 MILL <br />FINISH, FULL SIZE ROUND SUPPLY <br />II <br />o 11 <br />AND RETURN TO CONCENTRIC <br />DIFFUSER CONNECTIONS <br />N <br />N <br />I Oil <br />I! Ail, <br />PROVIDE CONCENTRIC DIFFUSER. SEE <br />RTU-5 DETAIL. RUSKIN CDS-60 48X48 MILL <br />FINISH, FULL SIZE ROUND SUPPLY <br />AND RETURN TO CONCENTRIC <br />DIFFUSER CONNECTIONS <br />CENTRAL CONTROLLER FOR RTU'S BY <br />CONTRACTOR- REFER TO LEASE <br />AGREEMENT FOR CONTROL SYSTEM <br />DETAILS <br />■ <br />F-1 <br />f� <br />-- <br />6" MINE <br />INSULA <br />MECHANICAL PART PLAN <br />1 /8" = 1 '-0" <br />STEEL WIRE TO STRUCTURE <br />SPIN -IN FITTING WITH <br />VOLUME DAMPER <br />METAL DUCT <br />FOR SIZE SEE <br />nPLAN <br />AIR SCOOP <br />(SUPPLY � N Y) <br />LOCKING QUADRANT <br />li. <br />- y' <br />t <br />• <br />" 1 <br />r a <br />r6 s <br />cy) <br />A <br />�r� r <br />1" LINER <br />1OP WITH OPEN END. <br />_y � <br />W <br />x' <br />^ <br />CD LO <br />CO 0 O <br />N <br />F+ <br />W U ti co <br />k <br />U) Lo <br />A:- <br />ULLJw <br />'o <br />NOTE: REFER TO GENERAL NOTE 4, `J <br />THIS SHEET FOR CONDENSATE DRAIN V Q z U a <br />REQUIREMENTS. N <br />calpp{ <br />RTU INSTALLATION DETAIL o <br />-jLL <br />MOUNT FAN FROM STRUCTURE <br />.r <br />ABOVE WITH THREADED RODS. <br />PROVIDE NEOPRENE ISOLATOR <br />PADS. {' ' <br />EXTEND 4' FROM <br />FAN DISCHARGE " } <br />PROVIDE BDD . . . <br />-SUPPORT STRAP'R ►,` <br />i- INSULATED <br />FLEX DUCT,: <br />HANGER (TYP.) .... <br />INSULATED SUPPLY ADAPTER/PLENUM • �° <br />T-BAR FRAME (TYP.)- PROVIDE METAL <br />GASKETED <br />FRAME AT GYP INSTALLTIONS <br />ACCES <br />✓- CEILING TO SIDEWALL PANELS FLEX CONN. U_ <br />DISCHARGE CAP <br />W/SCREEN <br />EE{t <br />O I <br />DEVICE NECK SIZE TO MATCH RUN OUT CEILING FAN DETAIL LL . <br />DIFFUSER / RETURN DETAILir <br />` <br />EXHAUST FAN, ROOF HOOD <br />:1. <br />4.. <br />RESILIENT PAD z_ w <br />(CAULK BOTH FACES) CO <br />F— 7ti;4u <br />3 X d <br />, »i4.1 �• <br />WOOD NAILER F <br />FIBERGLASS <br />INSULATION; �{ <br />PREFAB. ROOF }` <br />CURB W/CANT. <br />16009 t wrraj <br />MIN 8": FROM ROOF <br />TFLASHING <br />O UNIT <br />{":51 , <br />\ I / H BUILT-UP ROOF <br />W <br />INSULATION ' . <br />Q ah <br />TYPE RE 2 SQUARE THROAT 0 "" <br />ELBOW WITH VANES 0'°� <br />TYPE RE 1 RADIUS ELBOW <br />CENTERLINE = 3W = STD RADIUS <br />2 <br />DUCT ELBOW DETAIL <br />a,, k <br />0 <br />" <br />1 <br />ANGLE IRON FRAME SUPPORT <br />YyF+' q 3 <br />r e i <br />�31 J ' <br />w <br />a, <br />NOTE: ROOF CURBS SHALL HAVE RAISED <br />CANTS WTIH HEIGHT TO MATCH <br />... <br />AIR DEVICE SCHEDULE <br />DESIGN <br />MARK <br />LAYOUT BASIS <br />TYPE <br />FACE SIZE <br />MOUNTING <br />FINISH <br />MATERIAL <br />NOTES <br />S-1 <br />TITUS TMS <br />CEILING DIFFUSER <br />24X24 <br />LAY -IN <br />WHITE <br />STEEL <br />1,2,4 <br />S-2 <br />TITUS 300_S <br />ADJUSTABLE DBL DEFLECTION SIDEWALL <br />PER PLANS <br />WALL <br />WHITE <br />STEEL <br />1,3,5 <br />R-1 <br />TITUS 50FF <br />3/4" SINGLE DEFL SIDEWALL RETURN <br />24X24 <br />LAY -IN <br />WHITE <br />ALUMINUM <br />1,2,4 <br />R-2 <br />TITUS 350FSF <br />3/4" SINGLE DEFL SIDEWALL RETURN <br />PER PLANS <br />GYP. <br />WHITE <br />STEEL <br />1,5 <br />NOTES <br />1 <br />. NECK SIZE TO MATCH DUCT RUN OUT SIZE AS SHOWN ON MECHANICAL PLANS. <br />2 <br />.PROVIDE MANUFACTURER'S ACCESSORY INSULATED PLENUM WITH RUN OUT SIZED CONNECTION. <br />3 <br />.DIVERT DIFFUSER BLADES TO 35 GREES BELOW VERTICAL TO COVER 120 DEGREE SPREAD <br />4 <br />.BALANCING DEVICE AT RUN OUT TAKEOFF <br />5 <br />.PROVIDE BALANCING DEVICE AT GRILLE/RETURN FACE <br />END <br />ROOF INSULATION <br />4..£,,�Y•.,. ; <br />CONTRACT DATE: 01.05.2016 <br />RTU CURB DETAIL <br />j <br />BUILDING TYPE: N/A <br />PLAN VERSION: DEC 2015,'-•, <br />SITE NUMBER: N/A <br />i <br />STORE NUMBER: N/A <br />' e; <br />SHELL BUILDOUT <br />5935 GALL BLVD�.` <br />ZEPHYRHILLS, FL 33541 <br />PACKAGED GAS/ELECTRIC ROOFTOP UNIT SCHEDULE <br />MIN <br />FAN <br />COOLING <br />COOLING <br />HEATING <br />HEATING <br />NOM <br />UNIT <br />QTY <br />FAN <br />OA <br />FAN <br />MOTOR <br />TOTAL <br />SENSIBLE <br />MBH <br />MBH <br />HEATING <br />VOLTS/ <br />MARK <br />SERVES <br />MODEL <br />TONS <br />CONFIG <br />COMPR. <br />CFM <br />CFM <br />ESP <br />HP <br />MBH <br />MBH <br />OUTPUT <br />INPUT <br />STAGES <br />PHASE <br />RTU-1 <br />LOADING AREA <br />TRANE YHC120 <br />10 <br />DOWNFLOW <br />2.00 <br />3500 <br />450 <br />0.5 <br />2 <br />120 <br />90 <br />120 <br />150 <br />1 <br />20813 <br />RTU-2,3;4,5 <br />SALES <br />TRANE YSC150 <br />12.5 <br />[}OWNFLOW <br />2.00 <br />4375 <br />1 500 <br />0.5 <br />2 <br />1 146 <br />110 <br />120 <br />150 <br />1 1 <br />208/3 <br />RTU-6 <br />ENTRY/SALES <br />TRANE YHC150 <br />12.5 <br />DOWNFLOW <br />2.00 <br />4375 <br />300 <br />0.5 <br />2 <br />146 <br />110 <br />120 <br />150 <br />1 <br />208/3 <br />72.5 <br />NOTE 1: INDOOR COIL EAT = 80/67 FOR COOLING, 70 FOR HEATING. <br />NOTE 2: OUTDOOR COIL EAT = 95 FOR COOLING, 17 FOR HEATING. <br />NOTE 3: ESP DOES NOT INCLUDE FILTERS. FAN PERFORMANCE FOR DIRECT <br />DRIVE UNITS IS AT HIGH SPEED. <br />NOTE 4: UNIT MOUNTED DISCONNECT AND UNPOWERED RECEPTACLE, CONDENSER COIL GUARDS- EPDXY COAT EVAP/COND COILS, STAINLESS STEEL <br />HEAT EXCHANGEF <br />NOTE 5: FACTORY MOUNTED SMOKE DETECTOR IN RETURN COMPARTMENT AND INTERNAL FLOAT SWITCH WIRED FOR UNIT SHUTDOWN. <br />NOTE 7: PROVIDE MANUFACTURER ACCESSORY ROOF CURB. CURB ADAPTORS SHALL REQUIRE SPECIFIC ENGINEER APPROVAL. <br />NOTE 8: COORDINATE VOLTAGES WITH ELECTRICAL DRAWINGS PRIOR TO ORDERING. SUBMITTALS SHALL BE REQUIRED TO HAVE ELECTRICAL ENG. APPROVAL <br />NOTE 9: LOW GAS HEAT WITH 7 W.C. INLET PRESSURE. PROVIDE REGULATOR AT EACH UNIT SIZED TO ACHIEVE 7" W.C. DELIVERY PRESSURE. <br />NOTE 10. PROVIDE REFRIGERANT HOT GAS REHEAT DEHUMIDIFICATION. RTU-6 <br />T7 <br />11 <br />11 11 <br />I I I I I I <br />I <br />1 <br />1 <br />ENCI <br />x; •:x i <br />,1 , <br />REMODEL <br />PHASE 1 <br />a• <br />'.: <br />MECHANICAL <br />P <br />FLOOR <br />it <br />PLANS AND <br />r�� s <br />SCHEDULES <br />m1mo <br />, R t <br />}r 3 <br />7,t <br />}�y} <br />PLOT DATE: <br />
The URL can be used to link to this page
Your browser does not support the video tag.