My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
5935 Gall Blvd
Zephyrhills
>
Building Department
>
Building Plans
>
5935 Gall Blvd
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2025 12:19:46 PM
Creation date
2/18/2025 3:24:28 PM
Metadata
Fields
Template:
Building Plans
Street #
5935
Location
Gall Blvd
Contractor
CW Hayes Construction
Building Plans - Permit #
17157
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
II <br />THREADED ROD TO STRUCTURE <br />II <br />^�I CLEVIS HANGER <br />L l <br />y <br />�C IIJ <br />� I fir II <br />II PIPE OR <br />II CONDUIT <br />6 WIDE SADDLEI II _ _ <br />r I II 1 - <br />RIGID INSULATION INSERT <br />PIPING HANGERS <br />1. PROVIDE CLEVIS SUPPORTS WITH BEAM CLAMP, CONCRETE ANCHORS (CONCRETE STRUCTURE), SCREWED <br />BRACKET (WOOD STRUCTURE). PROVIDE HANGER OUTSIDE OF INSULATION WITH RIGID FOAM GLASS INSULATION <br />SECTION AT HANGERS. PROVIDE 16 GAUGE PIPING SADDLE AT EACH HANGER. NO WELDING OR CUTTING OF STEEL <br />STRUCTURAL MEMBERS SHALL BE PERMITTED. LAYOUT BASIS SHALL BE ANVIL 260. ROD SIZE PER CLEVIS HANGER <br />DIMENSIONS FOR EACH PIPE SIZE: 3/8" FOR 2" PIPE OR LESS, 1/2" UP TO 3" PIPE AND 5/8" FOR 4" PIPE <br />2. HANGER INSTALLATION FOR HOT WATER PIPING SHALL NOT PREVENT MOVEMENT FOR PIPING EXPANSION. <br />SPACING AS FOLLOWS: <br />STEEL PIPE: 1/2 TO 1-1/4 - 7' ; 1-1/2 TO 2-1/2 - 9' ; 3 &4 - 12' ; 6 &8 - 17' ; 10 AND UP- 22' <br />COPPER PIPE: 1/2 TO 1 - 5' ; 1-1/4 TO 2 - 7' ; 2-1/2 AND UP - 9' <br />CAST IRON: 10' WITH SUPPORT AT EACH JOINT, TAKEOFF, AND FITTING. <br />PVC DRAINAGE (140 DEG F SERVICE UP TO 6 - 80 DEG F ABOVE 6 ): UP TO 3 - 3' ; 4 TO 6 - 4,; ABOVE 6 - 8' <br />PVC VENT (80 DEG F SERVICE): UP TO 1-1/2 - 5' ; 2 -3 - 6' ; ABOVE 3 7' <br />CHROME PLATED <br />ESCUTCHEON AT WALL <br />3/4"xi/2" TEE. <br />" C.W. SUPPLY <br />'? HEADER ABOVE <br />--\ \\J71, <br />k, CEILING <br />--- ----- -----L--- <br />TRAP PRIMER VALVE WITH INTEGRAL <br />BACKFLOW PREVENTER AND VACUUM <br />BREAKER PORT. PRECISION PLUMBING <br />PRODUCTS Pi-500 OR P2-500 —� <br />1/2" COPPER TUBIING TRAP <br />SUPPLIES. ROUTE BELOW FLOOR TO <br />FLOOR DRAIN TRAPS. SEE PLANS <br />FOR EXACT NUMBER OF LINES. <br />PIPE HANGER DETAIL. <br />PROVIDE DISTRIBUTION HEADER <br />ACCESSORY FOR PRIMERS SHOWN <br />SERVING MULTIPLE FIXTURES. <br />i I <br />i <br />NOTE: <br />MOUNT THE TRAP PRIMER VALVE ABOVE CEILING AND AT LEAST ONE FOOT <br />ABOVE THE FLOOD LEVEL RIM OF THE HUB DRAIN FLOOR FOR EVERY 20 <br />FEET OF PRIMER LINE. PROVIDE WITH ACCESS PANEL WHERE LOCATED <br />ABOVE A HARD CEILING). PROVIDE PRIMER SERVICE FOR ALL FLOOR <br />DRAINS AND HUB DRAINS. <br />TRAP PRIMER DETAIL <br />COMBINATION T&P <br />RELIEF VALVE <br />ROUTE T&P DI <br />TO SPILL INTC <br />SINK. <br />a;WI T <br />=LIEF VALVE <br />3/4" CW <br />ELECTRIC UNION, <br />P <br />?ANSION TANK <br />SURE TO WALL <br />)EEP SHEETMETAL <br />MN PAN <br />ROUTE 3/4" DRAIN <br />PAN TO MOP SINK <br />ELEC. WATER HEATER DETAIL <br />a <br />PILLOW BLOCK MODEL <br />SHOWN. MODEL 1.5 MAY <br />USED FOR SMALLER <br />PIPING. SEE P3.1 FOR PI <br />SIZES. <br />WC-2 <br />LV-1 <br />DOMESTIC WATER FLOOR PLAN_ <br />NYLON ROLLER <br />WITH TEFLON BASE <br />MOUNTING HOLES FOR <br />PLUMBER'S TAPE AS REQUIRED <br />BY CODE. <br />NOTE: <br />1) PIPE SUPPORTS SHALL BE SPACED AS SPECIFIED IN THE PLUMBING SPECIFICATIONS. <br />2) DO NOT ATTACH SUPPORTS TO ROOF. PROVIDE PROTECTIVE MEMBRANE BETWEEN ROOF <br />AND SUPPORT PER ROOFING MANUFACTURER'S RECOMMENDATIONS. PROVIDED AND <br />INSTALLED BY THE PLUMBING CONTRACTOR. <br />3) PIPING SUPPORT NOT PERMITTED ON REFRIGERANT OR ANY OTHER INSULATED ROOF <br />PIPING, <br />ROOF PLUMBING PIPE SUPPORT DETAIL <br />VALVES FOR NATURAL GAS SYSTEM <br />1. PLUG VALVES (3" IN SIZE AND LARGER): VALVES SHALL BE THE SEMI -STEEL <br />TYPE WITH CAST IRON BODY, LUBRICATED CAST IRON PLUG, FLANGED ENDS <br />AND WRENCH OPERATED FOR 175 POUND W.O.G. VALVES LAYOUT BASIS <br />SHALL BE WALWORTH1797F <br />2. PLUG VALVES (2 1/2" IN SIZE AND SMALLER): VALVES SHALL HAVE BRONZE <br />BODY AND PLUG, THREADED ENDS AND SQUARE HEAD FOR 175 POUND <br />W.O.G. VALVE LAYOUT BASIS SHALL BE: WALWORTH NO. 1736 <br />3. BALL VALVES (1/2", 3/4", AND 1" UP TO 1/2 PSI FOR APPLIANCE <br />CONNECTION): VALVE SHALL BE LEVER HANDLE, 600 PSI CWP RATED - 1/2 <br />PSI FOR INDOOR APPLIANCE CONNECTIONS PER ANSI Z21.15 & CGA 9.1A. <br />LAYOUT BASIS SHALL BE NIBCO GB1A. <br />4. LUBRICATED PLUG VALVES SHALL BE LUBRICATED AT THE FACTORY AND <br />SEALANT SHALL BE DESIGNED FOR NATURAL GAS. PROVIDE SIX (6) STICKS <br />OR TUBES OF SEALANT UTILIZED AND TURN SUCH OVER TO THE OWNER. <br />PROVIDE ONE (1) VALVE WRENCH FOR EACH SIZE AND TYPE OF VALVE <br />HEAD AND TURN SUCH WRENCHES OVER TO THE OWNER. <br />5. PRESSURE REGULATING VALVE: VALVE SHALL HAVE INTERCHANGEABLE <br />ALUMINUM ORIFICE, MOLDED DEEP CONVOLUTION DIAPHRAGM WITH <br />O-RING SEAL, PLATED STEEL DIAPHRAGM PLATE, STAINLESS STEEL LEVER <br />PIN, ONE PIECE MOLDED BUNA-N VALVE SEAT, DIE CAST ZINC VALVE STEM, <br />DELRINFI VENT VALVE WITH BUNA-N SEAT, SPRING LOADED INTERNAL <br />RELIEF VALVE ASSEMBLY, 1" AND 3/4" THREADED VENT WITH STAINLESS <br />STEEL SCREEN, FIBERGLASS REINFORCED POLETHELYNE SEAL CAP WITH <br />INTEGRAL RELIEF VALVE STOP, AND FIELD INTERCHANGEABLE ADJUSTMENT <br />SPRING, CSA 6-18 APPROVED. PROVIDE THREE SPRINGS AT RATED OUTLET <br />PRESSURE PLUS SPRING FOR NEXT HIGHES AND LOWEST PRESSURE RATING <br />FOR BALANCING PURPOSES. PROVIDE ALL VENTING REQUIRED BY THE <br />MANUFACTURER FOR ALL INDOOR MOUNTED REGULATORS. LAYOUT BASIS <br />SHALL BE ACTARIS B42N. <br />6. CONTRACTOR SHALL PROVIDE REGULATORS AT ALL APPLIANCE <br />CONNECTIONS REGARDLESS OF SUPPLY PRESSURE UNLESS THE REQUIRED <br />EQUIPMENT DELIVERY PRESSURE CAN BE DELIVERED WITHOUT THE USE OF <br />A REGULATOR. <br />7. CONTRACTOR TO COORDINATE INLET/OUTLET PRESSURES WITH DRAWINGS <br />AND GAS EQUIPMENT MANUFACTURERS REQUIREMENTS. <br />8. INSTALL ALL REGULATORS CLEAR OF ANY EQUIPMENT ACCESS SUCH THAT <br />VALVE SPRINGS AND ORIFICE CAN BE ACCESSED WITHOUT REMOVING <br />VALVE. <br />MAKE CONNECTION TO OR <br />APPLIANCE FLEX HOSE QUICK <br />CONNECTION FITTING OR UNIT <br />GAS MANIFOLD INSIDE CABINET <br />WITH GROUND JOINT UNION. <br />PROVIDE GROMMET IN CABINET <br />FOR WATER -TIGHT SEAL FOR C <br />HVAC CONNECTIONS. <br />PRESSURE REGULATOR <br />WITH VENT LIMITER OR <br />VENT TO OUTDOORS. <br />PROVIDE AT EACH <br />APPLIANCE WHEN <br />SERVICE IS GREATER <br />THAN 7" W.C. cq-� <br />FULL SIZE FULL PORT GAS <br />COCK OR BALL VALVE <br />RIP/DIRT POCKET <br />NOTE: <br />CONTRACTOR SHALL VERIFY ALL GAS FIRED EQUIPMENT CONNECTION LOCATIONS IN <br />THE FIELD PRIOR TO INSTALLING ANY GAS PIPE MAINS OR BRANCHES. INSTALL THE GAS <br />TRAIN SUCH THAT ACCESS PANEL SWINGSHALL NOT BE IMPEDED. <br />GAS PIPING EQUIPMENT CONNECTION DETAIL, <br />NATURAL GAS FLOOR PLAN <br />vas„ _ 11_0„ <br />LAP SEALANT <br />S/S CLAMPING RING <br />PRE -MOLDED PIPE <br />FLASHING BOOT. — <br />ATTACH BOOT TO ROOF <br />PER ROOF MFR ---N <br />RECOMMENDATIONS. <br />TO INDOOR GAS <br />EQUIPMENT--, <br />PRESSURE REGULATOR <br />WITH INTERNAL VENT. <br />in <br />STEEL SLEEVE WELD TO <br />STRUCTURE AND FILL WITH <br />WATER PROOF MASTIC <br />GAS PIPING RUN TIGHT TO <br />BOTTOM OF STRUCTURE <br />GROUND JOINT UNION <br />GAS COCK WITH PLUGGED 1/8" <br />NPT TEST GAUGE CONNECTION <br />DRIP/DIRT POCKET <br />GAS PIPING DETAIL- ROOF INSTALLATION <br />GAS PIPING ON ROOF. SEE <br />P200 FOR ROUTING. <br />GAS PIPE ADJUSTMENT AT <br />ROOF OBSTRUCTIONS <br />TYPICAL <br />GAS PIPE SUPPORT. SEE <br />DETAIL 13/P400 (TYP) <br />• <br />U <br />z <br />H <br />Zw� <br />�A c) <br />C <br />�co <br />N o � co <br />CD <br />�UwwC/)a-) <br />Nz�Q� <br />L11::)I <br />rr=cam <br />F—UJzUco <br />oN� <br />� pc\l <br />_- <br />cn <br />h� <br />w <br />z <br />w <br />v <br />Q <br />0 <br />Ir <br />0 <br />J <br />CONTRACT DATE: <br />01.05.2016 <br />BUILDING TYPE: <br />N/A <br />PLAN VERSION: <br />DEC 2015 <br />SITE NUMBER: <br />N/A <br />STORE NUMBER: <br />N/A <br />SHELL BUILDOUT <br />5935 GALL BLVD <br />ZEPHYRHILLS, FL 33541 <br />REMODEL <br />PHASE 1 <br />DOMETIC WATER <br />AND <br />NATURAL GAS <br />FLOOR PLANS <br />P1.0 <br />PLOT DATE: <br />
The URL can be used to link to this page
Your browser does not support the video tag.