GENERAL NOTESi
<br />1. TENANT'S GENERAL CONTRACTOR (T.G,C.) TO PROVIDE AND INSTALL ITEMS NOT
<br />SPECIFICALLY NOTED OTHERWISE TO MAKE FOR COMPLETE SYSTEMS,
<br />RESPONSIBILITIES ARE LISTED FOR CLARIFICATION AND D❑ NOT RELIEVE
<br />T,G,C, OF THE RESPONSIBILITY TO COORDINATE THE WORK AND MATERIAL
<br />DELIVERY OF ALL SUBCONTRACTORS.
<br />2, T,G,C, SHALL BE RESPONSIBLE FOR COORDINATING DELIVERY OF ALL
<br />FRANCHISEE (TENANT) FURNISHED ITEMS WITH THE CICI'S SUPPORT OFFICE
<br />CONSTRUCTION DEPARTMENT, AND TO NOTIFY THE SAME IMMEDIATELY OF ANY
<br />DELAYS OF A WEEK OR MORE IN THE CONSTRUCTION SCHEDULE.
<br />3, T.G.C. SHALL RECEIVE, UNLOAD, AND STORE ALL TENANT FURNISHED ITEMS
<br />AND SHALL PROTECT THEM FROM DAMAGE AND PILFERAGE,
<br />4. CONTACT JMC RESTAURANT DISTRIBUTION (972) 745- 4200 FOR
<br />INSTRUCTIONS ON HANDLING DAMAGES INCURRED DURING SHIPMENT OF
<br />TENANT FURNISHED ITEMS,
<br />5. T,G,C. SHALL PAY ALL RESTOCK AND/OR DELIVERY CHARGES RESULTING
<br />FROM REFUSAL OR NON ACCEPTANCE OF PLANNED DELIVERY OF TENANT
<br />FURNISHED EQUIPMENT AND FIXTURES.
<br />6, T,G,C, SHALL INSTALL TENANT FURNISHED ACRYLIC INTERIOR SIGNS USING
<br />DOUBLE STICK FOAM TAPE AT LOCATIONS DIRECTED BY TENANT,
<br />7, T,G,C, SHALL INSTALL TENANT FURNISHED ART WORK & MENU BOARDS AT
<br />LOCATIONS DIRECTED BY TENANT.
<br />8, T,G,C, SHALL ASSEMBLE AND INSTALL TABLES, SHELVES, EQUIPMENT, ETC,
<br />9. T,G,C, SHALL PROVIDE AND INSTALL 8-3/4 IN, #10 SCREWS FOR EACH TABLE,
<br />10, T,G,C, SHALL PROVIDE NATIONAL #121-210 ROPE HOOKS FOR INSTALLATION
<br />OF PIZZA PAN WALL RACK (2 REQUIRED PER RACK),
<br />11. T,G,C, SHALL PROVIDE POSITIVE DRAINAGE TO ALL DRAINS,
<br />12. EXTERIOR TO INTERIOR TRANSITIONS SHALL BE VERIFIED & CORRECTED IF
<br />REQ'D FOR HANDICAPPED ACCESSIBILITY, SEE GENERAL ACCESSIBILITY
<br />NOTES ON SHEET A3,
<br />13. T.G.C. SHALL BE RESPONSIBLE FOR DEMOLITION AND REMOVAL OF EXISTING
<br />FIXTURES, ARCHITECTURAL FINISHES AND MECHANICAL/ELECTRICAL ITEMS
<br />NOT USED IN FINISHED CONSTRUCTION WORK,
<br />14, COORDINATE ANY DEMOLITION WITH FINISHED CONSTRUCTION WORK,
<br />15. T,G,C. SHALL LOCATE ALL MECHANICAL AND ELECTRICAL SERVICES AND
<br />DISTRIBUTION SYSTEMS WHETHER SHOWN OR NOT, AND SHALL PROTECT THEM
<br />FROM DAMAGE, T,G,C, SHALL BEAR ALL EXPENSE FOR REPAIR OR
<br />REPLACEMENT OF OTHER UTILITIES OR OTHER PROPERTY DAMAGE BY
<br />OPERATIONS IN CONJUNCTION WITH THE PERFORMANCE OF THE WORK.
<br />16, PROVIDE REQUIRED STRUCTURAL SUPPORT FOR NEW HVAC UNITS AND
<br />CONDENSERS ON ROOF. COORDINATE WITH LANDLORD'S ROOFER.
<br />17. T,G,C, SHALL INSTALL WALK-IN COOLER ON BARE SLAB. COOLER SCREED
<br />(TRACK) SHALL BE SET IN A CONTINUOUS BED OF BUTYL RUBBER CEMENT,
<br />COOLER WALLS SHALL THEN BE ERECTED ON SCREED PER MFR'S.
<br />INSTALLATION INSTRUCTIONS,
<br />18. 2 HEAVY DUTY ADHESIVE BACKED FELT STRIPS (AVAILABLE AT LOWES
<br />BUILDING CENTER) AT EACH TABLE ON PERIMETER OF DINING ROOM,
<br />19. ALL WALLS CONTAINING PLUMBING (WET WALLS) SHALL BE CLAD W/WATER
<br />RESISTANT GYP. BD.
<br />20. T,G,C. SHALL BE RESPONSIBLE TO COORDINATE WITH ALL TRADES AND
<br />VERIFY THAT ALL EQUIPMENT SHIPPED TO THE SITE IS COMPATIBLE WITH
<br />MECHANICAL, ELECTRICAL AND PLUMBING SYSTEMS PRIOR TO INSTALLATION
<br />OF SAID EQUIPMENT, IN THE EVENT OF ANY DISCREPANCIES, THE T.G.C.
<br />SHALL IMMEDIATELY CONTA
<br />CT T DESIGNER BEFORE PROCEEDING,
<br />21, T,G,C, SHALL INSTALL SILICONE SEALANT @ ALL MATERIAL TRANSITIONS,
<br />GAPS, OPENINGS & PENETRATIONS (INCLUDING WOOD TRIM TO LAMINATE
<br />CONDITIONS),
<br />22, T.G,C, SHALL CAULK JOINT BETWEEN CEILING GRID & FRP WALL PANELS IN
<br />ALL KITCHEN & RESTROOM AREAS,
<br />23, INSIDE OF ALL CABINETRY SHALL RECEIVE WHITE MELAMINE EXCEPT
<br />UNDERSIDE OF BUFFET & BEVERAGE STATION COUNTER TOP,
<br />24. T.G,C, SHALL LIGHTLY SAND ALL OUTSIDE CORNERS ON WOOD TRIM MAKING
<br />WOOD FREE OF SPLINTERS AND SHARP CORNERS
<br />1.0 GENERAL DEFINITIONS
<br />1.1 'PROVIDE' AND 'FURNISH' SHALL MEAN TO PURCHASE AND LOCATE AN
<br />ITEM ON THE JOBSITE.
<br />1,2 'INSTALL' SHALL MEAN TO PHYSICALLY INSTALL THE ITEM, AND TO
<br />CONNECT ALL REQUIRED SERVICES TO MAKE THAT ITEM FULLY
<br />FUNCTIONAL.
<br />1.3 'NEW STORE DEVELOPMENT' SHALL MEAN CICI ENTERPRISES, INC'S NEW
<br />STORE DEVELOPMENT DEPARTMENT,
<br />1.4 A.F.F. SHALL MEAN 'ABOVE FINISHED FLOOR'
<br />1.5 UNLESS SPECIFICALLY NOTED OTHERWISE, ALL ITEMS SHALL BE
<br />FURNISHED AND INSTALLED BY THE T,G.C.
<br />1.6 'T.G.C.' SHALL MEAN THE TENANT GENERAL CONTRACTOR
<br />1.7 THE TERM 'OWNER' OR 'FRANCHISEE' SHALL BE SYNONYMOUS,
<br />2.0 INSURANCE
<br />PER CONTRACTUAL AGREEMENT BETWEEN OWNER & GENERAL CONTRACTOR.
<br />3.0 PROGRESS PAYMENTS
<br />PER CONTRACTUAL AGREEMENT BETWEEN OWNER & GENERAL CONTRACTOR,
<br />4.0 SUBCONTRACTOR APPROVAL
<br />THE OWNER AND/OR NEW STORE DEVELOPMENT RETAINS THE RIGHT TO REJECT
<br />THE USE OF ANY SUBCONTRACTOR FOR ANY REASON. THE T.G.C. SHALL EMPLOY
<br />SUBCONTRACTORS WHO ARE LICENSED IN THE STATE WHERE THE JOB IS
<br />LOCATED, THE T.G.C. SHALL ASSUME FULL RESPONSIBILITY TO INSURE THE
<br />VALIDITY OF ANY LICENSING INFORMATION AND INSURANCE COVERAGE
<br />INFORMATION GIVEN BY HIS SUBCONTRACTORS PRIOR TO THE AWARD OF THE
<br />CONTRACT, THE T.G.C. SHALL SUBMIT TO THE OWNER AND NEW STORE
<br />DEVELOPMENT, PRIOR TO RECEIVING FINAL RETAINAGE, A LIST OF THE
<br />SUBCONTRACTORS WHO WERE EMPLOYED ON THE PROJECT, LIST SHALL
<br />INCLUDE COMPANY NAME, STATE LICENSE NUMBER, ADDRESS AND PHONE
<br />NUMBER, THE OWNER AND/OR NEW STORE DEVELOPMENT RETAINS THE RIGHT
<br />TO REJECT THE USE OF ANY SUBCONTRACTOR FOR ANY REASON, THE T,G.C.
<br />SHALL EMPLOY SUBCONTRACTORS WHO ARE LICENSED IN THE STATE WHERE
<br />THE JOB IS LOCATED, THE T,G.C. SHALL ASSUME FULL RESPONSIBILITY TO
<br />INSURE THE VALIDITY OF ANY LICENSING INFORMATION AND INSURANCE
<br />COVERAGE INFORMATION GIVEN BY HIS SUBCONTRACTORS PRIOR TO THE
<br />AWARD OF THE CONTRACT, THE T.G.C. SHALL SUBMIT TO THE OWNER,
<br />LANDLORD, AND THE NEW STORE DEVELOPMENT DEPARTMENT, PRIOR TO
<br />RECEIVING FINAL RETAINAGE, A LIST OF THE SUBCONTRACTORS WHO WERE
<br />EMPLOYED ON THIS PROJECT. LIST SHALL INCLUDE COMPANY, NAMES, STATE
<br />LICENSE NUMBER, ADDRESS AND PHONE NUMBER AND COPY OF
<br />SUBCONTRACTORS INSURANCE CERTIFICATE NAMING ALL AS AN ADDITIONAL INSURED,
<br />5.0 COORDINATION OF TRADES
<br />IT WILL BE THE T.G,C.'S RESPONSIBILITY TO COORDINATE THE ACTIVITIES OF ALL
<br />CICI'S PIZZA CONSTRUCTION TEAM MEMBERS, THE TEAM INCLUDES, BUT IS NOT
<br />LIMITED TO, ALL SUBCONTRACTORS, SPECIALTY CONTRACTORS, EQUIPMENT
<br />SUPPLIERS, SERVICE PROVIDERS, LOCAL CODE ENFORCEMENT OFFICIALS, AND
<br />JOB VALIDATION INSPECTORS. THE T.G.C. SHALL PUBLISH WITHIN FORTY-EIGHT
<br />(48) HOURS OF THE CONTRACT BEING SIGNED, A JOB CONTACT LIST AND
<br />CONSTRUCTION SCHEDULE FOR THE PROJECTi THE COPY OF THE CONTACT LIST
<br />AND CONSTRUCTION SCHEDULE SHALL BE FAXED TO ALL OF THE
<br />CONSTRUCTION TEAM MEMBERS,
<br />6,0 PROJECT COMPLETION AND VALIDATION
<br />THE PROJECT SHALL BE COMPLETED WHEN THE FOLLOWING VALIDATION
<br />PROCESSES, JOBSITE CONDITIONS, AND PAPERWORK ARE COMPLETED AND
<br />APPROVED BY THE NEW STORE DEVELOPMENT DEPARTMENT,
<br />6.1 DEFICIENCIESi ANY DEFICIENCIES NOTED BY THE INSPECTOR(S) SHALL
<br />BE CORRECTED BY THE RESPONSIBLE PARTY IN A TIMELY FASHION. THE
<br />T,G.C. HAS FULL RESPONSIBILITY FOR COORDINATING ALL CORRECTIVE
<br />ACTION REQUIRED ON THE PROJECT, WHEN CORRECTIVE ACTION IS
<br />COMPLETED, THE T.G.C, IS TO RECEIVE WRITTEN NOTIFICATION FROM
<br />EACH SUBCONTRACTOR THAT THEIR PORTION OF THE PUNCH LIST IS
<br />COMPLETE. THE T.G.C. SHALL COORDINATE AND PAY FOR ANY NEEDED
<br />OR REQUIRED RE -INSPECTION (S).
<br />6.2 PUNCH LISTi OWNER AND/OR OWNER REPRESENTATIVE (S) AGREES TO
<br />ISSUE ONE (1) CONSOLIDATED AND FINAL PUNCH LIST TO THE T,G.C.
<br />PUNCH LIST ITEMS MUST BE CORRECTED WITHIN TEN (10) DAYS OF THE
<br />DATE THE PUNCH LIST WAS WRITTEN, OWNER WILL WALK THROUGH THE
<br />STORE WITH THE T.G.C, AFTER THE PUNCH LIST HAS BEEN COMPLETED
<br />AND SIGN OFF ON EACH PUNCH LIST ITEM INDICATING THAT ALL HAVE
<br />BEEN CORRECTED, FINAL RETAINAGE WILL BE RELEASED ONCE THE
<br />OWNER HAS SIGNED OFF ON ALL PUNCH LIST ITEMS AGREEING THAT
<br />THEY HAVE BEEN COMPLETED.
<br />6.3 LOCAL CODE ENFORCEMENT INSPECTIONt THE T,G.C. SHALL PROVIDE A
<br />COPY OF ALL INSPECTION REPORTS COMPLETED BY LOCAL CODE
<br />ENFORCEMENT OFFICIALS UPON COMPLETION OF THE PROJECT. IF A
<br />DEFICIENCY IS NOTED BY AN OFFICIAL, A COPY SHALL BE FAXED TO THE
<br />NEW STORE DEVELOPMENT DEPARTMENT WITH THE RESPONSIBLE
<br />SUBCONTRACTOR AND EQUIPMENT SUPPLIERS DESIGNATED PROJECT
<br />CONTACT, A COPY OF THE CERTIFICATE OF OCCUPANCY WILL BE
<br />PROVIDED TO THE LANDLORD AND TENANT,
<br />6,4 AS -BUILT DRAWINGS, THE T.G,C, SHALL PROVIDE ONE (1) SET OF 'AS -
<br />BUILT DRAWINGS' OF MECHANICAL AND ELECTRICAL SYSTEMS TO THE
<br />OWNER UPON COMPLETION OF THE PROJECT.
<br />7.0 GUARANTEE
<br />THE T,G,C, SHALL PROVIDE A WRITTEN GUARANTEE, EXTENDING FOR ONE (1)
<br />YEAR BEYOND DATE OF CERTIFICATE OF OCCUPANCY, WARRANTING THE
<br />PROJECT AGAINST DEFECTS IN MATERIALS AND WORKMANSHIP. THE T.G.C. AS
<br />REQUIRED SHALL PROVIDE MATERIALS AND LABOR TO EFFECT REPAIR AND
<br />REPLACEMENTS. ALL GUARANTEES OR WARRANTIES SHALL INSURE TO THE
<br />BENEFIT OF THE OWNER,
<br />8.0 PERMITS & LICENSES
<br />THE T,G,C, SHALL CONTACT THE NEW STORE DEVELOPMENT TO OBTAIN THE
<br />PERMIT STATUS, THE T,G.C. IS THEN RESPONSIBLE FOR OBTAINING ALL
<br />NECESSARY DRAWINGS, SPECIFICATIONS, STAMPS AND SIGNATURES FOR
<br />OBTAINING ALL NECESSARY PERMITS AND LICENSES, COST OF ALL BUILDING
<br />PERMIT FEES SHALL BE SHOWN AS AN ALLOWANCE IN THE T.G.C.'S BID.
<br />9,0 UTILITIES
<br />9.1 THE T.G.C. SHALL PAY FOR ALL TEMPORARY SERVICE AND UTILITIES FOR
<br />THE PROJECT,
<br />9.2 THE T.G.C, SHALL LOCATE ALL MECHANICAL AND ELECTRICAL SERVICES
<br />AND DISTRIBUTION SYSTEMS, WHETHER SHOWN ON THE PLANS OR NOT,
<br />AND SHALL PROTECT THEM FROM DAMAGE. THE T,G.C, SHALL BEAR ALL
<br />EXPENSES FOR THE REPAIR OR REPLACEMENT OF OTHER UTILITIES OR
<br />OTHER PROPERTY DAMAGE BY OPERATIONS IN CONJUNCTION WITH THE
<br />PERFORMANCE OF THE WORK.
<br />10.0 EXISTING CONDITIONS
<br />THE T,G,C, ACCEPTS PREMISES AS FOUND, THE OWNER AND LANDLORD ASSUMES
<br />NO RESPONSIBILITY OR THE CONDITION OF THE BUILDING OR LIABILITY FOR
<br />LOCATION OF EXISTING UTILITIES, ROOF STRUCTURE, OR ELEVATION AT THE
<br />TIME OF BIDDING OR THEREAFTER, THE T.G.C. ACCEPTS PREMISE AS FOUND,
<br />11,0 PROJECT SAFETY
<br />THE T.G,C. IS RESPONSIBLE FOR THE SAFETY, ACTIONS, AND CONDUCT OF THEIR
<br />EMPLOYEES AND SUBCONTRACTOR'S EMPLOYEES WHILE IN THE PROJECT AREA,
<br />ADJACENT AREAS, IN THE BUILDING, AND ITS VICINITY,
<br />12,0 BUILDING AND ACCESSIBILITY CODES
<br />ALL WORK DESCRIBED BY THESE DOCUMENTS SHALL BE PERFORMED IN FULL
<br />ACCORDANCE WITH ALL APPLICABLE LOCAL, STATE, AND NATIONAL CODES,
<br />LAWS, AND ORDINANCES BEING ADOPTED BY THE BUILDING AUTHORITY
<br />HAVING JURISDICTION OVER THIS PROJECT. THE T,G.C. ASSUMES SOLE
<br />RESPONSIBILITY TO IDENTIFY ALL APPLICABLE CODES FOR EACH SUB -TRADE AS
<br />WELL AS LOCAL AND NATIONAL ACCESSIBILITY CODES AND PERFORMING ALL
<br />WORK ACCORDINGLY.
<br />13.0 PLAN DIMENSIONS
<br />DIMENSIONS SHALL GOVERN THESE DRAWINGS AND THEY ARE NOT TO BE
<br />SCALED, THE T.G.C. SHALL VERIFY ALL EXISTING DIMENSIONS. SHOULD THERE
<br />BE DISCREPANCIES, THE T.G.C. SHALL NOTIFY THE NEW STORE DEVELOPMENT
<br />AND SHALL BASE BIDDING/PRICING ON THE MOST EXPENSIVE COMBINATION OF
<br />QUALITY AND/OR QUANTITY OF THE WORK INDICATED,
<br />14.0 PLAN REVIEW
<br />THE T.G,C. SHALL REVIEW THE PLANS AND SPECIFICATIONS THOROUGHLY, MAKE
<br />A DETAILED SITE VISIT, AND SHALL IMMEDIATELY BRING ANY INCONSISTENCY,
<br />SITE LAYOUT PROBLEMS, OR ANY OTHER REQUEST FOR CLARIFICATION TO THE
<br />NEW STORE DEVELOPMENT FOR RESOLUTION PRIOR TO THE DELIVERY OF ANY
<br />BID. FAILURE TO D❑ S❑ SHALL CAUSE THE T,G.C, TO BE INELIGIBLE FOR
<br />REQUESTING EXTRAS RELATING TO SUCH MATTERS.
<br />15.0 ENGINEERED SHOP DRAWINGS
<br />THE T.G.C. SHALL ENSURE THAT APPLICABLE SUBCONTRACTORS SUBMIT
<br />ENGINEERED SHOP DRAWINGS TO THE NEW STORE DEVELOPMENT FOR
<br />APPROVAL OF ALL ASSEMBLIES, TO OBTAIN BUILDING PERMITS, IF REQUIRED,
<br />AND LICENSES, OR FOR SUBSTITUTIONS,
<br />16.0 CHANGE ORDERS
<br />THE T.G.C, MUST SUBMIT ALL CHANGE ORDERS IN WRITING TO THE NEW STORE
<br />DEVELOPMENT AND THE OWNER, THE OWNER MUST RECEIVE THE NEW STORE
<br />DEVELOPMENT DEPARTMENT'S PRELIMINARY APPROVAL BEFORE GIVING THE
<br />T.G,C, PERMISSION TO MOVE FORWARD WITH THE CHANGE ORDER, THE T.G.C,
<br />MUST HAVE THE OWNER'S SIGNATURE BEFORE PROCEEDING WITH THE WORK,
<br />SHOULD THE T.G.C. PROCEED WITH THE WORK PRIOR TO OBTAINING THE
<br />OWNER'S SIGNATURE ON THE CHANGE ORDER, THE T.G.C. WILL BE RESPONSIBLE
<br />FOR ALL COSTS ASSOCIATED WITH THE CHANGE ORDER.
<br />17,0 TENANT T.G,C. RESPONSIBILITIES
<br />THE T.G,C,'S RESPONSIBILITIES TO INSTALL AND FURNISH MATERIAL/EQUIPMENT
<br />ARE LISTED FOR CLARIFICATION AND DO NOT RELIEVE THE T,G,C. OF THE
<br />RESPONSIBILITY TO COORDINATE THE MATERIAL/EQUIPMENT DELIVERY OF ALL
<br />SUBCONTRACTORS, ALL MATERIAL/EQUIPMENT ASSOCIATED WITH THIS
<br />PROJECT SHALL BE INSTALLED IN FULL ACCORDANCE WITH THE SUPPLIER'S
<br />AND/OR MANUFACTURER'S WRITTEN RECOMMENDATION,
<br />18.0 PRODUCT SUBSTITUTIONS
<br />THE T.G.C, SHALL RECEIVE APPROVAL FROM NEW STORE DEVELOPMENT FOR
<br />ANY SUBSTITUTIONS TO ANY PRODUCT, TECHNIQUE, MATERIAL OR EQUIPMENT
<br />PRIOR TO THE IMPLEMENTATION OF THE SUBSTITUTION, PROPOSED
<br />SUBSTITUTION SHALL BE OF EQUAL QUALITY AND PERFORMANCE
<br />SPECIFICATION TO THAT ORIGINALLY SPECIFIED,
<br />19.0 LANDLORD REQUIREMENTS
<br />❑F BUILDING SYSTEMS T 19.1 ATTACHMENT UILDI 0 SLAB THE METHOD OF
<br />ATTACHMENT OF TENANT WORK TO THE BASE BUILDING STRUCTURE
<br />WILL BE IN ACCORDANCE WITH STANDARDS REQUIRED BY THE
<br />LANDLORD, THE T,G,C, WILL CONSULT THE LANDLORD IN THOSE
<br />MATTERS PRIOR TO ATTACHMENT OF SYSTEMS,
<br />19.2 PLACEMENT OF EQUIPMENT ON ROOFt THE T,G,C, SHALL RESTRICT THE
<br />LOCATION OF ALL MECHANICAL EQUIPMENT ON THE ROOF TO MEET
<br />LOCAL CODE AND LANDLORD REQUIREMENTS, ANY CHANGES RELATED
<br />TO THE MOVING OF EQUIPMENT BECAUSE OF CODE VIOLATIONS OR IF
<br />PLACEMENT DOES NOT MEET MANUFACTURER'S REQUIREMENTS SHALL
<br />BE THE RESPONSIBILITY OF THE T,G,C,
<br />19.3 ROOFING WORK, IT IS THE RESPONSIBILITY OF THE T.G,C. TO DETERMINE
<br />IF THE ROOF IS A BONDED ROOF. IF THE ROOF IS BONDED, THE T,G,C,
<br />SHALL BE RESPONSIBLE FOR COORDINATING ALL ROOFING WORK WITH
<br />LANDLORD'S DESIGNATED ROOFING CONTRACTOR. ANY ROOFING COSTS
<br />ASSOCIATED WITH THE PROJECT SHALL BE INCLUDED IN THE T.G.C,'S BID,
<br />THE ROOFING CONTRACTOR SHALL WARRANT ALL WORK PER THEIR
<br />STANDARD TERMS AND CONDITIONS TO THE LANDLORD. THE ROOFING
<br />CONTRACTOR SHALL WARRANT ALL ROOF WORK TO THE OWNER FOR A
<br />PERIOD OF ONE (1) YEAR FROM THE CERTIFICATE OF OCCUPANCY DATE.
<br />ANY WARRANTY PROBLEMS ASSOCIATED WITH THE ROOF SHALL BE
<br />COORDINATED THROUGH THE T.G,C.
<br />20.0 WEATHER PROTECTION
<br />THE CONSTRUCTION SITE SHALL BE MAINTAINED IN A WEATHERPROOF
<br />CONDITION AT ALL TIMES, ANY WEATHER DAMAGE TO THE PROJECT WORK,
<br />BUILDING, CONSTRUCTION MATERIALS OR EQUIPMENT FROM WEATHER DURING
<br />THE CONSTRUCTION PROCESS SHALL BE THE SOLE RESPONSIBILITY OF THE T,G.C,
<br />21.0 COORDINATION OF MATERIAL/EQUIPMENT DELIVERY
<br />NEW STORE DEVELOPMENT WILL SUPPLY THE T,G,C. WITH AN OWNER SUPPLIED
<br />EQUIPMENT DELIVERY SCHEDULE ONCE THE CONSTRUCTION CONTRACT HAS
<br />BEEN EXECUTED. THE T.G.C. SHALL SUBMIT FINAL DELIVERY DATES TO NEW
<br />STORE DEVELOPMENT WITHIN THREE (3) DAYS OF RECEIVING THE PR
<br />ELIMINARY
<br />DELIVERY SCHEDULE, THE T.G.C. SHALL BE RESP❑NSIBLE FOR NOTIFYING NEW
<br />STORE DEVELOPMENT IMMEDIATELY OF ANY DELAYS OF A WEEK OR MORE IN
<br />THE CONSTRUCTION SCHEDULE SO THAT THE DELIVERY SCHEDULE CAN BE
<br />ADJUSTED ACCORDINGLY, THE T.G.C, IS RESPONSIBLE FOR ALL ADDITIONAL
<br />COSTS ASSOCIATED WITH STORAGE AND DELIVERY IF THIS PROCEDURE IS NOT
<br />FOLLOWED.
<br />22,0 RECEIPT OF MATERIAL/EQUIPMENT
<br />ALTHOUGH JMC RESTAURANT DISTRIBUTION WILL DO EVERYTHING POSSIBLE To
<br />HAVE MATERIAL/EQUIPMENT FOR THE PROJECT SHIPPED TO THE J❑BSITE ON
<br />TIME PER THE FINAL PUBLISHED CONSTRUCTION SCHEDULE, IT IS THE T,G,C.
<br />RESPONSIBILITY TO RECEIVE AND SIGN FOR A MATERIAL/EQUIPMENT T LLF❑R HE
<br />PROJECT AND PROJECT TEAM MEMBERS. UNDER NO CIRCUMSTANCES SHALL
<br />ANY SHIPMENT BE REFUSED FOR ANY REASON OTHER THAN DAMAGE, WHICH
<br />OCCURRED TO THE MATERIAL/EQUIPMENT DURING SHIPPING (PLEASE REFER
<br />SECTION 25.0, THE T,G,C. SHALL BE HELD ACCOUNTABLE TO CONFIRM THE ITEMS
<br />ON THE BILL OF LADING WHERE PRESENT IN THE SHIPMENT. ANY
<br />DISCREPANCIES SHALL BE NOTED AT THE TIME OF RECEIPT. ANY HEAVY
<br />EQUIPMENT RENTAL (I.E, FORKLIFTS, CRANES, ETC,) REQUIRED TO OFF-LOAD AN
<br />INCOMING TRUCK AND PLACE EQUIPMENT IN THE SECURED STORAGE AREA
<br />SHALL BE THE RESPONSIBILITY OF THE T.G.C. THE T.G.C. SHALL PAY FOR ANY
<br />CHARGES INCURRED BECAUSE SHIPMENTS ARE REFUSED.
<br />23.0 EQUIPMENT STORAGE
<br />THE T.G.C. SHALL PROVIDE A STORAGE AREA THAT IS SECURED FROM THEFT,
<br />VANDALISM AND WEATHER DURING THE CONSTRUCTION PROCESS FOR ALL
<br />SUPPLIES AND EQUIPMENT. AT THE T.G.C.'S DISCRETION, THE T,G.C, MAY ELECT
<br />TO HAVE THE EQUIPMENT STORED AT THE TRUCKER'S FREIGHT TERMINAL OR
<br />OFF SITE AT THE T.G.C.'S OWN FACILITY, ANY CHARGES INCURRED RELATED TO
<br />THE STORAGE AND REDELIVERY OF THE EQUIPMENT SHALL BE THE SOLE
<br />RESPONSIBILITY OF THE T.G.C, UNDER NO CIRCUMSTANCES SHALL THE T,G,C,
<br />SURROGATE RESPONSIBILITY TO ANY SUBCONTRACTOR AND/OR TEAM MEMBER.
<br />24.0 DAMAGED MATERIALS/EQUIPMENT
<br />24.1 DAMAGED UPON DELIVERYi UPON DELIVERY OF MATERIALS/EQUIPMENT,
<br />IT IS THE RESPONSIBILITY OF THE T.G.C, TO THOROUGHLY INSPECT ALL
<br />MATERIALS/EQUIPMENT PRIOR TO ACCEPTING DELIVERY. SHOULD THE
<br />T.G.C, FIND ANY DAMAGE TO THE MATERIALS/EQUIPMENT CAUSED
<br />DURING SHIPMENT, THE T,G,C, SHALL REFUSE DELIVERY AND CONTACT
<br />JMC RESTAURANT DISTRIBUTION'S CUSTOMER SERVICE DEPARTMENT
<br />(972-389-2420) IMMEDIATELY, UNDER NO CIRCUMSTANCES SHALL THE
<br />T.G,C. SURROGATE THIS RESPONSIBILITY TO ANY SUBCONTRACTOR
<br />AND/OR TEAM MEMBER, (SEE ATTACHED APPENDIX 'A')
<br />24.2 DAMAGE DURING THE CONSTRUCTION PROCESSi SHOULD ANY
<br />MATERIALS/EQUIPMENT BECOME DAMAGED DURING THE CONSTRUCTION
<br />PROCESS, THE T.G,C, SHALL CONTACT JMC RESTAURANT DISTRIBUTION
<br />IMMEDIATELY TO RECEIVE DIRECTION AS TO THE CORRECT REPAIR
<br />PROCESS. THE T.G,C, IS NOT TO PROCEED WITH REPAIRS TO
<br />MATERIALS/EQUIPMENT DAMAGED DURING THE CONSTRUCTION
<br />PROCESS WITH❑UT FIRST SPEAKING WITH A JMC RESTAURANT
<br />DISTRIBUTION CUSTOMER SERVICE REPRESENTATIVE, FREIGHT DAMAGE
<br />FOUND TWO OR MORE DAYS AFTER DELIVERY WILL BE DEEMED DAMAGE
<br />DURING CONSTRUCTION, THE T.G.C. WILL BE RESPONSIBLE FOR ALL
<br />REPAIR COSTS FOR ITEMS DAMAGED DURING CONSTRUCTION, UNDER NO
<br />CIRCUMSTANCES SHALL THE T,G.C. SURROGATE THIS RESPONSIBILITY To
<br />ANY SUBCONTRACTOR AND/OR TEAM MEMBER,
<br />24.3 DAMAGED HVAC EQUIPMENTi UPON DELIVERY OF
<br />MATERIALS/EQUIPMENT, IT IS THE RESPONSIBILITY OF THE T.G.C, TO
<br />THOROUGHLY INSPECT ALL MATERIALS/EQUIPMENT PRIOR TO
<br />ACCEPTING DELIVERY. SHOULD THE T,G.C, FIND ANY DAMAGE TO THE
<br />MATERIALS/EQUIPMENT CAUSED DURING SHIPPING, THE T,G.C. SHALL
<br />NOTE ALL DAMAGE ON THE BILL OF LADING, ACCEPT DELIVERY AND
<br />CONTACT THE CICI'S PIZZA LENNOX REPRESENTATIVE IMMEDIATELY,
<br />THE T.G.C. SHALL ALSO FAX A COPY OF THE DETAILED BILL OF LADING TO
<br />THE CICI'S PIZZA TRANE REPRESENTATIVE. UNDER NO CIRCUMSTANCES
<br />SHALL THE T.G.C. SURROGATE THIS RESPONSIBILITY TO ANY
<br />SUBCONTRACTOR AND/OR TEAM MEMBER,
<br />25.0 EARLY DELIVERY OF EQUIPMENT
<br />EQUIPMENT WILL BE ORDERED TO DELIVER ON SCHEDULED DATES (PLUS OR
<br />MINUS ABOUT FOUR (4) DAYS, THE T.G.C, SHOULD CALL A JMC RESTAURANT
<br />DISTRIBUTION'S CUSTOMER SERVICE REPRESENTATIVE FOR DISPOSITION ON ANY
<br />ITEM ATTEMPTING TO BE DELIVERED PRIOR TO THIS TIME THAT THEY DEEM A
<br />PROBLEM.
<br />TABLE OF CONTENTS
<br />GENERAL CONDITIONS
<br />01010 FORMAT AND CONTENT
<br />01014 CONTRACTOR'S USE OF SITE AND PREMISE
<br />01015 OWNER FURNISHED ITEMS
<br />01017 WORK BY OTHERS
<br />01500 TEMPORARY FACILITIES
<br />01600 MATERIALS AND WORKMANSHIP
<br />01630 SUBSTITUTIONS
<br />01710 FINAL CLEANING
<br />10730 OPERATION AND MAINTENANCE DATA
<br />10740 WARRANTY
<br />10760 CONTRACT CLOSEOUT
<br />DIVISION 2 SITE WORK (NOT USED)
<br />DIVISION 3 - CONCRETE (NOT USED)
<br />DIVISION 4 - MASONRY (NOT USED)
<br />DIVISION 5 - METALS
<br />05400 STEEL STUD FRAMING
<br />DIVISION 6 - CARPENTRY
<br />06200 FINISH CARPENTRY
<br />DIVISION 7 - MOISTURE PROTECTION
<br />07200 BUILDING INSULATION
<br />07900 CAULKING AND SEALANTS
<br />08100
<br />STEEL DOORS AND FRAMES
<br />08250
<br />FLUSH WOOD DOORS
<br />08400
<br />ALUMINUM FRAMING
<br />08700
<br />FINISH HARDWARE
<br />DIVISION 9
<br />- FINISHES
<br />GYPSUM WALLBOARD
<br />09250
<br />09300
<br />TILE
<br />09500
<br />LAY -IN CEILINGS
<br />09900
<br />PAINTING
<br />DIVISION 10
<br />- SPECIALTIES
<br />EXTERIOR SIGNAGE
<br />10430
<br />10440
<br />INTERIOR SIGNAGE
<br />10520
<br />FIRE EXTINGUISHERS
<br />10800
<br />TOILET ACCESSORIES
<br />DIVISION it
<br />- EQUIPMENT
<br />FOOD SERVICE EQUIPMENT
<br />11400
<br />15000 HEATING, VENTILATING AND AIR CONDITIONING
<br />15001 PLUMBING
<br />LION 16 - ELECTRICAL
<br />GENERAL CONDITIONS
<br />BASIC DEFINITIONS,
<br />THE CONTRACT DOCUMENTS ARE ALL THE DOCUMENTS REQUIRED FOR THE
<br />GENERAL CONTRACTOR TO SUCCESSFULLY COMPLETE THE WORK, AND
<br />INCLUDE NOT ONLY THE ARCHITECT'S DRAWINGS AND THE ARCHITECTS
<br />SPECIFICATIONS BUT ALSO DRAWINGS, SPECIFICATIONS AND OTHER
<br />DOCUMENTS NOT LISTED HERE, WHICH HAVE BEEN OR WILL BE PREPARED
<br />BY CONSULTANTS, MANUFACTURERS, SUPPLIERS, VENDORS AND OTHERS
<br />FOR THE OWNER,
<br />DRAWINGS AND SPECIFICATIONS
<br />UNLESS SPECIFICALLY NOTED OTHERWISE ANY REFERENCE TO THE DRAWINGS
<br />OR SPECIFICATIONS SHALL MEAN THE DRAWINGS AND SPECIFICATIONS
<br />PREAPRED BY THE ARCHITECT.
<br />CONFLICTS, DISCREPANCIES OR INCONSISTENCIESi
<br />IN THE EVENT OF CONFLICTS DISCREPANCIES OR INCONSISTENCIES AMONG
<br />E ES
<br />CONTRACT DOCUMENTS, INTERPRETATIONS WILL BE MADE BY THE ARCHITECT
<br />BASED ON THE FOLLOWING, IN ORDER OF PRIORITY, WITH ITEM 1 BEING ❑FFIRST,
<br />OR HIGHEST PRIORITYt
<br />1. AGREEMENT BETWEEN THE OWNER AND GENERAL CONTRACTOR.
<br />2. ADDENDA TO THE DRAWINGS AND SPECIFICATIONS, WITH THOSE
<br />LATER DATE HAVING PRECEDENCE OVER THOSE OF EARLIER DATE
<br />3. DRAWINGS AND SPECIFICATIONS, IN THE EVENT OF CONFLICTS,
<br />A. WHERE NOT CLARIFIED BY THE AGREEMENT OR ADDENDA TO
<br />THE DRAWINGS AND SPECIFICATIONS, THE BETTER QUALITY OR
<br />GREATER QUANTITY OF WORK SHALL BE PROVIDED AS REQUIRED
<br />BY EITHER THE DRAWINGS OR SPECIFICATIONS IN ACCORDANCE
<br />WITH THE ARCHITECT'S INTERPRETATION.
<br />B. AS BETWEEN DIMENSIONS SHOWN ON THE DRAWINGS AND
<br />SCALED MEASUREMENTS, THE DIMENSIONS SHALL GOVERN,
<br />C. AS BETWEEN LARGE-SCALE DRAWINGS AND SMALL -SCALED
<br />DRAWINGS, THE LARGER SCALE SHALL GOVERN,
<br />D. MATERIALS AND EQUIPMENT SHALL BE INSTALLED IN STRICT
<br />COMPLIANCE WITH THE MOST CURRENT PRINTED OR PUBLISHED
<br />SPECIFICATIONS AND INSTRUCTIONS OF THE MANUFACTURER OR
<br />SUPPLIER OF THE MATERIAL OR EQUIPMENT, EXCEPT WHERE
<br />SUCH DOCUMENTS CONFLICT WITH THE ARCHITECT'S
<br />SPECIFICATIONS) IN SUCH CASES THE BETTER QUALITY OR
<br />GREATER QUANTITY OF WORK SHALL BE PROVIDED IN
<br />ACCORDANCE WITH THE ARCHITECT'S INTERPRETATION AS
<br />REQUIRED BY EITHER (1) THE MANUFACTURER'S OR SUPPLIER'S
<br />REQUIREMENTS OR (2) THE ARCHITECT'S SPECIFICATIONS,
<br />PRODUCT DESIGNATIONS
<br />WHEN REFERENCE IS MADE TO TRADE NAMES OR TO THE NAMES OF
<br />MANUFACTURERS, SUCH REFERENCES ARE MADE SOLELY TO DESIGNATE OR IDENTIFY
<br />THE QUALITY OF MATERIAL OR EQUIPMENT TO BE FURNISHED AND ARE INTENDED TO
<br />RESTRICT THE USE OF EQUAL MATERIAL OR EQUIPMENT EXCEPT WHERE
<br />SPECIFICALLY STATED OTHERWISE, IF THE CONTRACTOR WISHED TO USE
<br />MATERIALS AND EQUIPMENT OTHER THEN THOSE MENTIONED IN THE SPECIFICATIONS,
<br />THE CONTRACTOR SHALL SUBMIT IN WRITING AND INCLUDING ADEQUATE
<br />INFORMATION REGARDING THE SUBSTITUTION, TO REVIEW OF CONTRACT DOCUMENTS
<br />AND FIELD CONDITIONS BY CONTRACTORBEFORE ORDERING ANY MATERIALS OR ANY
<br />WORK, THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND MEASUREMENTS AND
<br />SHALL BE RESPONSIBLE FOR CORRECTNESS OF SAME. NO EXTRA CHARGE OR
<br />COMPENSATION WILL BE ALLOWED BECAUSE OF DIFFERENCES BETWEEN ACTUAL
<br />DIMENSIONS AND MEASUREMENTS AND THOSE INDICATED ON THE DRAWINGS AND
<br />DIFFERENCES WHICH MAY BE FOUND SHALL BE SUBMITTED TO THE ARCHITECT
<br />FOR CONSIDERATION BEFORE PROCEEDING WITH THE WORK, THIS APPLIES TO ALL
<br />ASPECTS OF THE WORK INCLUDING, BUT NOT LIMITED TO, EQUIPMENT OR
<br />MATERIALS FURNISHED BY OWNER OR CONTRACTOR.
<br />PERMIT FEES AND NOTICES
<br />UNLESS OTHERWISE PROVIDED IN THE CONTRACT DOCUMENTS, THE CONTRACTOR
<br />SHALL SECURE AND PAY FOR THE REMOVAL, RELOCATION AND INSTALLATION OF
<br />ELECTRICAL UTILITY POLES AND LINES AND FOR WATER, NATURAL GAS AND SEWER
<br />SUBCONTRACTOR RELATIONSTHE CONTRACTOR SHALL INCLUDE IN HIS SUBCONTRACTS
<br />THE FOLLOWING CLAUSE, BY EXECUTING THE CONTRACT BETWEEN THE GENERAL
<br />CONTRACTOR AND THE SUBCONTRACTOR EACH SUBCONTRACTOR REPRESENTS THAT HE
<br />HAS MORE CURRENT AND INTIMATE KNOWLEDGE OF PREVAILING CODES IN HIS
<br />SPECIAL FIELD THAN D❑ GENERALIST. THE SUBCONTRACTOR AGREES TO REPORT TO
<br />THE GENERAL CONTRACTOR AS EARLY IN THE PROJECT AS POSSIBLE (PRIOR TO
<br />SIGNING THE CONTRACTOR/SUBCONTRACTOR CONTRACT IF KNOWN AT THE TIME BUT
<br />IN ANY EVENT AS SOON AS KNOWN) ANY WORK REQUIRED BY THE DRAWINGS AND
<br />SPECIFICATIONS, OR ANY OF THE OTHER CONTRACT DOCUMENTS WHICH VIOLATES
<br />ANY CODE AFFECTING OR CONTROLLING THE SUBCONTRACTOR'S SPECIALTY, THE
<br />CONTRACTOR SHALL IN TURN IMMEDIATELY CONVEY THIS INFORMATION ❑T THE
<br />ARCHITECT,
<br />DIVISION 1 - GENERAL REQUIREMENTS
<br />SECTION 01010
<br />FORMAT AND CONTENT
<br />THE SPECIFICATIONS HAVE BEEN PREPARED FOR MULTIPLE PROJECTS AND
<br />SECTION 01010 MAY CONTAIN REFERENCES TO ITEMS NOT INCLUDED IN THIS SPECIFIC
<br />PROJECT. VERIFY ITEMS USED IN THIS SPECIFIC PROJECT BY REFERRING
<br />TO THE DRAWINGS. THE SPECIFICATIONS MAY MAKE REFERENCE TO THESE
<br />ITEMS BY STATING • IF REQUIRED PER DRAWINGS• • IF ANY' OR SIMILAR
<br />LANGUAGE, THE DRAWINGS ARE SCHEMATIC IN NATURE AND THE
<br />CONTRACTOR SHALL NOT RELY ON SCALING DRAWINGS TO DETERMINE
<br />CRITICAL DISTANCES.
<br />WHERE CONTRACT DOCUMENTS (DRAWINGS AND SPECIFICATIONS) ARE
<br />INCOMPLETE, AMBIGUOUS OR CONTAIN CONFLICTING INSTRUCTIONS, DO NOT
<br />PROCEED UNTIL RECEIVING CLARIFICATION FROM THE ARCHITECT IN WRITING.
<br />CONTRACTOR'S USE OF SITE AND PREMISE,
<br />SECTION 01014
<br />CONTRACTOR'S USE OF SITE AND PREMISE
<br />LIMITED USE OF THE SITE,
<br />VERIFY WITH THE OWNER OR LANDLORD FOR
<br />ESTABLISHED USE LIMITS AND RESTRICTIONS OF THE SITE,
<br />D❑ NOT COMMENCE WORK WHICH SPECIFICALLY AFFECTS THE OPERATION OF
<br />ANY OTHER TENANT WITHOUT FIRST COORDINATING AND MAKING SATISFACTORY
<br />ARRANGEMENTS FOR SUCH WORK THROUGH THE OWNER OR LANDLORD,
<br />OWNER -FURNISHED ITEMS
<br />SECTION 01015
<br />OWNER FURNISHED ITEMS
<br />CERTAIN CONSTRUCTION AND EQUIPMENT ITEMS INDICATED IN THE DRAWINGS
<br />AND SPECIFICATIONS MAY BE FURNISHED BY THE OWNER. SUCH ITEMS ARE
<br />DESIGNATED ON THE DRAWINGS IN THE 'EQUIPMENT SCHEDULE' OR ELSEWHERE
<br />AS SUPPLIED BY OWNER OR VENDOR,
<br />UNLESS SPECIFICALLY OTHERWISE INDICATED, OWNER WILL DELIVER SUCH
<br />ITEMS TO THE CONTRACTOR WHO SHALL BE RESPONSIBLE FOR RECEIVING,
<br />UNLOADING, INVENTORYING, WAREHOUSING, PROTECTING, INSURING,
<br />ASSEMBLING AND INSTALLING THEM IN THE SAME MANNER AS IF PURCHASED
<br />DIRECTLY BY THE CONTRACTOR,
<br />WORK BY OTHERS
<br />SECTION 01017
<br />WORK BY OTHERS
<br />CERTAIN ITEMS INDICATED IN THE DRAWINGS AND SPECIFICATIONS MAY BE
<br />FURNISHED AND INSTALLED BY ENTITIES OTHER THAN THE CONTRACTOR AND
<br />SECTION 01500
<br />ARE EXCLUDED FORM THE CONTRACT TO BUILD. SUCH ITEMS (IF ANY) ARE
<br />INDICATE IN 'EQUIPMENT SCHEDULE' OR ELSEWHERE ON THE DRAWINGS.
<br />CONTRACTOR SHALL INDICATE SEPARATE INSTALLATION COST FOR ITEMS
<br />DESIGNATED IN 'EQUIPMENT SCHEDULE ' TO BE FURNISHED BY OWNER OR
<br />'OTHERS',
<br />SECTION 01500
<br />TEMPORARY FACILITIES
<br />THE CONTRACTOR IS RESPONSIBLE FOR ARRANGING AND PAYING FOR ALL UTILITIES
<br />INCLUDING PHONE AND SANITATION SERVICE NECESSARY TO CONSTRUCT THE PROJECT.
<br />THE CONTRACTOR IS RESP❑NSIBLE FOR THE PROTECTION AND SECURITY OF ALL
<br />CONSTRUCTION AND ALL BUILDING MATERIALS AND EQUIPMENT AND SHALL FURNISH
<br />AT HIS EXPENSE ON -SITE STORAGE EQUIVALENT TO AN 8 FOOT BY 8 FOOT BY 40
<br />FOOT, LOCKABLE, WEATHER TIGHT TRAILER THROUGHOUT THE CONSTRUCTION UNLESS
<br />MATERIALS AND WORKMANSHIP
<br />OTHERWISE INDICATED.
<br />SECTION 01600
<br />MATERIALS AND WORKMANSHIP
<br />ENTITIES PERFORMING WORK SHALL BE SKILLED AND KNOWLEDGEABLE IN METHODS
<br />AND CRAFTSMANSHIP NEEDED TO PRODUCE REQUIRED QUALITY LEVELS. REMOVE AND
<br />REPLACE WORK, WHICH DOES NOT COMPLY, WITH WORKMANSHIP STANDARDS
<br />SPECIFIED AND AS RECOGNIZED IN THE CONSTRUCTION INDUSTRY FOR APPLICATIONS
<br />INTENDED,
<br />INSTALLER OF EACH MAJOR UNIT OF WORK SHALL INSPECT SUBSTRATA TO RECEIVE
<br />WORK AND CONDITIONS UNDER WHICH WORK IS TO BE PERFORMED, DO NOT PROCEED
<br />WITH WORK UNTIL UNSATISFACTORY CONDITIONS HAVE BEEN CORRECTED.
<br />HANDLE, STORE, INSTALL, MAINTAIN AND OTHERWISE USE PRODUCTS IN COMPLIANCE
<br />WITH MANUFACTURER'S APPLICABLE
<br />I ABLE INSTRUCTIONS AND RECOMMENDATIONS AND IN
<br />A MANNER TO ENSURE BEST POSSIBLE RESULTS,
<br />PROVIDE ATTACHMENT AND CONNECTION DEVICES AND METHODS FOR SECURING
<br />WORK PROPERLY, TRUE TO LINE AND LEVEL AND WITHIN RECOGNIZED INDUSTRY
<br />TOLERANCES IF NOT OTHERWISE INDICATED. ALLOW FOR EXPANSION, CONTRACTION
<br />AND OTHER NORMAL BUILDING MOVEMENTS,
<br />PROTECT AND MAINTAIN WORK TO ENSURE FREEDOM FROM DAMAGE OR
<br />DETERIORATION AT TIME OF COMPLETION. PERMANENTLY ISOLATE EACH UNIT OF
<br />WORK FROM NON -COMPATIBLE WORK TO PREVENT DETERIORATION,
<br />FIELD CHECK AND VERIFY AS -BUILT DIMENSIONS TO ASSURE PROPER FIT OF
<br />PREFABRICATED MATERIALS AND EQUIPMENT,
<br />INSTALL WORK DURING OPTIMUM WEATHER CONDITIONS OF TEMPERATURE, HUMIDITY,
<br />FORECASTED WEATHER, ETC„ TO ENSURE BEST POSSIBLE RESULTS,
<br />EXCEPT FOR REQUIRED LABELS AND OPERATING DATA, D❑ NOT PERMANENTLY ATTACH
<br />OR IMPRINT MANUFACTURER'S NAMEPLATES OR TRADEMARKS ON EXPOSED SURFACES
<br />OR PRODUCTS WHICH WILL BE EXPOSED TO VIEW IN OCCUPIED SPACES OR ON THE
<br />EXTERIOR.
<br />ADJUST ALL MOVING PARTS AND VARIABLES TO OPTIMUM SETTINGS,
<br />SUBSTITUTIONS
<br />SECTION 01630
<br />SUBSTITUTIONS
<br />NO SUBSTITUTIONS FOR PRODUCTS WILL BE ALLOWED UNLESS SPECIFICALLY
<br />INDICATED BY THE ARCHITECT, SUBSTITUTION FOR PRODUCTS AND EQUIPMENT MAY
<br />BE CONSIDERED WHEN A PRODUCT BECOMES UNAVAILABLE THROUGH NO FAULT OF
<br />THE CONTRACTOR OR AS FOLLOWSt
<br />1, AN 'OR OWNER APPROVED SUBSTITUTION' CLAUSE OR SIMILAR LANGUAGE
<br />IN THE CONTRACT DOCUMENTS,
<br />2. WHEN THE PRODUCT CANNOT BE PROVIDED IN TIME TO KEEP THE PROJECT
<br />ON SCHEDULE, THROUGH NO FAULT OF THE CONTRACTOR.
<br />3. WHEN THE PRODUCT DOES NOT MEET THE APPROVAL OF THE GOVERNING
<br />AUTHORITIES.
<br />4, WHEN THE OWNER IS OFFERED SUBSTANTIAL ADVANTAGE IN TERMS OF
<br />COST, TIME OR QUALITY,
<br />WHENEVER A PRODUCT IS SPECIFIED BY USING A PROPRIETARY NAME OR
<br />THE NAME OF A PARTICULAR MANUFACTURER OR VENDOR, THE SPECIFIC
<br />ITEM MENTIONED SHALL BE UNDERSTOOD AS ESTABLISHING TYPE, FUNCTION,
<br />DIMENSION, APPEARANCE AND QUALITY DESIRED. REQUESTS FOR SUBSTITUTING
<br />OTHER MANUFACTURER'S PRODUCTS MAY BE ACCEPTED PROVIDED SUFFICIENT
<br />INFORMATION IS SUBMITTED TO ALLOW THE OWNER TO DETERMINE SUITABILITY
<br />OF THE PROPOSED SUBSTITUTION(S) AND AS FOLL❑WSJ
<br />1, PRODUCT APPROVAL, IF A QUALIFIED BIDDER PROPOSES TO FURNISH
<br />MATERIALS, PRODUCTS OR EQUIPMENT NOT SPECIFIED, BIDDER MUST
<br />RECEIVE PRIOR WRITTEN APPROVAL THRU AN ADDENDUM ISSUED BY THE
<br />OWNER OR ARCHITECT AND SHALL SUBMIT MANUFACTURER'S NAME AND
<br />CATALOG INFORMATION NO LATER THAN SEVEN (7) WORKING DAYS PRIOR
<br />TO THE BIDDING OF THE PROJECT, UNLESS SPECIFICALLY OTHERWISE
<br />INDICATED BY THE CONSTRUCTION MANAGER, THE OWNER (UPON
<br />EXAMINATION OF DATA, SAMPLES, ETC,) WILL INSTRUCT THE ARCHITECT TO
<br />ISSUE AN ADDENDUM TO THE DRAWINGS AND SPECIFICATION. IF NO
<br />ADDENDUM IS ISSUED, IT IS UNDERSTOOD THAT THE BIDDER SHALL SUPPLY
<br />MATERIALS, PRODUCTS AND EQUIPMENT EXACTLY AS SPECIFIED,
<br />c
<br />E
<br />c ,
<br />rn
<br />y
<br />8
<br />,
<br />N
<br />v N
<br />0
<br />04
<br />o
<br />�
<br />U
<br />'
<br />JLL
<br />o
<br />a
<br />o
<br />14
<br />00
<br />CD
<br />C
<br />N
<br />Q
<br />0
<br />o
<br />a
<br />0
<br />JM
<br />M
<br />J
<br />0
<br />La
<br />U�a
<br />M
<br />o0
<br />00
<br />o
<br />0
<br />z
<br />o
<br />> $
<br />N
<br />J
<br />oC
<br />Q
<br />Qi
<br />v
<br />vi
<br />c
<br />_1
<br />n
<br />1
<br />J
<br />LL
<br />o�
<br />U
<br />O
<br />0
<br />0
<br />0
<br />N
<br />J Nt
<br />Q Mw
<br />0 UJ J J
<br />z N Q=LL
<br />O E m J
<br />a �J=
<br />w U �Q�
<br />V' _
<br />Q V
<br />LJJ oo L li
<br />N(0N
<br />Revisions:
<br />CD
<br />Z
<br />060
<br />U)Q
<br />FU
<br />o U_
<br />ZU
<br />a.
<br />CD
<br />Project Number
<br />07059
<br />Date
<br />02-28-08
<br />Sheet Number
<br />G1.2
<br />
|