SECTION 01710
<br />FINAL CLEANING
<br />EXECUTE FINAL CLEANING PRIOR TO FINAL INSPECTION. THOROUGHLY CLEAN THE
<br />PROJECT INCLUDING (BUT NOT NECESSARILY LIMITED T❑) THE FOLLOWING!
<br />A. REMOVE LABELS, WHICH ARE NOT REQUIRED AS PERMANENT LABELS.
<br />B. CLEAN TRANSPARENT MATERIALS, INCLUDING MIRRORS, WINDOW
<br />AND DOOR GLASS, TO A POLISHED CONDITION, REMOVING
<br />SUBSTANCES, WHICH ARE NOTICEABLE AS VISI❑N-OBSCURING
<br />MATERIALS, REPLACE BROKEN AND DAMAGED GLASS AND
<br />DAMAGED TRANSPARENT MATERIALS,
<br />C. CLEAN EXPOSED EXTERIOR AND INTERIOR HARD -SURFACED FINISHES,
<br />TO A DIRT -FREE CONDITION, FREE OF DUST, STAINS, FILMS AND
<br />SIMILAR NOTICEABLE DISTRACTING SUBSTANCES, EXCEPT
<br />OTHERWISE INDICATED, AVOID DISTURBANCE OF NATURAL
<br />WEATHERING OF EXTERIOR SURFACES, RESTORE REFLECTIVE
<br />SURFACES TO ORIGINAL REFLECTIVE CONDITION.
<br />D. WIPE SURFACES OR MECHANICAL AND ELECTRICAL EQUIPMENT
<br />CLEAN. REMOVE EXCESS LUBRICATION AND OTHER SUBSTANCES.
<br />E. REMOVE DEBRIS AND SURFACE DUST FROM LIMITED -ACCESS SPACES
<br />INCLUDING PLENUMS, SHAFTS, TRENCHES, MANHOLES, ATTICS AND
<br />SIMILAR SPACES.
<br />F. THOROUGHLY CLEAN CONCRETE FLOORS,
<br />G. VACUUM CLEAN CARPETED SURFACES AND SIMILAR SOFT SURFACES.
<br />H, CLEAN PLUMBING FIXTURES TO A SANITARY CONDITION, FREE OF
<br />STAINS INCLUDING THOSE RESULTING FROM WATER EXPOSURE,
<br />I. CLEAN FOOD SERVICE EQUIPMENT TO A CONDITION OF SANITATION
<br />READY AND ACCEPTABLE FOR INTENDED FOOD SERVICE USE,
<br />J. CLEAN LIGHT FIXTURES AND LAMPS/LIGHT BULBS, WHICH HAVE
<br />BURNED HALF THEIR RATED LIFE OR MORE,
<br />K. CLEAN PROJECT SITE (YARD AND GROUNDS), INCLUDING LANDSCAPE
<br />DEVELOPMENT AREAS, OF LITTER AND FOREIGN SUBSTANCES. SWEEP
<br />PAVED AREAS TO A BROOM -CLEAN CONDITION, REMOVE STAINS,
<br />PETROCHEMICAL SPILLS AND OTHER FOREIGN DEPOSITS, RAKE
<br />GROUNDS WHICH ARE NEITHER PLANTED NOR PAVED, TO A SMOOTH,
<br />EVEN -TEXTURED SURFACE,
<br />L. CLEAN FILTERS OF OPERATING EQUIPMENT,
<br />M. PROPERLY CLEAN AND SANITIZE FOOD CONTACT SURFACES BEFORE
<br />SERVICE USAGE,
<br />N. CLEAN DEBRIS FROM ROOF, GUTTERS, DOWNSPOUTS AND DRAINAGE
<br />SYSTEMS,
<br />0, REMOVE WASTE AND SURPLUS MATERIAL, RUBBISH AND
<br />CONSTRUCTION FACILITIES FROM THE SITE,
<br />SECTION 01740
<br />WARRANTY
<br />CONTRACTOR SHALL WARRANT ❑T THE OWNER THAT ON RECEIPT OF NOTICE
<br />FROM HIM, WITHIN A PERIOD OF ONE YEAR (OR SUCH OTHER PERIOD OF TIME
<br />AS MAY BE NOTED FOR SPECIFIC ITEMS) FOLLOWING DATE OF SUBSTANTIAL
<br />COMPLETION, THE CONTRACTOR SHALL, AT HIS COST,
<br />WARRANTY.ANY DEFECTS IN MATERIALS AND WORKMANSHIP THAT HAVE APPEARED
<br />IN THE WORK SO THAT THEY MEET THE CONDITIONS ORIGINALLY REQUIRED BY
<br />THE CONTRACT DOCUMENTS,
<br />PREPARE DUPLICATE NOTARIZED COPIES OF ALL WARRANTIES. EXECUTE
<br />AND ASSEMBLE DOCUMENTS FROM SUBCONTRACTORS, SUPPLIERS AND
<br />MANUFACTURERS,
<br />RETAIN ALL DOCUMENTS IN THE OPERATION AND MAINTENANCE
<br />INSTRUCTIONS MANUAL NOTED IN SECTION 01730 AT THE JOB SITE UPON
<br />COMPLETION OF THE WORK,
<br />SECTION 01760
<br />CONTRACT CLOSEOUT
<br />1,01 FINAL WORK
<br />AT COMPLETION OF THE WORK, LEAVE THE BUILDING COMPLETELY CLEAN
<br />AND IN CONDITION SATISFACTORY ❑T THE OWNER. CLEAN AND POLISH ALL
<br />GLASS AND MIRRORS, LEAVE FLOORS, HARDWARE, PLUMBING FIXTURES AND
<br />LIGHTING FIXTURES CLEAN AND DUST FREE, ETC,, THIS IS NOT AN
<br />ENUMERATION OF WORK TO BE DONE, BUT IS MERELY AN INDICATION OF
<br />WHAT WILL BE CONSIDERED 'SATISFACTORY'
<br />1.02 BONDS, GUARANTEES AND WARRANTIES
<br />A. THROUGHOUT THE SPECIFICATIONS VARIOUS SURETY BONDS, GUARANTEES
<br />AND WARRANTIES ARE REQUIRED. THE CONTRACTOR SHALL SECURE AND
<br />PRESENT THESE BONDS AND GUARANTEES TO THE OWNER,
<br />B. THE CONTRACTOR SHALL PRESENT THE OWNER WITH ALL OPERATING
<br />MANUALS, MANUALS, PARTS LIST, ETC„ COVERING ALL MECHANICAL
<br />EQUIPMENT OR OTHER OPERATING DEVICES IN THE WORK.
<br />C. THE CONTRACTOR SHALL PRESENT THE OWNER WITH ALL SPECIAL TOOLS
<br />REQUIRED FOR ROUTINE MAINTENANCE OF EQUIPMENT, ETC,
<br />1.03 RECORD DRAWINGS
<br />THE CONTRACTOR SHALL PRESENT THE OWNER WITH A COPY OF
<br />RECORD DRAWINGS,
<br />DIVISION 2 - SITE WORK (NOT USED)
<br />DIVISION 3 - CONCRETE (NOT USED)
<br />DIVISION 4- MASONRY (NOT USED)
<br />DIVISION 5 - METALS
<br />SECTION 05400
<br />STEEL STUD FRAMING
<br />PART ONE - GENERAL
<br />1,01 SCOPE
<br />FURNISH AND INSTALL STEEL STUDS, OTHER STEEL FRAMING MEMBERS,
<br />BRACING, FASTENERS AND OTHER RELATED ACCESSORIES IN LOCATIONS
<br />RELATED HERE IN AND SHOWN ON THE DRAWINGS,
<br />PART TWO - PRODUCTS
<br />2.01 STEEL STUD FRAMING
<br />MATERIALS COLD FORMED STEEL FRAMING AS MANUFACTURED BY U.S,G.
<br />USING HOT DIPPED GALVANIZED STEEL WITH MINIMUM G-60 COATING WHICH
<br />CONFORMS TO ASTM SPECIFICATION A-446 AND A-525, LATEST EDITION,
<br />UNLESS NOTED OTHERWISE ON THE DRAWINGS, PRODUCT SHALL BE,
<br />1. EQUAL TO U,S.G. SJ STEEL STUDS, 3 5/8, 25 GAUGE, SPACED 16'
<br />ON CENTERS.
<br />2, RUNNER CHANNELS AT TOP AND BOTTOM OF STUDS SHALL BE OF SAME,
<br />SIZE AND GAUGE AS STUDS,
<br />B. MISCELLANEOUS COMPONENTS, PROVIDE ALL NECESSARY COMPONENT PARTS
<br />AND FASTENERS REQUIRED. FINISH TO HOT DIPPED GALVANIZED AS
<br />PECIFIED FOR STUDS OR STAINLESS STEEL,
<br />2.02 ISOLATION JOINTS
<br />WHERE ALUMINUM OR OTHER DISSIMILAR MATERIALS COME IN CONTACT
<br />WITH STEEL FRAMING, FURNISH AND INSTALL PLASTIC ISOLATION
<br />BLOCKS (SHIMS) OR BUILDING FELT BETWEEN DISSIMILAR MATERIALS,
<br />PART THREE - EXECUTION
<br />3.01 INSTALLATION
<br />INSTALL STEEL FRAMING TRUE TO LINE, LEVEL AND PLUMB, IN ACCORDANCE
<br />WITH THE DRAWINGS, AND APPROVED SHOP DRAWINGS AND THE MANUFACTURER'S
<br />WRITTEN INSTRUCTIONS.
<br />3.02 FIELD PAINTING
<br />TOUCHUP GALVANIZED COATINGS DAMAGED DURING HANDLING AND
<br />INSTALLATION WITH GALVANIZING REPAIR PAINT,
<br />DIVISION 6 - CARPENTRY
<br />SECTION 06200
<br />FINISH CARPENTRY
<br />PART ONE - GENERAL
<br />1,01 SCOPE
<br />A. THIS SECTION INCLUDES FURNISHING AND INSTALLING ALL
<br />MISCELLANE❑US EXPOSED WOOD MEMBERS AND TRIM ITEMS
<br />AND SERVING COUNTER, AS DETAILED ON THE DRAWINGS,
<br />B. THIS SECTION INCLUDES INSTALLATION OF METAL FRAMES,
<br />WOOD DOORS, FINISH HARDWARE, AND MISCELLANEOUS METALS
<br />AND SPECIALTIES FURNISHED UNDER OTHER SECTIONS OF THESE
<br />SPECIFICATIONS, AND RELATED ITEMS NECESSARY FOR A
<br />COMPLETE AND PROPER INSTALLATION.
<br />PART TWO - MATERIALS
<br />2.01 GENERAL REQUIREMENTS
<br />A. RECEIVE, STOCK AND STORE MATERIALS IN ACCORDANCE WITH
<br />GOOD PRACTICE,
<br />B. GRADING, EACH PIECE OF FINISH LUMBER SHALL BE GRADE -
<br />MARKED AND KILN -DRIED. BUNDLED STOCK SHALL HAVE GRADE
<br />MARKS APPLIED TO EACH BUNDLE.
<br />C. SIZES AND PATTERNSt WORK LUMBER TO PATTERN DETAILED.
<br />SHAPED MATERIAL SHALL CONFORM TO STANDARD PATTERNS
<br />INDICATED,
<br />D. M❑ISTURE CONTENTi MAXIMUM MOISTURE CONTENT OF
<br />TREATED OR UNTREATED FINISH LUMBER, TRIM AND MILLWORK
<br />SHALL BE 12 PERCENT AT TIME OF DELIVERY TO JOB SITE.
<br />2.02 ROUGH HARDWARE
<br />THE GENERAL CONTRACTOR SHALL FURNISH ALL ROUGH HARDWARE,
<br />INCLUDING NAILS, SCREWS AND SIMILAR ANCHORS AND FITTINGS AND
<br />ALL OTHER HARDWARE EITHER MENTIONED IN THESE SPECIFICATIONS
<br />OR REQUIRED FOR THE PROPER COMPLETION OF THE WORK,
<br />2.03 PLASTIC LAMINATE
<br />AS SCHEDULED ON THE DRAWINGS, COLORS AS SCHEDULED.
<br />2.04 PLYWOOD
<br />VENEER CORE PLYWOOD OF THICKNESS SHOWN ON THE DRAWINGS,
<br />A. WHERE BOTH SIDES COVERED WITH PLASTIC LAMINATEi APA C-D
<br />INT,
<br />B. WHERE BOTH SIDES VISIBLEt APA B-B INT.
<br />C. WHERE BOTH SIDES VISIBLEi APA B-C OR B-D INT.
<br />D. COUNTERTOP AT SERVING COUNTERi APA B-B, EXPOSURE I.
<br />2.05 FRP (FIBERGLASS REINFORCED POLYESTER) PANELS
<br />3/32' THICK WITH PEBBLED TEXTURE FACE, COLOR NOTED ON THE
<br />DRAWINGS, BY MARLITE. INSTALL ON FACE OF GYPSUM BOARD OR
<br />PLYWOOD USING MARLITE CAULKING, C-375 ADHESIVE, AND MATCHING
<br />FP100 PVC MOLDINGS OF THE PROPER SHAPE AT EDGES, INTERIOR AND
<br />EXTERIOR CORNERS, BETWEEN PANELS, ALL IN STRICT ACCORDANCE
<br />WITH MARLITE COMPANY SPECIFICATIONS,
<br />2.06 ADHESIVE
<br />FOR ADHERING PLASTIC LAMINATE TO PLYWOOD SUBSTRATE ON WALLS
<br />AND CABINETS, USE CONTACT ADHESIVE EQUAL TO WILSONART
<br />BRUSHABLE GRADE LW500 ON PLYWOOD AND PLASTIC LAMINATE
<br />SURFACES IN ACCORDANCE WITH ADHESIVE MANUFACTURER'S
<br />INSTRUCTIONS. FOR ADHERING SOLID SURFACING, BED THE SOLID
<br />SURFACE IN SILICONE SEALANT AS RECOMMENDED BY SOLID SURFACE
<br />MANUFACTURER ON THE WOOD/PLYWOOD FRAMING.
<br />PART THREE - EXECUTION
<br />3,01 INSTALLATION
<br />A. INSTALL WORK OF THIS SECTION AS INDICATED ON THE
<br />DRAWINGS AND SPECIFIED HEREIN, IN ACCORDANCE WITH
<br />APPROVED SHOP DRAWINGS AND MANUFACTURER'S WRITTEN
<br />INSTRUCTIONS,
<br />B. INSTALL THE WORK PLUMB, TRUE AND STRAIGHT WITH NO
<br />DISTORTIONS. SHIM AS REQUIRED USING CONCEALED SHIMS,
<br />INSTALL TO A TOLERANCE OF 1/8' IN 8'-0' FOR PLUMB AND LEVEL
<br />(INCLUDING COUNTERTOPS) AND WITH 1/16' MAXIMUM OFFSET IN
<br />FLUSH ADJOINING SURFACES, 1/8' MAXIMUM OFFSETS IN
<br />REVEALED ADJOINING SURFACES,
<br />3.02 FINISH HARDWARE
<br />RECEIVE, STORE AND INSTALL FINISH HARDWARE SPECIFIED ON THE
<br />DRAWINGS, AT COMPLETION OF THE JOB, CHECK AND LEAVE ALL
<br />HARDWARE IN OPTIMUM OPERATING CONDITION. TAG KEYS WITH HARD
<br />FIBER OR METAL EDGED CARDBOARD TAGS LABELED ACCORDING TO THE
<br />DOORS AS NUMBERED ON THE DRAWINGS, BOX KEYS NEATLY AND
<br />ORDERLY AND THEN TURN OVER TO THE OWNER,
<br />DIVISION 7 - M❑ISTURE PROTECTION
<br />SECTION 07200
<br />BUILDING INSULATION
<br />PART ONE - GENERAL
<br />1,01 SCOPE
<br />THE WORK OF THIS SECTION INCLUDES INSULATION AT EXTERIOR WALLS
<br />AND ELSEWHERE AS SHOWN ON THE DRAWINGS.
<br />PART TWO - MATERIALS
<br />2.01 THERMAL INSULATION
<br />INORGANIC GLASS FIBER BLANKETS WITH VAPOR BARRIER, 6' THICK, R-19.
<br />PART THREE - EXECUTION
<br />3,01 INSTALL THERMAL INSULATION
<br />ON TOP OF SUSPENDED CEILING TILES IN ATTIC SPACE AND IN WALL VOIDS
<br />OF EXTERIOR WALLS UNLESS NOTED OTHERWISE IN DRAWINGS. INSTALL ON
<br />OUTSIDE OF WATER PIPES IN EXTERIOR WALL,
<br />SECTION 07900
<br />CAULKING AND SEALANTS
<br />PART ONE - GENERAL
<br />1,01 SCOPE
<br />THE WORK OF THIS SECTION INCLUDES ALL SEALANTS AND CAULKING,
<br />BOTH INTERIOR AND EXTERIOR,
<br />PART TWO - MATERIALS
<br />2.01 CAULKING
<br />POLYSULFIDE (THLOKAL) BASE CAULKING COMPOUND, SYNTHACAULK
<br />GC9 BY PECORA, OR APPROVED EQUAL. COLORS SHALL REASONABLY
<br />MATCH THAT OF ADJOINING WORK,
<br />PART THREE - EXECUTION
<br />3.01 JOB CONDITIONS
<br />APPLY MATERIALS ONLY WHEN THE TEMPERATURE OF SPACES,
<br />MATERIALS, AND SURFACES IS ABOVE 40 DEGREES F, USE MATERIALS
<br />WITHIN THE MANUFACTURER'S RECOMMENDED SHELF -LIFE PRIORI
<br />REMOVE FROM THE JOB ANY MATERIALS WHOSE SHELF -LIFE PERIOD
<br />EXPIRES AFTER BEING BROUGHT TO THE JOB, AND REPLACE WITH FRESH
<br />MATERIAL,
<br />3,02 APPLICATION
<br />A. APPLY CAULKING IN ACCORDANCE WITH MANUFACTURER'S
<br />WRITTEN INSTRUCTIONSi USING PRESSURE TYPE CAULK GUN,
<br />PRIME SIDES OF JOINTS BEFORE APPLYING CAULKING IF
<br />RECOMMENDED BY THE MANUFACTURER, WIDTH AND DEPTH OF
<br />SEALANT IN JOINTS SHALL BE MINIMUM 1/8', IN LARGE JOINTS,
<br />THE DEPTH OF SEALANT SHALL BE ONE HALF THE WIDTH OF THE
<br />JOINT, IF REQUIRED, PACK SPACES WITH COMPRESSIBLE
<br />MATERIALS, COMPATIBLE WITH THE CAULKING MATERIAL, TO
<br />WITHIN THE PROPER DISTANCE OF THE FINISHED JOINTi THEN FILL
<br />JOINT WITH CAULKING MATERIAL. PROTECT ADJACENT AREAS
<br />NOT TO RECEIVE SEALANTS AND CAULKING, REMOVE PROMPTLY
<br />IF CAULKING OR SEALANT DOES GET ON THESE SURFACESi CLEAN
<br />SATISFACTORILY OR REPLACE SURFACES WITH NEW MATERIALS.
<br />USE GUN NOZZLES TO FIT JOINTS, FINISH JOINTS NEATLY.
<br />REMOVE EXCESS MATERIAL, LEAVE JOINTS CLEAN.
<br />B. CAULK JOINTS BETWEEN DOOR AND WINDOW FRAMES AND
<br />ADJOINING WORK, AT ALL JOINTS BETWEEN DIFFERENT
<br />MATERIALS, AND ELSEWHERE AS SHOWN OR REQUIRED TO SEAL
<br />JOINTS WIND AND WATER TIGHT, EXERCISE CARE TO SEAL ALL
<br />OPENINGS IN EXTERIOR WALLS TO BE WIND, WATER AND INSECT
<br />TIGHT.
<br />C, USING SPECIFIED SEALANT, SEAL BETWEEN FOOD SERVICE
<br />EQUIPMENT AND ADJOINING WALL, BASES, ETC., AS REQUIRED TO
<br />SEAL CRACKS OR OTHER OPENINGS, AND AROUND PIPES, SO TO
<br />PREVENT ACCESS OF VERMIN AND ACCUMULATION OF CRUMBS,
<br />GREASE OR OTHER FOREIGN SUBSTANCES,
<br />DIVISIONS - DOORS AND WINDOWS
<br />SECTION 08100
<br />STEEL DOORS AND FRAMES
<br />PART ONE - GENERAL
<br />1.01 SCOPE
<br />THE WORK OF THIS SECTION INCLUDES FURNISHING OF ALL HOLLOW
<br />METAL DOORS AND STEEL FRAMES. INSTALLATION OF DOORS AND
<br />FRAMES IS INCLUDED UNDER SECTION 06200.
<br />1,02 MARKING
<br />SHIP DOORS AND FRAMES TO JOB WITH EACH ITEM IDENTIFIED WITH
<br />ARCHITECT'S MARK
<br />1.02 PROTECTION AND CLEANING
<br />PROTECT ALL DOOR FRAMES AND DOORS FROM DAMAGE DURING
<br />TRANSPORTATION AND AT THE JOB SITE] STORE AT THE SITE UNDER
<br />COVER ON WOOD BLOCKING OR ON SUITABLE FLOOR, AFTER
<br />INSTALLATION, PROTECT FROM DAMAGE DURING SUBSEQUENT
<br />CONSTRUCTION ACTIVITIES. DAMAGED WORK WILL BE REJECTED AND
<br />SHALL BE REPLACED WITH NEW WORK.
<br />PART TWO - MATERIALS
<br />2,01 METAL FRAMES
<br />FLUSH DOUBLE RABBIT ARC-WEIDED FRAMES BY RDL SUPPLY, OF DEPTHS
<br />AND CONFIGURATIONS SHOWN ON THE DRAWINGS. PROVIDE WEATHER
<br />HOOD FULL WIDTH OF FRAME AT HEAD ON EXTERIOR SIDE OF EXTERIOR
<br />DOORS. PREPARE FRAME AT FACTORY FOR HARDWARE INSTALLATION,
<br />PROVIDE METAL ANCHORS OF SHAPES AND SIZES INDICATED ON JAMBS
<br />NEAR TOP AND BOTTOM OF EACH FRAME, AND AT INTERMEDIATE POINTS
<br />NOT OVER 24' ON CENTER. PR❑VIDE TEMPORARY STEEL SPREADERS
<br />FASTENED ACROSS BOTTOM OF FRAMES. WHERE CONSTRUCTION WILL
<br />PERMIT CONCEALMENT, LEAVE SPREADERS IN PLACE AFTER
<br />INSTALLATIONi OTHERWISE, REMOVE SPREADERS AFTER FRAMES ARE
<br />SET AND ANCHORED,
<br />2.02 HOLLOW METAL DOORS
<br />METAL FRAMES BY RDL SUPPLY, WITH METAL FRAME VIEW PANEL AS
<br />SHOWN ON THE DRAWINGS. PREPARE FOR HARDWARE SPECIFIED IN
<br />SECTION 08700, PROVIDE TOP CAP FOR WEATHER PROTECTION,
<br />2,03 SHOP PAINTING
<br />CLEAN AND CHEMICALLY TREAT (PHOSPHATES) METAL SURFACES TO
<br />ASSURE MAXIMUM PAINT ADHERENCE! FOLLOW WITH A DIP OR SPRAY
<br />COAT OR RUST -INHIBITIVE METALLIC OXIDE, ZINC CHROMATE, OR
<br />SYNTHETIC RESIN PRIMER ON ALL EXPOSED SURFACES, FINISH SURFACES
<br />SHALL BE SMOOTH AND FREE FROM IRREGULARITIES AND ROUGH SPOTS,
<br />EACH COAT OF PAINT SHALL BE SEPARATELY BAKED OR OVEN DRIED,
<br />SECTION 08250
<br />FLUSH WOOD DOORS
<br />PART ONE - GENERAL
<br />1,01 SCOPE OF WORK
<br />A. PR❑VIDE SOLID FLUSH DOORS, COMPLETE IN PLACE WITH FINISH
<br />HARDWARE INSTALLED, WHERE SHOWN ON THE DRAWINGS, AS
<br />SPECIFIED HEREIN, AND AS NEEDED FOR A COMPLETE AND
<br />PROPER INSTALLATION.
<br />1,02 QUALITY ASSURANCE
<br />A, USE ADEQUATE NUMBERS OF SKILLED WORKMEN WHO ARE
<br />THOROUGHLY TRAINED AND EXPERIENCED IN THE NECESSARY
<br />CRAFTS AND WHO ARE COMPLETELY FAMILIAR WITH THE
<br />SPECIFIED REQUIREMENTS AND THE METHODS NEEDED FOR
<br />PROPER PERFORMANCE OF THE WORK OF THIS SECTION.
<br />B. IN ADDITION TO COMPLY WITH PERTINENT CODES AND
<br />REQUIREMENTS OF GOVERNMENTAL AGENCIES HAVING
<br />JURISDICTION, COMPLY WITHi
<br />1. 'MANUAL OF MILLWORK' OF THE WOODWORK
<br />INSTITUTE OF CALIFORNIA, FOR THE GRADE OR GRADES
<br />SPECIFIED) OR
<br />2. 'ARCHITECTURAL WOODWORK QUALITY STANDARDS'
<br />OF THE ARCHITECTURAL WOODWORK INSTITUTE FOR
<br />THE GRADE OR GRADES SPECIFIED,
<br />3. CERTIFICATION AND STAMPS WILL NOT BE REQUIRED,
<br />1,03 DELIVERY, STORAGE AND HANDLING
<br />A. DELIVERY,
<br />1. DELIVER DOORS TO SITE AFTER BUILDING HAS REACHED
<br />AVERAGE PREVAILING HUMIDITY OF ITS LOCALITY,
<br />2. DELIVER DOORS IN MANUFACTURER'S ORIGINAL
<br />CONTAINERS, CLEARLY MARKED WITH MANUFACTURER'S
<br />NAME, BRAND NAME, SIZE, THICKNESS, AND IDENTIFYING
<br />SYMBOL ON THE COVERING.
<br />3. SEAL ALL FOUR EDGES OF THE UNFINISHED DOORS WHEN
<br />DELIVERED TO THE JOB SITE,
<br />B. STORAGEt
<br />1. STACK DOOR FLAT ON 2 X 4 LUMBER, LAID 12' FROM ENDS
<br />AND ACROSS CENTER.
<br />2. UNDER BOTTOM DOOR AND OVER TOP OF STACK, PROVIDE
<br />PLYWOOD OR CORRUGATED CARDBOARD TO PROTECT
<br />DOOR SURFACES,
<br />3. STORE DOORS IN AREA WHERE THERE WILL BE NO GREAT
<br />VARIATIONS IN HEAT, DRYNESS, AND HUMIDITY,
<br />C. DO NOT DRAG DOORS ACROSS ONE ANOTHERi LIFT DOORS AND
<br />CARRY THEM INTO POSITION.
<br />PART TWO - PRODUCTS
<br />2,01 GENERAL
<br />A. PROVIDE SOLID FLUSH WOOD DOORS OF THE TYPES, DESIGNS, AND
<br />THICKNESSES SHOWN ON THE DRAWINGS, LABELED OR NON -
<br />LABELED AS INDICATED AND REQUIRED, AND IN SOLID CORE OR
<br />HOLLOW CORE SHOWN ON THE DRAWINGS,
<br />B. GRADEi EXCEPT AS MAY BE SHOWN OTHERWISE ON THE
<br />DRAWINGS, FABRICATE THE WORK OF THIS SECTION TO 'CUSTOM
<br />GRADE' STANDARDS OF THE REFERENCED ORGANIZATIONS,
<br />C. FOR HOLLOW CORE DOORS, PROVIDE CARE CONSTRUCTION AS
<br />NEEDED TO ACCOMMODATE FINISH HARDWARE.
<br />D. SPECIESt
<br />1. WHERE PAINT GRADE OR OPAQUE FINISH ARE CALLED FOR
<br />ON THE DRAWINGS, PROVIDE BIRCH OR BEECH FACES FOR
<br />OPAQUE FINISH.
<br />2. FOR ALL OTHER FLUSH WOOD DOORS, PROVIDE RIFT CUT
<br />WHITE OAK FACES FOR TRANSPARENT FINISH,
<br />PART THREE - EXECUTION
<br />3.01 SURFACE CONDITIONS
<br />A. EXAMINE THE AREAS AND CONDITIONS UNDER WHICH THE WORK
<br />OF THIS SECTION WILL BE PERFORMED, CORRECT CONDITIONS
<br />DETRIMENTAL TO TIMELY AND PROPER COMPLETION OF THE
<br />WORK, DO NOT PROCEED UNTIL SATISFACTORY CONDITIONS ARE
<br />CORRECTED.
<br />3,02 INSTALLATION
<br />A. FITTING AND MATCHING,
<br />1. UNLESS DOORS ARE COMPLETELY FITTED AND MACHINED
<br />AT THE MILL, FIT THEM FOR WIDTH BY PLANNING AND FIT
<br />THEM FOR HEIGHT BY SAWING,
<br />a. BOTTOM, 1/2' CLEARANCE MAXIMUM
<br />b, TOPt 1/8' CLEARANCE MINIMUM
<br />C. LOCK EDGE AND HINGE EDGE, BEVEL 1/8' IN 2' MAXIMUM
<br />2. MACHINE DOORS FOR HARDWARE IN ACCORDANCE WITH
<br />RECOMMENDATIONS OF THE HARDWARE
<br />MANUFACTURERS, AS THOSE RECOMMENDATIONS HAVE
<br />BEEN APPROVED BY THE ARCHITECT,
<br />B, RECEIVE AND RETAIN CUSTODY OF FINISH HARDWARE
<br />FURNISHED FOR THE WORK OF THIS SECTION EXCEPT AS
<br />OTHERWISE DIRECTED BY THE ARCHITECT. INSTALL ALL SUCH
<br />FINISH HARDWARE IN STRICT ACCORDANCE WITH THE
<br />RECOMMENDATIONS OF ITS MANUFACTURER.
<br />C. REPLACE OR REHANG DOORS WHICH ARE HINGE BOUND AND DO
<br />NOT SWING OR OPERATE FREELY.
<br />SECTION 08400
<br />ALUMINUM FRAMING (IF REQUIRED PER DRAWINGS)
<br />PART ONE - GENERAL
<br />1,01 SCOPE
<br />THE WORK OF THIS SECTION INCLUDES ALUMINUM STOREFRONT
<br />MATERIAL AND WINDOW ASSEMBLIES.
<br />PART TWO - MATERIALS
<br />2.01 WINDOW FRAMING
<br />DESIGN IS BASED ON USE OF KAWNEER TRIFAB NO, 451 SERIES FRAMING,
<br />AS INDICATED ON THE DRAWINGS, FINISH SHALL BE KAWNEER NO, 17
<br />CLEAR ANODIZED,
<br />2.02 ALUMINUM SPECIALTIES
<br />A. COLUMN COVERS AND AT SILLS OF WINDOWS, .040' ANODIZED
<br />ALUMINUM, FINISH TO MATCH FRAMING,
<br />B. DRIP STRIP AT WINDOW HEADS, .032' ANODIZED ALUMINUM,
<br />FINISH TO MATCH FRAMING,
<br />2.03 CAULKING
<br />AS SPECIFIED IN SECTION 07900, AND AS RECOMMENDED BY ALUMINUM
<br />FRAMING MANUFACTURER.
<br />2.04 FASTENERS
<br />USE ONLY HARD ALUMINUM ALLOY OR NON-MAGNETIC STAINLESS STEEL
<br />SCREWS AND BOLTS,
<br />PART THREE - EXECUTION
<br />3.01 GENERAL
<br />CAREFULLY ERECT ALL WORK PLUM, TRUE, SQUARE IN OPENINGS AND
<br />SECURELY ANCHOR IN PLACE. PROTECT ALUMINUM SURFACES FROM
<br />CONTACT WITH STEEL OR MASONRY WITH TWO COATS OF ZINC
<br />CHROMATE PAINT.
<br />3,02 FRAMING INSTALLATION
<br />INSTALL WINDOW FRAMING AS INDICATED ON THE DRAWINGS, SET ON
<br />P❑LYSULFIDE CAULKING BEAD, AND SECURELY ATTACH TO WOOD SUB -
<br />FRAME,
<br />SECTION 08700
<br />FINISH HARDWARE
<br />PART ONE - GENERAL
<br />1,01 WORK INCLUDED
<br />INSTALLATION OF FINISH HARDWARE IS COVERED UNDER SECTION 06200,
<br />FURNISH ALL FINISH HARDWARE AND RELATED ITEMS NECESSARY TO
<br />COMPLETE THE WORK,
<br />1,02 PRODUCT HANDLING
<br />INDIVIDUALLY PACKAGE EACH UNIT OF FINISH HARDWARE COMPLETE
<br />WITH PROPER FASTENINGS AND APPURTENANCES, CLEARLY IDENTIFIED,
<br />1.03 GUARANTEE
<br />ANY HARDWARE, WHICH PROVES TO BE DEFECTIVE OR FAULTY WITHIN A
<br />PERIOD OF ONE YEAR, SHALL BE REPLACED AT NO COST TO THE OWNER,
<br />PART TWO - PRODUCTS
<br />2,01 GENERAL
<br />A. FURNISH HARDWARE IN ACCORDANCE WITH HARDWARE
<br />SCHEDULE. FURNISH EACH KIND OF HARDWARE FROM ONLY ONE
<br />MANUFACTURER,
<br />B. FINISHES OF ALL HARDWARE SHALL MATCH THE FINISH OF THE
<br />LOCKSETS, UNLESS OTHERWISE SCHEDULED,
<br />A. FURNISH NON -REMOVABLE PINS AT OUT SWINGING EXTERIOR
<br />DOORS.
<br />D. CLOSERS, SIZE THE CLOSERS IN ACCORDANCE WITH THE
<br />MANUFACTURER'S WRITTEN RECOMMENDATIONS. FURNISH SEX
<br />BOLTS FOR CLOSERS TO BE MOUNTED IN PARTICLEBOARD OF
<br />MINERAL CORE DOORS,
<br />E, DOOR SILENCERS, FURNISH THREE SILENCERS FOR EACH STEEL
<br />DOOR FRAME.
<br />F. HAND OF DOORi THE DRAWINGS SHOW THE SWING OF EACH DOOR
<br />LEAF, FURNISH EACH ITEM OF HARDWARE FOR PROPER
<br />INSTALLATION AND OPERATION OF THE DOOR SWING AS SHOWN,
<br />G. FASTENERSt FURNISH ALL NECESSARY SCREWS, BOLTS, AND
<br />OTHER FASTENERS OF SUITABLE SIZE AND TYPE ACCORDING TO
<br />THE MATERIAL TO WHICH THE HARDWARE IS TO BE APPLIED AND
<br />THE RECOMMENDATIONS OF THE HARDWARE MANUFACTURER,
<br />ALL FASTENINGS SHALL HARMONIZE WITH THE HARDWARE AS TO
<br />MATERIAL AND FINISH,
<br />2.02 KEYING
<br />A. KEY LOCKS IN DOORS INDIVIDUALLY, FURNISH 2 KEYS PER LOCK,
<br />2.03 HARDWARE SCHEDULE
<br />SEE DOOR SCHEDULE ON THE DRAWINGS,
<br />DIVISION 9 - FINISHES
<br />SECTION 09250
<br />GYPSUM DRYWALL
<br />PART ONE - GENERAL
<br />1.01 SCOPE
<br />THIS SECTION INCLUDES MATERIALS, INSTALLATION AND FINISHING OF
<br />JOINTS FOR GYPSUM DRYWALL WALLS AND CEILINGS,
<br />1.02 MATERIAL HANDLING
<br />DELIVER ALL MATERIALS IN ORIGINAL UNOPENED PACKAGES AND STORE IN
<br />AN ENCLOSED SHELTER PROVIDING PROTECTION FROM DAMAGE AND EXPOSURE
<br />TO THE ELEMENTS, REMOVE DAMAGED OR DETERIORATED MATERIALS FROM
<br />THE PREMISES.
<br />1.03 JOB CONDITIONS
<br />IN COLD WEATHER AND DURING GYPSUM PANEL APPLICATION AND JOINT
<br />FINISHING MAINTAIN TEMPERATURES WITHIN THE BUILDING WITHIN THE RANGE
<br />OF 50 F TO 70 F. PROVIDE ADEQUATE VENTILATION TO REMOVE EXCESS
<br />MOISTURE.
<br />1.04 RELATED WORK
<br />WOOD FRAMING IS INCLUDED IN SECTION 06100. STEEL STUD FRAMING IS
<br />INCLUDED IN SECTION 05400,
<br />PART TWO - MATERIALS
<br />2.01 GYPSUM BOARD
<br />TAPERED EDGE, THICKNESS AS INDICATED ON DRAWINGS, BY GOLD BOND OR
<br />EQUAL, USE REGULAR 5/8' FIRE SHIELD AND M❑ISTURE RESISTANT (MR) 5/8'
<br />BOARD SUBSTRATE FOR ALL CERAMIC WALL TILE FINISHES.
<br />2.02 FASTENERS
<br />FOR ATTACHMENT OF GYPSUM BOARD PANELS TO WOOD FRAMING AND STEEL STUD
<br />FRAM F FRAMING, USE BUGLE HEAD DRYWALL SCREWS EQUAL T❑ GOLD BOND, SPACING ❑ S CI G
<br />PER MANUFACTURER'S RECOMMENDATIONS,
<br />2,03 TRIM
<br />GOLD BOND CASING BEAD NO. 100 OR EQUAL,
<br />2,04 CORNER BEAD
<br />GOLD BOND MULTI -FLEX TAPE BEAD OR EQUAL,
<br />2.05 JOINT TREATMENT
<br />GOLD BOND REINFORCING TAPE AND J❑INT COMPOUND.
<br />PART THREE - EXECUTION
<br />3,01 GYPSUM PANEL ERECTION
<br />APPLY GYPSUM PANELS WITH LONG DIMENSION PERPENDICULAR TO FRAMING.
<br />POSITION ALL END JOINTS OVER FRAMING MEMBERS, USE MAXIMUM PRACTICAL
<br />LENGTHS TO MINIMIZE END JOINTS, FIT END AND EDGES CLOSELY, BUT NOT
<br />FORCED TOGETHER, STAGGER JOINTS ON OPPOSITE SIDES OF PARTITION,
<br />3.02
<br />A. FINISH ALL FACE PANEL JOINTS AND INTERNAL ANGLES WITH JOINT
<br />TREATMENT INSTALLED ACCORDING TO MANUFACTURER'S DIRECTIONS, SPOT
<br />EXPOSED FASTENERS ON FACE LAYERS AND FINISH CORNER BEAD, CONTROL
<br />JOINTS AND TRIM AS REQUIRED, WITH AT LEAST THREE COATS OF J❑INT
<br />COMPOUND FEATHERED OUT ONTO PANEL FACES AND SANDED SMOOTH,
<br />B, REINFORCE ALL VERTICAL AND HORIZONTAL EXTERIOR CORNERS WITH CORNER
<br />BEAD FASTENED WITH 9/16' ROSIN COATED STAPLES 12' D.C. ON BOTH
<br />FLANGES ALONG ENTIRE LENGTH OF BEAD,
<br />C, WHERE ASSEMBLY TERMINATES AGAINST DISSIMILAR MATERIAL OR AT
<br />DISCONTINUOUS EDGES (EXCEPT BEHIND CERAMIC TILE), APPLY TRIM OVER
<br />PANEL EDGE AND FASTEN WITH SCREWS 12' O.C,
<br />D, POWER -DRIVE FASTENERS AT LEAST 3/8' FROM EDGE OR ENDS OF PANELS
<br />TO PROVIDE UNIFORM DIMPLE 1/32' DEEP,
<br />SECTION 09300
<br />TILE
<br />PART ONE - GENERAL
<br />1.01 SCOPE
<br />A. THIS SECTION INCLUDES MATERIALS AND INSTALLATION OF FLOOR AND WALL
<br />TILES,
<br />1. CERAMIC TILE, AS SPECIFIED ON THE DRAWINGS,
<br />2, QUARRY TILE, AS SPECIFIED ON THE DRAWINGS,
<br />1.02 QUALITY ASSURANCE
<br />A, PROVIDE PRODUCTS OF THE FOLLOWING,
<br />B. TILE COUNCIL OF AMERICA STANDARD 137.1 IS THE BASIS FOR REQUIREMENTS.
<br />1.03 PRODUCT HANDLING
<br />A, DELIVER PACKAGED MATERIALS AND STORE IN ORIGINAL CONTAINERS WITH
<br />SEALS UNBROKEN AND LABELS INTACT UNTIL TIME OF USE,
<br />1.04 JOB CONDITIONS
<br />MAINTAIN ENVIRONMENTAL CONDITIONS AND PROTECT WORK DURING AND AFTER
<br />INSTALLATION IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS,
<br />PART TWO - PRODUCTS
<br />2,01 TILE PRODUCTS
<br />AS SPECIFIED ON THE DRAWINGS,
<br />2.02 GROUT
<br />AS SPECIFIED ON THE DRAWINGS.
<br />PART THREE - EXECUTION
<br />3,01 TILE INSTALLATION STANDARDS
<br />A. COMPLY WITH APPLICABLE REQUIREMENTS OF THE FOLLOWING AMERICAN
<br />NATIONAL STANDARDS INSTITUTE STANDARDS.
<br />1. A108,4 FOR TILE INSTALLED WITH ORGANIC ADHESIVE.
<br />2. A108,5 FOR TILE INSTALLED WITH DRY -SET PORTLAND CEMENT MORTAR
<br />OR LATEX-PORTLAND CEMENT MORTAR,
<br />3. A108.6 FOR TILE INSTALLED WITH EPDXY ADHESIVE,
<br />B, COMPLY WITH MANUFACTURER'S INSTRUCTIONS FOR MIXING AND
<br />INSTALLATION OF PROPRIETARY MATERIALS.
<br />3,02 INSTALLATION
<br />A. EXTEND TILE WORK INTO RECESSES AND UNDER OR BEHIND EQUIPMENT AND
<br />FIXTURES, TO FORM A COMPLETE COVERING WITHOUT INTERRUPTIONS.
<br />B. ACCURATELY FORM INTERSECTIONS AND RETURNS, PERFORM CUTTING AND
<br />DRILLING OF TILE WITHOUT MARRING VISIBLE SURFACES, CAREFULLY GRIND
<br />CUT EDGES OF TILE ABUTTING TRIM, FINISH OR BUILT-IN ITEMS FOR
<br />STRAIGHT ALIGNED SURFACES,
<br />C. INSTALL TILE USING THE FOLL❑WING SETTING BEDS AS SHOWN OR
<br />SCHEDULED,
<br />1. QUARRY TILE FLOORS, DRY -SET PORTLAND CEMENT MORTAR OR LATEX-
<br />PORTLAND CEMENT MORTAR OVER CONCRETE
<br />2, GLAZED WALL TILE, ORGANIC ADHESIVE,
<br />3. QUARRY TILE FLOORS IN COOLER/FREEZER, SET WITH EPDXY ADHESIVE.
<br />D, UNLESS OTHERWISE SHOWN, LAY TILE IN GRID PATTERN, ALIGN JOINTS
<br />WHEN ADJOINING TILES ON FLOOR, BASE, WALLS AND TRIM AREA SAME SIZE.
<br />LAYOUT TILE WORK AND CENTER TILE FIELDS IN BOTH DIRECTIONS IN EACH
<br />SPACE, ADJUST TO MINIMIZE TILE CUTTING. PROVIDE UNIFORM JOINT
<br />WIDTHS, UNLESS OTHERWISE SHOWN,
<br />E. INSTALL EXPANSION JOINTS MAXIMUM 16' - 0' D.C.., IN EACH DIRECTION,
<br />3,03 CLEANING AND PROTECTION
<br />A. UPON COMPLETION OF PLACEMENT AND GROUTING, CLEAN ALL TILE SURFACES
<br />S❑ THEY ARE FREE OF FOREIGN MATTER.
<br />B. LEAVE FINISHED INSTALLATION CLEAN AND FREE OF CRACKED, CHIPPED,
<br />BROKEN, UN -BONDED, OR OTHERWISE DEFECTIVE TILE WORK.
<br />C. PROHIBIT FOOT AND WHEEL TRAFFIC FROM USING TILES FLOORS FOR AT
<br />LEAST THREE (3) DAYS AFTER GROUTING IS COMPLETED,
<br />D. COVER ALL TILE FLOORS WITH 'KRAFT PAPER' IN ALL AREAS AND D❑ NOT
<br />REMOVE THE PAPER UNTIL FINAL CLEAN UP AT COMPLETION OF
<br />CONSTRUCTION.
<br />�y
<br />c
<br />o
<br />:200
<br />c
<br />oQ
<br />E
<br />U-
<br />o
<br />47
<br />N
<br />�
<br />c
<br />�
<br />�
<br />o
<br />11
<br />o
<br />a-
<br />o
<br />N
<br />/� 04
<br />r
<br />C
<br />v
<br />O�
<br />a
<br />o
<br />M
<br />M
<br />J
<br />LL
<br />0
<br />Ua
<br />o
<br />O*
<br />O
<br />z
<br />rn
<br />C
<br />o
<br />CUa�i
<br />Q'
<br />U
<br />a
<br />t
<br />O C'
<br />C
<br />2LO
<br />J
<br />C
<br />Q
<br />J
<br />O
<br />J
<br />N_
<br />LL
<br />06
<br />U
<br />.y
<br />°c
<br />ti
<br />0
<br />N
<br />�ry
<br />It
<br />Cr)
<br />W W�
<br />J
<br />o
<br />N
<br />UC=LL
<br />O
<br />n..
<br />-J m
<br />J
<br />�QQ!
<br />W 66
<br />W
<br />N (0
<br />N
<br />Revisions:
<br />U)
<br />Z
<br />060
<br />W Q
<br />FU
<br />p LL
<br />ZU
<br />W
<br />CL
<br />W
<br />Project Number
<br />07059
<br />Date
<br />02-28-08
<br />Sheet Number
<br />Gl .3
<br />
|