My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
6834 Gall Blvd A
Zephyrhills
>
Building Department
>
Building Plans
>
6834 Gall Blvd A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2025 3:19:55 PM
Creation date
2/18/2025 3:31:02 PM
Metadata
Fields
Template:
Building Plans
Street #
6834
Location
Gall Blvd A
Contractor
Jovanovic & Lyons, LLC
Building Plans - Permit #
6855
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 I 1 11 1 1 1 _ <br />130'-8" <br />9'-01, 3'--4' 48'-4' 3'-4" 26'-8' 3'-4' 36'-8" <br />3 1 3 1 3 1 <br />S-2 S-2 S-2 S-2 <br />9 ----------_-----_. — —--------------— — — — — — — — — — — — — — — — — ------ — — — — <br />--------- <br />S-2 I '.. <br />'� <br />I I I•I <br />I I.I <br />I I I•I <br />' I A BE POURED RETHIS AREA D REDATALATER DATEI . <br />I <br />FINISH FLOOR E:i.EV1 ICN SHALL <br />COMPLY WI"I'li ENGINEERED DESIGN <br />I,I <br />AND/OR CITY OF ZF.PHYRHILLS <br />S-2 I ORDINANCE <br />I I �•I <br />CU <br />it l <br />I I I I I s-2 <br />I I <br />I I <br />I <br />I I I•I <br />•• • .1 P,•49•• • • • • • • ••10•• • •• <br />----....------.---L <br />9 2 1 9 2 3 2 9 9 2 3 9 1 3 2 9 <br />S-2 S-2 S-2 S-2 S-2 S-2 S-2 S-2 S-2 S-2 S-2 S-2 S- S-2 S-2 S-2 <br />37'-4" <br />6'-4° _ 43 -4' 6'- 4' 20'-8' 6'-4" 10'-4" <br />0 7 <br />I <br />it.l S-2 <br />130'-8' <br />1 FOUNDATION PLAN <br />S —1 SCALES 1/8' = 1'-0' <br />130'-8' <br />TOP OF STEEL <br />EL. 12'-9 1/2' <br />aD <br />8 <br />S-2 <br />36 <br />X36' R <br />OF <br />CUB <br />FOR <br />FUTURE <br />VERIFY <br />W/ <br />MFGN <br />j� � <br />II II <br />II II <br />II II <br />II II <br />36 <br />X36' R)OF� <br />CUB <br />FOR <br />FUTURE <br />— <br />SU <br />PLY F <br />N <br />(V <br />RIFY <br />/ MFG.) <br />ROOF <br />CURB FOR <br />ROOF CURB <br />FOR <br />FUTU <br />E RTU' <br />FUTURE <br />RTU'S <br />(APPR <br />X, 3'-1 <br />X <br />(APPR❑ <br />, 4'-2' <br />X <br />5'-7' <br />TYP, 2) <br />6'-6' 1 <br />YP. 2) <br />m <br />s <br />Y <br />OD <br />Cu <br />M <br />6 \—TOP OF STEEL 6 <br />S-2 EL, 13'-4' S-2 <br />130'-8" <br />Z ROOF FRAMING PLAN <br />S — 1 SCALE, 1/8' = 11-0' <br />a� <br />FOUNDATION NOTES & SPECIFICATIONS <br />1, FINISHED FLOOR ELEVATION = DATUM EL,+O'-O'(FOR ACTUAL ELEVATION <br />REFER TO SITE PLAN.) <br />2. ELEVATION TOP OF COLUMN AND WALL F❑OTINGS -1'-4' BELOW FIRST <br />FLOOR DATUM, <br />3, FUTURE SLAB ON GRADE TO BE 4' THICK REINFORCED WITH WWF 6X6-W1.4XW1,4 <br />CENTERED IN SLAB. PLACE SLAB ON 6 MIL POLYETHELENE VAPOR BARRIER, <br />4. PROVIDE 1' DEEP SAW CUT CONTRACTION CONTROL JOINTS IN SLAB ON <br />GRADE (6-12 HOURS AFTER POUR) IN EACH DIRECTION TO FORM <br />APPROXIMATELY EQUAL PANELS NOT EXCEEDING 12 FEET IN EACH DIRECTION. <br />5. PROVIDE #5 VERTICAL REINFORCING IN MASONRY WALLS AT LOCATIONS <br />INDICATED ON PLAN. DOWEL VERTICAL BARS INTO FOOTING AND LAP <br />30' AT INTERMEDIATE SPLICE LOCATIONS, HOOK BARS INT❑ TIE BEAM <br />AT ROOF LEVEL OR EXTEND BARS INTO PARAPET WHERE APPLICABLE, <br />6, PROVIDE VERTICAL CONTROL JOINTS IN MASONRY WALLS AT L❑CATIONS <br />INDICATED THUS 'CJ' ON PLAN, <br />7. ALL STEEL COLUMNS SHOWN ON PLAN ARE TS4X4X1/4 WITH BASE PLATE <br />10'X10'X3/4', FOR COLUMN BASE DETAIL, SEE SECT,6/S31 <br />I ROOF FRAMING NOTES & SPECIFICATIONS I <br />1. ROOF CONSTRUCTI❑NI 22 GAGE, 1 1/2' FLUTED METAL DECK (PAINTED) <br />WITH RIGID INSULATION AND MEMBRANE ROOFING SUPPORTED BY OPEN <br />WEB STEEL JOISTS C 4'-0' O,C. (SLOPING), <br />2, REFER TO PLAN FOR JOIST BEARING ELEVATIONS, <br />3, ELEVATION TOP OF STEEL BEAMS INDICATED THUS (+ ) ON PLAN <br />REFERENCED TO FIRST FLOOR DATUM, <br />4. PROVIDE ANGLE FRAME L4X4X1/4 AT 4 SIDES OF ALL ROOF OPENINGS <br />LARGER THAN 6'X6', EXTEND ANGLE TO FRAME BETWEEN JOISTS. <br />5, PROVIDE ANGLE FRAME L4X4X1/4 BENEATH PERIMETER ROOF CURB OF ALL <br />ROOF TOP MECH, UNITS (REFER TO MECH, DWGS, FOR LOCATION), <br />COORDINATE SIZE AND L❑CATION WITH MECH. EQUIPMENT MANUFACTURER, <br />EXTEND ANGLES TO FRAME BETWEEN J❑ISTS, <br />-,6, PROVIDE H❑RIZONTAL JOIST BRIDGING Ll 1/4X1 1/4X1/8 AT TOP AND <br />BOTTOM CHORD OF JOISTS SPACED IN ACCORDANCE WITH STEEL JOIST <br />INSTITUTE SPECIFICATIONS, LINE OF JOIST BRIDGING NEAREST MIDSPAN <br />TO BE DIAGONAL BRIDGING WITH BOLTED CONNECTIONS AT THE CHORDS AND <br />INTERSECTIONS. IN ADDITI❑N, PROVIDE DIAG❑NAL CROSS BRIDGING AT <br />i EXTERIOR END 3 J❑IST PANELS, PROVIDE SINGLE ROW OF HORIZONTAL <br />JOIST BRIDGING AT FIRST PANEL P❑INT OF JOIST BOTTOM CHORD FOR <br />`. UPLIFT REQUIREMENTS. <br />w <br />U� <br />2 <br />$ <br />0O <br />06 <br />� <br />n <br />C <br />c <br />a <br />co <br />" <br />S <br />o <br />CO <br />6 <br />00 <br />n <br />L <br />N <br />2 <br />Q <br />0 <br />a� <br />0 <br />L <br />LL <br />0 <br />o� <br />U° <br />•— <br />in <br />0 <br />0 <br />N <br />cn' <br />ago <br />z <br />0 <br />oLll <br />N <br />U <br />J <br />C <br />O <br />J <br />� <br />LL <br />06 <br />U <br />O <br />C <br />cc <br />ti <br />O <br />O <br />N <br />crUJ <br />o <br />-J <br />z <br />O <br />LLJ.. <br />- <br />W <br />co <br />LL <br />5 <br />J <br />Z0Cl) <br />Q <br />:3 <br />Q <br />U <br />= <br />momItt <br />W <br />a' <br />M <br />= <br />a- <br />z <br />N <br />UJ <br />Q0N <br />Revisions; <br />L— <br />Q <br />f <br />0 <br />06 <br />Z <br />. <br />Z <br />o <br />z <br />0 <br />F- <br />Q <br />a. <br />0 <br />; -� q <br />io <br />o <br />177 <br />D <br />0 <br />LL <br />LL <br />Project Number <br />06082a <br />Date <br />03-19-07 <br />Sheet Number <br />S-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.