My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7050 Gall Blvd (101)
Zephyrhills
>
Building Department
>
Building Plans
>
7050 Gall Blvd (101)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2025 5:13:14 PM
Creation date
2/18/2025 3:35:44 PM
Metadata
Fields
Template:
Building Plans
Street #
7050
Location
Gall Blvd
Contractor
Barton Malow
Building Plans - Permit #
5388
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I I 1 11 Ii, 11' 11!1' <br />I I lop'1 ! m I I I _- <br />f: <br />I <br />W <br />Uj <br />w <br />E <br />C <br />B <br />Q <br />1 2 3 4 5 6 <br />PHASING NOTES: <br />KEYED NOTES <br />1� <br />FOR DURATION OF CONSTRUCTION, CONTRACTOR <br />SHALL ERECT TEMPORARY ICRA PARTITIONS AND <br />BARRIERS, AS REQUIRED, TO SEPARATE THE <br />CONSTRUCTION AREA FROM ADJACENT <br />OCCUPIED SPACES/AREAS. DOORS WITHIN ICRA <br />BARRIERS SHALL INCLUDE, AS MINIMUM, A 45- <br />MINUTE FIRE -RATED DOOR, SELF -CLOSING & <br />POSITIVE LATCHING HARDWARE, AND LOCKING <br />MECHANISM. SEE DETAIL FOR TEMPORARY ICRA <br />BARRIER REQUIREMENTS. <br />2O <br />DURING CONSTRUCTION, CONTRACTOR SHALL <br />LOCATE TEMPORARY 10LB TYPE ABC FIRE <br />EXTINGUISHER WITHIN WORK AREA. <br />30 <br />DURING CONSTRUCTION, CONTRACTOR SHALL <br />LOCATE HEPA FILTER NEGATIVE AIR MACHINE(S) <br />TO NEGATIVELY PRESSURIZE CONSTRUCTION <br />AREA. <br />O <br />CONTRACTOR SHALL LOCATE WALK -OFF MATS AT <br />ALL ENTRY/EXIT POINTS TO CONSTRUCTION AREA <br />TO PREVENT MIGRATION OF DUST & DEBRIS <br />OUTSIDE OF CONSTRUCTION AREA. CONTRACTOR <br />TO ENSURE THAT CORRIDOR SPACE OUTSIDE OF <br />ENTRY POINT TO KEPT CLEAN OF DUST VIA <br />MOPPING, AS REQUIRED. <br />5O <br />EXISTING SPACE TO REMAIN ACTIVE FOR THE <br />DURATION OF CONSTRUCTION. CONTRACTOR TO <br />KEEP SPACE FREE OF DEBRIS AND <br />OBSTRUCTIONS TO MAINTAIN EGRESS PATH. <br />6O <br />LOCATION AND CONSTRUCTION OF ICRA BARRIER <br />SHALL NOT INTERFERE WITH OPERATION OR <br />CLOSURE OF EXISTING CROSS -CORRIDOR <br />DOORS. <br />7O <br />EGRESS PATH MUST BE MAINTAINED AT ALL TIMES <br />FOR EXITING IN AN EMERGENCY FROM OCCUPIED <br />AREAS OF THE SMOKE COMPARTMENT. <br />• CONTRACTOR TO PROVIDE AND MAINTAIN <br />TEMPORARY ACCESS THROUGH <br />CONSTRUCTION AREA AT ALL TIMES, DAY AND <br />NIGHT, 24 HOURS A DAY <br />• ROUTE SHALL BE MAINTAINED AS <br />ACCESSIBLE, UNOBSTRUCTED, CODE - <br />COMPLIANT, AND FREE OF DEBRIS OR OTHER <br />ELEMENTS THROGHOUT DURATION OF <br />CONSTRUCTION. <br />8� <br />FACILITY AND STAFF MUST HAVE ACCESS TO THE <br />TELEMETRY ROOM WITHIN THE PCU SUITE FOR <br />USE THROUGHOUT DURATION OF <br />CONSTRUCTION. CONTRACTOR SHALL MAINTAIN <br />UNOBSTRUCTED ACCESS TO TELEMETRY AT ALL <br />TIMES. <br />PAT. RM. <br />PUBLIC ELEV. <br />PHASING NOTES: <br />SEQUENCING <br />PHASE: 0.1 <br />T UPGRADE FOUR (4) EXISTING PCU PATIENT ROOMS <br />TO SERVE AS TEMPORARY ICU PATIENT ROOMS. <br />2. ROOMS TO SERVE AS TEMPORARY ICU PATIENT <br />ROOMS DURING PCU PHASE OF WORK. <br />3. ROOMS WILL NOT SERVE SEVERE INTENSIVE CARE <br />OR CRITICAL CARE PATIENTS <br />4. TEMPORARY ICRA BARRIERS WILL BE ERECTED <br />DURING CONSTRUCTION WORK TO ENSURE THAT <br />THESE PATIENT ROOMS HAVE ACCESS TO THE ICU <br />STAFF AND SUPPORT SPACES. <br />PHASE' I M A <br />1. FINISH UPGRADE OF EXISTING PCU PATIENT <br />ROOMS AND PCU WING CORRIDORS AND CORE <br />SPACES. <br />2. SPACES SHALL BE UPGRADED VIA WORK SHOWN <br />IN PLANS FOR PCU PHASE 1. <br />A. CASEWORK, PATIENT HEADWALL, CEILINGS, <br />TOILET ROOMS, FINISHES <br />3. TEMPORARY ICRA BARRIERS WILL BE ERECTED <br />4. CONTRACTOR SHALL MAINTAIN EMERGENCY <br />EGRESS PATH AS SHOWN IN PLAN FOR ENTIRE <br />DURATION OF CONSTRUCTION. <br />PHASE: 1.0 B <br />1. UPGRADE AND RENOVATION OF FOUR (4) EXISTING <br />ICU PATIENT ROOMS. <br />A. RENOVATE ROOMS TO UPGRADE PATIENT BED <br />& HEADWALL AS REQUIRED. <br />B. RENOVATE TO UPGRADE FINISHES AS <br />REQUIRED. <br />2. TEMPORARY ICRA BARRIERS WILL BE ERECTED <br />DURING CONSTRUCTION WORK TO ENSURE THAT <br />THESE PATIENT ROOMS HAVE ACCESS TO THE <br />PCU STAFF AND SUPPORT SPACES. <br />PHASE: 2.0 <br />1. FINISH UPGRADE OF EXISTING PCU PATIENT <br />ROOMS, PCU WING CORRIDORS, AND CORE <br />SPACES IN PCU PHASE 2. <br />A. UPGRADE OF FLOOR & WALL FINISHES AS <br />SHOWN IN PLANS. <br />B. SEE BASE BID & ALTERNATE NOTES FOR <br />OTHER SCOPE. <br />2. FINISH UPGRADE OF EXISTING SEMI -PRIVATE ICU <br />PATIENT ROOM AND TOILET ROOM. <br />A. UPGRADE OF FLOOR & WALL FINISHES AS <br />SHOWN IN PLANS. <br />B. SEE BASE BID & ALTERNATE NOTES FOR <br />OTHER SCOPE. <br />3. TEMPORARY ICRA BARRIERS WILL BE ERECTED <br />4. CONTRACTOR SHALL MAINTAIN EMERGENCY <br />EGRESS PATH AS SHOWN IN PLAN FOR ENTIRE <br />DURATION OF CONSTRUCTION <br />WALL RATINGS: <br />--�S—�-S—�-S— <br />—N-S--��S---�♦S— <br />—♦-T—♦T <br />S- <br />PARTITIONS: <br />1 HOUR FIRE <br />1 HOUR FIRE/ SMOKE BARRIER <br />2 HOUR FIRE <br />2 HOUR FIRE/ SMOKE BARRIER <br />TEMPORARY 1 HOUR FIRE <br />SMOKE BARRIER <br />"GRAY" = EXISTING RATING <br />TO REMAIN <br />EXISTING/REMAINING <br />NEW WORK <br />C = _ DEMOLISHED <br />E <br />B <br />A <br />chapuis design group <br />architecture.pa <br />510 VONDERBURG DR. SUITE 216 <br />BRANDON, FL 33511 <br />Tel. 813-667-2340 <br />CGDPA - FL # AA-26003049 <br />PROJECT FOR <br />ADVENTHEALTH- <br />ZEPHYRHILLS <br />PCU REFRESH <br />7050 Gall Blvd. <br />Zephyrhills, FL 33541 <br />AdventHealth <br />AHCA CLIENT CODE / FILE NUMBER: NIA <br />1 I NOV. 2, 2022 1 Addendum 2 - Construction Coordination <br />MARK I DATE I DESCRIPTION <br />PROJECT NUMBER <br />042.22-236.01 <br />ORIGINAL ISSUE <br />AUGUST 26, 2022 . <br />PROJECT MANAGER <br />TEC <br />PROJECT DESIGNER <br />TEC <br />PROJECT ARCHITECT <br />THOMAS E. CHAPUIS - AR97109 <br />LANDSCAPE ARCHITECT <br />N/A <br />CIVIL ENGINEER <br />N/A <br />STRUCTURAL ENGINEER <br />N/A <br />MECHANICAL ENGINEER <br />TIMOTHY P. PENNOCK - PE54516 <br />ELECTRICAL ENGINEER <br />CHARLES T. ALEXANDER - PE76422 <br />INTERIOR DESIGNER <br />CDG <br />EQUIPMENT PLANNER <br />N/A <br />DRAWN BY <br />I SDL <br />PLANS - PHASING <br />PCU WING <br />CONSTRUCTION <br />SCALEI As indicated <br />M <br />a <br />0 <br />N <br />0 <br />PLAN - LVL 2 - PHASING - PCU WING - PHASE 1 A & 2 <br />3/32" = V-0" <br />PLAN - LVL 2 - PHASING - PCU WING - 1 B <br />3/32" = 1'-0" <br />PROJECT <br />NORTH <br />APH=1 01 <br />1 2 3 4 5 6 Project Status <br />
The URL can be used to link to this page
Your browser does not support the video tag.