I _ _ _____ __L_ <br />SCOPE OF WORK FOR ALL DISCIPLINES <br />ITEMS TO INCLUDE IN YOUR BID IF NOT ALREADY NOTED ON PLANS: <br />• CONTRACTOR TO WALK THE SITE WITH THE HOBBY LOBBY ON -SITE <br />SUPERINTENDENT AND VERIFY ALL EXISTING CONDITIONS PRIOR TO BID. <br />• INCLUDE LABOR IN JOB TO COMPLETE YOUR SCOPE OF WORK IN THE TIME <br />ALLOWED BY FIELD SUPERINTENDENT. <br />• CLEAN UP DAILY OR MORE OFTEN IF NECESSARY TO KEEP SITE CLEAN AND <br />SAFE. <br />• CONTRACTOR TO SUPPLY AS -BUILT DRAWINGS AT COMPLETION OF PROJECT. <br />• ALL INFORMATION WILL BE PROVIDED TO ON -SITE SUPERINTENDENT OR THEIR <br />REPRESENTATIVE. <br />• CONTRACTOR TO BID COMPLETE SET OF DRAWINGS / ALL SHEETS. <br />• SUBCONTRACTOR MUST PROVIDE PAYMENT AND PERFORMANCE BOND FOR ANY <br />WORK OVER $100,000.00. CONTRACTOR TO SHOW BOND PRICE IN BID. BOND <br />MUST BE RECEIVED BY HOBBY LOBBY WITH IN 5 BUSINESS DAYS AFTER <br />CONTRACT RECEIVED. <br />• CONTRACTOR MUST INCLUDE AND SHOW SALES TAX ON BIDS. <br />• CONTRACTOR IS TO PLACE ALL DEBRIS IN THE G.C. PROVIDED DUMPSTER. <br />DRYWALL AND FRAMING <br />ITEMS TO INCLUDE IN YOUR BID IF NOT ALREADY NOTED ON PLANS: <br />• A MINIMUM OF 20 GAUGE METAL TO BE USED ON ALL FRAMING COMPONENTS. <br />• REFER TO PLANS FOR LOCATIONS OF HEAVIER GAUGE METALS TO BE USED. <br />• DRYWALL TO BE 5/8" TYPE X, UNLESS NOTED OTHERWISE, TAPED, BEDDED WITH <br />MEDIUM KNOCK DOWN TEXTURE READY FOR PAINT. <br />• 5/8" GREEN BOARD OR "M.R.S." (MOISTURE RESISTANT SHEET ROCK) IN REST <br />ROOMS ON WALLS THAT ARE WITHIN 4'-O" OF ANY PLUMBING FIXTURES. <br />• FURNISH AND INSTALL F.R.P., GLUE MUST BE APPLIED WITH A TROWEL NO <br />EXCEPTIONS. INSTALL F.R.P. CORNERS, JOINTS AND CEILING TRIM CUT TRIM 4" <br />ABOVE FINISH FLOOR FOR COVE BASE INSTALLATION. WHERE APPLICABLE AS <br />SHOWN ON PLANS. <br />• CEILING TILE TO BE ARMSTRONG 2911 PROVIDED BY G.C. <br />• SUBCONTRACTOR TO FURNISH AND INSTALL VINYL CLAD DRYWALL CEILING TILE. <br />• HARD CEILING AND METAL DECKS TO BE TIED TO ROOF STRUCTURE WITH CEILING <br />WIRE AND 1 1 /2" COLD ROLLED STEEL. USE STRUCTURAL GAUGE METAL DECKING <br />ABOVE CASH OFFICE. <br />• CHECK LOCAL CODES FOR SPECIAL CONDITIONS ON CEILING GRID INSTALLATION. <br />• FURNISH LABOR TO INSTALL DOORS, JAMBS AND HARDWARE. <br />• FURNISH LABOR TO INSTALL O.S.B. WAINSCOT IN WAREHOUSE. <br />• FURNISH AND INSTALL WOOD BACKING AT DOOR JAMBS, TOILET PARTITIONS, <br />BABY CHANGING STATION, T.V., TOILET ACCESSORIES, CABINETS, STORE FRONT, <br />AND SIGNAGE IF APPLICABLE. <br />• FURNISH AND INSTALL WOOD BLOCKING AND CORNICE FRAMING AT TOP OF <br />PARAPET WALLS IF SHOWN ON PLANS. (ALTERNATE PROPOSAL) <br />• INSTALLATION OF RESTROOM PARTITIONS AND ALL TOILET ACCESSORIES. <br />• INCLUDE CEILING GRID IN DRYWALL PROPOSAL. <br />• INCLUDE ALL EXTERIOR FRAMING, SHEATHING, AND MOISTURE BARRIER ON ALL <br />EXTERIOR FRAMEWORK. <br />• USE FIRE RATED CAULKING ON FIRE RATED WALLS, WHERE REQUIRED. <br />• INSULATE ALL WALLS BELOW CEILING GRID BETWEEN OFFICES, RETAIL, AND <br />RESTROOM WALLS ADJACENT TO STAGING AREA AS SHOWN ON PLANS. <br />• LABOR AND FASTENERS TO INSTALL G.C. SUPPLIED CABINETS AND SHELVING. <br />• FURNISH AND INSTALL CEILING WIRE AT ALL LIGHT FIXTURE CEILING BRACKETS. <br />COORDINATE EXACT LOCATION WITH ELECTRICIAN. <br />PLUMBING <br />ITEMS TO INCLUDE IN YOUR BID IF NOT ALREADY NOTED ON PLANS: <br />• SAW CUTTING AND REMOVAL OF CONCRETE SLAB AS NEEDED FOR NEW IN <br />GROUND PLUMBING. REPLACE WITH CONCRETE OF EQUAL DEPTH AND STRENGTH, <br />DOWEL EDGES OF SLAB 16" O.C. USING 1 /2" X 2' REBAR. <br />• CAP ALL UNUSED PLUMBING LINES A MINIMUM OF 4" BELOW FINISH FLOOR, NO <br />CONCRETE TO BE POURED INTO ABANDONED LINES. <br />• CAMERA ALL NEW LINES AT COMPLETION OF JOB ON GROUND UP CONSTRUCTION. <br />CAMERA ALL EXISTING LINES AT BEGINNING AND END OF JOBS TO BE REUSED. <br />PROVIDE TAPE OR DVD TO GENERAL CONTRACTOR. <br />• HOT WATER TANK TO BE ELECTRIC AS SPECIFIED. <br />CONTRACTOR TO INSTALL CONDENSATE LINES IF NECESSARY. <br />• HANDICAP SINKS TO RECEIVE WRAPPING ON EXPOSED PIPING PER CODE. <br />• CAP ALL WATER LINES THAT ARE ABANDONED AND REMOVE ALL ABANDONED <br />PIPING. <br />• PROVIDE TRAP PRIMERS ON ALL FLOOR DRAINS. <br />• IF PLANS INDICATE PRESSURE ASSIST TANKS ON WATER CLOSETS VERIFY THAT <br />THE HANDICAP HAVE THE SAME. <br />• GAS PIPING ON ROOF TO BE FASTENED DOWN TO APPROVED OR SPECIFIED <br />BLOCKING. <br />• IF A HIGH PRESSURE GAS LINE SYSTEM IS USED THE REGULATORS AND <br />SHUT-OFF VALVES WILL BE FURNISHED BY GAS PIPE INSTALLER. <br />• IDENTIFY LOCATION OF GAS, WATER AND IRRIGATION SERVICE AND METERS. <br />• CONFIRM NO CROSS CONNECTIONS ON NATURAL GAS SYSTEM OR WATER TO <br />ADJACENT SPACES IF APPLICABLE. <br />• IDENTIFY ANY SUB -METERS INSTALLED ON WATER SYSTEM AND DESCRIBE THEIR <br />PURPOSE. <br />• IDENTIFY LOCATION OF ALL BACK -FLOW PREVENTERS, I.E. FIRE SYSTEMS, <br />IRRIGATION, DOMESTIC WATER, ETC. AND TESTING IF APPLICABLE. <br />• SUBMITTALS FOR ANY NEW FIXTURES AND EQUIPMENT TO BE SUPPLIED TO <br />HOBBY LOBBY PRIOR TO INSTALLATION. <br />• SUBCONTRACTOR TO DO ALL EXCAVATING, COMPACTING AND BACK FILLING <br />NECESSARY. <br />• SUBCONTRACTOR RESPONSIBLE FOR ALL BACKING NECESSARY TO COMPLETE HIS <br />WORK. <br />PLUMBING (GROUND UP) <br />• ALL PIPES SHALL BE CUT OFF AT LEAST 1" BELOW FINISH FLOOR WITH A <br />COUPLING TO TIE INTO AND EXTEND UP AFTER FLOOR AND WALLS HAVE BEEN <br />POURED. <br />• PLACE 12" SONA-TUBE AROUND EACH PIPE FILLED WITH SAND TO 1" BELOW <br />FINISH FLOOR. <br />• AFTER WALLS HAVE BEEN ERECTED LOCATE ALL PIPES AND BREAK OUT <br />CONCRETE COVERING THEM AND EXTEND UP ABOVE FLOOR. <br />• ALL WATER LINES SHALL BE COPPER AND RAN OVERHEAD. <br />• ALL WATER LINES SHALL BE HUNG ON APPROVED HANGERS AND INSULATED. <br />• ALL PVC SHALL BE SCHEDULE 40. <br />CONCRETE <br />ITEMS TO INCLUDE IN YOUR BID IF NOT ALREADY NOTED ON PLANS: <br />• CONTRACTOR TO SUPPLY HOBBY LOBBY WITH MIX DESIGN OF CONCRETE FROM <br />SUPPLIER OR SUPPLIERS PRIOR TO THE POURING OF ANY CONCRETE. ALLOW 2 <br />WEEKS LEAD TIME FOR ENGINEERS APPROVAL. <br />• IF CONTRACTOR USES ANY COMPANY OR INDIVIDUAL AS A SUBCONTRACTOR TO <br />COMPLETE ANY PORTION OF THEIR CONTRACT, THEY MUST NOTIFY HOBBY LOBBY <br />WITH PROOF OF THEIR INSURANCE PRIOR TO DOING ANY WORK ON THE JOB. <br />• CONTRACTOR TO SUPPLY AND INSTALL ALL STEEL REINFORCEMENT TO BE USED <br />ON THIS PROJECT. CONTRACTOR IS RESPONSIBLE FOR ANY FABRICATION TO <br />FORM INTO SHAPES AND LENGTHS REQUIRED. <br />• CONTRACTOR TO SUPPLY ALL CONCRETE, MATERIALS, AND LABOR TO COMPLETE <br />THIS PROJECT. (ANY EXCLUSION MUST BE NOTED ON CONTRACT) <br />• G.C. WILL HAVE A SURVEYOR SET PINS FOR BUILDING CORNERS, PIERS, BACK OF <br />CURBS, LIGHT POLE BASES, LOADING DOCK WALLS AND REFERENCE FOR OTHER <br />POINTS ALONG WITH ELEVATIONS. IT IS THE CONTRACTORS RESPONSIBILITY TO <br />SET BATTER BOARDS OR LINES FOR OTHER TRADES TO USE TO ESTABLISH THE <br />LOCATIONS NEEDED FOR INSTALLATION OF OTHER'S ITEMS AS REQUIRED. <br />• CONTRACTOR IS TO LAYOUT AND PLACE ALL EMBEDS AND ANCHOR BOLTS IN <br />CONCRETE AS SHOWN BY DRAWINGS. <br />• CONTRACTOR TO FURNISH AND PUT TO GRADE ALL MATERIALS NEEDED TO BRING <br />SUB GRADE TO FINAL GRADE ONCE SUB GRADE HAS BEEN BROUGHT TO PLUS <br />(+) OR MINUS (-) A TENTH OF A FOOT. <br />• ANY MATERIALS EXCAVATED BY CONTRACTOR ARE TO BE MOVED TO AN AREA <br />DESIGNATED BY SUPERINTENDENT TO BE USED FOR BACK FILL LATER. (ALL <br />SPOILS TO BE REMOVED FROM JOBSITE BY CONTRACTOR) <br />• CONTRACTOR TO EXCAVATE DIRT BETWEEN PIERS FOR PANELS THEN BACKFILL <br />AND COMPACT ALL AREAS NEXT TO ANY AND ALL WALLS. <br />• CONTRACTOR TO FURNISH AND INSTALL ALL SHIMS AND REBAR PINS TO ENSURE <br />LINE AND GRADE OF PANELS. <br />• CONTRACTOR TO MARK PANEL LOCATIONS AND TO HAVE A PERSON PRESENT <br />WHEN PANELS ARE BEING SET TO SURVEY IN PANELS TO ENSURE THEY ARE SET <br />TRUE TO LINE AND GRADE. <br />• CONTRACTOR WILL BE RESPONSIBLE FOR ENGINEERING OF LIFTING POINTS AND <br />BRACING OF PANELS. <br />• CONTRACTOR WILL FURNISH AND INSTALL ALL EMBEDS FOR LIFTING AND <br />BRACING. <br />• CONTRACTOR WILL CLEAN ALL EMBEDS AND REMOVE ANY INSPECTED BY <br />ERECTOR PRIOR TO LIFTING OF ANY PANELS TO INSURE THEY ARE PROPERLY <br />CLEANED AND NO DAMAGE HAS ACCRUED TO LIFTING AND BRACING EMBEDS. <br />• CONTRACTOR TO SET NUTS ON ANCHOR BOLTS TO GRADE READY FOR <br />PLACEMENTS OF COLUMNS. <br />• CONTRACTOR WILL BE RESPONSIBLE FOR ANY CHARGES INCURRED DUE TO <br />ANCHOR BOLTS OR EMBED BEING OFF FROM WHERE SHOWN ON DRAWINGS. <br />• WHEN PANELS ARE SET AND STEEL ERECTED CONTRACTOR TO FURNISH AND <br />POUR CONCRETE ON BOTH SIDES OF PANEL JOINTS TO SECURE THEM. THIS IS <br />TO BE DONE BEFORE ANY BRACING IS REMOVED. <br />ITEMS TO INCLUDE IN YOUR BID <br />• CONTRACTOR TO FURNISH AND INSTALL ANY BLOCK OUTS FOR PLUMBING, <br />ELECTRICAL OR ANCHOR BOLTS. THESE ARE TO BE SET AT GRADE NOT TO <br />EXCEED 1" BELOW FINISH FLOOR AND FILLED WITH SAND TO TOP OF FORM. <br />CONCRETE TO BE POURED OVER THESE. ONCE PANELS ARE LIFTED THESE ARE <br />TO BE CLEANED OUT SO ANY OTHER WORK CAN BE DONE AND THEN FILLED <br />BACK WITH CONCRETE ONCE FINISHED. <br />• CONTRACTOR TO FURNISH AND INSTALL NON -SHRINK GROUT UNDER ALL <br />COLUMNS. <br />• ANY JOINTS WHERE POURS MEET ON FLOOR MUST BE A FLAT SURFACE AND <br />ANY RAISED AREAS WILL BE GROUND BACK FLAT BY CONTRACTOR. <br />• CONTRACTOR WILL FILL ALL PENETRATIONS MADE IN FLOOR. -ALL EMBEDS FOR <br />LIFTING OR BRACING THAT WILL BE EXPOSED ABOVE DECK OR IN STAGING AREA <br />WILL BE FILLED IN TO MAKE A SMOOTH SURFACE. <br />• PANEL EDGES ON THE EXTERIOR WHERE TWO PANELS MEET WILL HAVE A <br />CHAMFERED EDGE. HOBBY LOBBY WILL FURNISH DETAIL. <br />• ANY IMPERFECTIONS IN PANELS THAT ARE EXPOSED TO OUTSIDE OF BUILDING <br />WILL EITHER BE RUBBED OR FILLED SO THAT THEY WILL NOT. SHOW AFTER <br />PAINTED AND/OR TEX-COATED. <br />• CONTRACTOR TO SAW CUT ALL CONCRETE AS LAID OUT ON PLANS. THIS IS TO <br />BE DONE AS SOON AS IT CAN BE DONE WITHOUT CAUSING ANY DAMAGE TO <br />CONCRETE. NOT TO EXCEED 8 HOURS AFTER FINISHING. ANY DUSTS FROM <br />SAWING TO BE SWEPT OFF OF SLAB TO ENSURE CLEAN SURFACE FOR PANELS. <br />• SAW JOINTS WHERE PANELS ARE TO BE POURED ON TOP OF SLAB ARE TO BE <br />FILLED WITH PATCHING CEMENT SO NOT TO TRANSFER TO PANELS AS A DEFECT <br />OR LINE. <br />• CONTRACTOR TO SAW CUT PANELS AT 18" ABOVE DECK BEARING ELEVATION <br />FOR TERMINATION BAR OF ROOFING (WHEN APPLICABLE). THIS IS TO BE DONE <br />BEFORE LIFTING OF PANELS. <br />• CONTRACTOR TO CAULK A LINE ON PANELS BEFORE LIFTING AT DECK BEARING <br />ELEVATION TO CHECK THAT ALL EMBEDS ARE AT PROPER HEIGHTS. THIS IS TO <br />KEEP FROM HAVING ANY DELAYS DURING ERECTION OF BUILDING. <br />• ALL CURBS ARE TO BE POURED AS EITHER A CURB AND GUTTER, OR <br />MONOLITHIC WITH PARKING. CURBS MUST BE FORMED TO ENSURE A UNIFORM <br />SHAPE. <br />• CONTRACTOR TO FURNISH HOBBY LOBBY WITH A SCHEDULE OF WORK TO <br />ENSURE IT MEETS OUR FAST TRACK SCHEDULE AND FOR THE SCHEDULING OF <br />OTHER TRADES. <br />• LOADING DOCK WALLS AND LIGHT POLE BASES WILL BE HAND RUBBED TO A <br />TEXTURE FINISH AS TO NOT SHOW ANY DEFECTS. <br />• CONTRACTOR IS RESPONSIBLE FOR ANY PRICE INCREASE OR OTHER CHARGES <br />INCURRED TO MAINTAIN THE SCHEDULE OF THIS PROJECT. THESE CHARGES WILL <br />NOT BE PASSED ON TO HOBBY LOBBY. <br />• CONTRACTOR WILL BE RESPONSIBLE FOR PUMPING OF WATER THAT MIGHT BE <br />TRAPPED IN BLOCK OUTS FOR COLUMNS, LOADING DOCK OR STORM DRAINS <br />UNTIL THEY HAVE COMPLETED THEIR WORK IN THOSE AREAS. <br />• CONTRACTOR IS TO PAY FOR ALL DRILLING OF PIERS, PUMPING OF CONCRETE, <br />OR THAT OF ANY OTHER EQUIPMENT USED TO COMPLETE THEIR CONTRACT. <br />• CONTRACTOR TO INSTALL ALL ANCHOR BOLTS FOR LIGHT POLES. OTHERS WILL <br />SUPPLY BOLTS AND LOCATION. <br />• ALL FINISHES AND TOLERANCES ARE TO BE AS SPELLED OUT IN SPEC. BOOK. <br />• CONTRACTOR TO SUPPLY AND APPLY A RELEASING COMPOUND WHERE PANELS <br />ARE POURED ON SLAB. THIS IS TO BE APPLIED HEAVY ENOUGH TO ENSURE <br />THAT PANELS WILL NOT STICK. IF COST IS INCURRED DUE TO STICKING OF <br />PANELS, IT WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PAY FOR THIS <br />AT NO ADDITIONAL COST TO HOBBY LOBBY. ANY DAMAGE TO CONCRETE DUE TO <br />THE STICKING PANELS WILL BE REPLACED OR REPAIRED BY CONTRACTOR. <br />• CONTRACTOR WILL BE RESPONSIBLE FOR ANY BARRICADES TO PREVENT TRAFFIC <br />FROM DRIVING ON PARKING UNTIL IT HAS CURED TO A POINT TO RECEIVE <br />TRAFFIC. <br />• CONTRACTOR TO INSTALL ALL G.C. SUPPLIED EMBEDS. <br />• CONTRACTOR TO INSTALL ALL G.C. SUPPLIED PIPE BOLLARDS. <br />• CONTRACTOR TO BLOCK OUT ALL OPENINGS IN PANELS ON PANEL BOOKS. <br />THESE ARE TO BE SECURED TO MAKE SURE THEY ARE SQUARE. <br />H.V.A.C. <br />ITEMS TO INCLUDE IN YOUR BID IF NOT ALREADY NOTED ON PLANS: <br />• CONTRACTOR AWARDED CONTRACT TO INSTALL NEW LENNOX R.T.U. EQUIPMENT <br />SHALL COMPLY WITH LENNOX, HOBBY LOBBY, AND NATIONAL/LOCAL CODE <br />INSTALLATION CRITERIA. <br />• ANY EXISTING HEATING AND COOLING EQUIPMENT BEING USED ON THE BUILDING <br />IS TO BE INSPECTED USING THE HOBBY LOBBY CHECKLIST SHEET AT THE START <br />OF THE CONSTRUCTION PROJECT (WITHIN 2 WEEKS) AND A DETAILED LIST OF <br />REPAIRS ALONG WITH AN ESTIMATE SENT TO HOBBY LOBBY FOR EVALUATION BY <br />THE H.V.A.C. MANAGER. UPON NOTIFICATION OF BID ACCEPTANCE, CONTRACTOR <br />HAS 2 WEEKS TO INSPECT ALL EXISTING H.V.A.C. EQUIPMENT, NOT BEING <br />REPLACED, AND SUBMIT AN EVALUATION REPORT AND BID FOR REPAIRS TO G.C. <br />EVALUATION MUST BE RECORDED IN FULL ON A HOBBY LOBBY EQUIPMENT <br />EVALUATION FORM. FAILURE TO DO SO MAY AFFECT RETAINAGE IF ANOTHER <br />CONTRACTOR MUST BE CALLED IN TO PERFORM THIS TASK. EVALUATIONS NEED <br />ONLY TO BE COMPLETED ON EQUIPMENT NOT TO BE REPLACED. <br />• MECHANICAL CONTRACTOR IS RESPONSIBLE FOR ASSEMBLY, SPOTTING, INTERNAL <br />INSULATION, AND LEVELING OF ROOF CURBS. INSULATION MATERIAL USED FOR <br />THE INTERIOR SPACE OF THE R.T.U. CURBS WILL BE THE MECHANICAL <br />CONTRACTOR'S RESPONSIBILITY TO FURNISH AND INSTALL. <br />• CUT DECKING AT CURBS FOR DUCT WORK INSTALLATION AND ON NEW R.T.U. <br />UNITS HVAC CONTRACTOR SHALL INCLUDE SPACE FOR INSTALLATION OF 1" <br />CONDUIT BY ELECTRICAL CONTRACTOR FOR CABLING REQUIREMENTS. (SEE <br />ELECTRICAL SCOPE OF WORK) <br />• MECHANICAL CONTRACTOR WILL BE RESPONSIBLE FOR COORDINATION OF R.T.U. <br />DELIVERY TO JOBSITE WITH JOB SUPERINTENDENT AND LENNOX. EQUIPMENT <br />SHOULD BE TRANSFERRED BY CRANE FROM THE DELIVERY TRUCK TO THE R.T.U. <br />CURB AND NOT STORED ON THE GROUND. <br />• SET ROOF TOP UNITS. <br />• SMOKE DETECTORS ON ALL EXISTING R.T.U.S (NOT GROUND UP CONSTRUCTION) <br />SHALL BE REPLACED BY THE MECHANICAL CONTRACTOR AND MEET LOCAL <br />SMOKE DETECTOR FIRE CODES. SMOKE DETECTORS TO BE FURNISHED BY HOBBY <br />LOBBY AND INSTALLED BY MECHANICAL CONTRACTOR UNLESS NOTED OTHERWISE. <br />• INSTALL THERMOSTATS AND / OR AUTOMATION SENSORS. TERMINATE WIRING TO <br />REQUIRED UNITS AND THERMOSTATS. <br />• LENNOX UNITS WITH BELT DRIVE BLOWER MOTORS ARE SHIPPED WITH THE DRIVE <br />PULLEY IN THE OPEN POSITION. CONTRACTOR MUST ALIGN AND ADJUST PULLEY <br />TO WITHIN 1 TURN OF THE CLOSED POSITION AND THOROUGHLY TIGHTEN THE <br />SETSCREW LOCKING THE ADJUSTMENT IN PLACE. FAILURE TO ADJUST WILL CAUSE <br />THE UNIT TO CYCLE ON LOW PRESSURE DUE TO LOW AIR MOVEMENT. ONLY <br />EXCEPTION, IF CERTIFIED AIR BALANCE IS PERFORMED AND PULLEY HAS BEEN <br />SET BY THE CERTIFIED BALANCING PROCEDURE TO A DIFFERENT POSITION. <br />• G.C. WILL WIRE UNITS TO THE BUILDING AUTOMATION SYSTEM. CHECK FOR <br />REQUIREMENT BY SUBCONTRACTOR. (REFER TO DRAWINGS) <br />• JOBS WITH UNUSED OR DEMISED DUCTING INN THE CEILING CAVITY SHALL HAVE <br />SAID DUCT REMOVED BY THE MECHANICAL CONTRACTOR UNLESS STATED <br />OTHERWISE. <br />• FURNISH AND INSTALL ALL NECESSARY DUCTWORK PER DESIGN ENGINEER <br />SPECIFICATIONS USING HARD ROUND OR RECTANGLE DUCT (A MAXIMUM OF 6 <br />FOOT OF FLEX MAY BE USED PER RUN BETWEEN DIFFUSER AND METAL PIPE) OR <br />PER CODE. BALANCING DAMPERS ARE TO BE INSTALLED IN EACH SUPPLY DUCT <br />RUN FOR BALANCING PURPOSES. DAMPERS TO BE INSTALLED AT THE END OF <br />THE HARD PIPE DUCT RUN AND BEFORE THE FLEX DUCT CONNECTION TO THE <br />DIFFUSER. METAL ELBOWS SHALL BE USED IN A WAY TO KEEP FLEXIBLE DUCT <br />CONNECTIONS STRAIGHT BETWEEN ROUND METAL SUPPLY DUCTING AND THE <br />SUPPLY GRILLE. NO ELLS ARE TO BE FORMED WITH FLEXIBLE DUCTING. <br />• FURNISH AND INSTALL ALL DIFFUSERS. BALANCE AIRFLOW TO EACH REGISTER. <br />• RECOVER ALL REFRIGERANT IN ABANDONED UNITS. (CONTRACTOR TO SUPPLY <br />REFRIGERANT INCIDENT REPORT TO HOBBY LOBBY VERIFYING EQUIPMENT <br />DISPOSAL.) <br />• UNITS 7.5 TON AND LARGER WITH CONCENTRIC AIRFLOW DESIGN SHALL USE <br />RECTANGLE METAL CONNECTIONS PER THE M-2 DRAWINGS. ABSOLUTELY NO <br />FLEXIBLE ROUND DUCT OR RIGID ROUND DUCT CONNECTIONS IN ANY <br />CONFIGURATION WILL BE ACCEPTED BETWEEN THE UNIT AND CONCENTRIC <br />PACKAGES. <br />• MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR SPOTTING AND <br />COORDINATING INSTALLATION OF EXHAUST FAN CURB/S WITH THE ROOFING <br />CONTRACTOR. <br />• CONTRACTOR SHALL COMPLETE HOBBY LOBBY NEW EQUIPMENT START UP CHECK <br />LIST WHEN INSTALLATION IS COMPLETE. THE COMPLETED FORM, FOR EACH UNIT, <br />IS TO BE GIVEN TO THE HOBBY LOBBY SUPERINTENDENT WITH ALL INFORMATION <br />RECORDED FOR REVIEW. <br />• CONTRACTOR TO MAINTAIN A CLEAN WORK ENVIRONMENT AND REMOVE TRASH <br />AND DEBRIS FROM WORK AREA DAILY. ANY CHARGES FOR ROOF REPAIR OR <br />CLEAN UP CREATED DUE TO NEGLIGENCE WILL BE WITHHELD FROM <br />CONTRACTORS' RETAINAGE, NO EXCEPTIONS. <br />• NUMBERING OF H.V.A.C. EQUIPMENT TO MATCH HOBBY LOBBY DRAWING AND <br />PERFORMED BY H.V.A.C. CONTRACTOR PER SHEET BAS1. <br />• MECHANICAL CONTRACTOR WILL COORDINATE WITH ROOFER THE PLACEMENT OF <br />CURBS AND CUTTING OF THE DECKING MATERIAL. <br />• STORES WITH OPEN CEILINGS AND CONCENTRIC AIR DISTRIBUTION DESIGN WILL <br />HAVE CONCENTRIC SUPPLIES INSTALLED IN A MANNER TO PREVENT SUPPLY AIR <br />FROM DISCHARGING DIRECTLY ON LIGHT FIXTURES. THE TOP OF THE SUPPLY <br />DISCHARGE OPENING SHOULD BE MOUNTED NO HIGHER THAN THE BOTTOM OF <br />ALL LIGHTING FIXTURES. <br />• INSTALL DUCTWORK IN OPEN CEILING BEFORE PAINT AND INSTALL DUCTWORK IN <br />GRID CEILING BEFORE GRID INSTALLATION. <br />• MECHANICAL CONTRACTOR WILL BE RESPONSIBLE TO PERFORM TWO FILTER <br />CHANGES IN ALL R.T.U. UNITS OPERATED DURING CONSTRUCTION, USING PLEATED <br />FILTERS WITH A RATING OF NO LESS THAN A MERV 7. FIRST CHANGE TO BE <br />PERFORMED AT THE HEIGHT OF CONSTRUCTION DEMO WITH THE SECOND AFTER <br />FIXTURING BEFORE STORE OPENING. <br />UNLESS SPECIFIED ELSEWHERE,MECHANICAL <br />E CHANI CAL CONTRACTOR SHALL BE <br />RESPONSIBLE FOR CONDENSATE DRAINS MEETING LOCAL AND NATIONAL CODES. <br />SUPPORTS SHALL BE OF TYPE IDENTIFIED ON M-2 DRAWINGS AND ATTACHED TO <br />ROOF MEMBRANE IN A MANNER NOT TO AFFECT ROOF WARRANTY AND TO <br />PREVENT PIPING FROM MOVING OR SAGGING. <br />• LAY IN SUPPLY DIFFUSERS SHALL BE INSTALLED WITH AN INSULATED METAL <br />ELBOW CONNECTING FROM THE FLEXIBLE DUCT DROP TO THE MATCHING THROAT <br />SIZE OF THE DIFFUSER. DIFFUSER BACKING SURFACE SHALL ALSO BE OF THE <br />INSULATED VARIETY OR INSULATED BY THE MECHANICAL CONTRACTOR. <br />• EQUIPMENT TO BE REPLACED OR REMOVED FROM STRUCTURE SHALL BE <br />DISPOSED OF IN ACCORDANCE WITH APPROPRIATE EPA GUIDELINES. PROPER <br />DOCUMENTATION WILL BE FURNISHED TO HOBBY LOBBY DESCRIBING MEANS OF <br />RECOVERY AND DISPOSAL <br />• MECHANICAL CONTRACTOR WILL BE RESPONSIBLE FOR INSTALLATION OF FILTER <br />MEDIA, FURNISHED BY HOBBY LOBBY, TO ALL RETURN GRILLES OR UNFINISHED <br />RETURN DUCT OPENINGS OF R.T.U.'S OPERATED DURING CONSTRUCTION. NO UNIT <br />SHALL BE RUN DURING CONSTRUCTION WITHOUT THIS PRECAUTION BEING <br />ADHERED TO. <br />• MECHANICAL CONTRACTOR WILL COORDINATE WITH JOB SUPERINTENDENT THE <br />ISOLATION AND PROTECTION OF RETURN AIR SMOKE DETECTOR SAMPLING TUBES <br />AND SENSING CHAMBER IMMEDIATELY AFTER PLACEMENT OF EQUIPMENT ON THE <br />ROOF, BEFORE STARTUP. CONTRACTOR WILL BE HELD LIABLE FOR SMOKE <br />DETECTOR FAILURE IF THIS PROCEDURE IS NOT FOLLOWED - NO EXCEPTIONS. <br />PROCEDURE TO BE REVERSED BY THE MECHANICAL CONTRACTOR BEFORE <br />COMMISSIONING OF FIRE ALARM AND TESTING <br />L ES G OF SMOKE DETECTORS. <br />• AS-BUILTS ARE TO BE COMPLETED AND TURNED INTO THE HOBBY LOBBY <br />SUPERINTENDENT AT COMPLETION OF JOB. <br />• HVAC CONTRACTOR SHALL WIRE A THERMOSTAT FOR ALL EXISTING AND NEW <br />UNIT HEATERS. <br />ELECTRICAL <br />ITEMS TO INCLUDE IN YOUR BID IF NOT ALREADY NOTED ON PLANS: <br />• DEMO ALL UNUSED PANELS. <br />• DEMO ALL POWER COMING UP THRU FLOOR. <br />• DISCONNECT (SAFE OFF) ALL ELECTRICAL IN WALLS AND LIGHTING TO BE <br />REMOVED. <br />• RELOCATE ANY PANELS POSSIBLE NEEDED TO ACCOMMODATE NEW CIRCUITS. <br />WIRE AND INSTALL ALL OWNER PROVIDEDPOWER <br />OWER POLES PER PLANS. <br />• WIRE AND INSTALL ALL OWNER PROVIDED PLUG MOLD PER PLANS. <br />• WIRE AND INSTALL ALL 3 PHASE 208 OR 480 CIRCUITS TO ROOF TOP UNITS. <br />(DISCONNECT PROVIDED IN ALL NEW ROOF TOP UNITS.) CONTRACTOR TO PROVIDE <br />EXTERNAL DISCONNECT IF REQUIRED BY CODE. <br />• PROVIDE WIRE TO AND INSTALL WEATHER PROOF G.F.I. CIRCUITS PER LOCAL <br />CODE ON R.T.U.'S. <br />• A 1" CONDUIT IS TO BE INSTALLED ON ALL EXISTING AND NEW R.T.U'S FOR THE <br />PURPOSE OF ROUTING ALL COMMUNICATION AND LOW VOLTAGE WIRING. CONDUIT <br />SHALL CONNECT FORM INSIDE THE ELECTRICAL COMPARTMENT OF R.T.U. <br />PENETRATING THE ROOF DECK AND TO EXTEND NO LESS THAN 18" BELOW THE <br />ROOF DECK. CONDUIT ENDS SHALL HAVE A CONNECTOR AND BUSHING ON EACH <br />END. <br />• PROVIDE ALL CONDUIT STUBS FOR PHONE, DATA, T.V., CAMERAS, ALARMS OR <br />OTHER DEVICES PER PLANS. <br />• PROVIDE WIRE TO AND INSTALL BUZZER SYSTEM TO TRUCK DOCK ENTRANCE PER <br />PLANS. <br />• PROVIDE WIRE TO AND INSTALL BUZZER SYSTEM FOR STORE EMPLOYEE <br />ENTRANCE PER PLANS. <br />• WIRE CIRCUIT TO BALER PER PLANS AND FURNISH DISCONNECT. <br />• WIRE CIRCUIT TO COMPACTOR PER PLANS AND FURNISH DISCONNECT. <br />• WIRE (3) 120 VOLT 20 AMP CIRCUITS TO SIGNAGE PER PLANS WITH JUNCTION <br />BOXES. <br />• PROVIDE WIRE TO INSTALL (1) 120 VOLT 20 AMP DEDICATED CIRCUIT FOR <br />SECURITY SYSTEM. <br />• PROVIDE WIRE TO INSTALL (1) 120 VOLT 20 AMP DEDICATED CIRCUIT FOR FIRE <br />ALARM SYSTEM. <br />• WIRE AND INSTALL ALL OWNER PROVIDED LIGHT FIXTURES PER PRINT. <br />• SUPPLY UNI-STRUT AND FIXTURE CHAIN ON LIGHT FIXTURES IN SALES AREA. <br />(OPEN CEILING SYSTEMS ONLY) ALL LIGHTING TO BE LEVEL AND STRAIGHT. <br />• PROVIDE AND INSTALL (2) 3" CONDUITS FROM TELEPHONE BOARD TO DECK FOR <br />HOBBY LOBBY INSTALLED LOW VOLTAGE WIRING. <br />• ELECTRICAL CONTRACTOR SHALL INSTALL OWNER PROVIDED LIGHTING CONTACTOR <br />PANEL (L.C.O.). ALL BUILDING AUTOMATION SYSTEM INTERIOR AND EXTERIOR <br />LIGHTING, POWER POLES, AND CEILING PLUGS ARE TO BE CONNECTED IN THE <br />.C.P. THEN ROUTED BACK TO APPROPRIATE BREAKER PANEL. <br />• ELECTRICAL CONTRACTOR SHALL PROVIDE 120 VAC POWER TO L.C.P. ALSO <br />PROVIDE PVC RACEWAY TO EXTEND FROM THE TOP LEFT OF THE L.C.P. UP <br />THROUGH THE DROP CEILING OR CEILING GIRDER WHICH EVER IS REQUIRED. <br />• INVESTIGATE M.D.P. FOR LIGHTING CONTROL CIRCUITS FOR EXTERIOR LIGHTING <br />CIRCUITS, DESIGNATE, AND MARK. <br />• INVESTIGATE TO ASSURE NO OTHER BUILDINGS OR AREAS ARE BEING SUPPLIED <br />FROM HOBBY LOBBY ELECTRICAL SWITCH. <br />• TEMPORARY LIGHTING AS NEEDED FOR CONSTRUCTION PURPOSES. <br />• IDENTIFY AND MARK ALL SERVICE GEAR AND PANELS WITH TYPED PRINT. <br />• RENTAL EQUIPMENT <br />• ELECTRICAL PERMIT <br />• ALL DEMO WIRING AND PANELS ARE THE PROPERTY OF HOBBY LOBBY. <br />• IDENTIFY ELECTRIC SERVICE AND METER SUPPLYING POWER TO LOCATION. <br />• CONFIRM NO CIRCUITS FEED POWER TO ADJACENT SPACE OR EXTERIOR OF <br />BUILDING FROM DISTRIBUTION PANELS, I.E. PARKING LOT LIGHTING, PEDESTAL <br />SIGNS, ETC. <br />• IDENTIFY ANY SUB -METERS ON UTILITY SERVICE AND THEIR PURPOSE <br />• REQUEST THE MOST CURRENT FIXTURE PLAN FROM SUPERINTENDENT BEFORE <br />INSTALLING THE HOME RUNS TO THE POWER POLES AND ANY FIXTURE DISPLAY. <br />• ALL SENSOR, COMMUNICATION, (SECURITY AND FIRE AS NEEDED) CABLES SHALL <br />BE PULLED THROUGH 1" CONDUIT INTO R.T.U. CABLES ARE NOT TO BE <br />STRETCHED, NICKED, OR CUT. CABLES IS TO BE ROLLED UP AND TAPED INSIDE <br />OF UNIT. <br />• ALARM DRAWINGS PROVIDED BY HOBBY LOBBY. PROVIDE CONDUIT AND J-BOXES <br />WHERE REQUIRED FOR CEILING HORNS, PULL STATIONS, CONTROL PANEL AND <br />KEY PAD. IF ALARM PLAN IS UNAVAILABLE OR NOT ATTACHED TO THE SET OF <br />PLANS AT THE TIME OF BIDDING ONE WILL BE PROVIDED TO ELECTRICAL <br />CONTRACTOR. <br />• WIRE EXHAUST FAN FOR RESTROOMS AND CONFIRM VOLTAGE WITH H.V.A.C. <br />CONTRACTOR. <br />• WIRE WATER HEATER FOR RESTROOMS AND CONFIRM VOLTAGE WITH PLUMBING <br />CONTRACTOR. <br />• PROVIDE AND INSTALL (1) 3" CONDUIT FROM ALARM PANEL TO BOTTOM OF BAR <br />JOISTS. VERIFY LOCATION ON PLANS. <br />• PROVIDE TEMPORARY 200 AMP PANEL LOCATED IN THE CENTER OF THE STORE <br />WITH 20 CIRCUITS FOR CONTRACTOR USE. <br />• PROVIDE A SEPARATE PRICE FOR EXTERNAL DISCONNECT WHICH MAY BE <br />REQUIRED BY CODE. <br />• NUMBERING OF R.T.U.'S ARE TO FOLLOW BUILDING AUTOMATION SYSTEM DRAWING. <br />• AS-BUILTS ARE TO BE COMPLETED AND TURNED INTO THE HOBBY LOBBY <br />SUPERINTENDENT AT COMPLETION OF JOB. <br />• 10 TON LENNOX R.T.U. DISCONNECTS SHALL BE LOCATED AS INDICATED (SEE <br />DETAIL SHEET 5-E3). <br />• TWO (22) FOUR SQUARE BOXES (ONE ABOVE THE OTHER CONNECTED BY [" <br />CONDUIT) WITH S/G PLASTER RING (5/8" RAISE) SHALL BE MOUNTED ON <br />COLUMNS WITH THERMOSTATS. TWO [" CONDUITS OUT OF THE TOP OF THE BOX <br />SHALL BE EXTENDED 6 INCHES ABOVE CEILING GRID. CONDUIT END SHALL HAVE <br />A CONNECTOR AND BUSHING ON EACH END. <br />• A (2-") FOUR SQUARE BOX WITH S/G PLASTER RING (NO RAISE) SHALL BE <br />MOUNTED FOR UNIT HEATER SENSORS PER E1 OR BUILDING AUTOMATION SYSTEM <br />DRAWINGS. A [" CONDUIT OUT OF THE TOP OF THE BOX IS TO BE EXTENDED NO <br />LESS THAN 1 FOOT FROM THE DECK. CONDUIT END SHALL HAVE A CONNECTOR <br />AND BUSHING ON EACH END. <br />• ALL BREAKERS ARE TO BE LABELED. <br />• ELECTRICAL CONTRACTOR SHALL INSTALL OWNER PROVIDED VERIS METER AT <br />SERVICE ENTRANCE FEEDING MAIN DISTRIBUTION PANEL. THE VERIS METER IS TO <br />BE POWERED WITH A 3-PHASE 20 AMP BREAKER. <br />• PROVIDE ADD ALTERNATE TO FURNISH AND INSTALL CEILING WIRE AT ALL LIGHT <br />FIXTURE CEILING BRACKETS. <br />SPRINKLER <br />ITEMS TO INCLUDE IN YOUR BID IF NOT ALREADY NOTED ON PLANS: <br />• PRIOR TO STARTING WORK CONTRACTOR SHALL SEND TWO COPIES OF PLANS TO <br />CORPORATE OFFICE FOR OUR REVIEW AND RECORDS. SEND TO CONSTRUCTION <br />DEPARTMENT CONTRACTOR ADMINISTRATOR: 7707 S.W. 44TH STREET, OKLAHOMA <br />CITY, OKLAHOMA 73179. <br />• PROVIDE AND INSTALL VALVED TEST CONNECTIONS FOR SYSTEM AS REQUIRED. <br />• NECESSARY ENAMEL SIGNS SHALL BE INSTALLED ON CONTROL VALVES, DRAINS, AND <br />INSPECTOR'S TEST IN ACCORDANCE WITH GOVERNING BODIES SPECIFICATIONS. <br />• CONTRACTOR IS RESPONSIBLE FOR INSTALLING FIRE SUPPRESSION SYSTEM PER <br />GOVERNING AGENCY. <br />• CONTRACTOR RESPONSIBLE FOR ALL PERMITS, LICENSE AND OBTAINING <br />APPROVED DRAWINGS FOR GOVERNING AGENCY. <br />• CONTRACTOR TO DESIGN LOCATION OF SPRINKLER HEADS TO AVOID CONFLICT <br />WITH LAYOUT OF LIGHT FIXTURES AND CEILING GRID. LIGHT FIXTURE LAYOUT WILL <br />STAY AS DESIGNED AND NOT BE MOVED. SPRINKLER HEADS WILL BE ADJUSTED <br />ACCORDINGLY AROUND FIXTURE LAYOUT. <br />• CONTRACTOR IS RESPONSIBLE FOR STANDARD PIPE CONNECTION, CONNECTION TO <br />THE BUILDING, AND BRINGING MAIN INTO BUILDING AT SPECIFIED STUB UP. <br />OWNER PROVIDES WATER MAIN LOCATED 5' OUTSIDE OF BUILDING LINE. <br />CONTRACTOR IS RESPONSIBLE FOR EXCAVATION AND BACKFILL. <br />• CONTRACTOR TO PROVIDE BACK FLOW PREVENTER IF REQUIRED BY NATIONAL <br />CODE OR CITY REQUIREMENTS. <br />• CONTRACTOR IS RESPONSIBLE FOR ALL TESTS TO MEET GOVERNING CODES. <br />• CONTRACTOR TO PROVIDE ALL TAMPER AND FLOW VALVES NECESSARY FOR <br />SYSTEMS. <br />• CONTRACTOR WILL BE REQUIRED TO BE AVAILABLE AT THE JOB SITE FOR ALL <br />SPRINKLER AND ALARM RELATED INSPECTIONS. RE -INSPECTIONS ARE INCLUDED <br />ALSO. <br />• P.I.V., F.D.C. AND ASSOCIATED BACK FLOWS PROVIDED IF REQUIRED. <br />• CONTRACTOR TO FURNISH AND INSTALL BOX FOR SPARE HEADS AND WRENCHES. <br />• ALL AREAS WITH A GRID CEILING AND SURFACE MOUNTED LIGHTS SHALL HAVE A <br />PENDANT TYPE SPRINKLER HEAD WITH A 2 PIECE ESCUTCHEON THAT HANGS <br />DOWN BELOW THE CEILING SO THAT LIGHTS WILL NOT INTERFERE WITH THE <br />COVERAGE. ALL LAYOUT OF SPRINKLERS MUST MATCH HOBBY LOBBY LIGHTING <br />LAYOUT. <br />• ALL SPRINKLERS SHALL BE COORDINATED TO MISS THE CEILING GRID. <br />• SPRINKLERS SHALL BE SPACED IN ACCORDANCE WITH THE LIGHTING AND <br />MECHANICAL EQUIPMENT. LIGHTING AND MECHANICAL EQUIPMENT PLACEMENT <br />SHALL HAVE PRIORITY OVER THE SPRINKLER PIPING. SPRINKLER PIPES SHALL <br />NOT PENETRATE AIR DUCTS OR STRUCTURAL MEMBERS. PROVIDE ADDITIONAL <br />SPRINKLERS AROUND MECHANICAL EQUIPMENT, PIPING, DUCTWORK AND OTHER <br />OBSTRUCTIONS AS REQUIRED BY NFPA 13. <br />• PROVIDE CEILING ACCESS DOORS WHERE REQUIRED TO ACCESS VALVES OR <br />OTHER ITEMS REQUIRING MAINTENANCE IN PLASTER CEILINGS. ALL ACCESS <br />DOORS SHALL BE SIZED AND LOCATED TO PERMIT EASY ACCESS TO THE ITEMS <br />REQUIRING MAINTENANCE. CEILING ACCESS DOORS SHALL BE 24" x 24" <br />MINIMUM. <br />• ALL PIPING SHALL BE CONCEALED ABOVE CEILING OR IN WALL SPACES UNLESS <br />OTHERWISE NOTED. THE ROUTING OF ALL EXPOSED PIPING SHALL BE REVIEWED <br />AND APPROVED IN THE FIELD BY HOBBY LOBBY PRIOR TO INSTALLATION. <br />• ALL EXPOSED SPRINKLER PIPING DOES NOT NEED TO BE PAINTED UNLESS <br />REQUIRED BY LOCAL CODE. IF SPRINKLER PIPE PAINTING IS REQUIRED ALL <br />PIPING SHALL BE THOROUGHLY CLEANED BEFORE IT IS PAINTED. INSTALL <br />CHROME ESCUTCHEONS AT ALL EXPOSED WALL PENETRATIONS. SLEEVE AND <br />SEAL WALL AND FLOOR PENETRATIONS AS SPECIFIED. <br />• ALL WALL PENETRATIONS OF FIRE RATED ASSEMBLIES SHALL BE SEALED AS <br />SPECIFIED. VERIFY LOCATION OF ALL FIRE RATED WALLS AND FLOORS WITH <br />OWNER. SEAL ALL REVEALING WALL PENETRATIONS & CAULK. SEE <br />SPECIFICATIONS. <br />ALL SPRINKLER PIPING SHALL BE INSTALLED AT SUCH T T C H HE SYSTEM WILL <br />COMPLETELY DRAIN BACK TO THE MAIN. IF A SECTION OF PIPING CANNOT BE <br />SLOPED BACK TO THE MAIN, AN AUXILIARY DRAIN VALVE WITH PERMANENT <br />LABEL AND HOSE THREAD CONNECTION MUST BE INSTALLED. ALL AUXILIARY <br />DRAINS SHALL BE CONCEALED FROM OCCUPIED SPACES. <br />• FIRE PROTECTION CONTRACTOR SHALL PERFORM FLOW TEST TO VERIFY <br />AVAILABLE FLOW PRIOR TO PREPARING HYDRAULIC CALCULATIONS. <br />STEEL ERECTION <br />ITEMS TO INCLUDE IN YOUR BID IF NOT ALREADY NOTED ON PLANS: <br />• CONTRACTOR TO SCHEDULE UNLOADING OF ALL STEEL DELIVERED TO SITE AND <br />STAGE IN DESIGNATED AREA. <br />• CONTRACTOR IS TO PROVIDE ALL EQUIPMENT AND LABOR NECESSARY FOR <br />INSTALLATION OF ALL STEEL AND ANY WORK RELATED TO CONTRACT. <br />• CONTRACTOR IS TO CONFIRM MATERIAL LIST AT TIME OF OFF LOAD. SHORTAGES <br />SHOULD BE NOTED ON DELIVERY TICKET. <br />• CONTRACTOR WILL BE REQUIRED TO CONFIRM PANEL LAYOUT WITH CONCRETE <br />CONTRACTOR. <br />• CONTRACTOR IS REQUIRED TO INSTALL ALL R.T.U. STRUCTURAL FRAMING SHOWN <br />ON PRINTS AND COORDINATE WITH H.V.A.C. CONTRACTOR. <br />• PANEL ERECTING IS TO BE INCLUDED ALONG WITH BRACING. <br />• CONTRACTOR TO INCLUDE PRICE FOR RAILING AND JIB CRANE INSTALLATION. <br />E.I.F.S. <br />ITEMS TO INCLUDE IN YOUR BID IF NOT ALREADY NOTED ON PLANS: <br />• CONTRACTOR IS TO PROVIDE ALL NECESSARY EQUIPMENT TO COMPLETE THE JOB. <br />• CONTRACTOR IS REQUIRED TO KEEP PRODUCT OFF OF OTHER MATERIALS AND <br />SURFACES. <br />• CONTRACTOR MUST VERIFY E.I.F.S. COLORS THROUGH HOBBY LOBBY BEFORE <br />ORDERING MATERIALS. <br />• CONTRACTOR IS TO PROVIDE A PRICE FOR WEATHER PROTECTION IF IT BECOMES <br />NECESSARY. <br />• CONTRACTOR IS REQUIRED TO USE SENERGY OR DRYVIT FINISH PRODUCTS. <br />MASONRY <br />ITEMS TO INCLUDE IN YOUR BID IF NOT ALREADY NOTED ON PLANS: <br />• CONTRACTOR TO PROVIDE ALL MATERIALS AND LABOR AS SPECIFIED. <br />• CONTRACTOR IS TO PROVIDE ALL EQUIPMENT NECESSARY INCLUDING <br />SCAFFOLDING TO COMPLETE THE JOB. <br />• CONTRACTOR IS TO PROVIDE A COST FOR WINTERIZATION AS AN ALTERNATE. <br />• CONTRACTOR IS TO BE RESPONSIBLE FOR STORAGE OF HIS MATERIALS AND <br />SUPPLIES ON THE JOB SITE. <br />• CONTRACTOR IS RESPONSIBLE FOR REMOVING WATER, SILT, SLUDGE, SAND, OR <br />DIRT THAT HAS ACCUMULATED ON FOOTING DURING CONSTRUCTION WORK IN <br />ORDER TO PROCEED WITH HIS OWN WORK. <br />• CONTRACTOR IS TO PROVIDE AND INSTALL ALL STEEL LINTELS, REBAR AND DRY <br />STACK STONES. <br />• MASONRY CONTRACTOR IS RESPONSIBLE FOR ALL BRACING NECESSARY FOR THE <br />WALLS. <br />• CONTRACTOR IS TO PROVIDE AND INSTALL WEEP HOLES WHERE SHOWN ON <br />DRAWINGS. <br />• CONTRACTOR IS RESPONSIBLE FOR CLEANING OUT MASONRY EXPANSION JOINTS <br />BEFORE THE WATERPROOFING OF EXPANSION JOINT WITH CAULKING. <br />• CONTRACTOR IS RESPONSIBLE FOR REMOVAL OF EXCESS GROUT IN JOIST <br />POCKETS. <br />• CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ALL EMBED PLATES AND <br />ANCHOR BOLTS. <br />• CONTRACTOR IS RESPONSIBLE FOR FILLING CELLS WITH GROUT PER STRUCTURAL <br />DRAWINGS AND APPLICABLE CODES PER CITY AND STATE. <br />• CONTRACTOR IS RESPONSIBLE FOR MATCHING COLOR OF MASONRY AND GROUT. <br />• PROVIDE SAMPLE PANEL OF MASONRY PRODUCTS IF REQUIRED. <br />STOREFRONT <br />ITEMS TO INCLUDE IN YOUR BID IF NOTE ALREADY NOTED ON PLANS: <br />• CONTRACTOR IS TO PROVIDE SILL PLATE AT BOTTOMS OF ALL MULLIONS. <br />• CONTRACTOR IS TO PROVIDE CLOSED BACK JAMB FOR INSTALLATION OF <br />AUTOMATIC DOORS. <br />• VERIFY ON PRINTS, ANY TINTING REQUIREMENTS BY CODE. <br />• WHEN USING 4 1 /2" INCH MULLIONS YOU WILL BE REQUIRED TO WET SET INSIDE <br />OF RAILS AND STILES BEFORE SETTING GLASS. <br />• CONTRACTOR IS TO PROVIDE ALL CAULKING AROUND PERIMETER OF GLASS <br />STOREFRONT INSIDE AND OUT. <br />• CONTRACTOR WILL BE REQUIRED TO INSTALL STOREFRONT BEFORE AUTOMATIC <br />DOORS ARE INSTALLED. VERIFY FINISHED OPENING BEFORE MANUFACTURING. <br />• VERIFY THAT ALL FRAMES AND GLAZING MEET APPLICABLE CODES. <br />ROOFING <br />ITEMS TO INCLUDE IN YOUR BID IF NOT ALREADY NOTED ON PLANS: <br />• CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF WOOD NAILERS AND <br />PLYWOOD AT THE TOP OF C.M.U., TILT UP WALL, E.I.F.S., AND STRUCTURAL <br />FRAMING AND BID AS AN ADD ALTERNATE. <br />• CONTRACTOR IS REQUIRED TO PROVIDE ALL NECESSARY PADS UNDER GAS LINES, <br />CONDENSATE LINES, AND WALK PADS. <br />• CONTRACTOR IS TO PROVIDE THE ROOF WARRANTY TO HOBBY LOBBY IN THE <br />OWNER'S NAME AND ADDRESS. VERIFY COVERAGE REQUIRED (I.E. 15 OR 20 YEAR <br />WARRANTY) <br />• CONTRACTOR IS REQUIRED TO USE HICKMAN FLASHING, OR APPROVED EQUAL, <br />WHERE DESIGNATED ON PRINTS. <br />• CONTRACTOR IS REQUIRED TO FILL IN METAL DECKING BEFORE RE -ROOFING <br />OVER (ON REMODELS). <br />• CONTRACTOR IS RESPONSIBLE FOR ALL GUTTERING AND DOWNSPOUTS AS PER <br />PLANS. PROVIDE ADAPTORS AT BOTTOM OF DOWNSPOUT TO STORM SEWER <br />SYSTEM IF REQUIRED. <br />• CONTRACTOR WILL BE REQUIRED TO DO A FINAL SWEEP AFTER STORE IS <br />COMPLETED TO REPAIR DAMAGE OR FAULTY INSTALLATION. A ROOF DAMAGED BY <br />NEGLIGENCE WILL BE BACK CHARGED TO RESPONSIBLE PARTY. <br />• CONTRACTOR MUST PROVIDE AND INSTALL EXPANSION JOINTS, VERTICAL AND <br />HORIZONTAL WHEN REQUIRED. THEY MUST BE INSTALLED PER DETAILS ON <br />DRAWINGS. <br />PAINTING <br />ITEMS TO INCLUDE IN YOUR BID IF NOT ALREADY NOTED ON PLANS: <br />• CONTRACTOR IS REQUIRED TO PROVIDE ALL EQUIPMENT AND MATERIALS <br />NECESSARY TO COMPLETE JOB. <br />• CONTRACTOR IS RESPONSIBLE FOR KEEPING ALL PAINT OFF OF FLOORS, <br />PARAPETS, AND BAR JOISTS. <br />• CONTRACTOR WILL BE REQUIRED TO CAULK ALL PRODUCTS FINISHED TO: F.R.P., <br />METAL JAMBS, CABINETS, ETC. <br />• ALL WALLS, COLUMNS, AND PEG WILL BE REQUIRED TO HAVE ONE COAT PRIMER <br />AND TWO COATS FINISH. <br />• CONTRACTOR IS REQUIRED TO SUBMIT EXTERIOR PAINT SAMPLES TO BE <br />APPROVED BY HOBBY LOBBY. <br />• ALL PAINT MATERIALS TO BE PURCHASED FROM SHERWIN WILLIAMS. OIL BASE IS <br />REQUIRED ON ALL METAL. SEMI -GLOSS LATEX IS REQUIRED ON ALL WALLS <br />INCLUDING STAGING AREA WALLS. C.M.U. AND CONCRETE WALLS ARE NOT <br />REQUIRED TO BE PAINTED IF NEW ONLY IF PREVIOUSLY PAINTED. IF PAINTED, <br />BLOCK FILLER MUST BE INCLUDED. <br />• CONTRACTOR NEEDS TO REPLACE CEILING TILE IF REMOVED WHILE PAINTING. <br />• CONTRACTOR IS REQUIRED TO IDENTIFY ALL TOUCH UP PAINT WITH PERMANENT <br />MARKER FOR STORE MANAGER. REMOVE ALL OTHER PAINT AND MATERIALS FROM <br />JOB SITE AND DISPOSE OF AV PROPERLY. CH -UP PAINT. <br />LEAVE TOUCH-UP <br />• ALL SPRINKLER HEADS ARE TO BE PROTECTED FROM PAINT OVER SPRAY AND <br />THE METHOD OF PROTECTION OR COVERING REMOVED. <br />• PAINT ALL EXPOSED METAL ON ROOF INCLUDING ROOF HATCH AND BRACES. <br />• PAINT ALL GAS LINES ON ROOF. <br />• IN AN OPEN OR EXPOSED CEILING SITUATION CONTRACTOR IS TO PROTECT OR <br />CLEAN FLOORING AND ALL AREAS NOT TO RECEIVE PAINT. <br />ALARM SYSTEMS <br />ITEMS TO INCLUDE IN YOUR BID IF NOT ALREADY NOTED ON PLANS: <br />• ALARM CONTRACTOR TO BID AND INSTALL SYSTEM PER HOBBY LOBBY ALARM <br />CONTRACTOR FIELD PACK. <br />p+enb412 <br />hitecture <br />gineering <br />710 West Roselawn Drive <br />Rogers, Arkansas 72756 <br />Phone: 479.636.3545 <br />Fax: 479.636.1209 <br />William Douglas Hurley <br />Florida License No AR91919 <br />Firm License No: AA26000940 <br />W �� ~w wpzN <br />(n o Lnows �N<-ao <br />zaF zwt�w¢3 <br />W w �V)LX a5�poo< <br />aQ E=zQN= <br />Of a oa <br />O Loa ¢c�a``'ac~io�o <br />!i a CJ .z,z�� �w�F <br />U <br />X <br />O 3w�W��oowawCr LU acr~oa <br />00- z�� oa���z� <br />Qzv)nw8o v� w� ocno <br />aaSaz V- ZF-J�C7F- <br />0_ 00Xww<w`o�wWZ �m <br />�wazl-'~ow�'ooc�ao} <br />U7 F-�ii�n(Aa.z>iraawoaM <br />>M <br />I <br />M <br />0 <br />w Q <br />Q <br />~ JO <br />1Z )LL <br />illiiiiiiiiiiiiiiiiiiiiii <br />O 0(6 <br />m J <br />�_ J 2 <br />Q <br />r>_W <br />'o <br />Ly(D= <br />CL=�MCO <br />N <br />0 <br />M <br />(` <br />w <br />�� <br />as <br />0 <br />ti <br />ISSUE BLOCK <br />CHECKED BY: <br />DF <br />DRAWN BY: <br />JCF <br />FILE NAME: <br />G1.1 <br />DOCUMENT DATE: <br />08-09-13 <br />I <br />.0 <br />DID <br />NOTES <br />I I . <br />SHEET: <br />G1.1 1 - <br />