Laserfiche WebLink
REVISIONS BY <br />Xk4AU57 kA00D DUCT e C7ION lE5 _ k4A7I1�G, \/N7ILA7I0�1, AI G N AL N07 5 <br />�07 e (5"' G.C.> CONE) I7IONINC:; AND fP,,EF IG AXON <br />FEX�PAU'E)T <br />YER EXHAUST COLLARS AND EXHAUST GENERAL PROVISIONS THE DUCT COLLAR EXCEEDS 12" DIAMETER THE <br />ORK ARE SIZED TO MAINTAIN 2100 FPM DRAW BAND MUST BE POSITIONED BEHIND A 1. MECHANICAL CONTRACTOR SHALL VERIFY THAT <br />AIR VELOCITY. ALL GREASE EXHAUST I. SCOPE: PROVIDE ALL LABOR, MATERIAL, AND BEAD ON THE METAL COLLAR. ALL EQUIPMENT. AS SHOWN ON THESE <br />ORK SHALL BE CONSTRUCTED AND INSTALLED EQUIPMENT IN ACCORDANCE WITH THESE (6) INSULATION AND VAPOR BARRIERS PRESENT ON DRAWINGS, WILL NOT CONFLICT WITH ANY DRAINS, <br />ACCORDANCE WITH NFPA-9(o. GREASE SPECIFICATIONS AND THE ACCOMPANYING ALL FLEX CONNECTORS SHALL BE FITTED OVER SCUTTLES, JOINTS, VENTS, ETC. <br />EXHAUST DUCTWORK SHALL HAVE ALL SEAMS, DRAWINGS TO PROVIDE A COMPLETE AND PROPERLY THE CORE CONNECTION AND SHALL BE <br />JOINTS AND PENETRATIONS SEALED LIQUID TIGHT. OPERATING HEATING, VENTILATING, AIR SUPPLEMENTALLY SECURED WITH A DRAW BAND 2. ALL ROOF MOUNTED EQUIPMENT AND <br />CONDITIONING, AND REFRIGERATION SYSTEMS FOR AND TAPED. PENETRATIONS SHALL BE FLASHED A MINIMUM OF <br />ALL HORIZONTAL RUNS OF GREASE DUCT, EXHAUST THE BUILDING. WORK UNDER THIS SECTION INCLUDES, 1 12" ABOVE THE ROOF. PROVIDE AMPLE CURBS <br />OR CONDENSATE SHALL SLOPE BACK TOWARD THE BUT 15 NOT NECESSARILY LIMITED TO: 5. TEMPERATURE SETTINGS: AT CONCLUSION OF PROJECT, OR PIPE SEALS FOR ELECTRICAL CONDUITS <br />HOOD, GRILLE OR DRAIN AT A SLOPE OF P PER SET POINTS SHALL BE APPROXIMATELY COOLING WHICH SUPPLY MECHANICAL EQUIPMENT. <br />FOOT. PROVIDE A RESIDUE TRAP AT THE BASE OF A. FURNISH AND INSTALL THE FOLLOWING: ROOFTOP i8 DEGREES F/ HEATING rob DEGREES F, AND INSTRUCT <br />UNITS AND CURBS DUCT INSULATION AND OWNER HOW TO RESET. 3. ALL SIDE AIR INTAKES SHALL BE A MINIMUM <br />EACH VERTICAL RISER. DUCT WORK FOR HVAC SYSTEMOUT <br />S DIFFUSERS, GRILLES, OF OUT FROM ANY EXHAUST FAN OR PLUMBING f • <br />AND PLENUM BOXES CONTROL PANEL AND CONTROL 6. ROOF CURBS: CURBS TO BE FURNISHED BY VENT. REFER TO ROOF PLAN. <br />THE MECHANICAL CONTRACTOR IS TO PROVIDE WIRING ASSOCIATED EQUIPMENT MANUFACTURER AND <br />CLEANOUT5, PER DETAILS, IN GREASE EXHAUST B. INSTALL TIE FOLLOWING: - EXHAUST FANS, HOODS, INSTALLED IN ACCORDANCE WITH DETAILS ON SHEET M2 4. THE MECHANICAL CONTRACTOR SHALL BE <br />DUCTWORK AT A MINIMUM OF 10' INTERVALS, AT AND DUCTS FOR VENTILATION OF COOKING AND IN ACCORDANCE WITH MANUFACTURER'S RESPONSIBLE FOR ADMINISTERING ALL <br />EACH CHANGE OF DIRECTION AND AT EACH RESIDUE EQUIPMENT - ICE MACHINE AIR COOLED CONDENSER RECOMMENDATIONS. COORDINATE WITH ROOF WARRANTIES ON EQUIPMENT WHICH HE INSTALLS. ' <br />TRAP. ON ROOF CONTRACTOR. RTU'5 SHALL BE INSTALLED SUCH THAT TH15 INCLUDES ALL CONDENSERS, REFRIGERANT <br />ROOF DECK IS COMPLETE AND CONTINUOUS BENEATH LINES, AND OTHER ITEMS FURNISHED BY OTHERS ` <br />THE DISCHARGE OF THE GREASE EXHAUST FAN 2. GENERAL REQUIREMENTS: ALL WORK UNDER THIS UNITS, AND SHALL BE GUT ONLY FOR UNIT SUPPLY AND <br />CONTRACT SHALL BE ACCOMPLISHED IN STRIC7 RETURN OPENINGS. SPACE BETWEEN BOTTOM OF RTU'S AS WELL AS THOSE FURNISHED BY HIM. <br />SHALL BE UPWARD AND A MINIMUM OF 40 r � � <br />ABOVE THE ROOF SURFACE AND A MINIMUM OF 10' ACCORDANCE WITH FEDERAL, STATE, AND LOCAL AND ROOF DECK SHALL BE FILLED WITH ACCOUSTICAL <br />CODES. WHERE THESE PLANS AND SPECIFICATIONS INSULATION. 5. CONDENSATE DRAINAGE FROM ROOF TOP HVAC <br />FROM ANY OUTSIDE AIR INTAKE. ARE IN CONFLICT WITH SUCH CODES, TH= CODES UNITS SHALL BE TRAPPED. REFER TO ROOF PLAN x <br />ALL GREASE EXHAUST DUCTS SHALL HAVE SHALL GOVERN. PAY FOR AND OBTAIN NECESSARY 1. TESTING AND ADJUSTING OF HVAC SYSTEM: UPON = ti <br />RADIUSED ELBOWS. EXHAUST DUCT PROTECTION: CONSTRUCTION PERMITS AND CERTIFICATES OF COMPLETION OF THE INSTALLATION, THE PROJECT (o. PROVIDE VIBRATION ISOLATION DEVICES AND 7y y <br />INSPECTION. SHALL BE TESTED AND ADJUSTED AS FOLLOWS: FLEXIBLE CONNECTIONS TO ALL MOVING <br />GREASE EXHAUST DUCT SHALL BE CARBON STEEL 16 MACHINERY. - ' o C� .' <br />NOTE: A. ADJUST FAN DRIVES TO ACHIEVE REQUIRED AND /' ¢ y <br />GAUGE WELDED DUCTS PER NFPA-96 PROTECTED WHERE ENERGY CALCULATIONS ARE REQUIRED, THESE RATED CFM AND SPECIFIED RPM. i. ALL DUCT DIMEN51ON5 SHOWN ON DRAWINGS ARE ¢ o <br />WITH THE FOLLOWING: P AIR SPACE FROM DUCT TO 22 SHALL BE. PREPARED BY THE G.C. AND SUBMITTED TO B. ADJUST TEMPERATURE AND FAN CONTROL SEQUENCE. CLEAR INSIDE DIMENSIONS. ¢ J 3 <br />GA SHEET METAL COVERED WITH P MINERAL WOOL AFC'S AREA DEVELOPMENT DEAPARTMENT FOR C. ADJUST THE ENTIRE INSTALLATION AS TO MINIMIZE T N 3 <br />AND WIRE MESH SECURED TO COMBUSTIBLES WITH P APPROVAL PRIOR to ANY CONSTRUCTION. NOISE AND VIBRATION FROM FANS, 8. MECHANICAL CONTRACTOR SHALL COORDINATE <br />NON COMBUSTIBLE SPACERS TO REDUCE COMPRESSORS, STARTERS, AND RELAYS. ALL DUCT AND DIFFUSER LOCATIONS WITH • <br />CLEARANCE TO COMBUSTIBLES TO 3" PER NFPA 9Co A. COORDINATION: COORDINATE WORK WITH OTHER D.ELIMINATE ANY DUCT PULSATION BY USE OF LIGHTING LAYOUTS AS REQUIRED. .- - <br />k-�ERAMIC5" <br />2. TRADES. LOCATIONS SHOWN ARE APPROXIMATE. STIFFENERS OR ADDITIONAL SUPPORTS AS <br />REFER TO THE ARCHITECTURAL PLANS FOR EXACT REQUIRED. 9. THE CONTRACTOR SHALL PROVIDE COMPLETE <br />DUCT PROTECTION: USE FIRE MASTER MEASUREMENTS IN THE PLACEMENT OF EQUIPMENT, E. CORRECT ANY EQUIPMENT OR COMPONENT WHICH 15 INFORMATION AND COOPERATION TO THE OTHER <br />DUCT FIRE PROTECTION SYSTEM BY "THERMAL FIXTURES, OUTLETS, ETC. WHERE THE LOCATIONS ARE GENERATING OBJECTIONABLE NOISE IN THE CONTRACTORS AND TRADES AS REQUIRED FOR <br />WHICH OFFERS ZERO CLEARANCE TO NOT CLEAR, OBTAIN THE EXACT LOCATION FROM OPINION OF THE OWNER OR BY LOCAL COMPLETION AND COORDINATION OF THE <br />IBLE 2 HR. RATING. AFC'S ARCHITECTURE AND ENGINEERING AUTHORITIES.COMPLETE PROJECT. <br />DEPARTMENT AND FIELD VERIFY. THE PLANS DO F. BALANCE EXHAUST AND OUTSIDE AIR TO QUANTITIESNOT GIVE EXACT DETAILS AS TO ELEVATIONS AND INDICATED ON THE PLANS. REFER TO 10. THIS CONTRACTOR SHALL COORDINATE WITH THE <br />EX�4AUST k4OOD LOCATIONS OF VARIOUS PIPES, FITTINGS, DUCTS, BUILDING AIR BALANCE SCHEDULE. GENERAL CONTRACTOR AND OTHER TRADES, ALLCONDUIT, ETC., AND DO NOT SHOW ALL OFFSETS AND G. PROVIDE OWNER TWO (2) COPIES OF A WRITTEN AIR REQUIRED OPENINGS AND EXCAVATIONS. ALL <br />I ITE5 OTHER INSTALLATION DETAILS WHICH MAY BE BALANCE REPORT INDICATING ALL FINAL REQUIRED OPENINGS IN FOUNDATIONS, FLOORS, <br />REQUIRED. EXHAUST, SUPPLY, AND OUTSIDE AIR FLOWS. WALLS AND ROOFS SHALL BE DESIGNED INTO THE <br />ES INITIALLY BY THE USE OF SLEEV <br />ES, <br />V, { <br />MATERIALS AND PERFORMANCE (CONTRACTOR SHALL PROVIDE ALL TOOLS AND LEST STRUCTUREf� wjl <br />I. THE FOLLOWING EQUIPMENT SHALL BE SUPPLIED EQUIPMENT NECESSARY FOR BALANCING ALL HVAC AND CURBS, ETC. CUTTING AND PATCHING SHALL BE x <br />BY OWNER AND INSTALLED BY THE HELD TO A MINIMUM. <br />I. MATERIALS: ALL MATERIALS SHALL BE NEW AND OF EXHAUST AIR SYSTEMS. A DIGITAL ANEMOMETER MODEL <br />MECHANICAL CONTRACTOR. THE QUALITY INDICATED BY THE SPECIFIED BRAND DA 4000 WITH A 215 PROBE IS RECOMMENDED FOR <br />II. THERMOSTATS SHALL BE LOCATED GENERALLY chW � 4 <br />NAMES. SUBSTITUTIONS OF MATERIAL OF EQUAL MEASURING HOOD EXHAUST.) ,y p; 5! <br />A. STAINLESS STEEL HOODS AS SPECIFIED PRE QUALITY BY OTHER FIRST -LINE MANUFACTURERS MAY AS SHOWN BUT THEIR EXACT LOCATION SHALL BE J,z w <br />PIPED FOR FIRE PROTECTION SYSTEM, AND BE ACCEPTABLE PROVIDED A LIST OF SUCH FIELD COORDINATED TO AVOID INTERFERENCE <br />CEILING CLOSURE STRIP, SUBSTITUTIONS 15 APPROVED IN WRITING BY AFC'S 8. REFRIGERANT PIPING: PIPING TO BE HERMETICALLY WITH WALL MOUNTED ITEMS. MOUNT 54" AFF. q Pam, <br />B. EXHAUST FANS AND CUR55 EXCEPT RE5TROOM ARCHITECTURE AND ENGINEERING DEPARTMENT. A SEALED AND PRE- CHARGED TUBING WITH O-RINGS <br />EXHAUST FAN AND CURB. SUBSTITUTIONS LIST SHALL BE SUBMITTED IN TRIPLICATE 5EAL5 AS PROVIDED BY THE REFRIGERANT 12. THE G.G. SHALL PERFORM AND BE RESPONSIBLE <br />FIVE (5) DAYS BEFORE THE CONTRACT 15 TO BE LET. EQUIPMENT MANUFACTURER WITH ADEQUATE FOAMED FOR ALL REFRIGERATION WORK REQUIRED FOR o <br />C4 W <br />2. THE MECHANICAL CONTRACTOR SHALL RECEIVE NEOPRENE INSULATION. CHARGE AND TEST SYSTEM THE WALK-IN COOLER, WALK-IN FREEZER. G.C. <br />2. NATIONAL ACCOUNTS: ROOFTOP HVAC EQUIPMENT, FOR LEAKS. ENSURE AGAINST LEAKS AND PROPER SHALL AL50 BE RESPONSIBLE FOR START UP. <br />THE ABOVE EQUIPMENT, UNGRAtE, BE rl� <br />AGE TOILET EXH,4UST FANS, HVAC DUCT SYSTEMS, AND EVACUATION PRIOR TO CHARGING. DO NOT EXCEED <br />RESPONSIBLE FOR REPORTING DAMAND A HVAC DIFFUSERS, GRILLS, AND PLENUM BOXES ARE MANUFACTURER'S RECOMMENDED CHARGE SCHEDULE. 13. THE GENERAL CONTRACTOR SHALL PERFORM <br />RECEIVED DURING SHIPMENT, <br />RESPONSIBLE FOR LOSS DAMAGE TO THE AVAILABLE FROM NATIONAL ACCOUNTS INDICATED ON SLEEVES THROUGH WALL OF FREEZER/COOLER SHOULD AND BE RESPONSIBLE FOR ALL REFRIGERATION <br />ABOVE EQUIPMENT ONCE RECEIVED ON THE THE DRAWING COVER SHEET. INSTALL ALL EQUIPMENT BE RUBBER OR NEOPRENE. WORK REQUIRED FOR THE ICE MACHINES. ALL HIS <br />JOB. IN ACCORDANCE WITH PLANS AND MANUFACTURERS' WORK SHALL BE DONE IN ACCORDANCE WITH THE <br />INSTRUCTIONS. NATIONAL ACCOUNTS REFER TO 9, CONTROLS: FURNISH AND INSTALL AS INDICATED ON MANUFACTURER'S RECOMMENDATIONS. CONTACT <br />3. EXHAUST HOODS PROVIDED WILL MEET OR DIRECTORY DRAWINGS. FURNISH AND INSTALL ALL CONTROL THE EQUIPMENT SUPPLIERS TO OBTAIN ALL <br />WIRING AND CABLES FROM HVAC UNITS, NECESSARY INFORMATION TO PERFORM THE <br />EXCEED THE FOLLOWING REQUIREMENTS: 3. ROUTING OF DUCT SYSTEMS: COORDINATE ROUTING OF TEMPERATURE SENSORS, PHOTOCELL, AND CONTACTOR REFRIGERATION WORK. G.G. SHALL ALSO BE <br />- NSF M 1362 BEAR THE NSF SEAL OF APPROVAL DUCT SYSTEMS WITH OTHERS, LINE UP WORK TRUE PANEL AS REQUIRED. ROUTE CONTROL WIRING IN RESPONSIBLE FOR ARRANGING FACTORY <br />- U.L. CLASSIFICATION « 24N1 TO ADJACENT SPACES AND IN A WORKMANLIKE RACEWAY IN EQUIPMENT IF PROVIDED. AUTHORIZED START-UP AND ADJUSTMENT ON THE <br />- MEET OR EXCEED NFPA " 9(o, 1998 EDITION MANNER, ANP USE STANDARD RADIUS 90 ELBOWS. ICE MACHINES. <br />- 200(0 IMC, WHERE REQUIRED, DUCTWORK IS TO BE STURDILY 10. COOKING EXHAUST FANS AND DUCTWORK: INSTALL ALL <br />SUPPORTED AND SEPARATED IN ACCORDANCE WITH COOKING EXHAUST FANS IN ACCORDANCE WITH THE <br />THE MECHANICAL CONTRACTOR SHALL BE A5HRAE t SMAGNA STANDARDS. PLANS AND MANUFACTURER'S INSTALLATION 14 BACKS D OF ALL T DIFFUSERS. TO INSULATE . • <br />.•.•• '`fir <br />RESPONSIBLE FOR OBTAINING A SET OF SHOP INSTRUCTIONS. COOKING EXHAUST FANS ARE SUPPLIED- <br />DRAWINGS FROM THE HOOD MANUFACTURER. 4. DUCTWORK FOR HVAC SYSTEM: BY OWNER. VENTILATOR EXHAUST DUCT SHALL BE *0 I a �Q b° <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLED IN ACCORDANCE WITH NFPA 96. 15. TRANSITION ALL DUCTS AS REQUIRED TO ATTACH O .. <br />NOTIFYING THE HOOD MANUFACTURER OF ANY A. GENERAL NOTES: <br />TO EQUIPMENT. <br />LOCAL CODES WHICH WILL AFFECT THE HOOD 11. CLEANUP: AFTER COMPLETION OF THE WORK BEFORE <br />(I) VOLUME DAMPERS SHALL BE INSTALLED AT FINAL INSPECTION GLEAN HVAC EQUIPMENT. 16. OFFSET RETURN AIR DUCTS FOR ROOF TOP AC • . v <br />MANUFACTURE OR INSTALLATION. UNITS TO AVOID FRAMING AS REQUIRED, w " <br />BRANCH RUNOUTS WHERE INDICATED. •• O <br />4. THE HOOD MANUFACTURER WILL PROVIDE (2) DUCT DIMENSIONS INDICATED FOR RTU"1 ARE 12. FILTERS: PROVIDE CLEAN SET OF FILTERS FOR EACH .•F� ``` <br />INSIDE DIMENSIONS WITH NO INTERNAL DUCT LINER. HVAC UNIT WHEN TURNED OVER TO THE OWNER. 1-1. ALL DAMAGED COIL FINS SHALL BE COMBED 0 <br />0 <br />6 -• © , <br />PRE -PIPED AUTOMATIC FIRE CONTROL DIMENSIONS FOR OTHER RTU-2 ARE INSIDE STRAIGHT. <br />SYSTEMS FOR THE FRYER HOOD INCLUDING FIRE DIMENSIONS SIZED WITH I" INTERNAL DUCT LINER. 13. HVAC OPERATOR'S MANUAL AND DIAGRAMS: <br />CONTROL CABINETS - AND FURNISH A 2 POLE \ / �� I� V " <br />(3) DUCT WORK SHALL BE BUILT IN ACCORDANCE x I `l C `o � <br />MICRO SWITCH FURNISHED FOR EQUIPMENT SHUT WITH A5HRAE AND SMAGNA STANDARDS. A. PROJECTS PARTICIPATING IN THE NATIONAL �g <br />OFF TO BE HOOKED UP BY G.C. THE HOOD (4) USE 90 DEG. TURNING VANES IN ALL ELBOWS ACCOUNTS PROGRAM SHALL FOLLOW THE I �'�` W N <br />I�l I `�W M <br />MANUFACTURER WILL BE RESPONSIBLE FOR WHERE INDICATED ON THE DRAWINGS. VANES TO PROCEDURE OUTLINED IN THE NATIONAL <br />FINAL INSTALLATION AND INSPECTIONS OF THE BE PROPERLY SPACED IN ACCORDANCE WITH ACCOUNT. ral <br />,O d <br />HOOD FIRE EXTINGUISHING SYSTEM. - COMPLETE A5HRAE AND SMAGNA. B. PROJECTS NOT PARTICIPATING IN THE NATIONAL ,C y <br />EXTINGUISHING SYSTEM BY HOOD (5) DUCT BOARD IS NOT ALLOWED. ACCOUNT SHALL FOLLOW THE FOLLOWING THE MECHANICAL CONTRACTOR SHALL PROVIDE <br />MANUFACTURER. PROCEDURE: ALL CONTROL WIRING DIAGRAMS FOR THE HVAC .� _� <br />B. METAL DUCT WORK: EQUIPMENT. 24 VOLT WIRING AND CONDUIT SHALL C O <br />(1) DUCT WORK SHALL BE CONSTRUCTED OF NEW PREPARE IN DUPLICATE A MANUAL DESCRIBING THE BE PROVIDED AND INSTALLED BY THE �� n CL <br />5. THE PLUMBING CONTRACTOR SHALL INSTALL THE GALVANIZED PRIME GRADE STEEL PROPER MAINTENANCE AND OPERATION OF THE MECHANICAL CONTRACTOR. PROVIDE ADDITIONAL W o <br />MECHANICAL GAS VALVE IN ACCORDANCE WILL <br />WITH SHEETS. SYSTEM. THIS MANUAL SHALL NOT CONSIST OF 24 VOLT TRANSFORMERS AS REQUIRED. <br />THE PLUMBING DRAWINGS. THE VALVE WILL BE (2) THE GAUGES OF METAL TO BE USED AND THE STANDARD FACTORY -PRINTED INSTRUCTIONS, <br />PROVIDED TO HIM BY THE HOOD SUPPLIER. CONSTRUCTION AND BRACING OF ALTHOUGH THESE MAY BE INCLUDED, BUT SHALLBE ROOFTOP AIR CONDITIONING UNITS <br />VERIFY WITH LOCAL AUTHORITIES. JOINTS SHALL BE IN ACCORDANCE WITH ASHRAE PREPARED TO DESCRIBE THIS PARTICULAR L- <br />6. THE ELECTRICAL CONTRACTOR 6HALL PROVIDE AND SMAGNA STANDARDS. PROJECT. THE AIR CONDITIONING UNIT FANS, HEATING AND <br />(3) METAL DUCT SHALL BE SUPPORTED FROM Z <br />WIRING IN ACCORDANCE WITH THE "HOOD WIRING BUILDING STRUCTURE ON STRIP HANGERS NOT THE MANUALS SHALL BE BOUND, INDEXED, DATED, COOLING SHALL BE CONTROLLED FROM 24 VOLT N <br />DIAGRAM" SHEET M3. OVER 8'-0" APART. AND SIGNED BY THE GENERAL CONTRACTOR ONE (1) ROOM THERMOSTATS LOCATED APPROXIMATELY W <br />COPY SHALL BE SENT TO AFC'5 ARCHITECTURE AND AS SHOWN ON THE PLANS. THE THERMOSTATS 0 Y 0 <br />SHALL BE MOUNTED BY THIS CONTRACTOR 42" <br />NOTE: C. EXTERNAL DUCT WRAP FOR RTU "1 (KITCHEN UNIT): ENGINEERING DEPARTMENT AND THE OTHER TO THE OWNER V <br />MECHANICAL CONTRACTOR TO A.F.F. >O _ •O <br />VERIFY TRUSS CLEARANCE'S (1) INSULATE EXTERIOR OF ALL METAL MAIN SUPPLY QUALIFIED REPRESENTATIVES OF THE AIR O m <br />PRIOR TO COMMENCEMENT OF ANDRETURN DUCTS WITH 2" THICK FIBERGLASS, 3/4 CONDITIONING CONTRACTOR SHALL MEET FANS a� U <br />LB.DENSITY, BLANKET INSULATION WITH FOIL WITH THE DESIGNATED REPRESENTATIVE OF THE OWNER vi <br />BACKING ANDUL LABELED. THE OWNER'S REPRESENTATIVE SHALL BE INSTRUCTED IN EF-2 AND EF-3, SHALL BE CONTROLLED BY A <br />APPROVED HVAC, NATIONAL ACCOUNT (2) INSULATION SHALL HAVE A FLAME SPREAD OF THE PROPER OPERATION AND MAINTENANCE OF THE HVAC SWITCH LOCATED ON THE HOOD SUPPLIED BY THAT O .. <br />APPROVED VENDORS: TWENTY FIVE(25) OR LESS AND A SMOKE AND CONTROL SYSTEM. FAN. � W >. <br />CARRIER DEVELOPED RATING OF FIFTY(50) OR LESS. X �.., a <br />TRANE (3) INSULATION SHALL BE OWEN5-CORNING FRK25 14. GUARANTEE: MATERIALS AND WORKMANSHIP SHALL EF-I EXISTING TO REMAIN w Lil O <br />LENNOX OR EQUAL. BE GUARANTEED FOR ONE (1) YEAR FROM DATE OF LJ <br />(4) INSULATION SHALL BE SPOT GLUED ON 6" COMPLETION. IN ADDITION, ALL REFRIGERATION i N <br />CENTERS, AND LIGHTLY LAPPED WITH 2" WIDE COMPRESSORS SHALL BEAR A NON -PRORATED HVAC UNITS RTU-1,2 SHALL BE INTERLOCKED WITH 0 O <br />VAPOR BARRIER PRESSURE- SENSITIVE TAPE. 5-YEAR FACTORY WARRANTY, AND ALL EXTENDED EXHAUST HOOD FANS EF-2 AND EF-3. '� CL <br />(5) DUCT WRAP SHALL BE INSTALLED IN A NEAT WARRANTIES. <br />AND COMPETENT MANNER WITH ALL EDGES Si" COKE DETECTORS _ <br />COVERED WITH APPROVED METALLIC DUCT TAPE 15. SERVICE ACCESS: PROVIDE SERVICE ACCE55 AS <br />TO VAPOR -PROOF THE ENTIRE DUCT. REQUIRED IN MANUFACTURER'S INSTALLATION PROVIDE EACH AIR CONDITIONING UNIT WITH A <br />INSTRUCTIONS. IF SUCH ACCESS IS NOT AVAILABLE, DUCT MOUNTED SMOKE DETECTOR IN THE SUPPLY Date: 03. 28. 13 <br />D. FLEX CONNECTORS/FLEX DUCT: NOTIFY OWNER AND ATTEMPT TO SEE IF NECESSARY AIR DUCT SYSTEM CAPABLE OF SHUTTING DOWN ITS <br />CHANGES CAN BE WORKED OUT WITH OTHER TRADES. IF RESPECTIVE AIR CONDITIONING UNIT UPON <br />(1) FLEX CONNECTORS SHALL BE CERTAFLEX NOT, DO NOT INSTALL EQUIPMENT WHICH DOES NOT ACTIVATION, THE SMOKE DETECTOR SHALL CONSIST Scale: AS NOTED <br />PUNCHLINE 25 WITH A R-(o RATING AND 1 1/2" THICK MEET MANUFACTURER'S R�,=IREMENT5 FOR OF A SIMPLEX DUCT DETECTOR WITH <br />INSULATION. ACCESSIBILITY. IN NO CASE FID, SUBMIT, OR PHOTOELECTRIC DETECTOR, AND SAMPLING TUBE. Project Mgr: GGS <br />(2) CERTAFLEX PUNCHLINE 25 MEETS OR EXCEEDS INSTALL EQUIPMENT IN SITUATISPNS THAT DO NOT MEET ALL LINE VOLTAGE WIRING AND CONDUIT SHALL BE <br />IMC NFPA WA-905, 55CC1 (829l), AND UL 181 THE MANUFACTURER'S WARRANTY REQUIREMENTS. BY THE ELECTRICAL CONTRACTOR AND ALL <br />CLASS 1. OTHER WORK SHALL BE BY THE MECHANICAL Drawn: ES <br />(3) THE ENDS OF FLEX CONNECTORS SHALL BE 16. ENVIRONMENTAL CORROSION PROTECTION. CONTRACTOR. <br />TRIMMED SQUARELY PRIOR TO INSTALLATION. CONDENSER, COOLING/HEATING COILS: Job: 13-03 <br />(4) COLLARS AND SLEEVES SHALL BE INSERTED A. REQUIRED FACTORY DIPf-ED COATING WITHIN <br />INTO FLEXIBLE DUCT A MINIMUM OF 1" BEFORE ONE MILE OF ANY SALT WATER BODY. <br />FASTENING. FACTORY PRE -COAT WITHIN ONE TO FIVE Sheet <br />(5) FLEXIBLE CONNECTORS SHALL BE SECURED TO MILES OF ANY SALT WATER BODY. <br />THE SLEEVE OR COLLAR U51NG A DRAW BAND. IF m 1 <br />