<br />GENERAL PROJECT NOTES
<br />GENERAL
<br />SURVEYOR SHALL BE LICENSED iN THE STATE OF THE PROJECT. SURVEYING COSTS ARE THE SOLE RESPONSIBILITY OF THE CONTRACTOR.
<br />5. DO NOT PERMIT STORAGE ON FINISHED SURFACES AND EQUIPMENT.
<br />1. THE DRAWINGS, SPECIFICATIONS, AND BID DOCUMENTS SHALL BE CONSIDERED COMPLIMENTARY. WHAT IS REQUIRED BY ONE SHALL BE CONSIDERED TO
<br />1.4. FOR FIELD OR SHOP DRAWING ENGINEERING, THE CONTRACTOR SHALL EMPLOY A PROFESSIONAL, LICENSED ENGINEER OF THE DISCIPLINE REQUIRED FOR
<br />6. REMOVE PROTECTIVE COVERING WHEN NO LONGER NEEDED. REUSE OR RECYCLE COVERINGS IF POSSIBLE.
<br />BE REQUIRED OF ALL. WHERE CONFLICTS IN THE DOCUMENTS OCCUR, THE CONTRACTOR SHALL ASSUME THAT MORE RESTRICTIVE CONDITION OR HIGHER
<br />THE ENGINEERING. THE ENGINEER SHALL BE LICENSED IN THE STATE OF THE PROJECT. ENGINEERING COSTS ARE THE SOLE RESPONSIBILITY OF THE
<br />ADJUSTING
<br />QUALITY OR STANDARD APPLIES. THE OWNER AND THE ARCHITECT ASSUME THE CONTRACTOR HAS INCLUDED IN HIS BID THE HIGHEST QUALITY AND
<br />CONTRACTOR.
<br />1. ADJUST OPERATING PRODUCTS AND EQUIPMENT TO ENSURE SMOOTH AND UNHINDERED OPERATION. COMPLY WITH MANUFACTURER'S WRITTEN
<br />GREATEST QUANTITY FOR THE PURPOSE OF RESOLVING ANY CONFLICTS IN THE DOCUMENTS WHICH ARE IMPLIED OR UNDEFINED.
<br />1.5. FOR DESIGN OF TEMPORARY SHORING AND BRACING, THE CONTRACTOR SHALL EMPLOY A PROFESSIONAL, LICENSED ENGINEER OF THE DISCIPLINE
<br />INSTRUCTIONS AND THE REQUIREMENTS OF ALL REFERENCED STANDARDS.
<br />2. THESE NOTES APPLY TO THE ENTIRE SCOPE OF WORK NOT ALL SECTIONS MAY APPLY TO THIS SCOPE OF WORK
<br />REQUIRED FOR THE ENGINEERING. THE ENGINEER SHALL BE LICENSED IN THE STATE OF THE PROJECT. ENGINEERING COSTS ARE THE SOLE
<br />3. DO NOT SCALE DRAWINGS, DIMENSIONS TAKE PRECEDENT. IF THE CONTRACTOR FEELS ADDITIONAL DIMENSIONAL INFORMATION IS REQUIRED, SUBMIT
<br />RESPONSIBILITY OF THE CONTRACTOR.
<br />CLEANING
<br />REQUEST TO ARCHITECT IN WRITING PRIOR TO PROCEEDING WITH THE WORK.
<br />1. CLEAN EXISTING SYSTEMS, EQUIPMENT, AND SURFACES TO REMAIN.
<br />4. COMPLY WITH ALL OSHA, AND LOCAL, SAFETY REGULATIONS.
<br />2. PROJECT CONDITIONS:
<br />2. MAINTAIN THE CONSTRUCTION SITE IN A CLEAN AND ORDERLY MANNER AND PERFORM PROGRESS CLEANINGS ON A DAILY BASIS. PROPERLY REMOVE AND
<br />DISPOSE OF ALL WASTE, DEBRIS, AND RUBBISH OFF -SITE AT AN APPROVED WASTE MANAGEMENT FACILITY. COMPLY WITH ALL LOCAL, STATE, AND
<br />ADMINISTRATIVE REQUIREMENTS
<br />1. COMPLY WITH ALL REQUIREMENTS OF THE LANDLORD, MALL SECURITY, AND MALL REGULATIONS.
<br />2. CONTRACTOR SHALL PROVIDE THE OWNER WITH A CONSTRUCTION SCHEDULE. INCLUDE ALL ACTIVITIES AND MILESTONES RELEVANT TO THE PROJECT.
<br />INCLUDE ACTMTiES FOR ALL SUBMITTALS.
<br />3. CONTRACTOR SHALL COORDINATE ALL SCHEDULING, SUBMITTALS, SEQUENCING, AND WORK TO PROVIDE TIMELY INSTALLATION OF PRODUCTS AND MATERIALS
<br />AND COMPLY WITH THE OWNER'S CRITICAL DATE(S).
<br />4. CONTRACTOR SHALL COORDINATE ALL SPACE REQUIREMENTS, SUPPORTS AND INSTALLATION AS REQUIRED TO COMPLETE THE WORK.
<br />5. CONTRACTOR SHALL CHECK -IN AND COORDINATE ALL WORK WITH THE LANDLORD'S REPRESENTATIVE PRIOR TO PROCEEDING WiTH THE WORK.
<br />6. CONTRACTOR SHALL COORDINATE ALL WORK WITH THE TENANTS REQUIREMENTS PRIOR TO PROCEEDING WITH THE WORK.
<br />7. CONTRACTOR SHALL COORDINATE SUBSTANTIAL COMPLETION OF THE WORK AND FINAL CLEAN-UP WITH THE OWNER'S REQUIREMENT. AFTER SUBSTANTIAL
<br />COMPLETION, CONTRACTOR SHALL EFFECT ALL REPAIRS AND OTHER CORRECTIVE ACTIONS REQUIRED IN A TIMELY FASHION WITH MINIMAL DISRUPTION TO
<br />THE LANDLORD OR THE TENANT.
<br />8. SUBMITTALS: ALL SUBMITTALS SHALL BE PROVIDED IN PDF FORMAT FOR REVIEW BY THE RESPONSIBLE PARTIES. PHYSICAL COPIES WILL NOT BE
<br />ACCEPTED.
<br />9. RFIS: ALL REQUESTS FOR INFORMATION SHALL BE SUBMITTED IN WRITING, ELECTRONICALLY, FORE REVIEW BY THE RESPONSIBLE PARTIES. PHYSICAL
<br />COPIES WILL NOT BE ACCEPTED.
<br />10. CHANGES IN THE WORK: CONTRACTORS NOT PROCEED HALL EED WITH CHANGES IN THE WORK WITHOUT AUTHORIZATION BY THE LANDLORD. CONTRACTOR
<br />MUST NOTIFY THE LANDLORD AND THE ARCHITECT, IN WRITING, OF ANY COST IMPACT PRIOR TO PROCEEDING WITH THE WORK.
<br />11. SECURITY. CONTRACTOR SHALL COMPLY WITH ALL SECURITY REQUIREMENTS OF THE LANDLORD.
<br />12. WORK HOURS: COMPLY WITH ALL REQUIREMENTS OF THE LANDLORD AND MALL SECURITY. LANDLORD WILL REQUIRE AFTER-HOURS WORK BE
<br />PERFORMED FOR ALL LOUD WORK THAT CANNOT BE CONTAINED.
<br />13. INTERACTION WiTH THE PUBLIC / PATRONS: COMPLY WITH ALL REQUIREMENTS OF THE LANDLORD AND MALL CODE OF CONDUCT NOTIFICATIONS.
<br />CONTRACTOR SHALL LIMIT INTERACTION WITH THE PUBLIC. WHERE INTERACTION DOES OCCUR, INTERACTION WILL BE PROFESSIONAL AND COURTEOUS,
<br />RUDE OR INAPPROPRIATE BEHAVIOR WILL NOTE BE TOLERATED.
<br />14. CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS, APPROVALS, INSPECTIONS BY LOCAL AUTHORITIES HAVING JURISDICTION, CERTIFICATES OF
<br />COMPLIANCE, AND CERTIFICATES OF OCCUPANCY.
<br />15. CONTRACTOR IS RESPONSIBLE SCHEDULING ALL MATERIAL AND SPECIAL INSPECTIONS PERFORMED BY THIRD PARTY ORGANIZATIONS. OWNER SHALL
<br />ENGAGE THE TESTING AGENCY AND PAY FOR THE INSPECTIONS AND REPORTS.
<br />16. SMOKING IS PROHIBITED.
<br />17. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS PRIOR TO PROCEEDING WITH THE WORK. ANY DISCREPANCIES SHALL BE
<br />REPORTED TO THE LANDLORD AND THE ARCHITECT FOR RESOLUTION PRIOR TO PROCEEDING WITH THE WORK.
<br />18. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE REPAIR, CORRECTION, AND/OR RESTITUTION TO ADJACENT TENANTS RESULTING FROM DAMAGE TO
<br />THE TENANT SPACE, DAMAGE TO MERCHANDISE, OR LOSS OF REVENUE DUE TO UTILITY INTERRUPTION CAUSED BY CONSTRUCTION ACTIVITIES.
<br />19. ALL WORK SHALL BE COMPLETED IN A NEAT AND PROFESSIONAL MANNER.
<br />20. CONTRACTOR SHALL MAINTAIN A COMPLETE SET OF DOCUMENTS ON SITE AT ALL ITEMS. THIS SHALL INCLUDE ALL REVSIIONS AND ADDENDA.
<br />21. ALL REQUIRED MODIFICATIONS TO THE FIRE ALARM AND FIRE SUPPRESSION SYSTEMS SHALL BE MADE IN COMPLIANCE WiTH THE REQUIREMENTS OF THE
<br />LOCAL AUTHORITY HAVING JURISDICTION AND NFPA 13 AND 72. WHERE SYSTEMS MUST BE DEACTIVATED OR TAKEN OFFLINE TO BE MODIFIED, SAID
<br />WORK WILL OCCUR WHEN THE BUILDING IS UNOCCUPIED AND WITH PRIOR APPROVAL OF THE LOCAL AUTHORITY HAVING JURISDICTION. SYSTEMS MUST
<br />BE RESTORED PRIOR TO THE START OF THE NEXT DAY. SUBMIT ALL MODIFICATIONS REVIEW PRIOR TO PROCEEDING WITH THE WORK; OBTAIN APPROVAL
<br />OF LOCAL AUTHORITY HAVING JURISDICTION.
<br />TEMPORARY FACILITIES AND CONTROLS
<br />1. RESTROOMS: CONTRACTOR MAY UTILIZE RESTROOM FACILITIES IN THE MALL. CONTRACTOR SHALL THE RESTROOMS ARE MAINTAINED IN THE CONDITION
<br />THEY ARE FOUND IN. THE LANDLORD RESERVES THE RIGHT TO BACKCHARGE THE CONTRACTOR FOR ADDITIONAL CLEANING REQUIRED OF THE RESTROOMS
<br />DUE TO CONTRACTOR USE.
<br />2. UTILITIES/SERVICES: CONTRACTOR MAY UTILIZE EXISTING ELECTRICAL/WATER SERVICES IN THE BUILDING. EXTENSION OF UTILITIES/SERVICES FROM A
<br />MAIN CONNECTION POINT IS SOLELY THE RESPONSIBILITY OF THE CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE FOR PAYING FOR THESE SERVICES
<br />FOR THE DURATION OF THE CONSTRUCTION. WHERE THE BUILDING CANNOT PROVIDE AND PAY FOR THE SERVICES REQUIRED BY CONSTRUCTION
<br />ACTIVITIES, THE CONTRACTOR SHALL PROVIDE HIS OWN. THE CONTRACTOR SHALL PROVIDE ALL REQUIRED HEATING AND COOLING DURING CONSTRUCTION.
<br />EXISTING/NEW MECHANICAL EQUIPMENT MAY NOT BE UTILIZED DURING THE PERFORMANCE OF THE WORK, EXCEPT FOR INSTALLATION OF PAINT AND
<br />OTHER FINISHES. CONTRACTOR SHALL REPLACE ALL FILTERS AT THE END OF THE PROJECT.
<br />3. VEHICULAR ACCESS AND PARKING: CONTRACTOR SHALL COMPLY WITH ALL LOCAL TRAFFIC CODE REQUIREMENTS AND REGULATIONS AND SHALL NOT
<br />BLOCK EXTERIOR EXIT PATHS TO RIGHT OF WAYS, DRIVE AISLES, AND LANES UNLESS PRIOR AUTHORIZATION HAS BEEN OBTAINED FROM THE LANDLORD.
<br />PARK VEHICLES AT LOCATION INDICATED BY THE LANDLORD.
<br />4. PROGRESS CLEANING AND WASTE REMOVAL CONTRACTOR SHALL MAINTAIN THE WORK AREA IN A CLEAN AND ORDERLY MANNER AND FREE OF DUST,
<br />DEBRIS, AND WASTE. AT THE END OF THE WORK DAY, THE JOB SITE MUST BE BROOM CLEAN. CONTRACTOR IS RESPONSIBLE FOR PROPERLY REMOVING
<br />AND DISPOSING OF ALL WASTE. CONTRACTOR MAY NOT USE THE LANDLORD'S DUMPSTER OR TRASH RECEPTACLES.
<br />5. FIRE PREVENTION: CONTRACTOR SHALL PROVIDE ALL REQUIRED SAFETY EQUIPMENT AS REQUIRED BY THE LOCAL AUTHORITY HAVING JURISDICTION AND
<br />GOOD PRACTICE. MAINTAIN (1) ARE EXTINGUISHER ON EACH FLOOR. ESTABLISH A FIRE / SAFETY WATCH FOR ALL CUTTING AND WELDING OPERATIONS.
<br />6. TRAFFIC REGULATION: MAINTAIN PEDESTRIAN TRAFFIC AT SIDEWALKS. PROVIDE NECESSARY SAFETY EQUIPMENT AND BARRIERS WHEN REQUIRED FOR
<br />CONSTRUCTION OPERATIONS. OBTAIN APPROVAL FROM OWNER FOR ALL REQUIRED CLOSURES OF STREET OR SIDEWALK.
<br />7. CONSTRUCTION BARRIERS:
<br />7.1. PROVIDE TEMPORARY CONSTRUCTION BARRIERS AS REQUIRED TO COMPLETE THE SCOPE OF WORK, PROVIDE SECURITY, PREVENT UNAUTHORIZED ENTRY TO
<br />THE CONSTRUCTION SITE, ALLOW THE OWNER'S CONTINUED ACCESS AND USE OF THE SITE, TO PROTECT EXISTING FACILITIES AND PROPERTY FROM
<br />DAMAGE, AND AS REQUIRED TO SECURE THE EDGE OF FLOOR OPENINGS AND OTHER HAZARDS. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR
<br />THE DESIGN OF CONSTRUCTION BARRIERS, IN COMPLIANCE WITH THE DESIGN LOAD INFORMATION IN THE STRUCTURAL DRAWINGS. GENERAL LAYOUT MAY
<br />BE SHOWN IN THE DRAWINGS. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING THE EXACT LOCATiON(S) AND EXTANT(S) WITH THEIR OWN
<br />CONSTRUCTION REQUIREMENTS AND THE OWNER'S REQUIREMENTS.
<br />7.2. PROVIDE A FULL HEIGHT BARRICADE AT THE FRONT THE OPEN PERIMETER OF THE TENANT SPACE. COMPLY WITH OWNER REQUIREMENTS FOR
<br />CONSTRUCTION AND FINISH.
<br />7.3. PROVIDE TEMPORARY ENCLOSURES IN THE AREA OF WORK TO CONTROL AS REQUIRED TO SEPARATE THE AREA OF WORK FROM OWNER/TENANT OCCUPIED
<br />AREAS.. ENCLOSURES SHALL BE FULL HEIGHT AND CONTROL THE MOVEMENT OF DUST. PROVIDE POSITIVE MEANS OF PREVENTING AIR -BORNE DUST FROM
<br />DISPERSING, ACTIVE VENTILATION AND FILTERING MAY BE REQUIRED. CONTAMINATION OF THE ADJACENT MAIL SPACES WILL NOT BE ACCEPTED.
<br />7.4. AT FLOOR OPENINGS, PROVIDE TEMPORARY GUARDRAILS AT THE PERIMETER OF THE OPENING. RAILS SHALL HAVE THE FOLLOWING MINIMUM CONSTRUCTION.
<br />2x4 FIRE TREATED WOOD FRAMING, 42"H. PROVIDE VERTICAL TRIANGULAR BRACED FRAMES AT 48" O.C., SECURED TO EXISTING FLOOR CONSTRUCTION.
<br />PROVIDE (3) HORIZONTAL RAILS AT 18' O.C. (MAX.)
<br />7.5. UNLESS INDICATED OTHERWISE, CONSTRUCTION BARRIERS (INTERIOR) SHALL HAVE THE FOLLOWING MINIMUM CONSTRUCTION: 6" METAL STUDS AT 16" O.C.
<br />WITH 5/8' GYPSUM BOARD (LEVEL 4 FINISH) AND 3' ACOUSTiCAL BATT INSULATION. PROVIDE 6' METAL STUD BRACING AS REQUIRED, BRACING MAY NOT
<br />BE EXPOSED TO PUBLIC VIEW. PROPERLY FINISH ALL SURFACES AND EDGES EXPOSED TO PUBLIC VIEW. PAINT WALL NEUTRAL COLOR (WHITE).
<br />COORDINATE WITH OWNER/TENANT ON ANY REQUIRED TEMPORARY GRAPHICS OR SIGNAGE.
<br />7.6. UNLESS INDICATED OTHERWISE, CONSTRUCTION BARRIERS (EXTERIOR) SHALL HAVE THE FOLLOWING MINIMUM CONSTRUCTION: 8' METAL STUDS AT 16" O.C.
<br />WITH 3/4" ENGINEERED WOOD PANELS (WEATHER EXPOSED RATED AND SMOOTH, NON -PATTERNED FACE) AND R13 VAPOR RETARDER FACED BAIT
<br />INSULATION. PROVIDE 8" METAL STUD BRACING AS REQUIRED, BRACING MAY NOT BE EXPOSED TO PUBLIC VIEW.. PROPERLY FINISH ALL SURFACES AND
<br />EDGES EXPOSED TO PUBLIC VIEW AND SEAL WEATHER TIGHT TO EXISTING CONSTRUCTION. PAINT WAIL NEUTRAL COLOR (WHITE). COORDINATE WITH
<br />OWNER/TENANT ON ANY REQUIRED TEMPORARY GRAPHICS OR SIGNAGE. IF REQUIRED BY LAYOUT, PROVIDE A ROOF. MIN. 8' METAL STUDS AT 16' O.C.
<br />WITH 3/4" PLYWOOD SHEATHING, R19 BATT INSULATION, AND A WHITE EPDM ROOF MEMBRANE WITH WHITE ALUMINUM FLASHINGS AS REQUIRED FOR
<br />WEATHER TIGHT ENCLOSURE.
<br />7.7. UNLESS INDICATED OTHERWISE, TEMPORARY ENCLOSURES (INTERIOR) SHALL HAVE THE FOLLOWING MINIMUM CONSTRUCTION: 2x FIRE -TREATED WOOD
<br />FRAMING AT 16" O.C. WITH REINFORCED POLYETHYLENE SHEETING. PROVIDE 2x FIRE -TREATED WOOD BRACING AS REQUIRED. SEAL ALL JOINTS AND
<br />EDGES TIGHT. ALL MATERIALS SHALL HAVE A FLAME SPREAD OF 25 OR LESS AND A SMOKE DEVELOPED OF 50 OR LESS.
<br />8. SECURITY: PROVIDE SECURITY, CONTROLS, AND FACILITIES TO PROTECT THE WORK, EXISTING FACILITIES, AND THE OWNER'S OPERATIONS FROM
<br />UNAUTHORIZED ACCESS, VANDALISM, OR THEFT.
<br />9. REMOVAL OF UTILITIES, FACILITIES, AND CONTROLS: REMOVE ALL TEMPORARY UTILITIES, FACILITIES, AND CONTROLS AT THE COMPLETION OF THE WORK.
<br />EXCEPTIONS: MAINTAIN SAFETY RAILINGS AT ALL FLOOR OPENINGS AND BARRICADES AT ALL OPEN PERIMETER OF THE TENANT DEMISING AREA.
<br />PRODUCT REQUIREMENTS
<br />1. INSTALL ALL EQUIPMENT, ACCESSORIES AND MANUFACTURED ITEMS IN STRICT COMPLIANCE WITH THE MANUFACTURER'S WRITTEN INSTRUCTIONS, AND
<br />RELATED NATIONALLY RECOGNIZED STANDARDS.
<br />2. UNLESS INDICATED FOR REINSTALLATION, OR EXISTING ITEMS PROVIDED BY THE OWNER OR TENANT, ONLY NEW MATERIALS SHALL BE UTILIZED IN THE
<br />PROJECT.
<br />3. MATERIALS SHALL COME FROM THE SAME PRODUCT/RUN/DYE/ETC. LOT. MISMATCHED MATERIALS, ESPECIALLY FINISHED MATERIALS SHALL NOT BE
<br />ACCEPTED.
<br />4. PROTECT AND STORE ALL ITEMS INDICATED AS 'TO REMAIN' OR 'TO BE REMOVED AND STORED". TURN OVER TO OWNER, IN SEALED PROTECTIVE
<br />PACKAGING THAT PROTECTS THE ITEM(S) FROM DUST, DEBRIS, AND DAMAGE.
<br />5. ALL ITEMS INDICATED "f0 BE REMOVED" BECOME THE PROPERTY OF THE CONTRACTOR. THE CONTRACTOR SHALL REMOVE THESE ITEMS FROM THE SITE
<br />AND SHALL PROPERLY DISPOSE OF THESE ITEMS IN COMPLIANCE WITH LOCAL REGULATIONS.
<br />6. IN EXISTING SPACES, DO NOT PROVIDE A LESSER QUALITY PRODUCT THAN THE EXISTING PRODUCTS, UNLESS INDICATED OTHERWISE.
<br />7. CONTRACTOR SHALL VERIFY ALL MATERIALS EXPOSED WITHIN PLENUM SPACES HAS A FLAME SPREAD RATING OF 25 OR LESS AND A SMOKE DEVELOPED
<br />RATING OF 50 OR LESS AS DETERMINED BY ASTM E 84. REFER TO MECHANICAL DRAWINGS FOR PLENUM LOCATIONS.
<br />8. PRODUCTS SPECIFIED BY REFERENCED STANDARDS OR BY DESCRIPTION ONLY: PROVIDE PRODUCTS MEETING THE PERFORMANCE REQUIREMENTS
<br />INDICATED.
<br />9. PRODUCTS SPECIFIED BY NAMING MANUFACTURER/PRODUCT, WITH NOT SUBSTITUTIONS: PROVIDE ONLY THIS PRODUCT. NO SUBSTITUTIONS SHALL BE
<br />ACCEPTED.
<br />10. PRODUCTS SPECIFIED BY NAMING MANUFACTURE/PRODUCT. PROVIDE THIS PRODUCT OR AN APPROVED SUBSTITUTION. SUBMIT SUBSTITUTION REQUEST
<br />TO ARCHITECT AND OWNER IN WRITING.
<br />11. MAINTENANCE MATERIALS: PROVIDE OWNER/TENANT WITH MAINTENANCE STOCK OF ALL FINISH MATERIAL MINIMUM SHALL BE 10% OF CONSTRUCTION
<br />MATERIAL QUANTITY OR ONE WHOLE UNIT (PACKAGE) OF THE CONSTRUCTION MATERIALS. PROVIDE COPIES OF ALL SOFTWARE, SPARE PARTS, AND
<br />SPECIALTY TOOLS SHIPPED WITH EQUIPMENT/MATERIALS.
<br />12. SUBSTITUTION REQUESTS AND PROCEDURES: SUBSTITUTIONS SHALL BE ACCEPTED, UNLESS "NO EXCEPTIONS" IS INDICATED. SUBSTITUTIONS SHOULD BE
<br />SUBMITTED AT THE TiME OF PRICING/BIDDING BUT WILL BE CONSIDERED DURING CONSTRUCTION ON A CASE BY CASE BASE DUE TO UNFORESEEN
<br />CONDITIONS AND ISSUES.
<br />12.1. THE SUBMITTER MUST SUBMIT SUBSTITUTIONS OF EQUAL OR GREATER QUALITY TO THAT SPECIFIED. BURDEN OF PROOF IS ON THE SUBMTTTER.
<br />12.2. THE SUBMITTER SHALL MAKE A WRITTEN REQUEST TO THE ARCHITECT AND OWNER; INCLUDE ALL PERTINENT PRODUCT DATA AND COLOR SELECTION.
<br />PHYSICAL SAMPLES ARE REQUIRED FOR FINISH MATERIALS.
<br />12.3. THE SUBMITTER SHALL SUPPLY THE SAME WARRANTY FOR THE SUBSTITUTION.
<br />12.4. THE SUBMITTER SHALL COORDINATE INSTALLATION AND MAKE CHANGES TO THE WORK THAT MAY BE REQUIRED FOR THE SUBSTITUTION AT NO ADDITIONAL
<br />COST TO THE OWNER OR ARCHITECT.
<br />12.5. THE SUBMITTER SHALL WANE ALL CLAIMS FOR ADDITIONAL COSTS AND TIME THAT MAY BECOME APPARENT.
<br />12.6. SUBSTITUTIONS SHALL NOT BE ACCEPTED WHEN INDICATED IN SHOP DRAWINGS OR OTHER SUBMITTALS WITHOUT PRIOR WRfiTEN REQUEST OR WHEN
<br />SUBSTITUTION WILL RESULT IN A CHANGE TO THE CONTRACT DOCUMENTS.
<br />12.7. THE ARCHITECT WILL NOTIFY THE OWNER AND THE CONTRACTOR IN WRITING IF THE SUBSTITUTION IS ACCEPTABLE OR UNACCEPTABLE.
<br />13. OWNER/TENANT SUPPLIED PRODUCTS:
<br />13.1. THE OWNER AND/OR TENANT MAY SUPPLY PRODUCTS OR MATERIALS FOR INSTALLATION IN THE PROJECT. THESE PARTIES WILL COORDINATE ORDERING,
<br />SCHEDULING, AND DELIVERY WITH THE CONTRACTOR IN A TIMELY MANNER AND WITHIN THE REQUIREMENTS OF THE PROJECT CONSTRUCTION SCHEDULE.
<br />13.2. THE CONTRACTOR SHALL REVIEW ALL PRODUCT DATA, SHOP DRAWINGS, AND OTHER INFORMATION FOR ALL OWNER SUPPLIED PRODUCTS OR MATERIALS
<br />AND COORDINATE DELIVERY DATE MILESTONES AND REQUIREMENTS WITH THE OWNER/TENANT. THE CONTRACTOR SHALL PREPARE ALL FIELD CONSTRUCTION
<br />TO RECEIVE THESE PRODUCTS AND MATERIALS. THE CONTRACTOR SHALL INSTALL ALL OWNER/TENANT SUPPLIED ITEMS, UNLESS INDICATED "BY OTHERS'.
<br />14. TRANSPORTATION AND HANDLING: TRANSPORT AND HANDLE IN COMPLIANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS. PROMPTLY INSPECT
<br />SHIPMENTS FOR TO ENSURE PRODUCTS AND MATERIALS COMPLY WITH THE REQUIREMENTS, QUANTITIES ARE CORRECT, AND PRODUCTS AND MATERIALS
<br />ARE UNDAMAGED. PROMPTLY REPLACE DAMAGED ITEMS.
<br />15. STORAGE AND PROTECTION: STORE AND PROTECT PRODUCTS AND MATERIALS IN ACCORDANCE WITH THE MANUFACTURER'S WRITTEN INSTRUCTIONS.
<br />15.1. STORE WITH SEALS, LABELS, AND PACKAGING INTACT AND LEGIBLE.
<br />15.2. PROTECT PRODUCTS AND MATERIALS FROM ALL DAMAGE, WEATHER, CHEMICALS OTHER POTENTIALLY HARMFUL EXPOSURES.
<br />15.3. DO NOT STORE PRODUCTS OUTSIDE, UNCOVERED. PROTECT ALL METAL MATERIALS FROM CORROSION AND OXIDATION.
<br />15.4. ALL FINISH PRODUCTS AND MATERIALS, AND MOISTURE/WEATHER SENSITIVE MATERIALS MUST BE STORED INSIDE IN A TEMPERATURE AND HUMIDITY
<br />CONTROLLED ENVIRONMENT.
<br />PERFORMANCE OF WORK
<br />1. GENERAL•
<br />1.1. ALL WORK MUST BE PERFORMED IN COMPLIANCE WITH THE PROJECT DOCUMENTS, ALL NAMED STANDARDS, AND THE RULES AND REQUIREMENTS OF THE
<br />LOCAL AUTHORITIES) HAVING JURISDICTION. THE CONTRACTOR SHALL PROCURE ALL REQUIRED LICENSES AND PERMITS PRIOR TO THE START OF
<br />CONSTRUCTION AND POST ALL REQUIRED DOCUMENTS ON THE JOBSITE IN AN OBVIOUS, SECURE LOCATION. OBTAIN ALL REQUIRED INSPECTIONS AND
<br />APPROVALS IN A TIMELY MANNER.
<br />1.2. ALL WORK ON THE PROJECT SHALL BE PERFORMED BY QUALIFIED CONTRACTORS WITH A MINIMUM OF (5) YEARS OF EXPERIENCE WITH THIS TYPE AND
<br />QUALITY OF CONSTRUCTION.
<br />1.3. FOR SURVEY WORK, THE CONTRACTOR SHALL EMPLOY A PROFESSIONAL , LICENSED SURVEYOR OF THE DISCIPLINE REQUIRED FOR THE SURVEYING. THE
<br />2.1. FOR SAFEGUARDS DURING CONSTRUCTION, COMPLY WITH IBC CHAPTER 33, NFPA 241, AND ALL LOCAL REQUIREMENTS.
<br />2.2. FOR DEMOLITION WORK, COMPLY WITH ANSI A10.6 AND ALL LOCAL REQUIREMENTS.
<br />2.3. PROTECT AREAS NOT UNDERGOING ALTERATION OR RENOVATION.
<br />2.4. VENTILATE AREAS AS REQUIRED FOR HUMIDITY CONTROL, DUST/VAPOR/GAS/ODOR REMOVAL, CURING, AND MATERIAL INSTALLATION.
<br />2.5. PROVIDE HFATiNG/COOLING AS REQUIRED FOR MATERIAL INSTALLATION AND TO MAINTAIN CONDITION ENVIRONMENT FOR ADJACENT AREAS NOT UNDERGOING
<br />ALTERATION OR RENOVATION.
<br />2.6. DUST CONTROL EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM DEMOLITION OR CONSTRUCTION ACTIVITIES. PROVIDE POSITIVE MEANS TO
<br />PREVENT AIR -BORNE DUST FROM DISPERSING INTO THE ATMOSPHERE. PROVIDE DUST -PROOF BARRIERS BETWEEN CONSTRUCTION AREAS AND AREAS
<br />BEING CONTINUED TO BE OCCUPIED.
<br />2.7. NOISE AND VIBRATION CONTROL PROVIDE, METHOD, MEANS, AND FACILITIES TO MINIMIZE NOISE AND VIBRATION CONTROL PRODUCED BY DEMOLITION OR
<br />CONSTRUCTION ACTIVITIES. COMPLY WITH LOCAL REQUIREMENTS FOR NOISE CONTROL.
<br />2.7.1. LOUD NOISE WILL NOT BE ACCEPTED DURING HOURS OF OPERATION. IF LOUD OPERATIONS MUST OCCUR, THE CONTRACTOR SHALL SCHEDULE THEM
<br />DURING OFF HOURS.
<br />2.7.2. VIBRATIONS MAY NOT BE TRANSMITTED TO ADJACENT AREAS. SHOULD DAMAGE RESULTTO ADJACENT AREAS, THE CONTRACTOR SHALL MAKE ALL
<br />REQUIRED CORRECTIONS AND REPAIRS AND HIS COST AND REIMBURSE THE AFFECTED PARTIES FOR LOST GODDS, TiME, AND REVENUE.
<br />2.7.3. CONTRACTOR SHALL TAKE SPECIAL CARE AT FLOOR/STRUCTURE/EQUIPMENT DEMOLITION AND OTHER HEAVY DEMOLITION ACTMTiES.
<br />2.7.4. CONCRETE AND MASONRY CONSTRUCTION SHALL BE REMOVED WITH A WATER-COOLED CONCRETE SAW. CUT MATERIAL TO SIZE INDICATED AND INTO
<br />SMALL SECTIONS FOR REMOVAL CONTRACTOR SHALL ACTIVELY WORK TO REMOVE WATER TO PREVENT LEAKAGE TO ADJACENT SPACES AND FLOORS.
<br />2.7.5. USE OF AIR HAMMERS, JACK HAMMERS, AND OTHER SUCH IMPACT EQUIPMENT WILL NOT BE ACCEPTED.
<br />2.7.6. MATERIALS TO BE REMOVED SHALL BE PROPERLY SUPPORTED AND LOWERED TO THE FLOOR BELOW. DROPPING OF MATERIALS TO THE FLOOR
<br />BELOW WILL NOT BE ACCEPTED.
<br />2.7.7. POLLUTION CONTROL PROVIDE METHODS, MEANS, AND FACILITIES TO PREVENT CONTAMINATION OF SOIL, WATER, AND ATMOSPHERE FROM DISCHARGE
<br />OF NOXIOUS SUBSTANCES, TOXIC SUBSTANCES, OR OTHER POLLUTION CREATED BY CONSTRUCTION ACTIVITIES. IF TOXIC SUBSTANCES ARE
<br />SUSPECTED OR NOTICED, STOP ALL WORK AND REPORT IMMEDIATELY TO THE OWNER AND THE ARCHITECT. COMPLY WITH ALL LOCATION POLLUTION
<br />REQUIREMENTS.
<br />LAYOUT OF THE WORK
<br />3. VERIFY LOCATION OF SURVEY AND CONTROL POINTS PRIOR TO STARTING THE WORK. CONTRACTOR SHALL PROTECT THESE POINTS THROUGHOUT
<br />CONSTRUCTION. IF THE POINTS ARE LOST, THE CONTRACTOR SHALL RESURVEY AT HIS COST.
<br />4. MAKE VERTICAL ELEMENTS PLUMB AND ALIGNED, UNLESS NOTED OTHERWISE.
<br />5. MAKE HORIZONTAL ELEMENTS LEVEL AND ALIGNED, UNLESS NOTED OTHERWISE.
<br />6. MAKE CONSISTENT TEXTURE ON SURFACES, WITH SEAMLESS TRANSITIONS, UNLESS NOTED OTHERWISE.
<br />7. MAKE NEAT TRANSITIONS BETWEEN DIFFERENT SURFACES, MAINTAINING TEXTURE AND APPEARANCE.
<br />8. WHERE MATING OR ABUTTING TO EXISTING MATERIALS, MAKE SURE FINISHED SURFACES ARE ALIGNED, FLUSH, AND SMOOTH, UNLESS NOTED OTHERWISE.
<br />FEATHER OR LEVEL OUT MATERIALS AS REQUIRED. WHERE TRANSITIONS GREATER THAN 1 /4" OCCUR, SUBMIT RECOMMENDATION ON PROVIDING A SMOOTH
<br />TRANSITION FOR THE ARCHITECT TO REVIEW.
<br />9. INSTALL EQUIPMENT, FITTINGS, AND ACCESSORIES PLUMB AND LEVEL, NEATLY ALIGNED WITH ADJACENT VERTICAL AND HORIZONTAL LINES, UNLESS
<br />INDICATED OTHERWISE.
<br />10. COORDINATE INSTALLATION OF BUILT-IN WORK AS WORK PROCEEDS. ENSURE PROPER INSTALLATION AND PREPARATION OF SUBSTRATES FOR BUILT-IN
<br />WORK.
<br />11. DO NOT INSTALL DEFECTIVE, DAMAGED, ROTTING, OR NET MATERIALS. REPLACE ANY AND ALL DAMAGED ITEMS.
<br />12. REMOVE ALL EXISTING CONSTRUCTION AS REQUIRED, WHETHER SHOWN OR NOT, TO COMPLETE THE NEW WORK. REMOVE ALL EXISTING ABANDONED
<br />UTILITIES, EQUIPMENT, AND DUCTWORK - CONCEALED OR EXPOSED.
<br />13. MAINTAIN ALL EXISTING UTILITIES INDICATED TO REMAIN; INTERRUPT ONLY TO MAKE NEW CONNECTIONS OR SWITCHOVERS. MINIMIZE THE DURATION OF
<br />THE OUTAGES. COORDINATE SCHEDULING WITH THE UTILITY. DO NOT INTERRUPT SERVICE TO ADJACENT SPACES WITHOUT NOTIFYING THE AFFECTED
<br />PARTIES AND SCHEDULING ACCORDINGLY. SCHEDULE AT OFF -HOURS, IF REQUIRED.
<br />14. PROTECT EXISTING WORK TO REMAIN. PREVENT MOVEMENT TO STRUCTURE, PROVIDE TEMPORARY BRACING IF REQUIRED. REPAIR ADJACENT EXISTING
<br />CONSTRUCTION AND FINISHES DAMAGED DURING DEMOLITION AND CONSTRUCTION ACTIVITIES.
<br />15. ASSUMED FINISH FLOOR IS 100.00'. COORDINATE WITH CIVIL DRAWINGS. NOTE THAT CIVIL MAY BE OUTSIDE OF THIS CONTRACT; EITHER CONTRACTED BY
<br />OWNER OR A THIRD PARTY.
<br />16. COORDINATE INSTALLATION OF ALL UTILITIES, PLUMBING FIXTURES, WALL LIGHT SCONCES, AND ACCESSORIES WITH THE INTERIOR DESIGN. CONTRACTOR
<br />SHALL BE SOLELY RESPONSIBLE FOR CORRECTING INSTALLATION OF THESE ITEMS IF THE WORK HAS NOT BEEN PROPERLY COORDINATED.
<br />17. ALL LANDING SIZES, DOOR CLEARANCES, AND DOOR HARDWARE FOR NEW WORK SHALL COMPLY WITH LOCAL ACCESSIBILITY STANDARDS.
<br />18. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR PROPERLY LAYING OUT THE WORK. CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE
<br />DRAWINGS. CONTRACTOR SHALL NOTIFY THE ARCHITECT OF ANY DISCREPANCIES PRIOR TO THE START OF THE WORK FOR RESOLUTION. THE
<br />CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR CORRECTING WORK THAT IS ERRONEOUSLY LAID OUT, EITHER THROUGH FAULT OF THEIR OWN OR
<br />THOR SUBCONTRACTORS, OR THROUGH FAILURE TO NOTIFY THE ARCHITECT OF DISCREPANCIES. THERE ARE SEVERAL TYPICAL ITEMS TO NOTE:
<br />18.1. AS SHOWN IN THE DRAWINGS, MANY STRUCTURAL COLUMNS FOR THIS PROJECT ARE LOCATED WITHIN WALL CONSTRUCTION. THESE COLUMNS SHALL BE
<br />CONCEALED WITHIN WALL CONSTRUCTION WiTH THE FINISH WALL SURFACES FLUSH WITH ADJACENT CONSTRUCTION. CONSTRUCTION NOT IN COMPLIANCE
<br />WiTH THE DESIGN INTENT SHOWN IN THE DOCUMENTS WILL NOT BE ACCEPTED, UNLESS SHOWN IN THE DOCUMENTS. REPORT ANY DISCREPANCIES TO
<br />THE ARCHITECT FOR RESOLUTION PRIOR TO PROCEEDING WiTH THE WORK.
<br />18.2. AS SHOWN IN THE DRAWINGS, ALL ROOF DRAINS AND OVERFLOW ROOF DRAIN VERTICAL LINES SHALL BE CONCEALED IN WALL CONSTRUCTION WITH THE
<br />FINISH WALL SURFACES FLUSH WITH ADJACENT CONSTRUCTION. CONSTRUCTION NOT IN COMPLIANCE WITH THE DESIGN INTENT SHOWN IN THE DOCUMENTS
<br />WILL NOT BE ACCEPTED. REPORT ANY DISCREPANCIES TO THE ARCHITECT FOR RESOLUTION PRIOR TO PROCEEDING WITH THE WORK.
<br />18.3. AS SHOWN IN THE DRAWINGS, FIRE EXTINGUISHER CABINET'S ARE TO BE SEMI-RECESSED/RECESSED INTO THE WALL CONSTRUCTION. THESE CABINETS
<br />SHALL ALL BE THE SAME STYLE AND INSTALLATION; METAL BOX CABINETS WITH VISION LITE AND INTEGRAL LETTERING. SEMI -RECESSED MAY BE REQUIRED
<br />DUE TO WALL FRAMING DEPTH LIMITATIONS. BUBBLE TYPE CABINETS SHALL NOT BE ACCEPTED. THE CONTRACTOR SHALL VERIFY FIELD CONDITIONS AND
<br />CONFIRM CABINETS AND RECESS DEPTH PRIOR TO SUBMITTING SHOP DRAWINGS AND PRODUCT DATA FOR FIRE EXTINGUISHER CABINETS. REPORT ANY
<br />DISCREPANCIES TO THE ARCHITECT FOR RESOLUTION PRIOR TO PROCEEDING WiTH THE WORK.
<br />18.4. PRIOR TO STARTING THE WORK CONTRACTOR SHALL VERIFY ALL FRAMING REQUIREMENTS FOR MECHANICAL EQUIPMENT, MECHANICAL CHASES, PLENUMS
<br />,
<br />CABINETS, PLUMBING/ELECTRICAL BANKS, AND OTHER CONSTRUCTION ITEMS WITHIN THE BUILDING BUT NOT SPECIFICALLY DETAILED IN THE DOCUMENTS.
<br />18.5. CONTRACTOR SHALL COORDINATE AND LOCATE ALL UNDERGROUND UTILITIES PRIOR TO POURING THE SLAB. CONTRACTOR SHALL COORDINATE WiTH ALL
<br />CASEWORK AND WALL CONSTRUCTION. LOCATION OF UTILITIES AT RECEPTION DESKS, SALES, DESKS, TRAINER DESKS, AND JUICE BARS SHALL BE
<br />CONSIDERED CRITICAL THIS INCLUDES, BUT IS NOT LIMITED TO, ELECTRICAL AND DATA/LOW VOLTAGE, LIFE SAFETY, CONTROLS, PLUMBING, AND FLOOR
<br />SINKS AT THE JUICE BAR.
<br />18.6. THE OWNER OR THE TENANT MAY HAVE OUTSIDE VENDORS THAT WILL PERFORM WORK DURING THE CONSTRUCTION OF THE PROJECT. THE CONTRACTOR
<br />SHALL COORDINATE ALL WORK, INCLUDING ALL REQUIRED BLOCKING, WITH THESE VENDORS.
<br />18.0. FOR PROJECTS BEING CONSTRUCTED IN EXISTING BUILDINGS OR ADJOINING EXISTING OR CONCURRENT WORK BONG PERFORMED BY OTHERS, THE
<br />CONTRACTOR SHALL CONFIRM ALL CONDITIONS AND REPORT ANY DISCREPANCIES TO THE ARCHITECT FOR RESOLUTION PRIOR TO PROCEEDING WITH THE
<br />WORK. THIS SHALL BE CONSIDERED CRITICAL WHERE DISCREPANCIES OCCUR AT THE JUNCTURE BETWEEN WORK WITH ADJACENT CONTRACTORS OR
<br />LANDLORD TENANT SPACES/LIMITS.
<br />18.1. ALL NEW CONSTRUCTION ADJOINING EXISTING SHALL BE FRAMED, ALIGNED AND FINISHED AS TO PRESENT NO EVIDENCE OF ATTACHMENT. NEW
<br />CONSTRUCTION SHALL ALIGN AND BE FLUSH WiTH EXISTING ADJACENT CONSTRUCTION. MASONRY OR CONCRETE CONSTRUCTION SHALL BE SEPARATED
<br />FROM ADJACENT WiTH A SEALED CONTROL JOINT. GYPSUM BOARD SHALL BE TAPED AND FINISHED FOR FLUSH, CONTINUOUS APPEARANCE; REMOVE ALL
<br />EXISTING GYPSUM BOARD TRIM AS REQUIRED TO COMPLETE THIS.
<br />COORDINATION
<br />1. COORDINATE THE SCHEDULING, SUBMITTALS, AND WORK TO ENSURE EFFICIENT AND ORDERLY SEQUENCE OF INSTALLATION OF INTERDEPENDENT
<br />CONSTRUCTION ELEMENTS WITH PROVISIONS FOR ACCOMMODATING ITEMS INSTALLED LATER AND TO ENSURE ON -TIME COMPLETION OF THE PROJECT.
<br />2. NOTIFY AFFECTED UTILITY COMPANIES AND COMPLY WITH THEIR REQUIREMENTS.
<br />3. VERIFY THE UTILITY REQUIREMENTS AND EQUIPMENT OF THE NEW WORK ARE COMPATIBLE WiTH THE BUILDING UTILITIES. CONTACT THE ARCHITECT TO
<br />RESOLVE ALL DISCREPANCIES PRIOR TO PROCEEDING WITH THE WORK. COORDINATE THE WORK OF VARIOUS SECTIONS HAVING INTERDEPENDENT
<br />RESPONSIBILITIES FOR INSTALLING, CONNECTING TO, AND PLACING IN SERVICE, SUCH EQUIPMENT.
<br />4. COORDINATE SPACE REQUIREMENTS, SUPPORTS, AND INSTALLATIONS OF MEP WORK THAT ARE INDICATED DIAGRAMMATICALLY ON THE DRAWINGS. FOLLOW
<br />ROUTING SHOWN ON PLANS AS CLOSELY AS PRACTICAL; PLACE RUNS PARALLEL WiTH THE LINES OF THE BUILDING. UTILIZE SPACE EFFICIENTLY TO
<br />MAXIMIZE ACCESSIBILITY FOR OTHER INSTALLATIONS, FOR MAINTENANCE, AND FOR REPAIRS. COORDINATE THIS WORK WITH ARCHITECTURAL CEILING
<br />REQUIREMENTS, CLEAR HEIGHT REQUIREMENTS, AND OTHER SPECIAL CLEARANCES AND REQUIREMENTS NOTED IN THE DRAWINGS. THESE REQUIREMENTS
<br />MUST BE MAINTAINED. THE CONTRACTOR SHALL SUPPLY FABRICATIONS AND INSTALLATIONS OF EQUIPMENT, DUCTWORK, PIPING, ACCESSORIES, CEILINGS,
<br />AND OTHER ITEMS, MEETING THE REQUIREMENTS OF THE DESIGN INTENT IN THE PROJECT DOCUMENTS. CONTRACTOR SHALL REPORT ALL DISCREPANCIES
<br />TO, AND RESOLVE ALL CONFLICTS WITH, THE ARCHITECT PRIOR TO FABRICATION AND INSTALLATION. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR
<br />ALL CORRECTIONS AND MODIFICATIONS REQUIRED IF THE DISCREPANCIES AND CONFLICTS ARE NOT REPORTED PRIOR TO FABRICATION AND INSTALLATION.
<br />5. COORDINATE CLOSEOUT AND COMPLETION OF THE WORK, ENSURE PROPER CLEANING AND LEAVE IN A STATE READY FOR INSPECTION AND OCCUPANCY.
<br />6. ONCE THE WORK HAS BEEN OCCUPIED, COORDINATE ACCESS TO THE SPACE WITH THE OWNER FOR PUNCHUST, CORRECTIONS, REPAIRS, AND OTHER
<br />ONGOING CONTRACTOR ACTIVITIES.
<br />SUBMITTALS
<br />1. SUBMIT PROJECT CONSTRUCTION SCHEDULE WITHIN (5) WORKING DAYS OF PROJECT NOTICE TO PROCEED.
<br />2. UPDATE CONSTRUCTION SCHEDULE ONLY A MONTHLY BASIS, OR AS NEEDED BY THE CONTRACTOR OR REQUESTED BY THE OWNER OR ARCHITECT.
<br />3. PROVIDE PRODUCT DATA/SUBMITTALS, SHOP DRAWINGS, AND FINISH SAMPLES AS REQUIRED TO DOCUMENT MATERIALS, PRODUCTS, AND FABRICATIONS
<br />BEING USED IN THE PROJECT. SUBMIT (1) ELECTRONIC COPY OF ALL DOCUMENTS, EXCEPT FINISH SAMPLES. SUBMIT (3) PHYSICAL COPIES OF ALL
<br />FINISH SAMPLES.
<br />4. THE ARCHITECT WILL RETURN (1) REVIEWED COPY TO ALL PARTIES, AND MAINTAIN (1) COPY ON FILE.
<br />5. WHERE REQUIRED BY LOCAL AUTHORITIES, CONTRACTOR SHALL SUBMIT ENGINEERED AND SEALED SHOP DRAWINGS AND OTHER SUBMITTALS AS REQUIRED.
<br />THIS MAY INCLUDE, BUT IS NOT LIMITED TO, RAILING SUBMITTALS, STAIR SHOP SUBMITTALS, FIRE SUPPRESSION SUBMITTALS, FIRE ALARM SUBMITTALS,
<br />AND U.L. RATED ASSEMBLY AND PENETRATION/JOINT ASSEMBLIES. CONTRACTOR SHALL OBTAIN APPROVAL OF LOCAL AUTHORITIES FOR ALL REQUIRED
<br />SUBMITTALS PRIOR TO PROCEEDING WITH THE WORK.
<br />6. DO NOT ORDER OR FABRICATE PRODUCTS AND MATERIALS UNTiL FINISHES, SAMPLES, COLORS, TEXTURES, AND ALL OTHER SUBMITTALS HAVE BEEN
<br />REVIEWED BY THE ARCHITECT. DO NOT PERFORM ANY WORK RELATED TO PRODUCTS AND MATERIALS UNTiL SUBMITTALS HAVE BEEN REVIEWED BY THE
<br />ARCHITECT. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR CORRECTING WORK AND REPLACING PRODUCTS AND MATERIAL WHERE THE CONTRACTOR
<br />HAS FAILED TO FOLLOW REVIEW PROCEDURE
<br />COORDINATION DRAWINGS:
<br />1. THE DESIGN INTENT SHOWN IN THE PROJECT DOCUMENTS IS SCHEMATIC ONLY. THE CONTRACTOR SHALL VERIFY THE INSTALLATION OF ALL MEP SYSTEMS
<br />WITH EXISTING/NEW STRUCTURE, ARCHITECTURAL CEILINGS, ALL INDICATED REQUIRED CLEARANCES.
<br />2. FOR ALL NEW PROJECTS OR ADDITIONS, AND FOR LARGE, COMPLEX RENOVATIONS, THE CONTRACTOR SHALL SUBMIT COLOR COORDINATION DRAWINGS FOR
<br />REVIEW AS PART OF THE SUBMITTAL PROCESS. THIS SHALL INCLUDE ALL MECHANICAL, ELECTRICAL, PLUMBING, AND LIFE SAFETY SYSTEMS AND THEIR
<br />RELATIONSHIP TO WAIL AND CEILING CONSTRUCTION. AS PART OF THE SUBMITTAL, THE CONTRACTOR SHALL CLOUD AND NOTE ALL CONFLICTS FOR THE
<br />ARCHITECTS REVIEW AND PROVIDE SUGGESTIONS FOR CORRECTIVE ACTION. CONTRACTOR SHALL NOT PROCEED WITH ANY WORK ASSOCIATED WITH THIS
<br />SUBMITTAL PRIOR TO REVIEW AND RESOLUTION OF CONFLICTS. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL CORRECTIONS REQUIRED, CAUSED
<br />BY EITHER IMPROPERLY PREPARED COORDINATION DRAWINGS OR PROCEEDING WfTH WORK PRIOR TO REVIEW OF THE SUBMITTAL
<br />3. FOR SMALL ALTERATIONS AND RENOVATIONS, COORDINATION DRAWINGS ARE NOTE REQUIRED.
<br />4. IN ALL CASES, THE CONTRACTOR SHALL SUPPLY FABRICATIONS AND INSTALLATIONS OF EQUIPMENT, DUCTWORK, PIPING, ACCESSORIES, CEILINGS, AND
<br />OTHER ITEMS, MEETING THE REQUIREMENTS OF THE DESIGN INTENT IN THE PROJECT DOCUMENTS. CONTRACTOR SHALL REPORT ALL DISCREPANCIES TO,
<br />AND RESOLVE ALL CONFLICTS WITH, THE ARCHITECT PRIOR TO FABRICATION AND INSTALLATION. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL
<br />CORRECTIONS AND MODIFICATIONS REQUIRED IF THE DISCREPANCIES AND CONFLICTS ARE NOT REPORTED PRIOR TO FABRICATION AND INSTALLATION.
<br />CLOSEOUT
<br />1. SUBMIT ALL FINAL DOCUMENTS AS REQUIRED BY THE LOCAL AUTHORITY HAVING JURISDICTION.
<br />2. PERFORM FINAL CLEANING, PRIOR TO SUBSTANTIAL COMPLETION.
<br />3. SUBSTANTIAL COMPLETION: NOTIFY THE OWNER AND THE ARCHITECT, IN WRITING, THAT THE WORK IS SUBSTANTIALLY COMPLETE. INCLUDE A
<br />CONTRACTOR'S PUNCHLIST OF MINOR ITEMS THAT NEED TO BE CORRECTED OR COMPLETED.
<br />4. PUNCHLIST: ARCHITECT WILL PERFORM AN ARCHITECTS PUNCHUST INSPECTION AFTER NOTIFICATION OF SUBSTANTIAL COMPLETION AND PROVIDE A FINAL.
<br />REPORT TO THE OWNER AND CONTRACTOR. THE CONTRACTOR SHALL MAKE ALL CORRECTIONS INDICATED AND PROVIDE WRITTEN DOCUMENTATION OF THE
<br />CORRECTIVE ACTIONS.
<br />5. TRAINING: PROVIDE TRAINING TO DESIGNATED OWNER STAFF FOR ALL EQUIPMENT AND SYSTEMS PRIOR TO TURNOVER. COORDINATE SCHEDULING WITH
<br />OWNER.
<br />6. PROJECT RECORD DOCUMENTS: MAINTAIN A CONTRACTOR'S SET OF RECORD DOCUMENTS ON SITE.
<br />6.1. INCLUDE ALL FIELD NOTATIONS PERTAINING TO CHANGES AND MODIFICATIONS OF THE WORK ON THIS SET. ENSURE ALL ENTRIES ARE ACCURATE AND
<br />COMPLETE.
<br />6.2. UPDATE THE SET CONCURRENT WITH THE CONSTRUCTION PROGRESS. STORE RECORD DOCUMENTS SEPARATE FROM DOCUMENTS USED FOR CONSTRUCTION.
<br />6.3. SUBMIT DOCUMENTS TO LANDLORD FOR REVIEW PRIOR TO MAKING APPLICATION FOR FINAL PAYMENT. INCLUDE A PHYSICAL COPY AND A SCANNED
<br />ELECTRONIC COPY ON A CD.
<br />6.4. INCLUDED AN OPERATIONS AND MAINTENANCE MANUAL INCLUDING ALL PRODUCT INFORMATION, WARRANTIES, OPERATING INSTRUCTIONS, AND CLEANING AND
<br />MAINTENANCE INSTRUCTIONS. PROVIDE IN BINDERS, ORGANIZED BY THE STANDARD CSI 16 DIVISION HEADINGS.
<br />WARRAN
<br />1. CONTRACTOR SHALL WARRANT ALL WORK TO BE FREE OF DEFECTS FOR A PERIOD OF (1) YEAR. PROVIDE OWNER WITH A COPY OF ALL MANUFACTURER
<br />STANDARD WARRANTIES FOR THE MATERIALS AND EQUIPMENT UTILIZED IN THE PROJECT.
<br />PROTECTION OF WORK
<br />1. PROTECT ALL EXISTING AND INSTALLED WORK FROM DAMAGE, MARKING, OR DISCOLORATION BY CONSTRUCTION ACTMTiES.
<br />2. PROVIDE TEMPORARY, REMOVABLE PROTECTION FOR INSTALLED PRODUCTS, SURFACES AND EQUIPMENT. CONTROL ACTIVITIES IN IMMEDIATE AREA TO
<br />PREVENT DAMAGE.
<br />3. PROVIDE TEMPORARY, REMOVABLE PROTECTION ON ALL FINISH FLOORING; PROTECTION SHALL BE DURABLE, HEAVY SHEET GOOD MATERIAL. DO NOT
<br />REMOVE UNTIL SUBSTANTIAL COMPLETION. CONTROL ACTIVITIES IN IMMEDIATE AREA TO PREVENT DAMAGE.
<br />4. CONTROL AND LIMIT ACCESS TO FINISH ARES TO PROTECT FINISH WORK.
<br />FEDERAL REGULATIONS. MAINTAIN "BROOM CLEAN" IN WORK AREA.
<br />3. PERFORM FINAL CLEANING PRIOR TO SUBSTANTIAL COMPLETION, LEAVING THE WORK AREA CLEAN AND READY FOR PUNCHUST INSPECTION AND
<br />OCCUPANCY. REMOVE ALL DEBRIS, DUST, DIRT, MARKS, EQUIPMENT, TOOLS, ETC. IF FIELD REVIEW BY THE ARCHITECT AND OWNER FIND THE FINAL
<br />CLEANING TO BE INADEQUATE, THE CONTRACTOR SHALL PERFORM AN ADDITIONAL CLEANING, AT HIS EXPENSE.
<br />QUALITY REQUIREMENTS
<br />1. REFERENCE STANDARDS: FOR PRODUCTS AND WORKMANSHIP SPECIFIED BY A REFERENCED STANDARD, COMPLY WITH THE REQUIREMENTS OF THE
<br />STANDARD, EXCEPT WHERE A HIGHER OR MORE RIGID REQUIREMENT IS SPECIFIED OR REQUIRED BY CODE. SHOULD SPECIFIED REFERENCE STANDARD
<br />CONFLICT WITH THE PROJECT DOCUMENTS, OBTAIN CLARIFICATION FROM THE ARCHITECT PRIOR TO PROCEEDING.
<br />2. TESTING AND INSPECTIONS:
<br />2.1. THE OWNER WILL EMPLOY THE SERVICES OF AN INDEPENDENT TESTING AGENCY TO PERFORM ALL SPECIFIED AND CODE REQUIRED TESTING. THE
<br />2.2. THE TESTING AGENCY WILL PERFORM ALL REQUIRED TESTING AND INSPECTION AS SPECIFIED AND ALL CODE REQUIRED TESTING AND CONFIRM COMPLIANCE
<br />OF THE WORK WITH THE PROJECT DOCUMENTS AND REQUIRED TESTING. THE TESTING AGENCY WILL PROVIDE QUALIFIED PERSONNEL WITH CONSISTENT
<br />OVERSIGHT AND STAFFING.
<br />2.3. CONTRACTOR SHALL SCHEDULE ALL TESTING THROUGH THE TESTING AGENCY WITH NOTIFICATION TO THE OWNER AS WELL. ENSURE ADEQUATE TiME FOR
<br />THE TESTING AGENCY TO SCHEDULE VISITS. THE CONTRACTOR SHALL ALSO PROVIDE THE TESTING AGENCY WITH ALL REQUIRED PRODUCT DATA AND
<br />SUBMITTALS REQUIRED FOR THEIR REVIEW AND INSPECTIONS (I.E. - CONCRETE MIX DESIGNS). THE CONTRACTOR SHALL COOPERATE WITH THE TESTING
<br />AGENCY ON ALL TESTING.
<br />2.4. THE TESTING AGENCY SHALL SUBMIT ALL REPORTS TO THE OWNER, THE ARCHITECT AND ENGINEER, AND THE CONTRACTOR. THE TESTING AGENCY WILL
<br />NOTIFY ALL PARTIES OF DEFICIENT OR NON -COMPLIANT WORK IMMEDIATELY.
<br />2.5. THE TESTING AGENCY MAY NOT RELEASE, REVOKE, ALTER, OR ENLARGE ON THE REQUIREMENTS OF THE PROJECT DOCUMENTS OR THE SCOPE OF WORK.
<br />NOR SHALL THE AGENCY APPROVE, ACCEPT, OR STOP ANY PORTION OF THE WORK. IF THE WORK MUST BE STOPPED, THE TESTING AGENCY MUST
<br />NOTIFY THE OWNER AND THE ARCHITECT.
<br />2.6. ALL WORK FOUND TO BE DEFICIENT SHALL BE CORRECTED OR REPLACED AT THE CONTRACTOR'S EXPENSE.
<br />2.7. ALL RETESTING REQUIRED FOR DEFICIENT OR NON -COMPLIANT WORK SHALL. BE PERFORMED BY THE SAME AGENCY.
<br />2.8. ALL RETESTING REQUIRED FOR DEFICIENT OR NON -COMPLIANT WORK SHALL BE PAID AT THE CONTRACTORS EXPENSE.
<br />3. CONTROL OF INSTALLATION:
<br />3.1. CONTRACTOR SHALL MONITOR AND MAINTAIN CONTROL OF SUBCONTRACTORS, SUPPLIERS, MANUFACTURERS, PRODUCTS, SERVICES, SITE CONDITIONS, AND
<br />WORKMANSHIP, TO OBTAIN THE SPECIFIED OR IMPLIED QUALITY.
<br />3.2. WORK SHALL BE PERFORMED BY PERSONNEL QUALIFIED TO PRODUCE THE SPECIFIED OR IMPLIED QUALITY.
<br />3.3. FIELD VERIFY DIMENSIONS FOR ALL SHOP FABRICATED ITEMS. THIS INCLUDES, BUT IS NOT LIMITED TO: DOORS, WINDOW, AND GLAZING; METAL
<br />FABRICATIONS; CASEWORK, AND FINISH ITEMS. IF THERE IS A CONFLICT BETWEEN THE PROJECT DOCUMENTS AND THE FIELD CONDITIONS, CONTACT THE
<br />ARCHITECT FOR RESOLUTION PRIOR TO PROCEEDING. REVIEW OF SHOP DRAWINGS BY THE ARCHITECT DOES NOT CONSTITUTE APPROVAL OF FINISH
<br />DIMENSIONS.
<br />3.4. SECURE ALL WORK IN PLACE WITH POSITIVE ATTACHMENT DEVICES DESIGNED AND SIZED TO WITHSTAND STRESS, VIBRATION, PHYSICAL DISTORTION, AND
<br />DISFIGUREMENT. UNLESS NOTED OTHERWISE IN THE DRAWINGS, ALL ATTACHMENTS SHALL BE FULLY CONCEALED.
<br />4. TOLERANCES:
<br />4.1. MONITOR FABRICATION AND INSTALLATION TOLERANCE CONTROL OF PRODUCTS AND FABRICATIONS TO OBTAIN THE SPECIFIED OR IMPLIED QUALITY. DO NOT
<br />PERMIT TOLERANCES TO ACCUMULATE.
<br />4.2. COMPLY WITH THE MANUFACTURER'S TOLERANCES EXCEPT WHERE REFERENCED STANDARDS ARE MORE RIGID OR HIGHER TOLERANCES, INDUSTRY
<br />STANDARDS ARE MORE RIGID OR HIGHER TOLERANCE, OR A MORE RIGID OR HIGHER TOLERANCE IS SPECIFIED IN THE DRAWINGS.
<br />CUTTING AND PATCHING
<br />1. EACH MISCELLANEOUS INCIDENCE OF CUTTING, PATCHING, AND SELECTIVE DEMOLITION IS NOT CALLED OUT IN THESE DRAWINGS. CONTRACTOR SHALL
<br />PROVIDE ALL NECESSARY CUTTING, PATCHING AND SELECTIVE DEMOLITION AS REQUIRED TO COMPLETE THE WORK.
<br />1.1. UNLESS INDICATED OTHERWISE, ALL TENANT DEMISING WALLS, FIRE -RESISTANCE RATED WALLS, SHAFT/ENCLOSURE WALLS, STAIR AND ELEVATOR WALLS,
<br />AND OTHER DEMISING ELEMENTS MUST BE RESTORED TO MATCH THE ORIGINAL CONSTRUCTION.
<br />2. ALL CUTTING, PATCHING, AND DEMOLITION WORK SHALL BE PERFORMED NEATLY AND CLEANLY AND IN COMPLIANCE WITH ALL LOCAL REGULATIONS.
<br />3. THE CONTRACTOR IS RESPONSIBLE FOR THE REPAIR, REFURBISHMENT, OR REPLACEMENT OF ALL DISTURBED MATERIALS. CONTRACTOR SHALL MATCH
<br />ADJACENT CONSTRUCTION AND MATCH ADJACENT FINISHES. WHERE ADJACENT FINISHES ARE NO LONGER ACCEPTABLE, CONTRACTOR SHALL PROPOSE
<br />ALTERNATE PRODUCTS FOR THE ARCHITECT TO REVIEW.
<br />4. CONTRACTOR SHALL PROPERLY LOCATE ALL REINFORCING AND STRUCTURAL ELEMENTS PRIOR TO PROCEEDING WITH ANY CUTTING OR SELECTIVE
<br />DEMOLITION.
<br />5. CONTRACTOR SHALL PROPERLY CAP AND/OR REMOVE ALL ABANDONED UTILITIES. COMPLY WiTH ALL LOCAL CODE REQUIREMENTS.
<br />6. SUBMIT WRITTEN REQUEST IN ADVANCE OF CUTTING OR ALTERATION WHICH AFFECTS:
<br />6.1. STRUCTURAL INTEGRITY OF ANY ELEMENT.
<br />6.2. INTEGRITY OF WEATHER EXPOSED OR MOISTURE RESISTANT ELEMENT.
<br />6.3. EFFICIENCY, MAINTENANCE, OR SAFETY OF ANY OPERATIONAL ELEMENT.
<br />6.4. VISUAL QUALITIES OF SIGHT EXPOSED ELEMENTS.
<br />6.5. WORK PERFORMED BY THE OWNER OR SEPARATE CONTRACTOR.
<br />6.6. CONTINUOUS OPERATION OF UTILITIES, BUILDING SERVICES, FIRE SUPPRESSION, FIRE ALARM, OR SECURITY SYSTEM.
<br />IDENTIFY THE LOCATION, DESCRIPTION, DIMENSIONS, MEANS AND METHODS, AND OTHER PERTINENT INFORMATION TO THE PROPOSED CUTTING AND PATCHING.
<br />7. CUTTING: EXECUTE WORK BY MEANS AND METHODS TO AVOID DAMAGE TO OTHER WORK AND ADJACENT TENANT SPACES, AND WHICH WILL PROVIDE
<br />PREPARE SURFACES FOR PATCHING AND FINISHING (BY OTHERS).
<br />7.1. IDENTIFY ALL HAZARDOUS MATERIALS PRIOR TO PROCEEDING WITH THE WORK AND REPORT TO THE LANDLORD AND ARCHITECT FOR RESOLUTION PRIOR TO
<br />PROCEEDING.
<br />7.2. EXECUTE CUTTING AND FiTTING AS REQUIRED TO COMPLETE THE WORK. COORDINATE WITH TENANT REQUIREMENTS.
<br />7.3. REMOVE AND REPLACE DEFECTIVE OR NON -CONFORMING WORK.
<br />8. PATCHING: EXECUTE WORK TO COMPLEMENT ADJACENT WORK.
<br />8.1. FIT PRODUCTS TOGETHER IN AN INTEGRATED WAY.
<br />8.2. RESTORE WORK WiTH NEW PRODUCTS MATCHING THE EXISTING. REFINISH SURFACES TO MATCH ADJACENT FINISH. FOR CONTINUOUS SURFACES,
<br />REFINISH TO THE NEAREST INTERSECTION OR NATURAL BREAK. FOR AN ASSEMBLY REFINISH ENTIRE UNIT.
<br />8.3. AT PENETRATIONS OF FIRE -RESISTANCE RATED ASSEMBLIES, PROVIDE FIRE -RESISTIVE JOINT SYSTEMS MATCHING THE HOURLY FIRE RATING OF THE
<br />ASSEMBLY BEING PENETRATED. SEAL TIGHT TO ADJACENT CONSTRUCTION.
<br />z
<br />C U)
<br />w
<br />0
<br />Q
<br />ca
<br />D
<br />V ..
<br />4-
<br />ico
<br />V
<br />0
<br />L_ w
<br />Q z
<br />S_
<br />Q)
<br />N
<br />N
<br />Oof
<br />L_
<br />..c W
<br />V
<br />l/1 a
<br />N
<br />O
<br />N
<br />0
<br />M
<br />0
<br />t=
<br />M_
<br />W
<br />w
<br />a
<br />W
<br />O
<br />0
<br />w
<br />kn
<br />kn
<br />cn �
<br />,I. 'I-
<br />>1 ib %0
<br />C-4
<br />0
<br />O N
<br />0 0
<br />L m
<br />"
<br />C
<br />0 . co N
<br />O
<br />O v
<br />bo
<br />U
<br />=
<br />00
<br />0
<br />O V
<br />..i
<br />3.. o y
<br />v
<br />m
<br />W
<br />_
<br />N cd N
<br />E I-
<br />_
<br />c
<br />v2
<br />Wv
<br />u
<br />a
<br />Q
<br />u
<br />N Q
<br />_
<br />N
<br />c 10
<br />m
<br />co
<br />-0 v
<br />0 0
<br />E:
<br />-C
<br />Ej
<br />Ui
<br />0
<br />N
<br />O
<br />N
<br />Q
<br />0
<br />iu
<br />0
<br />0
<br />.Q
<br />0
<br />cn
<br />a)
<br />0
<br />0
<br />Z
<br />Sheet Name:
<br />GENERAL PROJECT NOTES
<br />Proj #:
<br />Issue Date:
<br />210316
<br />09/01 /2022
<br />Sheet No.:
<br />GmO*2_
<br />Drawn By:
<br />Checked By:
<br />DL
<br />DS
<br />ISSUED FOR CONSTRUCTION
<br />
|