Laserfiche WebLink
SECTION 06 40 23 - INTERIOR ARCHITECTURAL WOODWORK <br />PART I - GENERAL <br />1.1 SECTION REQUIREMENTS <br />A. Submittals: Product Data for materials and Shop Drawings. <br />B. Quality Standard: Architectural Woodwork Institute's "Architectural Woodwork Quality Standards". <br />C. Environmental Limitations: Do not deliver or install woodwork until building is enclosed, wet work is completed, and HVAC system is operating. <br />D. Provide products having a percentage of post consumer and/or preconsumer recycled content. <br />PART 2 - PRODUCTS <br />2.1 MATERIALS <br />A. Hardboard: AHAA135.4. <br />B. Medium -Density Fiberboard: ANSI A208.2, Grade 130, made with binder containing no urea formaldehyde. <br />C. Softwood Plywood: DOC PS 1. <br />D. Hardwood Plywood and Face Veneers: HPVA HP-1, made with adhesive containing no urea formaldehyde. <br />E. Thermoset Decorative Panels: Comply with LMA SAT - 1. <br />F. High -Pressure Decorative Laminate: NEMA LD 3. <br />G. Solid -Surfacing Material: Homogeneous solid sheets of filled plastic resin complying with ISSFA-2. <br />2.2 CABINET HARDWARE AND ACCESSORY MATERIALS <br />A. Provide hardware as indicated complying with BHMA All 56.9. <br />B. Exposed Hardware Finishes: Comply with BHMA Al 56.18 for BHMA code number indicated. <br />C. Furring, Blocking, Shims, and Hanging Strips: Fire -retardant -treated lumber, kiln dried to 1 5 percent moisture content. <br />D. Adhesives: Provide adhesives containing low voc content and no ureaformaledhyde. <br />E. Provide wood products complying with FSC-accredited certification body. <br />2.3 INTERIOR WOODWORK <br />A. Complete fabrication to maximum extent possible before shipment to Project site. Disassemble components only as necessary for shipment and <br />installation. Where necessary for fitting at site, provide ample allowance for scribing, trimming, and fitting. <br />B. Backout or groove backs of flat trim members and kerf backs of other wide, flat members, except for members with ends exposed in finished work. <br />C. Interior Standing and Running Trim for Transparent Finish: Custom grade, species as indicated. <br />D. Interior Standing and Running Trim for Opaque Finish: Custom grade, made from any closed -grain hardwood. <br />E. Interior Ornamental Work for Transparent Finish: Custom grade, made from species as indicated. <br />F. Interior Ornamental Work for Opaque Finish: Custom grade, made from any closed -grain hardwood. <br />G. Wood Cabinets for Transparent Finish: Custom grade. <br />1. AW Type of Cabinet Construction: Flush overlay. <br />2. Wood Species and Cut for Exposed Surfaces: As indicated, and directed by Architect. <br />3. Grain Direction: As directed by Architect. <br />4. Matching of Veneer Leaves: As directed by Architect. <br />5. Semiexposed Surfaces Other Than Drawer Bodies: Same species and cut indicated for exposed surfaces. <br />6. Drawer Sides and Barks: Solid -hardwood lumber, stained to match species indicated for exposed surfaces. <br />7. Drawer Bottoms: Thermoset decorative panels. <br />H. Plastic -Laminate Cabinets: Custom grade, Greenguard certified laminate. <br />1. AW Type of Cabinet Construction: Flush overlay. <br />2. Drawer Sides and Backs: Solid hardwood. <br />3. Drawer Bottoms: Thermoset decorative panels. <br />1. Plastic -Laminate Countertops: Premium grade, Greenguard certified laminate. <br />1. Laminate Grade: HGS for flat countertops, HGP for post -formed countertops. <br />2. Edge Treatment: Same as laminate cladding on horizontal surfaces. <br />J. Solid -Surfacing Material Countertops: Custom grade. <br />1. Solid -Surfacing Material Thickness: 3/4 inch. <br />2. Fabricate tops in one piece with shop -applied edges. <br />2.4 SHOP FINISHING OF INTERIOR ARCHITECTURAL WOODWORK <br />A. Finishes: Same grades as items to be finished. <br />B. Finish architectural woodwork at the fabrication shop; defer only final touch up until after installation. <br />1. Apply one coat of sealer or primer to concealed surfaces of woodwork. <br />2. Apply two coats to back of paneling and to end -grain surfaces. <br />3. Apply a vinyl wash coat to woodwork made from closed -grain wood before staining and finishing. <br />4. After staining, if any, apply paste wood filler to open -grain woods and wipe off excess. Tint filler to match stained wood. <br />C. Transparent Finish: AW finish system conversion varnish. <br />PART 3 - EXECUTION <br />3.1 INSTALLATION <br />A. Before installation, condition woodwork to average prevailing humidity conditions in installation areas. <br />B. Install woodwork to comply with referenced quality standard for grade specified. <br />C. Install woodwork level, plumb, true, and straight. Shim as required with concealed shims. Install level and plumb (including tops) to a tolerance <br />of 1/8 inch in 96 inches. <br />D. Scribe and cut woodwork to fit adjoining work, refinish cut surfaces, and repair damaged finish at cuts. <br />E. Anchor woodwork to anchors or blocking built in or directly attached to substrates. Fasten with countersunk concealed fasteners and blind nailing. <br />Use fine finishing nails for exposed nailing, countersunk and filled flush with woodwork. <br />F. Standing and Running Trim: Install with minimum number of joints possible, using full-length pieces (from maximum length of lumber available) to <br />greatest extent possible. Do not use pieces less than 36 inches long, except where shorter single -length pieces are necessary. Scarf running joints <br />and stagger in adjacent and related members. <br />G. Anchor paneling to supports with concealed panel -hanger clips and by blind nailing on back-up strips, splined-connection strips, and similar <br />associated trim and framing. <br />H. Cabinets: Install so doors and drawers are accurately aligned. Adjust hardware to center doors and drawers in openings and to provide <br />unencumbered operation. <br />1. Fasten wall cabinets through back, near top and bottom, at ends and not more than 16 inches o.c. with [No. 1 0 wafer -head sheet metal screws <br />through metal backing or metal framing behind wall finish. <br />1. Anchor countertops securely to base units. Seal space between backsplash and wall. <br />END OF SECTION 06 40 23 <br />SECTION 072100 - BUILDING INSULATION <br />PART 1 - GENERAL <br />1.1 SUMMARY <br />A. Section Includes: <br />1 . Insulation. <br />1.2 SUBMITTALS <br />A. Product Data: Each type of insulation specified. <br />B. Product Test Reports: From and based on tests performed by a qualified independent testing agency evidencing compliance of insulation products with <br />specified requirements including those for thermal resistance, fire -test -response characteristics, water absorption, and other properties, based on comprehensive <br />testing of current products. <br />C. Research or Evaluation Reports: Reports of the model code organization acceptable to authorities having jurisdiction that evidence compliance of <br />foam -plastic insulations with building code in effect for Project. <br />1.3 QUALITY ASSURANCE <br />A. Single -Source Responsibility for Insulation Products: Obtain each type of building insulation from a single source with resources to provide products <br />complying with requirements indicated without delaying the Work. <br />B. Fire -Test -Response Characteristics: Provide insulation and related materials with the fire -test- response characteristics indicated on Drawings or specified <br />elsewhere in this Section as determined by testing identical products per test method indicated below by UL or another testing and inspecting agency acceptable to <br />authorities having jurisdiction. Identify materials with appropriate markings of applicable testing and inspecting agency. <br />1 . Surface-Buming Characteristics: ASTM E 84. <br />2. Fire -Resistance Ratings: ASTM E 1 1 9. <br />3. Combustion Characteristics: ASTM E 136. <br />1.4 DELIVERY, STORAGE, AND HANDLING <br />A. Protect insulation materials from physical damage and from deterioration by moisture, soiling, and other sources. Store inside and in a dry location. Comply <br />with manufacturer's written instructions for handling, storing, and protecting during installation. <br />2.1 MANUFACTURERS <br />A. Manufacturers: Subject to compliance with requirements, provide insulation products by one of the following: <br />1 . Sound Batt Insulation: <br />a. CertainTeed Corporation. <br />b. JohnsManville <br />C. Knauf Fiber Glass GmbH. <br />d. Owens-Corning Fiberglas Corporation. <br />e. Schuller International, Inc. <br />2.2 INSULATING MATERIALS <br />A. General: Provide insulating materials that comply with requirements and with referenced standards. <br />2.3 SOUND BATT INSULATION <br />A. Sound Batt Insulation: ASTM C 665, Type I (blankets without membrane facing), Class A, with maximum fiame-spread and smoke -developed indices of 10 <br />and 1 0, respectively, produced by combining thermosetting resins with mineral fibers manufactured from @lsee, @'a@ weel��rock wool. (Provide rock wool only) <br />1 . Thickness: To match cavity space indicated; provide single thickness blanket. <br />PART 3 - EXECUTION <br />3.1 EXAMINATION <br />A. Examine substrates and conditions, with Installer present, for compliance with requirements of Sections in which substrates and related work are specified <br />and to determine if other conditions affecting performance of insulation are satisfactory. Do not proceed with installation until unsatisfactory conditions have been <br />corrected. <br />3.2 PREPARATION i <br />A. Clean substrates of substances harmful to insulation. <br />3.3 INSTALLATION, GENERAL <br />A. Comply with insulation manufacturers written instructions applicable to products and application indicated. <br />B. Install insulation that is undamaged, dry, and unsoiled <br />C. Extend insulation in thickness indicated to envelop entire area to be insulated. Cut and fit tightly around obstructions and fill voids with insulation. Remove <br />projections that interfere with placement. <br />D. Apply single layer of insulation to produce thickness indicated, unless multiple layers are otherwise shown or required to make up total thickness. i <br />3.4 INSTALLATION OF INSULATION <br />A. General: Apply insulation types specified to substrates indicated, complying with manufacturer's written instructions and recommendations. <br />B. Install blanket insulation in cavities formed by framing members according to the following requirements: <br />1. Use blanket widths and lengths that fill the cavities formed by framing members. If more than one length is required to fill cavity, provide lengths thatwill <br />produce a snug fit between ends. <br />2. Place blankets in cavities formed by framing members to produce a friction fit between edges of insulation and adjoining framing members. <br />3. For metal -framed wall cavities where cavity heights exceed 96 inches, support unfaced blankets mechanically. <br />4. Do not force or compact insulation into stud cavity. <br />3.5 PROTECTION <br />A. General: Protect installed insulation from damage due to harmful weather exposures, physical abuse, and other causes. Provide temporary coverings or <br />enclosures where insulation is subject to abuse and cannot be concealed and protected by permanent construction immediately after installation. <br />END OF SECTION 0721 00 <br />SECTION 09 68 13 - TILE CARPETING <br />PARTI- GENERAL <br />1.1 SECTION REQUIREMENTS <br />A. Submittals: Product Data and Samples. <br />PART 2 - PRODUCTS <br />2.1 CARPET TILE <br />A. Provide carpet tile as indicated on Finish Schedule. <br />D. Critical Radiant Flux Classification: Not less than 0.45 W/sq. cm per ASTM E 648. <br />PART 3 - EXECUTION <br />3.1 INSTALLATION <br />A. Comply with CRI 104. <br />B. Prepare substrates according to ASTM F710. Verify that substrates are dry and free of curing compounds, sealers, and hardeners. <br />C. Installation Method: Glue down; releasable, pressure -sensitive adhesive. <br />D. Install borders parallel to walls. <br />END OF SECTION 09 68 13 <br />SECTION 09 91 20 - PAINTING (PROFESSIONAL LINE PRODUCTS) <br />PART1- GENERAL <br />1.1 SUBMITTALS <br />A. Product Data: For each paint system indicated. <br />B. Samples: Provide 12 by 12 inch samples of each paint color and finish. Paint sample to be applied on same type of substrate as indicated. <br />1.2 QUALITY ASSURANCE <br />A. Applicator Qualifications: A firm or individual experienced in applying paints and coatings similar in material, design, and extent to those indicated for <br />this Project, whose work has resulted in applications with a record of successful in-service performance. <br />B. Source Limitations: Obtain primers for each coating system from the same manufacturer as the finish coats. <br />PART 2 - PRODUCTS <br />2.1 MANUFACTURERS <br />A. Products: Subject to compliance with requirements, provide one of the products listed in other Part 2 articles. <br />B. Manufacturers' Names: Shortened versions (shown in parentheses) of the following manufacturers' names are used in other Part 2 articles: <br />1. ICI Paints (ICI Paints). <br />2. Porter Paints (Porter). <br />3. PPG Industries, Inc. (Pittsburgh Paints). <br />4. Sherwin-Williams Co. (Sherwin-Williams). <br />5. Flame Control Coatings, Inc. (Flame Control Coatings) <br />2.2 INTERIOR PRIMERS <br />A. Interior Gypsum Board Primer: Factory -formulated latex -based primer for interior application. <br />1 � ICI Paints; 1 000 Prep & Prime Hi -Hide Wall Interior Water -Based Primer Sealer: Applied at a dry film thickness of not less than 1.2 mils. <br />2. Porter; 867 ProMaster 2000 PVA Drywall Primer Sealer: Applied at a dry film thickness of not less than 1.1 mils. <br />3. Pittsburgh Paints; 6-2 SpeedHide Interior Quick -Drying Latex Sealer: Applied at a dry film thickness of not less than 1.0 mil. <br />4. Sherwin-Williams; PrepRite High Build Interior Latex Primer/Surfacer B28W601 Series: Applied at a dry film thickness of not less than 1.6 mils. <br />B. Interior Wood Primer for Acrylic -Enamel and Semigloss Acrylic -Enamel Finishes: Factory -formulated acrylic -latex -based interior wood primer. <br />1. ICI Paints; 3210 Prep & Prime Gripper Multi -Purpose Interior/Exterior Water -Based Primer Sealer: Applied at a dry film thickness of not less than 1.8 mils. <br />2. Porter; 1 1 29 Blanket Acrylic Primer Sealer: Applied at a dry film thickness of not less than 1.5 mils. <br />3. Pittsburgh Paints; 6-855 SpeedHide Latex Enamel Undercoater: Applied at a dry film thickness of not less than 1.0 mil. <br />4. Sherwin-Williams; PrepRite Wall and Wood Primer B49W200 Series: Applied at a dry film thickness of not less than 1.6 mils. <br />C. Interior Ferrous -Metal Primer: Factory -formulated quick -drying rust -inhibitive acrylic -based metal primer. <br />1. ICI Paints; 4160 Devguard Multi -Purpose Primer: Applied at a dry film thickness of not less than 2.2 mils. <br />2. Porter; 215 porter Guard DTM White Acrylic Metal Primer. Applied at a dry film thickness of not less than 2.0 mils. <br />3. Pittsburgh Paints; 90-712 Pitt -Tech Acrylic Primer: Applied at a dry film thickness of not less than 1.5 mils. <br />4. Sherwin-Williams; Kern Kromik Universal Metal Primer B66W1: Applied at a dry film thickness of not less than 3.0 mils. <br />D. Interior Zinc -Coated Metal Primer: Factory -formulated galvanized metal primer. <br />1. ICI Paints; 4160 Devguard Multi -Purpose Primer: Applied at a dry film thickness of not less than 2.0 mils. <br />2. Porter; 215 Porter Guard DTM White Acrylic Metal Primer: Applied at a dry film thickness of not less than 3.0 mils. <br />3. Pittsburgh Paints; 90-712 Pitt -Tech Water Borne Acrylic DTM Primer: Applied at a dry film thickness of not less than 3.0 mils. <br />4. Sherwin-Williams; B66W1 Direct to Metal (DTM) Acrylic Primer: Applied at a dry film thickness of not less than 3.0 mils. <br />2.3 INTERIOR FINISH COATS <br />A. Interior Flat Acrylic Enamel: Factory -formulated flat acrylic -latex interior enamel: <br />1. ICI Paints; 1200 Dulux Professional Velvet Matte Interior Flat Latex Wall & Trim Finish: Applied at a dry film thickness of not less than 1.4 mils. <br />2. Pittsburgh Paints; 6-70 Line SpeedHide Interior Wall Flat -Latex Paint: Applied at a dry film thickness of not less than 1.0 mil. <br />3. Sherwin-Williams; ProMar 200 Interior Latex Flat Wall Paint B30W200 Series: Applied at a dry film thickness of not less than 1.4 mils. <br />4. Porter Paints; Pro -Master 2000 Flat Interior Latex Wall Paint No. 6109: Applied at a dry film thickness of not less than 1.3 mils. <br />B. Interior Low -Luster Acrylic Enamel: Factory -formulated eggshell acrylic -latex interior enamel. <br />1. ICI Paints; 1402 Dulux Professional Acrylic Eggshell Interior Wall & Trim Enamel: Applied at a dry film thickness of not less than 1.4 mils. <br />2. Porter; 6129 ProMaster 2000 Acrylic Latex Eggshell Enamel: Applied at a dry film thickness of not less than 1.4 mils. <br />3. Pittsburgh Paints; 6-400 Series SpeedHide Eggshell Acrylic Latex Enamel: Applied at a dry film thickness of not less than 1.25 mils. <br />4. Sherwin-Williams; ProMar 400 Interior Latex Egg -Shell Enamel B20-4400 Series: Applied at a dry film thickness of not less than 1.6 mils. <br />C. Interior Semigloss Acrylic Enamel: Factory -formulated semigloss acrylic -latex enamel for interior application. <br />1. ICI Paints; 1406 Dulux Professional Acrylic Semi -Gloss Interior Wall & Trim Enamel: Applied at a dry film thickness of not less than 1.5 mils. <br />2. Porter; 6139 Promaster 2000 Acrylic Latex Semi -Gloss Enamel: Applied at a dry film thickness of less than 1.5 mils. <br />3. Pittsburgh Paints; 6-500 Series SpeedHide Interior Semi -Gloss Latex: Applied at a dry film thickness of not less than 1.0 mil. <br />4. Sherwin-Williams; ProMar 400 Interior Latex Semi -Gloss Enamel B31-4400 Series: Applied at a dry film thickness of not less than 1.3 mils. <br />PART 3 - EXECUTION <br />3.1 EXAMINATION <br />A. Examine substrates, areas, and conditions, with Applicator present, for compliance with requirements for paint application. Comply with procedures <br />specified in PDCA P4. <br />1. Proceed with paint application only after unsatisfactory conditions have been corrected and surfaces receiving paint are thoroughly dry. <br />B. Coordination of Work: Review other Sections in which primers are provided to ensure compatibility of the total system for various substrates. On <br />request, furnish information on characteristics of finish materials to ensure use of compatible primers. Notify Architect about anticipated problems when <br />using the materials specified over substrates primed by others. <br />3.2 PREPARATION <br />A. General: Remove hardware and hardware accessories, plates, machined surfaces, lighting fixtures, and similar items already installed that are not to <br />be painted. If removal is impractical or impossible because of size or weight of the item, provide surface -applied protection before surface preparation and <br />painting. After completing painting operations in each space or area, reinstall items removed using workers skilled in the trades involved. <br />B. Cleaning: Before applying paint or other surface treatments, clean substrates of substances that could impair bond of the various coatings. Remove oil <br />and grease before cleaning. <br />C. Surface Preparation: Clean and prepare surfaces to be painted according to manufacturers written instructions for each particular substrate condition <br />and as specified. <br />D. Material Preparation: Mix and prepare paint materials according to manufacturer's written instructions. <br />E. Tinting: Tint each undercoat a lighter shade to simplify identification of each coat when multiple coats of same material are applied. Tint undercoats to <br />match the color of the finish coat, but provide sufficient differences in shade of undercoats to distinguish each separate coat. <br />3.3 APPLICATION <br />A. General: Apply paint according to manufacturer's written instructions. Use applicators and techniques best suited for substrate and type of material <br />being applied. <br />1. Paint colors, surface treatments, and finishes are indicated in the paint schedules. <br />2. Do not paint over dirt, rust, scale, grease, moisture, scuffed surfaces, or conditions detrimental to formation of a durable paint film. <br />3. Provide finish coats that are compatible with primers used. <br />4. The term "exposed surfaces" includes areas visible when permanent or built-in fixtures, grilles, convector covers, covers for finned -tube radiation, and <br />similar components are in place. Extend coatings in these areas, as required, to maintain system integrity and provide desired protection. <br />5. Paint surfaces behind movable equipment and furniture the same as similar exposed surfaces. Before final installation of equipment, paint surfaces <br />behind permanently fixed equipment or furniture with prime coat only. <br />6. Paint interior surfaces of ducts with a flat, nonspecular black paint where visible through registers or grilles. <br />7. Paint back sides of access panels and removable or hinged covers to match exposed surfaces. <br />8. Finish exterior doors on tops, bottoms, and side edges the same as exterior faces. <br />B. Scheduling Painting: Apply first coat to surfaces that have been cleaned, pretreated, or otherwise prepared for painting as soon as practicable after <br />preparation and before subsequent surface deterioration. A minimum of one prime coat and two finish coats is required. <br />1. The number of coats and film thickness required are the same regardless of application method. Do not apply succeeding coats until previous coat <br />has cured as recommended by manufacturer. If sanding is required to produce a smooth, even surface according to manufacturers written instructions, <br />sand between applications. <br />2. Allow sufficient time between successive coats to permit proper drying. <br />C. Application Procedures: Apply paints and coatings by brush, roller, spray, or other applicators according to manufacturer's written instructions. <br />D. Minimum Coating Thickness: Apply paint materials no thinner than manufacturer's recommended spreading rate to achieve dry film thickness indicated. <br />E. Completed Work: Match approved samples for color, texture, and coverage. Remove, refinish, or repaint work not complying with requirements. <br />3.4 CLEANING <br />A. Cleanup: At the end of each workday, remove empty cans, rags, rubbish, and other discarded paint materials from Project site. <br />1. After completing painting, clean glass and paint -spattered surfaces. Remove spattered paint by washing and scraping without scratching or damaging <br />adjacent finished surfaces. <br />3.5 PROTECTION <br />A. Protect work of other trades, whether being painted or not, against damage from painting. Correct damage by cleaning, repairing or replacing, and <br />repainting, as approved by Architect. <br />END OF SECTION 09 91 20 <br />SECTION 10 44 13 - FIRE EXTINGUISHER CABINETS <br />PART1- GENERAL <br />1.1 SUBMITTALS <br />A. Product Data: For each type of product indicated. Include construction details, material descriptions, dimensions of individual components and <br />profiles, and finishes for fire protection cabinets. <br />1. Fire Protection Cabinets: Include roughing -in dimensions, details showing mounting methods, relationships of box and trim to surrounding <br />construction, door hardware, cabinet type, trim style, and panel style. <br />B. Shop Drawings: For fire protection cabinets. Include plans, elevations, sections, details, and attachments to other work. <br />1.2 QUALITY ASSURANCE <br />A. Fire -Rated, Fire Protection Cabinets: Listed and labeled to comply with requirements in ASTM E 814 for fire -resistance rating of walls where they <br />are installed. <br />PART 2 - PRODUCTS <br />2.1 MATERIALS <br />A. Cold -Rolled Steel Sheet: ASTM A 1008/A 1008M, Commercial Steel (CS), Type B. <br />B. Stainless -Steel Sheet: ASTM A 666, Type 304. <br />C. Tempered Float Glass: ASTM C 1048, Kind FT, Condition A, Type 1, Quality q3, 3 mm thick, Class 1 (clear). <br />2.2 FIRE PROTECTION CABINET <br />A. Cabinet Construction: To match wall receiving cabinet. <br />1. Fire -Rated Cabinets: Construct fire -rated cabinets with double walls fabricated from 0.0428-inch- thick, cold -rolled steel sheet lined with minimum <br />5/8-inch- thick, fire -barrier material. Provide factory -drilled mounting holes. <br />B. Cabinet Material: Stainless -steel sheet. <br />C. Cabinet Trim Material: Same material and finish as door. <br />D. Door Material: Stainless steel as indicated. <br />E. Door Style: Center glass panel with frame. <br />F. Door Glazing: Tempered float glass (clear). <br />G. Door Hardware: Manufacturer's standard. <br />H. Accessories: <br />1. Mounting Bracket: Manufacturer's standard steel, designed to secure fire extinguisher to fire protection cabinet, of sizes required for types and <br />capacities of fire extinguishers indicated, with plated or baked -enamel finish. <br />2. Door Lock: Cam lock that allows door to be opened during emergency by pulling sharply on door handle. <br />3. Identification: Lettering complying with authorities having jurisdiction for letter style, size, spacing, and location. <br />a. Identify fire extinguisher in fire protection cabinet with the words "FIRE EXTINGUISHER", black lettering, vertically. <br />4. Alarm: Manufacturer's standard alarm that actuates when fire protection cabinet door is opened and that is powered by low voltage, complete with <br />transformer. <br />J. Finishes: <br />1. Steel: Factory primed for field painting. <br />2. Stainless Steel: No. 4. <br />2.3 FABRICATION <br />A. Fire Protection Cabinets: Provide manufacturers standard box (tub) with trim, frame, door, and hardware to suit cabinet type, trim style, and door <br />style indicated. <br />1. Weld joints and grind smooth. <br />2. Provide factory -drilled mounting holes. <br />3. Prepare doors and frames to receive locks. <br />4. Install door locks at factory. <br />B. Cabinet Doors: Fabricate doors according to manufacturer's standards, from materials indicated and coordinated with cabinet types and trim style <br />selected. <br />1. Fabricate door frames with tubular stiles and rails and hollow -metal design, minimum 1/2 inch thick. <br />2. Miter and weld perimeter door frames. <br />C. Cabinet Trim: Fabricate cabinet trim in one piece with corners mitered, welded, and ground smooth. <br />2.4 GENERAL FINISH REQUIREMENTS <br />A. Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products" for recommendations for applying and designating finishes. <br />B. Protect mechanical finishes on exposed surfaces of fire protection cabinets from damage by applying a strippable, temporary protective covering <br />before shipping. <br />C. Finish fire protection cabinets after assembly. <br />D. Appearance of Finished Work: Noticeable variations in same piece are not acceptable. Variations in appearance of adjoining components are <br />acceptable if they are within the range of approved Samples and are assembled or installed to minimize contrast. <br />PART 3 - EXECUTION <br />3.1 EXAMINATION <br />A. Examine walls and partitions for suitable framing depth and blocking where recessed cabinets will be installed. <br />B. Proceed with installation only after unsatisfactory conditions have been corrected. <br />3.2 INSTALLATION <br />A. General: Install fire protection cabinets in locations and at mounting heights indicated or, if not indicated, at heights acceptable to <br />authorities having jurisdiction. <br />B. Fire Protection Cabinets: Fasten cabinets to structure, square and plumb. <br />1. Unless otherwise indicated, provide recessed fire protection cabinets. If wall thickness is not adequate for recessed cabinets, provide <br />semirecessed fire protection cabinets. <br />2. Provide inside latch and lock for break -glass panels. <br />3. Fasten mounting brackets to inside surface of fire protection cabinets, square and plumb. <br />C. Identification: Vertical lettering. <br />3.3 ADJUSTING AND CLEANING <br />A. Remove temporary protective coverings and strippable films, if any, as fire protection cabinets are installed unless otherwise indicated in <br />manufacturer's written installation instructions. <br />B. Adjust fire protection cabinet doors to operate easily without binding. Verify that integral locking devices operate properly. <br />C. Touch up marred finishes, or replace fire protection cabinets that cannot be restored to factory -finished appearance. Use only materials and <br />procedures recommended or furnished by fire protection cabinet and mounting bracket manufacturers. <br />D. Replace fire protection cabinets that have been damaged or have deteriorated beyond successful repair by finish touchup or similar minor <br />repair <br />procedures. <br />END OF SECTION 10 44 13 <br />SECTION 10 44 16 - FIRE EXTINGUISHERS <br />PART1- GENERAL <br />1.1 SUBMITTALS <br />A. Product Data: For each type of product indicated. Include rating and classification, material descriptions, dimensions of individual <br />components and profiles, and finishes for fire extinguisher. <br />1.2 QUALITY ASSURANCE <br />A. NFPA Compliance: Fabricate and label fire extinguishers to comply with NFPA 1 0, "Portable Fire Extinguishers." <br />B. Fire Extinguishers: Listed and labeled for type, rating, and classification by an independent testing agency acceptable to authorities <br />having jurisdiction. <br />1. Provide fire extinguishers approved, listed, and labeled by FMG. <br />1.3 WARRANTY <br />A. Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace fire extinguishers that fail in materials or <br />workmanship within specified warranty period. <br />1. Warranty Period: Six years from date of Substantial Completion. <br />PART 2 - PRODUCTS <br />2.1 PORTABLE, HAND -CARRIED FIRE EXTINGUISHERS <br />A. Fire Extinguishers: Type, size, and capacity for each fire protection cabinet indicated. <br />1. Valves: Manufacturer's standard. <br />2. Handles and Levers: Manufacturer's standard. <br />3. Instruction Labels: Include pictorial marking system complying with NFPA 1 0, Appendix B and bar coding for documenting fire <br />extinguisher location, inspections, maintenance, and recharging. <br />B. Multipurpose Dry -Chemical Type in Steel Container: UL-rated 4-A:60-B:C, 10-lb nominal capacity, with monoammonium phosphate -based dry <br />chemical in enameled -steel container. <br />1. Verify locations with Architect and comply with requirement of local authorities having jurisdiction. <br />PART 3 - EXECUTION <br />3.1 EXAMINATION <br />A. Examine fire extinguishers for proper charging and tagging. <br />1. Remove and replace damaged, defective, or undercharged fire extinguishers. <br />B. Proceed with installation only after unsatisfactory conditions have been corrected. <br />3.2 INSTALLATION <br />A. General: Install fire extinguishers in locations indicated and in compliance with requirements of authorities having jurisdiction. <br />END OF SECTION 10 44 16 <br />SECTION 11 31 00 - RESIDENTIAL APPLIANCES <br />PART1- GENERAL <br />1.1 SUBMITTALS <br />A. Product Data: For each type of product indicated. Include operating characteristics, dimensions of individual appliances, and finishes <br />for each appliance. <br />B. Appliance Schedule: For appliances; use same designations indicated on Drawings. <br />1.2 QUALITY ASSURANCE <br />A. Source Limitations: Obtain residential appliances through one source from a single manufacturer. <br />B. Regulatory Requirements: Comply with provisions of the following product certifications: <br />1. NFPA: Provide electrical appliances listed and labeled as defined in NFPA 70, Article 1 00, by a testing agency acceptable to <br />authorities having jurisdiction, and marked for intended use. <br />2. UL and NEMA: Provide electrical components required as part of residential appliances that are listed and labeled by UL and that <br />comply with applicable NEMA standards. <br />3. ANSI: Provide gas-buming appliances that comply with ANSI Z21 Series standards. <br />4. NAECA: Provide residential appliances that comply with NAECA standards. <br />C. Regulatory Requirements, Accessibility: Where residential appliances are indicated to comply with accessibility requirements, comply <br />with the U.S. Architectural & Transportation Barriers Compliance Board's "Americans with Disabilities Act (ADA), Accessibility Guidelines for <br />Buildings and Facilities (ADAAG)." <br />D. Energy Ratings: Provide residential appliances that carry labels indicating energy -cost analysis (estimated annual operating costs) and <br />efficiency information as required by the FTC Appliance Labeling Rule. <br />1. Provide appliances that qualify for the EPAIDOE ENERGY STAR product labeling program. <br />PART 2 - PRODUCTS <br />2.1 PRODUCTS <br />A. Products: Provide residential appliances as indicated on drawings schedule. <br />2.2 FINISHES, GENERAL <br />A. Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products" for recommendations for applying and <br />designating finishes. <br />B. Protect mechanical finishes on exposed surfaces from damage by applying a strippable, temporary protective covering before shipping. <br />PART 3 - EXECUTION <br />3.1 EXAMINATION <br />A. Examine conditions, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting <br />performance of work. <br />B. Examine roughing -in for piping systems to verify actual locations of piping connections before equipment installation. <br />C. Proceed with installation only after unsatisfactory conditions have been corrected. <br />3.2 INSTALLATION, GENERAL <br />A. General: Comply with manufacturers written instructions. <br />B. Built-in Equipment: Securely anchor units to supporting cabinets or countertops with concealed fasteners. Verify that clearances <br />are adequate for proper functioning and rough openings are completely concealed. <br />C. Freestanding Equipment: Place units in final locations after finishes have been completed in each area. Verify that clearances <br />are adequate to properly operate equipment. <br />3.3 CLEANING AND PROTECTION <br />A. Test each item of residential appliances to verify proper operation. Make necessary adjustments. <br />B. Verify that accessories required have been furnished and installed. <br />C. Remove packing material from residential appliances and leave units in clean condition, ready for operation. <br />END OF SECTION 11 31 00 <br />CAMPBELL +VAN DUSEN <br />ARCHITECTURE INTERIOR DESIGN <br />www.CVDstudio.com <br />CAMPBELL + VAN DUSEN Design Studio, LLC. <br />255 South Orange Avenue Suite # 1 240 <br />Orlando, Florida 32801 <br />Phone: 407.930.6016 <br />FL. Lic. No. AR001 6053 <br />I <br />. X� <br />I ,/�// ,,--I _k I ,-� <br />I ..� -1 t, <br />ARCHITECT OF RECORD <br />FRANK W. CAMPBELL AIA <br />FL LIC NO. AR001 6053 <br />COPY OF THIS PLAN IS NOT VALID UNLESS SIGNED, <br />SEALED AND DATED BY THE ARCHITECT OF RECORD <br />COPY OF THIS PLAN IS NOT VALID UNLESS SIGNED, <br />SEALED AND DATED BY THE ENGINEER OF RECORD <br />__1 <br />LL_ <br />Vi <br />J <br />_J <br />M <br />_:�; <br />I <br />W <br />0 <br />>_ <br />= <br />l­_ <br />0L <br />CL <br />= <br />LU <br />Fif <br />�- <br />r_4 <br />U <br />I <br />< <br />I <br />(-) <br />V) <br />(/') <br />> <br />LIJ <br />LU <br />I <br />_J <br />0 <br />= <br />1 <br />ca <br />�_ <br />F_ <br />+ <br />L0 <br />= <br />__J <br />_J <br />(-) <br />= <br />,0 <br />Cie <br />< <br />LIJ <br />) <br />LU <br />�> <br />I <br />I <br />>_ <br />= <br />C) � <br />0 <br />0 <br />LU <br />0- <br />11-0 19t <br />,O Lo <br />W <br />CL <br />< <br />3: <br />LU <br />17-4 <br />00 (y) <br />r--, (y) <br />CONSTRUCTION DOCUMENTS <br />03.24.2023 <br />��� DESCRIPTION <br />IIIIIIIIIIIIIIIIIIIIIIII <br />IIIIIIIIIIIIIIIIIIIIIII ______ __ ___ <br />IIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIII <br />IIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII <br />IIIIIIIIIIIIIIIIIIIIIIII <br />IIIIIIIIIIIIIIIIIIIIIIII III1IIIIIIIIIIIII1IIIIII1IIIIIIIIIIIII <br />IIIIIIIIIIIIIIIIIIIIIII <br />IIIIIIIIIIIIIIIIIIIIIII <br />IIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII <br />PRINCIPAL IN CHARGE <br />F. CAMPBELL <br />I . ................................................................. <br />PROJECT MANAGER <br />M. TORRES <br />.................................................................... <br />ADVENT HEALTH <br />WELL 65+ <br />ZEPHYRHILLS <br />22-0328-01 <br />NOTES <br />A0.4 <br />