My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
36524 Garden Wall Way
Zephyrhills
>
Building Department
>
Building Plans
>
36524 Garden Wall Way
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 9:18:03 AM
Creation date
2/18/2025 3:20:46 PM
Metadata
Fields
Template:
Building Plans
Street #
36524
Location
Garden Wall Way
Contractor
Lennar
Building Plans - Permit #
Unknown
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JACK TRUSS (AS SHOWN) <br />OR GABLE END SEE TRUSS <br />LAYOUT <br />CLIP EACH TRUSS <br />(SEE ROOF PLAN <br />FOR TYPE) <br />FRAME OUT TO <br />BLOCK EDGE <br />SEE PLAN <br />FOR BEAM SIZE <br />EXTERIOR SHEATHING <br />ATTACHED PER NAILING <br />SCHEDULE 2x SPF #2 <br />AT 16" O.C. <br />BUILDER FRAME <br />RADIUS <br />(2) 12D NAILS --r AS REQUIRED <br />AT 12" O.C. MAX <br />BEAM a� RAISED ENTRY <br />CROSS BRACING DETAIL JYP)r—,-' HIP/RIDGE BLOCKING DETAIL 2 MASONRY WALL 4 KNEEWALL @ ENTRY FRONT WALL 6 <br />SCALE:NTS SCALE: NTS SCALE:NTS SCALE: NTS <br />TRUSS NOTES: <br />1. WOOD TRUSS ERECTOR SHALL PROVIDE BRACING ACCORDING TO ANSI/TP1-2014 CONV. FRAMED RIDGE <br />YBE NAILED <br />(TRUSS PLATE INSTITUTE) NOTE THAT THE COMBINED WIND AREA IS GREATER w/ MIN. (4) 12d WHEN <br />BEFORE THE ROOF SHEATHING IS APPLIED, AND BRACING SHALL THEREFORE BE IT LANDS NEXT TO <br />INSTALLED AS THE TRUSSES ARE ERECTED. INADEQUATE BRACING IS THE MOST PRE-ENG. TRUSS <br />COMMON CAUSE OF ACCIDENT IN WOOD TRUSS CONSTRUCTION. FULL BUNDLES <br />OF PLYWOOD SHALL NOT BE PLACED ON TRUSSES. THIS CONSTRUCTION LOAD <br />SHOULD BE LIMITED TO 8 SHEETS OF PLYWOOD ON ANY PAIR OF TRUSSES & <br />SHALL BE LOCATED ADJACENT TO THE SUPPORTS. NO EXCESS CONCENTRATION <br />OF ANY CONSTRUCTION MATERIAL (SUCH AS GRAVEL OR SHINGLES) SHALL BE PLACED <br />ON THE TRUSSES IN ANY ONE AREA THEY SHALL BE SPREAD OUT EVENLY OVER <br />A LARGE AREA SO AS TO AVOID OVERLOADING ANY ONE TRUSS. <br />2. ALL BRACING (DB,CB,BB) SHOWN ABOVE SHALL BE IN ADDITION TO CONTINUOUS <br />LATERAL BRACING SPECIFIED BY THE TRUSS MANUFACTER ALL LATERAL BRACING <br />SPECIFIED BY TRUSS MANUF. SHALL HAVE ADDITIONAL DIAGONAL BRACES AT 20'-0" <br />O.C. MAXIMUM. <br />3. ALL BRACES SHALL BE 2X4 NOMINAL DIMENSION LUMBER & SHALL BE ATTACHED w/ (3) 12d <br />NAILS AT EACH TRUSS INTERSECTION. CB <br />4. ADDITIONAL BOTTOM CHORD BRACING SHALL BE INSTALLED AS REQUIRED BY TRUSS <br />DESIGN WHEREVER ADEQUATE STRUCTURAL CEILING ARE NOT <br />ATTACHED DIRECTLY TO THE BOTTOM CHORD OF THE TRUSS. Dg <br />5. PROVIDE TRUSS BLOCKING AT ALL TRUSS BEARING SUPPORTS WHERE TRUSS <br />DEPTH EXCEEDS STANDARD HEEL HEIGHT. SEE TYP. TRUSS BLOCKING DETAILS <br />TYP. HAND FRAMING ABOVE TRUSS <br />2X4 STUDS & PLATES AT 2'-0" O.C. <br />EACH DIRECTION TYP. U.N.O. <br />2x8 BLOCKING NAILED @ <br />EACH SIDE w/ (3) 12d NAILS <br />WHEN REQUIRED w/ (2) <br />SIMPSON HTS20 w/ (24) 10d x <br />1 1/2" NAILS EACH <br />M 17 14 <br />TB <br />PRE-ENG. TRUSS <br />2X4 DIAGONAL AT 8'-0" O.C. 2X4 BLOCKING <br />MAX &EACH END ALTERNATE BETWEEN EA. TRUSS CONT. ROOF SHEATHING AT TRUSS TOP — <br />CHORD AT ALL HAND FRAMED AREAS TYP. <br />DIRECTION TYP. —� <br />----LWOOD TRUSS <br />A <br />TYP. WOOD TRUSS BLOCKING DETAIL <br />SCALE:NTS <br />WOOD WALL <br />OR TRUSS. <br />SEE PLAN <br />STRUCTURAL SHEATHING <br />ATTACHED PER NAILING <br />SCHEDULE <br />VARIES W/ <br />ROOF SLOPE <br />2X4 CONT. W/ (2) <br />16d COMMONS <br />NAILS EACH <br />STUD TYP. T&B <br />/TRUSS OR <br />/ ROOF SYSTEM <br />SHEAR TRANSFER <br />EXTERIOR. WALL <br />SCALE:NTS <br />DIAGONAL - <br />AT T-0" <br />MAX <br />WOOD <br />TRUSS <br />IE <br />[ u <br />SEE ROOF <br />PLAN SHEATHING <br />2X4 BLOCKING <br />BETWEEN TRUSSES <br />SECT. A -A <br />G.T. <br />ADD 2X4 ALONGSIDE <br />TOP CHORD WHEN REQ'D <br />TO PREVENT PLYWOOD <br />SPAN FROM EXCEEDING <br />MAX 24" SPAN (EITHER <br />SIDE OR BOTH IF REQ'D) <br />PROVIDE 2X4 MIN. BLOCKING AT <br />Q OF HIP/RIDGE, TYP.BETWEEN <br />TRUSSES W/ (2) 12D NAILS EACH <br />END TO TRUSS TOP CHORD <br />TYP. <br />�7A TRUSS <br />HIP <br />G.T <br />(2) 2x8 #2 SYP w) <br />O.S.B. FLITCH Pt <br />TOP @ TRUSS B <br />U.N.O. ON ROOF <br />PLAN <br />TYPIC <br />WALL <br />NOTE: PENDING BEAM <br />BEARING LOCATION, THE <br />BEAM CAN SIT ON TOP OF <br />COLUMN w/ (2) SIMPSON <br />HTS20 w/ (24) 10d x 1 1/2" <br />NAILS EACH <br />SIMPSON HU46/HUC46 w/ (8) <br />16d NAILS TO POST & (4) 10d <br />NAILS TO BEAM <br />SUPPORT COLUMN BUILT-UP <br />(2) 2x4's OR 44 w/ (2) 10d <br />NAILS @ 8" O.C. EACH PLY <br />(SHOWN AS 4 x 4) <br />(2) SIMPSON HETA20 w/ (8) 10d <br />x 1 1/2" NAILS EACH - OR (2) <br />SIMPSON MSTAM36 w/ (7) 10d <br />& (4) 1/4"x2 1/4" TITENS EACH <br />TIE BEAM <br />VERTICAL SCAB 2 x 6 <br />#2 SPF 48" O.C. W/ (4) <br />10d TOP & BOTTOM <br />OR SIMPSON H2.5A w/ <br />SIMPSON LSTA18 <br />w/ (12) 10d NAILS <br />CENTERED AT <br />SPLIT TO TIE <br />BEAMS TOGETHER <br />SIMPSON HUC410 w/ (14) <br />16d INTO HEADER & (6) <br />10d INTO BEAM - SEE <br />ROOF PLAN FOR MORE <br />L.SEE PLAN L. <br />FOR CANT. <br />(10) 8d NAILS <br />INFO <br />COLLAR TIE <br />EVERY 3rd <br />RAFTER <br />2x4 SPF 2 (2) #7 x 3-1/2" <br />WOOD SCREW EACH <br />TRUSS OR SIMPSON <br />H2.5A w/ (10) 8d NAILS <br />AT 48" O.C. <br />BEVEL CUTS <br />(OPTIONAL) <br />2x8 #2 SPF RIDGE BEAM <br />2x6 #2 SYP RAFTERS FOR SPANS 4FT <br />TO 8FT 2X4 RAFTERS FOR SPANS LESS <br />THAN 4FT @ 2'-0"0.C. MAX. w/ (3) 10d <br />COMMON TOENAILS TO TIE BEAM <br />2X4 CONT. AT—/ CONC. MASONRY <br />T & B CHORD STEEL OR WOOD <br />BEARING SUPPORT <br />A —A ALTERNATE BLOCKING <br />DETAIL a@ INTERIOR BEARING 3 <br />SCALE:NTS <br />PROVIDE BLOCKING AT ALL TRUSS BEARING <br />SUPPORT WHERE TRUSS DEPTH EXCEEDS <br />STANDARD HEEL HEIGHT <br />AL VARIES <br />ROOF SHEATHING <br />ATTACHED PER <br />2x4 #2 SPF BRACING @ <br />NAILING SCHEDULE <br />16" O.C. W/ (4) 12d <br />LCOMMON TRUSSES. <br />TOENAILS TO TOP <br />SEE TRUSS PLAN <br />PLATE & (2) 12d END <br />NAILS TO TRUSS <br />MIN. (2) 2x4 <br />SPF TOP <br />FOR CONNECTION <br />INFORMATION. <br />BOTTOM CHORD <br />PLATE <br />VARIES SEE PLAN <br />FOR WALL LOCATION <br />�— MIN. 2X4 #2 SPF STUDS @ <br />16" O.C. W/ EXTERIOR <br />SHEATHING ATTACHED <br />PER NAILING SCHEDULE & <br />(3) 12d TOENAILS TO <br />SEE PLAN FOR <br />PLATE BELOW <br />TOP OF WALL <br />MIN. 2X4 #2 SYP P.T. PLATE <br />W/ 1/2"X8" EPDXY ANCHOR <br />MASONRY WALL SEE <br />@ 3" FROM EACH END & <br />PLAN FOR MORE <br />p <br />16" O.C. MAX. <br />INFO. <br />° <br />SECTION <br />@ ENTRY <br />s <br />SCALE:NTS <br />SEE FLOOR PLAN FOR <br />COLUMN SIZE & BASE 7/16" OSB FLITCH PLATE <br />SEE FLOOR PLAN CONNECTION INFO REQ'D ONLY WHEN <br />INDICATED ON BM. <br />FOR COLUMN SIZE <br />& ADDITIONAL INFO. 7/16" OSB FLITCH PLATE SEE FLOOR PLAN FOR SCHEDULE/PLAN <br />REQ'D ONLY WHEN COLUMN SIZE & BASE <br />OPTION A SCHEDUEDE/ON PLANM OPTION B CONNECTION INFO OPTION C <br />COMMON BM. TO POST ATTACHMENT A <br />SEE ROOF PLAN <br />FOR BEAM SIZE & SCALE: 3/4"=V-0" <br />BM. SPLICE OVER <br />CENTER OF POST <br />CONNECTION INFO. <br />A A <br />SEE PLAN FOR <br />SIMPSON MTS18 w/ (14) <br />10d NAILS TYP. U.N.O. SEE PLAN FOR <br />CANTILEVER IF <br />SEE FLOOR PLAN FOR INDICATED <br />COLUMN SIZE & <br />ADDITIONAL INFO. <br />(WOOD COLUMN SHOWN) <br />O <br />CORNER SEE FOUNDATION <br />PLAN FOR MORE INFO <br />5" <br />COMMON BM. ATTACHMENT <br />SCALE:NTS <br />2X4 STUDS w/ SIMPSON <br />SP1 w/ (10) 10d NAILS <br />AT BASE SEE J/S6 FOR <br />MORE INFO. <br />EXTERIOR SHEATHING <br />ATTACHED PER <br />NAILING SCHEDULE <br />2X4 BASE PLATE W/ <br />SIMPSON LSTA30 w/ <br />(22) 10d NAILS OR <br />SIMPSON MTS12 w/ <br />(14) 10d x 1 1/2" NAILS <br />TO FLOOR GIRDER <br />BELOW @ 16" O.C. <br />>< - <br />16" FLOOR SYSTEM FLOOR GIRDER <br />SEE PLAN FOR SEE PLAN FOR <br />DIRECTION CONNECTION <br />SECTION @ FLOOR <br />CONNECTION 22 <br />SCALE:NTS <br />SEE 1/S5 FOR <br />ADDITIONAL <br />OUTLOOKER <br />INFO. <br />GABLE <br />TRUSS <br />1/2" PLYWOOD <br />(2) 16d NAILS TO <br />EACH COMMON <br />TRUSS/ FRAMING <br />TYP TOP & BOTTOM <br />MIDDLE <br />8d NAILS AT <br />4" O.C. <br />SEE PLAN FOR <br />VALLEY TRUSS <br />INFO. <br />�• MASONRY WALL BELOW: SIMPSON <br />°<. HETA16 w/ (9) 10d x 1 1/2" NAILS @ <br />MASONRY WALL 4'-0" O.C. TO GABLE TRUSS <br />OR BEAM • BEAM BELOW: SIMPSON HTS20 w/ <br />SEE TRUSS PLAN as A (24) 10d x 1 1/2" NAILS @ 4'-0" O.C. <br />TO GABLE TRUSS <br />a COMMON TRUSS <br />SEE ROOF PLAN <br />FOR CONNECTION <br />SECTION AT HIP GABLE rj� <br />SCALE:NTS <br />2X4 #2 SYP NAILER. NAIL <br />TO STUDS w/ (3) 16d AT <br />EACH STUD -TOENAIL ROOF AND EXTERIOR <br />EACH TRUSS TO NAILER SHEATHING ATTACHED <br />wl (3)10d PER NAILING SCHEDULE <br />SEE 2ND FLOOR WALL SECTION <br />OR ADDITIONAL INFORMATION <br />IF 2x DOUBLE LEDGER, <br />ATTACH FIRST PLY <br />W/ (4) 16d NAILS TO EA. <br />END OF TRUSS THEN <br />ATTACH SECOND PLY <br />W/ (3) ROWS OF 16d <br />NAILS AT 24" O.C. <br />• <br />• <br />SIMPSON LUS26 w/ (8) 10d NAILS <br />OR IF 2 PLY TRUSS SIMPSON <br />LUS26-2 w/ (8)16d NAILS TO <br />SEE FLOOR FRAMING PLAN <br />LEDGER <br />AND J/S6 FOR MORE INFO. <br />2X10 #2 SYP CONT. LEDGER w/ (3) <br />1/2" X 4 1/2" LAG SCREWS ATTACH <br />LAG SCREWS INTO END OF EACH <br />FLOOR TRUSS, 24" O.C. MAX. (AT <br />VERIFY WITH PLAN FOR <br />LOCATION AND DIRECTION <br />(IF PARALLEL SEE 2/D2 FOR <br />BLOCKING INFO) <br />EACH SIDE OF G.T. INSTALL (4) LAG <br />MASONRY WALL <br />SCREWS EACH SIDE) <br />(TYPICAL) <br />SECTION AT LOW ROOF 9 <br />SCALE:NTS <br />LOW ROOF/WALL� <br />SHEATHING ATTACHED <br />PER NAILING SCHEDULE <br />2x STUDS @ 16" O.C. <br />w/ SIMPSON SP1 w/ (10) 10d <br />NAILS AT BASE & SIMPSON <br />SP2 w/ (12) 10d NAILS AT TOP <br />2x BLOCKING BETWEEN STUDS <br />TO TRUSS W/ (2) 12d TOENAILS <br />EACH END ( BETWEEN TRUSSES <br />(2) 12d NAILS TO EACH VERTICAL <br />STUD) <br />2x BASE PLATE W/ (2) 12d <br />NAILS @ 16" O.C. ALONG W/ <br />SIMPSON MTS12 w/ (14) 10d x <br />1 1/2" NAILS TO BLOCKING <br />BELOW @ 16" O.C. <br />PLYWOOD <br />FLOORING <br />LOW ROOF TRUSS W/---/ <br />L (2) 2x6 BLOCKING UNDER FLOOR G.T. <br />RAISED BOTTOM CHORD <br />2nd FLOOR WALL w/ SEE PLAN <br />EXTENSION SEE TRUSS <br />SIMPSON LUS24-2 w/ (16) <br />MANUF. SPEC'S FOR <br />16d NAILS AT EACH END <br />CONNECTIONS TO G.T. <br />SECTION @ <br />BUMP OUT 39 <br />SCALE: NTS <br />DETAILS &SECTIONS <br />CV <br />WO <br />'-'J dW <br />2- t <br />�r <br />w <br />s ao c c.i <br />— m x <br />•N 'T3 S`.1 .� <br />v ax <br />E <br />v <br />tfj'P�a <br />,���°,���'<ee11i1!lBlllit <br />ASE " <br />�% <br />. " •' o <br />U �0, O <br />'• <br />C2,�- <br />QR0FE BSX��� <br />`• <br />o`� <br />To the best of the Engineer's knowledge, information and belief, <br />the structural plans and specifications contained within these <br />drawings comply with the 2020 <br />Florida Building Code - <br />Residential 7th Edition. Engineer's signature and seal is only for <br />the structural engineering portions of the drawing pages bearing <br />Engineer's signature and seal. <br />, W <br />IF <br />o E <br />NOW wE <br />Q <br />8 <br />ON <br />O C cO n <br />0 <br />Uj <br />L- �� 1 <br />,Do <br />11 F <br />��� <br />C531 <br />0 Q <br />N C M V J <br />J S + <br />J a <br />W <br />Co @ O �i <br />IZ <br />Ff W <br />Z <br />;.�N� � o <br />0 <br />Z <br />o�mrn <br />T `V0 Qr� <br />N Cl) Z r <br />J <br />§ a Z <br />O U 00 <br />�.y�Z` qk'y•' W <br />El El <br />9 <br />L N O <br />O <br />z <br />N <br />z N <br />— <br />V) <br />z a <br />0 o <br />+-I <br />u, <br />U <br />O <br />ul <br />LUQ) o <br />Ln <br />5gag <br />W <br />E <br />U 'o °� <br />• <br />N <br />I� <br />4co <br />c <br />J <br />w <br />C"> <br />M <br />J <br />� ¢ <br />z0Z' <br />z <br />Q <br />`2 <br />U <br />Q O <br />zo <br />O <br />rn <br />Q N <br />Z <br />E CJ <br />I— N <br />z <br />g <br />tt a <br />oa <br />00 <br />❑ <br />0 <br />v <br />L <br />¢o <br />aw <br />¢oa <br />-0 <br />Z <br />a� <br />OLL <br />z <br />Qo <br />A <br />Nz <br />�o <br />az <br />_� <br />r-- <br />�3 <br />o <br />w-,< <br />>-.0 <br />Id -a <br />z<T3: <br />.o <br />C O <br />i <br />;n <br />Lnm <br />� <br />c� <br />^Q <br />CL <br />N <br />N <br />O <br />O <br />Cn m <br />co <br />N <br />m <br />� <br />Ln <br />r <br />Q� <br />ate•+ <br />0 <br />N <br />OO <br />O <br />CV <br />N <br />V+ <br />L0 <br />�-- <br />T <br />T <br />E <br />E N <br />LO T <br />M <br />o <br />M <br />Z <br />a <br />E O <br />CU <br />a <br />c0 0 <br />¢ o <br />JOB <br />NO: <br />23-00522 <br />SCALE: <br />AS NOTED <br />SHEET NO. <br />D 1 <br />. ins ;j I LIN 1, H h dl I i ii ,E I I 1 11 [ 1--TT-F— I I — —F— - 1 - — 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.