....-......_.__.
<br />:...__..........._................................:....t_..,......_............._.;
<br />....................
<br />21/2"CW FROM SITE: WATER s _
<br />MAIN. REFER 4 COORDINATE
<br />WITH CIVIL. 2"CW TO ABOVE
<br />:1st FLR CEILING AND
<br />d WALL. Z-7i-"L 1 1 !2 .. 1 V ^ 1 \n I �, i � .i_ __..__.........................
<br />s EACH FIXT
<br />---URE. 1 _ ' ! _ `" j
<br />..... ...._................__.... --._ _. .. .... ------- --_
<br />.... .... .. .... ............ _. ...... _... _. _. .. .. .._.......__.. _. .. .........._
<br />BB i E;
<br />i
<br />;�_ _
<br />' `, - i ��i? / I I�l_'•: 3"VENT UP TO AEGVE
<br />-
<br />1
<br />,-,., . 2ND FLOOR GE L I �G. - &.-
<br />An
<br />3115AN DOWN FROM
<br />2ND FLOOR, TO
<br />BELOW SLAB, —'''~
<br />4"SAN DOWN FROM
<br />2ND FLOOR
<br />/2 "H4CW DOWN
<br />TO P-2.
<br />i
<br />li.
<br />,...... HER
<br />d
<br />-MB WITH EWH-1 ABOVE. 1"CW
<br />TO EWH 4 1"HW FROM EWH. 1 ''
<br />I �
<br />CONTINUE 1ie"H4CW TOMB. UI
<br />it
<br />�d
<br />1
<br />....
<br />._..... .,
<br />i T FLOOR - PARTIAL PLUM5ING PLAN
<br />1
<br />LABEL
<br />FIXTURE
<br />W V CW HW
<br />DESCRIPTIONS
<br />P-i
<br />WATER CLOSET
<br />3" 2" 1/2" -
<br />ArERICM STANDARD %1016 WHITE ELONGATED
<br />HANDICAPPED
<br />HANDICAPPED Ito GALLON FLUSH WATER CLOSET
<br />OL50NITE i'95 WHITE SEAT, CP STOP AND SUPPLY.
<br />P-IA
<br />WATER CLOSET
<br />3" 2" 1" -
<br />AMERICAN STANDARD "CADET" t3043.102,
<br />HANDICAPPED
<br />I.6 GALLON FLUSH WITH OL50NITE 55 OPEN FRONT
<br />SEAT LESS COVER SLOAN MII FLUSH VALVE.
<br />P-2
<br />HANDICAPPED
<br />1112" 2" i/2" t/2"
<br />AMERICAN STANDARD'0355.012 WALL HUNG
<br />LAVATORY
<br />LAV, ZURN Z-831A4-GH FAUCET,;
<br />20 GAUGE CP P-TRAP LESS CLEANOI.I",';
<br />CRI1312-A CP STOPS AND SUPPLIES.
<br />P-3
<br />ELECTRIC
<br />11/2 2" 1/2" -
<br />ELKAYLRPBGRKVNeKBARRIER-FREE55COOLER ;
<br />WATER COOLER
<br />RECE55ED N-THE-WALL REFRURATION 5Y60 4 56'
<br />DUAL -LEVEL
<br />GRILLE N40MICALLY SEALED, RECIPROCATW: TYPE,
<br />115V, 60HZ, SINGLE PHASE, 2B FLA, 93 GPH OF 50T
<br />DRINKING WATER $10T ROOM TEMPERATURE.
<br />P-4
<br />MOP BA51N
<br />3" 2" 1/2 " 1/2 "
<br />FIAT M55-2424 MOP 6A6IN WITH 830-AA SERVICE
<br />FAUCET W/ 5RACKET 4 HANGER 145355 5TANLE55
<br />STEEL STRANER VAC. BKAKER 4 I IM T1VM 5P0ltf.
<br />P-5
<br />EXAM RM.
<br />11/2" 2" 1/2" 1/2"
<br />ELKAY LR51115' X 11�2" STAINLESS STEEL SW
<br />SINK
<br />COMPLETE WITH FAUCET AND BASKET 5TRA*R
<br />1-1/2" 20 GAUGE CP P-TRAP LESS C.O.
<br />STOPS AND SUPPLIES. 15" X 15" X 6"
<br />?-6
<br />COUNTER -TOP
<br />11/2" 2" 1/2" 1/2"
<br />AMERICAN STANDARD "CADET"'0419.444
<br />LAVATORY
<br />20" x 11" OVAL LAVATORY WITH ZUida Z-81104-P
<br />FAUCET, lie" CP P-TRAP, STOPS 4 SUPPLIES.
<br />P-1
<br />URINAL
<br />2" 2" 3/4" -
<br />AMERICAN STANDARD 6501.010 "WASHBROOK"
<br />10 GALLON FLUSH URINAL WITH SLOAN •
<br />FLUSH VALVE, MOLNT AT HANDICAPPED HEIGHT
<br />6-1
<br />SINK -SINGLE
<br />11/2" 2 12 12"
<br />ELKAY PSR-1918 IV'x18"xi1/2" DEEP, 20
<br />COMPARTMENT
<br />GAUGE -TYPE 302 SS 5ELF-RN'1MNG SINK WITH i
<br />DELTA 101-HDF-D5T SINGLE HANDLE FAUCET.
<br />j
<br />18 GA. P-TRAP, CHIC STOPS AND SUPPLIES. I
<br />1/2 HP GARBAGE DISPOSAL EQUAL TO
<br />NSNCERATOR AT BREAK ROOM ONLY.
<br />EWH-1
<br />ELECTRIC
<br />- - 3/4" 3/4 °
<br />A.O. SMITH DEL-50, 50 GALLON WATER
<br />EWH-2
<br />WATER HEATER
<br />HEATER 45 K.W. 6211 VOLT, 1 PHASE.
<br />U.L. LISTED AND ASHRAE W-A APPROVED.
<br />VB
<br />VALVE BOX
<br />- - �2 ° -
<br />RECE55FD VALVE WX WITH FRAM AND COVER'
<br />EQUAL TO WATER TITE MODEL WS000.'
<br />EW
<br />FAUCET MOUNT
<br />- - /2" -
<br />BRADLEY FAUCET MOUNT EYEWASH MODEL
<br />EYE WASH
<br />5I9-2005 ANSI/15EA STANDARD M&I COIJPLIANT ,
<br />RCP
<br />RECIRCULATING
<br />- - - /2"
<br />GRUNDFOS MODEL UP15-2SSU,1/25 HP,115 Y.,
<br />PUMP
<br />I PH, RATED AT 6 GPM AT F HEAD. BRONZE,
<br />N-LNE PUMP. ALTEiddATE5: TACO, BELL i C055ET.
<br />UM51GENERAL NOTES.,
<br />I. THE PLUMBING CONTRACOR SHALL SURVEY SITE PRIOR TO BID
<br />SUBMISSION TO VERIFY ALL EXISTING LOCATIONS, SLOPES AND
<br />INVERTS OF EXISTING SANITARY PIPING INCLUDING CONNECTION
<br />POINTS FOR NEW PIPING TO EXISTING. ALSO, VERIFY LOCATIONS
<br />AND CONNECTION POINT TO THE EXISTING HOT AND COLD WATER
<br />LINES.
<br />2. WASTE AND VENT PIPING SHALL BE SERVICE WEIGHT CAST IRON
<br />WITH NO -HUB FITTINGS,
<br />3. DOMESTIC WATER PIPING SHALL BE 'L' COPPER WITH (35/5
<br />SOLDERED FITTINGS. PROVIDE WATER HAMMER ARRESTORS
<br />EQUAL TO JAY R. SMITH AT EACH FIXTURE GROUP, IN
<br />ACCORDANCE WITH THE FBC - PLUMBING. PVC AND CPVC PIPINr
<br />15 NOT ALLOWED DUE TO RETURN AIR PLENUM.
<br />4. SLOPE WASTE LINES 3" AND LARGER AT Ys"PER FOOT. LINES
<br />SMALLER THAN 3" SHALL BE SLOPED AT i/4" PER FOOT.
<br />5, INSULATE ALL DOMESTIC HOT WATER PIPING WITH 1/2" WALL
<br />ARMAFLEX OR EQUIVALENT INSULATION.
<br />6. PROVIDE NEW ISOLATION VALVES AT ALL FIXTURES. NEW ISOLATION
<br />VALVES SHALL BE CHROME FINISH EQUAL TO BRASSCRAFT.
<br />1. INSTALLATION OF ALL PLUMBING FIXTURES, PIPING, COMPONENTS
<br />AND PERIPHERALS SHALL COMPLY WITH THE FLORIDA BUILDING
<br />CODE - PLUMBING AND ALL OTHER APPLICABLE CODES, LAWS,
<br />STANDARDS AND ORDINANCES.
<br />5. PLUMBING CONTRACTOR SHALL COORDINATE ALL ROUTING AND
<br />PIPING CONNECTIONS PRIOR TO COMMENCEMENT OF WORK.
<br />a. ALTERNATE FIXTURE MANUFACTURERS ARE ACCEPTABLE
<br />PROVIDED THEY ARE EQUIVALENT AND MEET THE KIND AND
<br />QUALITY OF THE FIXTURES SPECIFIED.
<br />10. PIPE HANGERS SHALL BE SPLIT RING TYPE, GALVANIZED, WITH
<br />THREADED ROD SUPPORT FROM STRUCTURE ABOVE EQUAL TO
<br />GRINNELL. DISTANCE BETWEEN SUPPORTS SHALL BE PER FBC -
<br />PLUMBING TABLE 308.5.
<br />L TESTING OF THE PLUMBING SYSTEMS SHALL BE PERFORMED BY
<br />THE PLUMBING SUBCONTRACTOR AND WITNESSED BY THE
<br />BUILDING DEPARTMENT INSPECTOR POTABLE HOT AND COLD
<br />WATER PIPING SHALL BE HYDR05TATICALLY TESTED AT 125 PSIG
<br />FOR 24 HOURS. SOIL, WASTE AND VENT PIPING SHALL BE: FILLED
<br />WITH WATER TO THE TOP OF THE SYSTEM FOR A PERIOD OF 24
<br />HOURS.
<br />1:2. CLEANOUTS SHALL BE PROVIDED PER PLAN AND/OR AS
<br />REQUIRED TO PROVIDE A COMPLETE SERVICEABLE SYSTEM.
<br />CLEANOUTS SHALL BE SAME 51ZE AS PIPE. FLOOR CLEANOUT5
<br />SHALL BE EQUAL TO ZURN Z-1400-KC WITH BRONZE TOP, WALL
<br />CLEANOUTS SHALL BE EQUAL TO ZURN Z-1411-KC WITH STAINLESS
<br />STEEL COVER
<br />13. ROOF DRAINAGE: PIPING AND LEADERS -SHALL BE SCHEDULE 40 PVG1
<br />WITH 2" THICK PREFORMED SECTIONAL FIBERGLASS INSULATION ON ALL
<br />HORIZONTAL RUNS AND FIRST 12" OF VERTICAL TURN -DOWN PAST THE
<br />HORIZONTAL.
<br />KEY FLAN
<br />
|