Laserfiche WebLink
....-......_.__. <br />:...__..........._................................:....t_..,......_............._.; <br />.................... <br />21/2"CW FROM SITE: WATER s _ <br />MAIN. REFER 4 COORDINATE <br />WITH CIVIL. 2"CW TO ABOVE <br />:1st FLR CEILING AND <br />d WALL. Z-7i-"L 1 1 !2 .. 1 V ^ 1 \n I �, i � .i_ __..__......................... <br />s EACH FIXT <br />---URE. 1 _ ' ! _ `" j <br />..... ...._................__.... --._ _. .. .... ------- --_ <br />.... .... .. .... ............ _. ...... _... _. _. .. .. .._.......__.. _. .. .........._ <br />BB i E; <br />i <br />;�_ _ <br />' `, - i ��i? / I I�l_'•: 3"VENT UP TO AEGVE <br />- <br />1 <br />,-,., . 2ND FLOOR GE L I �G. - &.- <br />An <br />3115AN DOWN FROM <br />2ND FLOOR, TO <br />BELOW SLAB, —'''~ <br />4"SAN DOWN FROM <br />2ND FLOOR <br />/2 "H4CW DOWN <br />TO P-2. <br />i <br />li. <br />,...... HER <br />d <br />-MB WITH EWH-1 ABOVE. 1"CW <br />TO EWH 4 1"HW FROM EWH. 1 '' <br />I � <br />CONTINUE 1ie"H4CW TOMB. UI <br />it <br />�d <br />1 <br />.... <br />._..... ., <br />i T FLOOR - PARTIAL PLUM5ING PLAN <br />1 <br />LABEL <br />FIXTURE <br />W V CW HW <br />DESCRIPTIONS <br />P-i <br />WATER CLOSET <br />3" 2" 1/2" - <br />ArERICM STANDARD %1016 WHITE ELONGATED <br />HANDICAPPED <br />HANDICAPPED Ito GALLON FLUSH WATER CLOSET <br />OL50NITE i'95 WHITE SEAT, CP STOP AND SUPPLY. <br />P-IA <br />WATER CLOSET <br />3" 2" 1" - <br />AMERICAN STANDARD "CADET" t3043.102, <br />HANDICAPPED <br />I.6 GALLON FLUSH WITH OL50NITE 55 OPEN FRONT <br />SEAT LESS COVER SLOAN MII FLUSH VALVE. <br />P-2 <br />HANDICAPPED <br />1112" 2" i/2" t/2" <br />AMERICAN STANDARD'0355.012 WALL HUNG <br />LAVATORY <br />LAV, ZURN Z-831A4-GH FAUCET,; <br />20 GAUGE CP P-TRAP LESS CLEANOI.I",'; <br />CRI1312-A CP STOPS AND SUPPLIES. <br />P-3 <br />ELECTRIC <br />11/2 2" 1/2" - <br />ELKAYLRPBGRKVNeKBARRIER-FREE55COOLER ; <br />WATER COOLER <br />RECE55ED N-THE-WALL REFRURATION 5Y60 4 56' <br />DUAL -LEVEL <br />GRILLE N40MICALLY SEALED, RECIPROCATW: TYPE, <br />115V, 60HZ, SINGLE PHASE, 2B FLA, 93 GPH OF 50T <br />DRINKING WATER $10T ROOM TEMPERATURE. <br />P-4 <br />MOP BA51N <br />3" 2" 1/2 " 1/2 " <br />FIAT M55-2424 MOP 6A6IN WITH 830-AA SERVICE <br />FAUCET W/ 5RACKET 4 HANGER 145355 5TANLE55 <br />STEEL STRANER VAC. BKAKER 4 I IM T1VM 5P0ltf. <br />P-5 <br />EXAM RM. <br />11/2" 2" 1/2" 1/2" <br />ELKAY LR51115' X 11�2" STAINLESS STEEL SW <br />SINK <br />COMPLETE WITH FAUCET AND BASKET 5TRA*R <br />1-1/2" 20 GAUGE CP P-TRAP LESS C.O. <br />STOPS AND SUPPLIES. 15" X 15" X 6" <br />?-6 <br />COUNTER -TOP <br />11/2" 2" 1/2" 1/2" <br />AMERICAN STANDARD "CADET"'0419.444 <br />LAVATORY <br />20" x 11" OVAL LAVATORY WITH ZUida Z-81104-P <br />FAUCET, lie" CP P-TRAP, STOPS 4 SUPPLIES. <br />P-1 <br />URINAL <br />2" 2" 3/4" - <br />AMERICAN STANDARD 6501.010 "WASHBROOK" <br />10 GALLON FLUSH URINAL WITH SLOAN • <br />FLUSH VALVE, MOLNT AT HANDICAPPED HEIGHT <br />6-1 <br />SINK -SINGLE <br />11/2" 2 12 12" <br />ELKAY PSR-1918 IV'x18"xi1/2" DEEP, 20 <br />COMPARTMENT <br />GAUGE -TYPE 302 SS 5ELF-RN'1MNG SINK WITH i <br />DELTA 101-HDF-D5T SINGLE HANDLE FAUCET. <br />j <br />18 GA. P-TRAP, CHIC STOPS AND SUPPLIES. I <br />1/2 HP GARBAGE DISPOSAL EQUAL TO <br />NSNCERATOR AT BREAK ROOM ONLY. <br />EWH-1 <br />ELECTRIC <br />- - 3/4" 3/4 ° <br />A.O. SMITH DEL-50, 50 GALLON WATER <br />EWH-2 <br />WATER HEATER <br />HEATER 45 K.W. 6211 VOLT, 1 PHASE. <br />U.L. LISTED AND ASHRAE W-A APPROVED. <br />VB <br />VALVE BOX <br />- - �2 ° - <br />RECE55FD VALVE WX WITH FRAM AND COVER' <br />EQUAL TO WATER TITE MODEL WS000.' <br />EW <br />FAUCET MOUNT <br />- - /2" - <br />BRADLEY FAUCET MOUNT EYEWASH MODEL <br />EYE WASH <br />5I9-2005 ANSI/15EA STANDARD M&I COIJPLIANT , <br />RCP <br />RECIRCULATING <br />- - - /2" <br />GRUNDFOS MODEL UP15-2SSU,1/25 HP,115 Y., <br />PUMP <br />I PH, RATED AT 6 GPM AT F HEAD. BRONZE, <br />N-LNE PUMP. ALTEiddATE5: TACO, BELL i C055ET. <br />UM51GENERAL NOTES., <br />I. THE PLUMBING CONTRACOR SHALL SURVEY SITE PRIOR TO BID <br />SUBMISSION TO VERIFY ALL EXISTING LOCATIONS, SLOPES AND <br />INVERTS OF EXISTING SANITARY PIPING INCLUDING CONNECTION <br />POINTS FOR NEW PIPING TO EXISTING. ALSO, VERIFY LOCATIONS <br />AND CONNECTION POINT TO THE EXISTING HOT AND COLD WATER <br />LINES. <br />2. WASTE AND VENT PIPING SHALL BE SERVICE WEIGHT CAST IRON <br />WITH NO -HUB FITTINGS, <br />3. DOMESTIC WATER PIPING SHALL BE 'L' COPPER WITH (35/5 <br />SOLDERED FITTINGS. PROVIDE WATER HAMMER ARRESTORS <br />EQUAL TO JAY R. SMITH AT EACH FIXTURE GROUP, IN <br />ACCORDANCE WITH THE FBC - PLUMBING. PVC AND CPVC PIPINr <br />15 NOT ALLOWED DUE TO RETURN AIR PLENUM. <br />4. SLOPE WASTE LINES 3" AND LARGER AT Ys"PER FOOT. LINES <br />SMALLER THAN 3" SHALL BE SLOPED AT i/4" PER FOOT. <br />5, INSULATE ALL DOMESTIC HOT WATER PIPING WITH 1/2" WALL <br />ARMAFLEX OR EQUIVALENT INSULATION. <br />6. PROVIDE NEW ISOLATION VALVES AT ALL FIXTURES. NEW ISOLATION <br />VALVES SHALL BE CHROME FINISH EQUAL TO BRASSCRAFT. <br />1. INSTALLATION OF ALL PLUMBING FIXTURES, PIPING, COMPONENTS <br />AND PERIPHERALS SHALL COMPLY WITH THE FLORIDA BUILDING <br />CODE - PLUMBING AND ALL OTHER APPLICABLE CODES, LAWS, <br />STANDARDS AND ORDINANCES. <br />5. PLUMBING CONTRACTOR SHALL COORDINATE ALL ROUTING AND <br />PIPING CONNECTIONS PRIOR TO COMMENCEMENT OF WORK. <br />a. ALTERNATE FIXTURE MANUFACTURERS ARE ACCEPTABLE <br />PROVIDED THEY ARE EQUIVALENT AND MEET THE KIND AND <br />QUALITY OF THE FIXTURES SPECIFIED. <br />10. PIPE HANGERS SHALL BE SPLIT RING TYPE, GALVANIZED, WITH <br />THREADED ROD SUPPORT FROM STRUCTURE ABOVE EQUAL TO <br />GRINNELL. DISTANCE BETWEEN SUPPORTS SHALL BE PER FBC - <br />PLUMBING TABLE 308.5. <br />L TESTING OF THE PLUMBING SYSTEMS SHALL BE PERFORMED BY <br />THE PLUMBING SUBCONTRACTOR AND WITNESSED BY THE <br />BUILDING DEPARTMENT INSPECTOR POTABLE HOT AND COLD <br />WATER PIPING SHALL BE HYDR05TATICALLY TESTED AT 125 PSIG <br />FOR 24 HOURS. SOIL, WASTE AND VENT PIPING SHALL BE: FILLED <br />WITH WATER TO THE TOP OF THE SYSTEM FOR A PERIOD OF 24 <br />HOURS. <br />1:2. CLEANOUTS SHALL BE PROVIDED PER PLAN AND/OR AS <br />REQUIRED TO PROVIDE A COMPLETE SERVICEABLE SYSTEM. <br />CLEANOUTS SHALL BE SAME 51ZE AS PIPE. FLOOR CLEANOUT5 <br />SHALL BE EQUAL TO ZURN Z-1400-KC WITH BRONZE TOP, WALL <br />CLEANOUTS SHALL BE EQUAL TO ZURN Z-1411-KC WITH STAINLESS <br />STEEL COVER <br />13. ROOF DRAINAGE: PIPING AND LEADERS -SHALL BE SCHEDULE 40 PVG1 <br />WITH 2" THICK PREFORMED SECTIONAL FIBERGLASS INSULATION ON ALL <br />HORIZONTAL RUNS AND FIRST 12" OF VERTICAL TURN -DOWN PAST THE <br />HORIZONTAL. <br />KEY FLAN <br />