My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
36763 Eiland Blvd (2)
Zephyrhills
>
Building Department
>
Building Plans
>
36763 Eiland Blvd (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 9:44:38 AM
Creation date
2/18/2025 3:22:20 PM
Metadata
Fields
Template:
Building Plans
Street #
36763
Location
Eiland Blvd
Contractor
Wallace Associates
Building Plans - Permit #
19892
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L.. - I - _ - ---J .._..... , _:. .__..._.. ._._....____—___., : _.------- ................._...._.._.........__._......_._.._.---...-- -.---__._..._.__—._.____..__._.._.._.-..._._�--`____.�....___._.... <br />/ / {— - 1 1 _ \ r _.. ........_.. .. ....__.:.r.:: ......_ ....... .............. _..__... .... ._..... ; <br />------------- ----- -_ --__ __ _- _ __------__ .__ - __ - - __ -- -- ___ __ ____ - -- _ --- --------- -- ----- -- ----- .._...-_....._._..__. <br />1 CWTT <br />.. <br />; ...._ '• .................r- <br />a I/s �EHWRiHWR... 2oi <br />...._.% <br />...........................:. <br />wx <br />.. ........... <br />- <br />- 3 VENT .u..._ P TO ABOVE 2ND <br />FLOOR CEILING. <br />i — 112 "HECW DOWN <br />I � <br />TO P-5. <br />. <br />NOT r <br />1. THE PLUMBING CONTRACOR SHALL RVEY 51 T E PRIOR TO BID <br />SUBMISSION TO VERIFY ALL EXISTING LOCATIONS, SLOPES AND <br />INVERTS OF EXISTING SANITARY PIPING INCLUDING CONNECTION <br />POINTS FOR NEW PIPING TO EXISTING. ALSO, VERIFY LOCATIONS <br />AND CONNECTION POINT TO THE EXISTING HOT AND COLD WATER <br />LINES. <br />2, WASTE AND VENT PIPING SHALL BE SERVICE WEIGHT CAST IRON <br />WITH NO -HUB FITTINGS. <br />3. DOMESTIC WATER PIPING SHALL BE 'L' COPPER WITH 95/5 <br />SOLDERED FITTINGS. PROVIDE WATER HAMMER ARRESTORS <br />EQUAL TO JAY R SMITH AT EACH FIXTURE GROUP, IN <br />ACCORDANCE WITH THE FBC - PLUMBING. PVC AND CPVC PIPING <br />IS NOT ALLOWED DUE TO RETURN AIR PLENUM. <br />4. SLOPE WASTE LINES 3" AND LARGER AT Ys" <br />PE FOOT, LINES <br />SMALLER THAN 3" SHALL BE SLOPED AT Y4" PER FOOT. <br />5. INSULATE ALL DOMESTIC HOT WATER PIPING WITH 1/2" WALL <br />ARMAFLEX OR EQUIVALENT INSULATION. <br />6. PROVIDE NEW ISOLATION VALVES AT ALL FIXTURES. NEW ISOLATION <br />VALVES SHALL BE CHROME FINISH EQUAL TO 5RA55CRAFT. <br />INSTALLATION OF ALL PLUMBING FIXTURES, PIPING, COMPONENTS <br />AND PERIPHERALS SHALL COMPLY WITH THE FLORIDA BUILDING <br />CODE - PLUMBING AND ALL OTHER APPLICABLE CODES, LAWS, <br />STANDARDS AND ORDINANCES. <br />8. PLUMBING CONTRACTOR SHALL COORDINATE ALL ROUTING AND <br />PIPING CONNECTIONS PRIOR TO COMMENCEMENT OF WORK <br />9. ALTERNATE FIXTURE MANUFACTURERS ARE ACCEPTABLE <br />PROVIDED THEY ARE EQUIVALENT AND MEET THE KIND AND <br />QUALITY OF THE FIXTURES SPECIFIED. <br />10. PIPE HANGERS SHALL BE SPLIT RING TYPE, GALVANIZED, WITH <br />THREADED ROD SUPPORT FROM STRUCTURE ABOVE EQUAL TO <br />GRINNELL. DISTANCE BETWEEN SUPPORTS SHALL BE PER FBC - <br />PLUMBING TABLE 3055. <br />TESTING OF THE PLUMBING SYSTEMS SHALL BE PERFORMED BY <br />THE PLUMBING SUBCONTRACTOR AND WITNESSED BY THE <br />BUILDING DEPARTMENT INSPECTOR POTABLE HOT AND COLD <br />WATER PIPING SHALL BE HYDROSTATICALLY TESTED AT 125 P51G <br />FOR 24 HOURS. SOIL, WASTE AND VENT PIPING SHALL BE FILLED <br />WITH WATER TO THE TOP OF THE SYSTEM FOR A PERIOD OF 24 <br />HOURS. <br />12. CLEANOUTS SHALL BE PROVIDED PER PLAN AND/OR AS <br />REQUIRED TO PROVIDE A COMPLETE SERVICEABLE SYSTEM. <br />CLEANOUT5 SHALL BE SAME SIZE AS PIPE. FLOOR CLEANOUT5 <br />SHALL BE EQUAL TO ZURN Z-1400-KC WITH BRONZE TOP. WALL <br />1 CLEANOUTS SHALL BE EQUAL TO ZURN Z-1411-KC WITH STAINLESS <br />STEEL COVER <br />13.- ROOF DRAINAGE PIPING AKD LEADERS 5HALL SE SCHEDULE 46 PVC <br />WITH 2" THICK PREFORMED SECTIONAL FIBERGLA65 INSULATION ON ALL <br />HORIZONTAL RUNS AND FIRST 12" OF VERTICAL TURN -DOWN PAST THE <br />HORI ONTAL. <br />r <br />SANITARY <br />COLD WATER <br />HOT WATER ®_ _ _ .._.._.... - - _---------- .- <br />HOT WATER RECIRCULATION <br />.r 1 <br />0 r <br />nnic �v <br />04.21. 1.8 B M -- <br />%Z\1-10-18 RFi-B-I T.A . <br />.f, <br />i1 <br />Wa� v:€a <br />01 <br />c <br />popaa r�(i�i�°- TP1Pj�o� c�`� <br />C o <br />a° U"1 75 ° o <br />° <br />,I, 4 <br />STATE OF <br />0 o <br />U m <br />Z m N h <br />Q 1 O, ~ <br />O N N <br />- _O O d <br />❑ EL •C y <br />JLL N 0 m m <br />u N..�. N <br />N 0 V) N g <br />G N C r- U <br />� O <br />0 <br />C <br />Uf <br />LLJ 0 <br />C) V <br />> - <br />L <br />a3 � <br />m <br />o <br />1_ <br />1 1_ E <br />Scale: AS NOTED <br />Project Mgr: AAY <br />L�r..v,E.. DMD <br />1ST FLOOfR - F'AfRT I AL f=L N <br />GALE: 3;1/0" = -O' <br />
The URL can be used to link to this page
Your browser does not support the video tag.