My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
36763 Eiland Blvd (2)
Zephyrhills
>
Building Department
>
Building Plans
>
36763 Eiland Blvd (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 9:44:38 AM
Creation date
2/18/2025 3:22:20 PM
Metadata
Fields
Template:
Building Plans
Street #
36763
Location
Eiland Blvd
Contractor
Wallace Associates
Building Plans - Permit #
19892
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 11 1 1 1 11 <br />I I <br />I I <br />I I <br />I � I <br />I <br />I I <br />---------------------------------------------------------------- llmcd <br />----------------L-------------------oFa-0 <br />--1------- <br />/ I / `` ( <br />I <br />I ( I wad- <br />it I <br />i <br />I � <br />-------------- - <br />I <br />LOCK BOX <br />ro'-0" A.F.F. <br />I <br />L <br />41�5_ ro <br />TIE <br />i <br />1LI <br />11 <br />E <br />KEYED NOTES <br />DRAWING NOTES FOR SHEETS Ela THRU E2c: L <br />1, MOUNT TH15 RECEPTACLE BELOW SINK FOR CONNECTION <br />OF MOTION ACTIVATE WATER VALVE ASSEMBLY. <br />2. PROVIDE A 2-GANG DEVICE BOX FOR INSTALLATION OF <br />LOW VOLTAGE TRANSFORMER AND A SINGLE GANG <br />DEVICE BOX WITH TOGGLE SWITCH FOR MAINTENANCE <br />DISCONNECTING OF POWER TO TRANSFORMER. MOUNT <br />BOXES ABOVE ACCESSIBLE CEILING AND ABOVE FLUSH <br />SENSOR MOUNTING BOX IN WALL. MAKE ALL LOW <br />VOLTAGE CONNECTION BETWEEN TRANSFORMER AND <br />WALL SENSOR. <br />3. PROVIDE ONE (0- 4" SQUARE X 2-1/2 DEEP DEVICE BOX <br />MOUNTED FLUSH WITH WALL FOR CONNECTION OF <br />INFRARED SENSOR AND FLUSH SOLENOID, REFER TO <br />MANUFACTURE INFORMATION FOR ADDITIONAL <br />INSTALLATION REQUIREMENTS. <br />4. PROVIDE FINAL CONNECTION TO AUTOMATIC DOOR <br />SYSTEM CONTROLLER. COORDINATE CONTROLLER <br />LOCATION AND CONNECTION REQUIREMENTS WITH SYSTEM <br />INSTALLER. <br />5. AREA OF RESCUE ASSISTANCE POWER SUPPLY. <br />b- AREA OF RESCUE ASSISTANCE MASTER STATION. MOUNT <br />CENTER OF STATION 60" AFF. WIRE BACK TO SYSTEM <br />CONTROLLER/POWER SUPPLY. COORDINATE EXACT <br />REQUIREMENTS WITH SYSTEM INSTALLER AND OWNER. <br />-f. PROVIDE FINAL CONNECTION TO THE ELECTRIC WATER <br />COOLER PROVIDE A RECEPTACLE CORD AND CAP AS <br />REQUIRED. <br />5. LOCATE A MICROWAVE OUTLET IN UPPER CABINET <br />MILLWORK AS DIRECTED BY ARCHITECT AS REQUIRED <br />FOR THE BUILT-IN MICROWAVE. COORDINATE WITH <br />MILLWORK INSTALLER. <br />9. PROVIDE FINAL CONNECTION TO GARBAGE DISPOSAL. <br />LOCATE SWITCH ABOVE COUNTER ADJACENT TO SINK_ <br />10, PROVIDE S' X LENGTH A5 SHOWN X 3/4" THICK PHONE <br />BOARD FOR COMMUNICATION SYSTEM REQUIREMENTS, <br />PAINT WITH 2 COATS OF FIRE RETARDANT PAINT. EXTEND <br />A 03/0 CU IN I"C TO THE TO BUILDING GROUND SYSTEM. <br />11, PROVIDE A SWITCHED RECEPTACLE. BOTTOM <br />RECEPTACLE SHALL BE SWITCHED BY POWER PACK OF <br />THE CEILING MOUNTED OCCUPANCY SENSOR PROVIDE <br />UNSWITCHED CONDUCTOR FOR UPPER RECEPTACLE. <br />12, FIRE ALARM ANNUNCIATION PANEL (FAAP). COORDINATE <br />EXACT LOCATION WITH AUTHORITY HAVING JURISDICTION <br />(AHJ) AND OWNER. <br />13. FIRE ALARM CONTROL PANEL (FRCP). <br />14. PROVIDE AND INSTALL JUNCTION BOX FOR TENANT <br />PYLON SIGNAGE. PROVIDE DISCONNECT TO 51GNAGE <br />PER ARTICLE 600-2 OF THE N.E.G. ROUTE VIA NEW <br />CONTROL PANEL LCP. FIELD VERIFY AND COORDINATE <br />EXACT LOCATION WITH G.C.- AND OWNER. <br />15. PROVIDE A DISCONNECT AND FINAL CONNECTION TO <br />HVAC ROOF TOP UNIT. COORDINATE EXACT LOCATION <br />AND REQUIREMENTS WITH MECHANICAL CONTRACTOR. <br />FUSE PER NAMEPLATE. REFER TO ELECTRICAL HVAC <br />SCHEDULE ON SHEET Eld. <br />Iro, PROVIDE A DISCONNECT AND FINAL CONNECTION TO <br />HVAC VAV UNIT. COORDINATE EXACT LOCATION AND <br />REQUIREMENTS WITH MECHANICAL CONTRACTOR. FUSE <br />PER NAMEPLATE. REFER TO ELECTRICAL HVAC <br />SCHEDULE ON SHEET Eld, <br />11. PROVIDE A DISCONNECT AND FINAL CONNECTION TO <br />HVAC AIR HANDLING OR CONDENSING UNIT_ COORDINATE <br />EXACT LOCATION AND REQUIREMENTS WITH MECHANICAL . <br />CONTRACTOR. FUSE PER NAMEPLATE. REFER TO <br />ELECTRICAL HVAC SCHEDULE ON SHEET Eld. <br />18. PROVIDE A DISCONNECT AND FINAL CONNECTION TO <br />ELECTRICAL WATER HEATER COORDINATE EXACT <br />LOCATION AND REQUIREMENTS WITH PLUMBING <br />CONTRACTOR AND DRAWINGS_ <br />19_ PROVIDE DISCONNECTS AND FINAL CONNECTION TO <br />ELEVATOR GAB LIGHT AND CONTROLLER. FIELD VERIFY <br />EXACT LOCATION AND REQUIREMENTS WITH ELEVATOR <br />INSTALLER AND G,C_ <br />20. PROVIDE A RECEPTACLE AND TV/DATA OUTLETS FOR <br />TV. COORDINATE EXACT LOCATION AND HEIGHTS WITH <br />G.C. AND OWNER PRIOR TO ROUGH -IN. <br />21. PROVIDE FINAL CONNECTION TO HOOD. FIELD VERIFY <br />EXACT LOCATION AND REQUIREMENTS WITH HOOD <br />INSTALLER AND OWNER. <br />22. DATA OUTLET AT WORKSTATION IN EXAM ROOM TO <br />MOUNTED BELOW COUNTER. (TYPICAL FOR ALL EXAM <br />ROOMS) <br />1 <br />23, ALL RECEPTACLES AT THE EXAM SINK AND <br />WORKSTATION TO BE MOUNTED ABOVE COUNTER. <br />(TYPICAL FOR ALL EXAM ROOMS). ))) <br />fC,EY gym-11-AN <br />O1ST FLOOR T-4%RTIAL ELECTRICAL OPLAN (SOUTH) d <br />SCALE- 3/16" - 1'-0" <br />REVISIONS <br />BY <br />1 ' \ 04.21. i8 <br />WR <br />.>0 <br />O-C <br />0 <br />,x <br />i <br />Ak <br />~ t <br />=0 <br />w� <br />x <br />~ x <br />c�a <br />O <br />04-27-18 <br />STATE OF <br />Cu <br />q in <br />CD <br />�f43WE� <br />E- s M o <br />Q y 6 Z <br />Q' aID t- <br />WLn u <br />� � Q QI <br />❑ Z� N N <br />EL O <br />�aw6 pz <br />^ N <br />Cu <br />z <br />Za, s <br />L)a Jam <br />o <br />a my Q a <br />U <br />N O <br />CJ <br />U <br />W <br />-0 <br />Z O <br />_J N <br />to Lr) <br />.� o re) <br />M <br />m <br />U Q V) <br />u `o <br />O <br />U <br />0 a <br />LL_ <br />W o <br />Vj U <br />a' <br />O Q O >1 <br />m , <br />CL <br />N <br />Z C <br />J w <br />L.� <br />Date: 02. 13. 18 <br />Scale: AS NOTED <br />Project Mgr: AAY <br />Drawn: IT/WR <br />Job: 15-025 <br />Sheet <br />E 1-b <br />
The URL can be used to link to this page
Your browser does not support the video tag.