My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
36763 Eiland Blvd (2)
Zephyrhills
>
Building Department
>
Building Plans
>
36763 Eiland Blvd (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 9:44:38 AM
Creation date
2/18/2025 3:22:20 PM
Metadata
Fields
Template:
Building Plans
Street #
36763
Location
Eiland Blvd
Contractor
Wallace Associates
Building Plans - Permit #
19892
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
..... ----- l <br />- I I <br />rpTIE <br />I I <br />/ I <br />LOCK BOX <br />I <br />I <br />I <br />I <br />0 IST FLOOR FAfiRT1AL ELECTRICAL PLAN (NORTH) <br />SCALE- 3/Ifo" m 1'-20" <br />KEYED NOTES <br />DRAWING NOTES FOR SHEETS Ela THRU Etc: O <br />1, MOUNT TH15 RECEPTACLE BELOW SINK FOR CONNECTION <br />OF MOTION ACTIVATE WATER VALVE ASSEMBLY. <br />2. PROVIDE A 2-GANG DEVICE BOX FOR INSTALLATION OF <br />LOW VOLTAGE TRANSFORMER AND A SINGLE GANG <br />DEVICE BOX WITH TOGGLE SWITCH FOR MAINTENANCE <br />DISCONNECTING OF POWER TO TRANSFORMER. MOUNT <br />BOXES ABOVE ACCESSIBLE CEILING AND ABOVE FLUSH <br />SENSOR MOUNTING BOX IN WALL" MAKE ALL LOW <br />VOLTAGE CONNECTION BETWEEN TRANSFORMER AND <br />WALL SENSOR <br />3. PROVIDE ONE (0- 4" SQUARE X 2-1/2 DEEP DEVICE BOX <br />MOUNTED FLUSH WITH WALL FOR CONNECTION OF <br />INFRARED SENSOR AND FLUSH SOLENOID. REFER TO <br />MANUFACTURE INFORMATION FOR ADDITIONAL <br />INSTALLATION REQUIREMENTS. <br />4, PROVIDE FINAL CONNECTION TO AUTOMATIC DOOR <br />SYSTEM CONTROLLER COORDINATE CONTROLLER <br />LOCATION AND CONNECTION REQUIREMENTS WITH SYSTEM <br />INSTALLER. <br />5. AREA OF RESCUE A5515TANCE POWER SUPPLY. <br />6. AREA OF RESCUE ASSISTANCE MASTER STATION. MOUNT <br />CENTER OF STATION 00" AFF. WIRE BACK TO 5Y5TEM <br />CONTROLLER/POWER SUPPLY. COORDINATE EXACT <br />REQUIREMENTS WITH SYSTEM INSTALLER AND OWNER <br />1. PROVIDE FINAL CONNECTION TO THE ELECTRIC WATER <br />COOLER. PROVIDE A RECEPTACLE CORD AND GAP AS <br />REQUIRED. <br />8. LOCATE A MICROWAVE OUTLET IN UPPER CABINET <br />MILLWORK AS DIRECTED BY ARCHITECT AS REQUIRED <br />FOR THE BUILT-IN MICROWAVE. COORDINATE WITH <br />MILLWORK INSTALLER <br />g. PROVIDE FINAL CONNECTION TO GARBAGE DISPOSAL. <br />LOCATE SWITCH ABOVE COUNTER ADJACENT TO SINK. <br />10. PROVIDE 8' X LENGTH AS SHOWN X 3/4" THICK PHONE <br />BOARD FOR COMMUNICATION SYSTEM REQUIREMENTS, <br />PAINT WITH 2 COATS OF FIRE RETARDANT PAINT. EXTEND <br />A $13/0 CU IN 1"C TO THE TO BUILDING GROUND SYSTEM. <br />11_ PROVIDE A SWITCHED RECEPTACLE. BOTTOM <br />RECEPTACLE SHALL BE SWITCHED BY POWER PACK OF <br />THE CEILING MOUNTED OCCUPANCY SENSOR PROVIDE <br />UN5WITGHED CONDUCTOR FOR UPPER RECEPTACLE. <br />12. FIRE ALARM ANNUNCIATION PANEL (FAAP). COORDINATE <br />EXACT LOCATION WITH AUTHORITY HAVING JURISDICTION <br />(AHJ) AND OWNER. <br />13, FIRE ALARM CONTROL PANEL (FACP). <br />14, PROVIDE AND INSTALL JUNCTION BOX FOR TENANT <br />PYLON SIGNAGE. PROVIDE DISCONNECT TO SIGNAGE <br />PER ARTICLE 600-2 OF THE N.E.C. ROUTE VIA NEW <br />CONTROL PANEL LCP. FIELD VERIFY AND COORDINATE <br />EXACT LOCATION WITH G"C. AND OWNER <br />15, PROVIDE A DISCONNECT AND FINAL CONNECTION TO <br />HVAC ROOF TOP UNIT. COORDINATE EXACT LOCATION <br />AND REQUIREMENTS WITH MECHANICAL CONTRACTOR" <br />FUSE PER NAMEPLATE. REFER TO ELECTRICAL HVAC <br />SCHEDULE ON SHEET Eld- <br />I/o. PROVIDE A DISCONNECT AND FINAL CONNECTION TO <br />HVAC VAV UNIT. COORDINATE EXACT LOCATION AND <br />REQUIREMENTS WITH MECHANICAL CONTRACTOR. FUSE <br />PER NAMEPLATE. REFER TO ELECTRICAL HVAC <br />SCHEDULE ON SHEET Eld" <br />11 PROVIDE A DISCONNECT AND FINAL CONNECTION TO <br />HVAC AIR HANDLING OR CONDENSING UNIT_ COORDINATE <br />EXACT LOCATION AND REQUIREMENTS WITH MECHANICAL <br />CONTRACTOR. FUSE PER NAMEPLATE. REFER TO <br />ELECTRICAL HvAC SCHEDULE ON 5HEET Eld. <br />15. PROVIDE A DISCONNECT AND FINAL CONNECTION TO <br />ELECTRICAL WATER HEATER COORDINATE EXACT <br />LOCATION AND REQUIREMENTS WITH PLUMBING <br />CONTRACTOR AND DRAWINGS_ <br />l9_ PROVIDE DISCONNECTS AND FINAL CONNECTION TO <br />ELEVATOR CAB LIGHT AND CONTROLLER. FIELD VERIFY <br />EXACT LOCATION AND REQUIREMENTS WITH ELEVATOR <br />INSTALLER AND G.C. <br />20. PROVIDE A RECEPTACLE AND TV/DATA OUTLETS FOR <br />TV. COORDINATE EXACT LOCATION AND HEIGHTS WITH <br />G.C. AND OWNER PRIOR TO ROUGH -IN. <br />2L PROVIDE FINAL CONNECTION TO HOOD. FIELD VERIFY <br />EXACT LOCATION AND REQUIREMENTS WITH HOOD <br />INSTALLER AND OWNER_ <br />22. DATA OUTLET AT WORKSTATION IN EXAM ROOM TO <br />MOUNTED BELOW COUNTER. (TYPICAL FOR ALL EXAM) <br />ROOMS) } <br />1 <br />23, ALL RECEPTACLES AT THE EXAM 5INK AND } <br />WORKSTATION TO BE MOUNTED ABOVE COUNTER_ <br />(TYPICAL FOR ALL EXAM ROOMS). <br />KEY 2FLAN <br />REVISIONS <br />BY <br />04. 21. 18 <br />WR <br />y <br />1001 <br />s /y <br />L i QJ <br />IN <br />-= x <br />psi <br />y <br />h <br />v, <br />x r.�:,; <br />tg-r <br />� <br />x <br />O" <br />04-27-18`. <br />STATE <br />I— 3 0 <br />Q Vf d Z <br />a� <br />y W <br />❑CL Z O N <br />W <br />[If'4 m6Oi� <br />c J 3 ZCZ)0 <br />w❑ m N <br />0^ N <br />1A <br />c U t-i Cn+' <br />Z W w s <br />a <br />ri V) `t a <br />(J <br />tU O <br />U <br />U <br />W <br />U <br />� Z ° <br />N <br />:J W d <br />m Lf7 <br />.� O to <br />M <br />m <br />v � � <br />•� <br />o <br />U <br />O ® <br />W <br />U <br />U to <br />Q O >1 <br />d m <br />0. <br />O � -0 N <br />Z O <br />w <br />1�1 • <br />1� <br />Date: 02. 13. 18 <br />Scale: AS NOTED <br />Project Mgr: AAY <br />Drawn: ITf WR <br />Job: 15-025 <br />Sheet <br />Etc <br />
The URL can be used to link to this page
Your browser does not support the video tag.