'- I' -1 - - - - -
<br />/--------------------------\
<br />KEYED NOTES
<br />DRAWING NOTES FOR SHEETS Ela THRU Etc: O
<br />L MOUNT THIS RECEPTACLE BELOW SINK FOR CONNECTION
<br />OF MOTION ACTIVATE WATER VALVE ASSEMBLY.
<br />2. PROVIDE A 2-GANG DEVICE BOX FOR INSTALLATION OF
<br />LOW VOLTAGE TRANSFORMER AND A SINGLE GANG
<br />DEVICE BOX WITH TOGGLE SWITCH FOR MAINTENANCE
<br />DISCONNECTING OF POWER TO TRANSFORMER. MOUNT
<br />5OXE5 ABOVE ACCESSIBLE CEILING AND ABOVE FLUSH
<br />SENSOR MOUNTING BOX IN WALL. MAKE ALL LOW
<br />VOLTAGE CONNECTION BETWEEN TRANSFORMER AND
<br />WALL SENSOR,
<br />3. PROVIDE ONE (0- 4" SQUARE X 2-1/2 DEEP DEVICE BOX
<br />MOUNTED FLUSH WITH WALL FOR CONNECTION OF
<br />INFRARED SENSOR AND FLUSH SOLENOID. REFER TO
<br />MANUFACTURE INFORMATION FOR ADDITIONAL
<br />INSTALLATION REQUIREMENTS.
<br />4. PROVIDE FINAL CONNECTION TO AUTOMATIC DOOR
<br />SYSTEM CONTROLLER. COORDINATE CONTROLLER
<br />LOCATION AND CONNECTION REQUIREMENTS WITH SYSTEM
<br />INSTALLER.
<br />5. AREA OF RESCUE A551STANCE POWER SUPPLY.
<br />6. AREA OF RESCUE ASSISTANCE MASTER STATION. MOUNT
<br />CENTER OF STATION 60" AFF. WIRE BACK TO SYSTEM
<br />CONTROLLER/POWER SUPPLY. COORDINATE EXACT
<br />REQUIREMENTS WITH SYSTEM INSTALLER AND OWNER
<br />7. PROVIDE FINAL CONNECTION TO THE ELECTRIC WATER
<br />COOLER. PROVIDE A RECEPTACLE CORD AND CAP AS
<br />REQUIRED,
<br />8. LOCATE A MICROWAVE OUTLET IN UPPER CABINET
<br />MILLWORK AS DIRECTED BY ARCHITECT AS REQUIRED
<br />FOR THE BUILT-IN MICROWAVE. COORDINATE WITH
<br />- - - - MILLWORK INSTALLER.
<br />L CTF,:1fCAL HVAC =If=�-INT D13GONN CT
<br />AND FEEDER 5C�4DUL
<br />UNIT ID
<br />DESCRIPTION
<br />WIRE AND CONDUIT SIZES
<br />DISCONNECT
<br />PH
<br />VOLT
<br />MCA
<br />MOCP
<br />VAV-AI
<br />VAV UNIT, SKW
<br />2 #a AND 1 #10 E.G. IN 3/4" C
<br />60/2/40
<br />1
<br />2-1-1
<br />36.1
<br />40
<br />VAV-A2
<br />VAV UNIT, 5KW
<br />2 010 AND 1 #}0 E.G. IN 3/4" C
<br />30/2 / 25
<br />1
<br />211
<br />22.6
<br />25
<br />VAV-A3
<br />VAV UNIT, 7KW
<br />2 #8 AND 1 #10 E.G. IN 3/4" C
<br />60 / 2 / 35
<br />1
<br />27-1
<br />31.6
<br />35
<br />VAV-A4
<br />VAV UNIT, 5.5KW
<br />2 010 AND 1 *10 E.G, IN 3/4" C
<br />30/2 / 25
<br />1
<br />211
<br />24.8
<br />25
<br />VAV-A5
<br />VAV UNIT, 7KW
<br />2 #8 AND 1 *10 E.G. IN 3/4" C
<br />0012 / 35
<br />1
<br />211
<br />31fo
<br />35
<br />VAV-A6
<br />VAV UNIT, SKW
<br />2 #8 AND 1 #10 E.G. IN 3/4" G
<br />60 / 2 / 40
<br />1
<br />271
<br />36.1
<br />40
<br />VAV-51
<br />VAV UNIT, SKW
<br />2 #a AND 1 010 E.G. IN 3/4" C
<br />60/2/40
<br />1
<br />211
<br />36.1
<br />40
<br />VAV-52
<br />VAV UNIT, 3BKW
<br />2 #10 AND 1 010 E.G. IN 3/4" C
<br />30/2 120
<br />1
<br />2-7
<br />15.5
<br />20
<br />VAV-53
<br />VAV UNIT, 4.5KW
<br />2 #10 AND 1 010 E.G_ IN 3/4" C
<br />30/2 / 25
<br />1
<br />211
<br />20.3
<br />25
<br />VAV-84
<br />VAV UNIT, 5.5KW
<br />2 010 AND 1 #10 E.G_ IN 3/4" C
<br />30/2 / 25
<br />1
<br />211
<br />24.8
<br />25
<br />VAV-55
<br />VAV UNIT, SKW
<br />2 #a AND 1 #10 E.G. IN 3/4" G
<br />60 / 2 / 40
<br />1
<br />21-1
<br />36.1
<br />40
<br />VAV-56
<br />VAV UNIT, 5.5KW
<br />2 010 AND 1 #10 E.G. IN 3/4" C
<br />30/2 / 25
<br />1
<br />211
<br />24.8
<br />25
<br />VAV-Bi
<br />VAV UNIT, 5BKW
<br />2 #10 AND 1#E.G. 10 EIN 3/4" C
<br />30 / 2 / 25
<br />1
<br />2-1-1
<br />24.8
<br />25
<br />VAV-CI
<br />VAV UNIT, SKW
<br />#
<br />2 #a AND i 10 E.G. IN 3/4 C
<br />60 / 2 / 40
<br />1
<br />211
<br />36.1
<br />40
<br />VAV-C2
<br />VAV UNIT, 5.5KW
<br />2 #10 AND 1 010 E.G. IN 3/4" C
<br />30/2 / 25
<br />1
<br />271
<br />24.8
<br />25
<br />VAV-C3
<br />VAV UNIT, 4.5KW
<br />2 1*10 AND 1 010 E.G. IN 3/4" C
<br />30/2 / 25
<br />1
<br />2-11
<br />20.3
<br />25
<br />VAV-C4
<br />VAV UNIT, IKW
<br />2 #a AND 1 010 E.G. IN 3/4" C
<br />60 / 2 / 35
<br />1
<br />211
<br />31.6
<br />35
<br />VAV-05
<br />VAV UNIT, 5.5KW
<br />2 010 AND 1 010 E.G. IN 3/4" C
<br />30/2 / 25
<br />1
<br />211
<br />24.8
<br />25
<br />VAV-C6
<br />VAV UNIT, 5.5KW
<br />2 #10 AND 1 010 E.G. IN 3/4" C
<br />30/2 / 25
<br />1
<br />211
<br />242
<br />25
<br />VAV-C-(
<br />VAV UNIT, SKW
<br />2 #8 AND 1 4110 E.C. IN 3/4" C
<br />6012140
<br />1
<br />211
<br />36.1
<br />40
<br />VAV-DI
<br />VAV UNIT, I.-1KW
<br />2 010 AND 1 410 E.G. IN 3/4" C
<br />30/2 / 15
<br />1
<br />2-11
<br />1.1
<br />15
<br />VAV-D2
<br />VAV UNIT, 5.5KW
<br />2 010 AND 1 010 E.G. IN 3/4" C
<br />30/2 / 25
<br />1
<br />211
<br />24.8
<br />25
<br />VAV-D3
<br />VAV UNIT, 4.5KW
<br />2 010 AND 1 010 E.G. IN 3/4" C
<br />30/2 / 25
<br />1
<br />2-11
<br />20.3
<br />25
<br />VAV-D4
<br />VAV UNIT, I<W
<br />2 #8 AND 1 #10 E.G. IN 3/4" C
<br />60 / 2 / 35
<br />1
<br />2"11
<br />316
<br />35
<br />VAV D5
<br />VAV UNIT, 5.5KW
<br />2 010 AND 1 010 EG. IN 3/4 C
<br />30/2 / 25
<br />1
<br />277
<br />24.8
<br />25
<br />VAV-D6
<br />VAV UNIT, 5.5KW
<br />2 010 AND 1 1*10 E.G. IN 3/4" C
<br />30/2 / 25
<br />1
<br />211
<br />24,8
<br />25
<br />VAV-D_1
<br />VAV UNIT, 5.5KW
<br />2 010 AND 1 010 ECG. IN 3/4" C
<br />30/2 / 25
<br />1
<br />211
<br />24.8
<br />25
<br />VAV-D8
<br />VAV UNIT, SKW
<br />2 08 AND 1 #10 E , IN 3/4" C
<br />6012140
<br />1
<br />271
<br />36.1
<br />40
<br />RTU-1
<br />ROOF TOP UNIT
<br />3 04 AND 1 #8 E.G. IN 1-1/2" C
<br />100 / 3 / 70 / 3R
<br />3
<br />460
<br />60.6
<br />70
<br />RTU-2
<br />ROOF TOP UNIT
<br />3 04 AND 106 E.G. IN 1-112" C
<br />100 / 3 / _10 / 3R
<br />3
<br />460
<br />60.6
<br />10
<br />RTU-3
<br />ROOF TOP UNIT
<br />3 04 AND 1 08 E.C. IN 1-1/2" C
<br />100 / 3 / _10 / 3R
<br />3
<br />460
<br />60.6
<br />10
<br />RTU-4
<br />ROOF TOP UNIT
<br />3 04 AND 1 08 E.G. IN 1-1/2" C
<br />100 / 3 / -10 / 3R
<br />3
<br />46O
<br />60.6
<br />-10
<br />AHU-1
<br />AIR HANDLING UNIT
<br />2 012 AND 1 012 E.G. IN 1/2" C
<br />30/2 / 15
<br />1
<br />120
<br />1.2
<br />15
<br />CU-1
<br />CONDENSING UNIT
<br />2 010 AND 1 110 E.G_ IN 3/4" C
<br />30 / 2 / 20 / 3R
<br />1
<br />120
<br />16
<br />20
<br />EWH-1
<br />ELECTRICAL WATER
<br />NEATER
<br />2 #10 AND 1 #10 Era. IN 3/4" C
<br />30 / 2 / NF
<br />1
<br />211
<br />25
<br />EWH-2
<br />ELECTRICAL WATER
<br />NEATER
<br />2 010 AND 1 #10 E.G. IN 3/4" C
<br />30 / 2 / NF
<br />1
<br />217
<br />25
<br />O1ST FLOOR 1-
<br />09-% �TIAL ELEC
<br />SCALE: 3/16" . 1�-011
<br />CAL PLANS
<br />9. PROVIDE FINAL CONNECTION TO GARBAGE DISPOSAL.
<br />LOCATE SWITCH ABOVE COUNTER ADJACENT TO 51NC,
<br />10. PROVIDE V X LENGTH AS SHOWN X 3/4" THICK PHONE
<br />BOARD FOR COMMUNICATION SYSTEM REQUIREMENTS.
<br />PAINT WITH 2 COATS OF FIRE RETARDANT PAINT. EXTEND
<br />A 03/0 CU IN PC TO THE TO BUILDING GROUND SYSTEM.
<br />11, PROVIDE A SWITCHED RECEPTACLE. BOTTOM
<br />RECEPTACLE SHALL BE SWITCHED BY POWER PACK OF
<br />THE CEILING MOUNTED OCCUPANCY SENSOR. PROVIDE
<br />UN5WITCHED CONDUCTOR FOR UPPER RECEPTACLE.
<br />12. FIRE ALARM ANNUNCIATION PANEL (FAAP). COORDINATE
<br />EXACT LOCATION WITH AUTHORITY HAVING JURISDICTION
<br />(AHJ) AND OWNER.
<br />13. FIRE ALARM CONTROL PANEL (FACP).
<br />14. PROVIDE AND INSTALL JUNCTION BOX FOR TENANT
<br />PYLON SIGNAGE. PROVIDE DISCONNECT TO SIGNAGE
<br />PER ARTICLE 600-2 OF THE N.E.C. ROUTE VIA NEW
<br />CONTROL PANEL LCP. FIELD VERIFY AND COORDINATE
<br />EXACT LOCATION WITH G.C. AND OWNER
<br />15, PROVIDE A DISCONNECT AND FINAL CONNECTION TO
<br />HVAC ROOF TOP UNIT. COORDINATE EXACT LOCATION
<br />AND REQUIREMENTS WITH MECHANICAL CONTRACTOR.
<br />FUSE PER NAMEPLATE. REFER TO ELECTRICAL HVAC
<br />SCHEDULE ON SHEET Eld.
<br />16. PROVIDE A DISCONNECT AND FINAL CONNECTION TO
<br />HVAC VAV UNIT. COORDINATE EXACT LOCATION AND
<br />REQUIREMENTS WITH MECHANICAL CONTRACTOR FUSE
<br />PER NAMEPLATE. REFER TO ELECTRICAL HVAC
<br />SCHEDULE ON SHEET Eld.
<br />11, PROVIDE A DISCONNECT AND FINAL CONNECTION TO
<br />HVAC AIR HANDLING OR CONDENSING UNIT. COORDINATE
<br />EXACT LOCATION AND REQUIREMENTS WITH MECHANICAL
<br />CONTRACTOR. FUSE PER NAMEPLATE, REFER TO
<br />ELECTRICAL HVAC SCHEDULE ON SHEET Eld,
<br />18. PROVIDE A DISCONNECT AND FINAL CONNECTION TO
<br />ELECTRICAL WATER HEATER COORDINATE EXACT
<br />LOCATION AND REQUIREMENTS WITH PLUMBING
<br />CONTRACTOR AND DRAWINGS.
<br />19. PROVIDE D15CONNECT5 AND FINAL CONNECTION TO
<br />ELEVATOR CAB LIGHT AND CONTROLLER. FIELD VERIFY
<br />EXACT LOCATION AND REQUIREMENTS WITH ELEVATOR
<br />INSTALLER AND G.C_
<br />20. PROVIDE A RECEPTACLE AND TV/DATA OUTLETS FOR
<br />TV. COORDINATE EXACT LOCATION AND HEIGHTS WITH
<br />G.C. AND OWNER PRIOR TO ROUGH-iN.
<br />21, PROVIDE FINAL CONNECTION TO HOOD, FIELD VERIFY
<br />EXACT LOCATION AND REQUIREMENTS WITH HOOD
<br />INSTALLER AND OWNER.
<br />22, DATA OUTLET AT WORKSTATION IN EXAM ROOM TO
<br />MOUNTED BELOW COUNTER. (TYPICAL FOR ALL EXAM)
<br />ROOMS)
<br />23, ALL RECEPTACLES AT THE EXAM 51NK AND
<br />WORKSTATION TO BE MOUNTED ABOVE COUNTER.
<br />(TYPICAL FOR ALL EXAM ROOMS). %}
<br />KEY PLAN
<br />REVISIONS
<br />BY
<br />�I 04. 21. 18
<br />WR
<br />v
<br />y
<br />< -
<br />x
<br />------------
<br />g j ti
<br />x �
<br />s.
<br />a
<br />O
<br />77
<br />04-27-18 tr `
<br />STARE CF c ;
<br />Cu
<br />ca
<br />3 m O
<br />Q�� z
<br />gI d• a� +,
<br />a w z r. u
<br />0OOo N
<br />Z � CU 0
<br />CL W �'- C`7 N
<br />Q� ¢m6U��
<br />m
<br />c O¢ y N N
<br />g Ll (u +;
<br />oZ M4, o, t
<br />_LaJ�o�
<br />d >1
<br />4 (m w Q O_
<br />U
<br />ttJ O
<br />u
<br />C7
<br />W
<br />Z_ 0
<br />0
<br />.� O M
<br />M
<br />m
<br />W 0
<br />uj U
<br />U N
<br />m
<br />� - -E m
<br />a o
<br />© m ¢
<br />Z 0
<br />J w
<br />l_
<br />Date: 02. 13. 18
<br />Scale: AS NOTED
<br />Project Mgr: AAY
<br />Drawn: IT/WR
<br />Job: 15-025
<br />Sheet
<br />E 1 d
<br />
|