Laserfiche WebLink
'- I' -1 - - - - - <br />/--------------------------\ <br />KEYED NOTES <br />DRAWING NOTES FOR SHEETS Ela THRU Etc: O <br />L MOUNT THIS RECEPTACLE BELOW SINK FOR CONNECTION <br />OF MOTION ACTIVATE WATER VALVE ASSEMBLY. <br />2. PROVIDE A 2-GANG DEVICE BOX FOR INSTALLATION OF <br />LOW VOLTAGE TRANSFORMER AND A SINGLE GANG <br />DEVICE BOX WITH TOGGLE SWITCH FOR MAINTENANCE <br />DISCONNECTING OF POWER TO TRANSFORMER. MOUNT <br />5OXE5 ABOVE ACCESSIBLE CEILING AND ABOVE FLUSH <br />SENSOR MOUNTING BOX IN WALL. MAKE ALL LOW <br />VOLTAGE CONNECTION BETWEEN TRANSFORMER AND <br />WALL SENSOR, <br />3. PROVIDE ONE (0- 4" SQUARE X 2-1/2 DEEP DEVICE BOX <br />MOUNTED FLUSH WITH WALL FOR CONNECTION OF <br />INFRARED SENSOR AND FLUSH SOLENOID. REFER TO <br />MANUFACTURE INFORMATION FOR ADDITIONAL <br />INSTALLATION REQUIREMENTS. <br />4. PROVIDE FINAL CONNECTION TO AUTOMATIC DOOR <br />SYSTEM CONTROLLER. COORDINATE CONTROLLER <br />LOCATION AND CONNECTION REQUIREMENTS WITH SYSTEM <br />INSTALLER. <br />5. AREA OF RESCUE A551STANCE POWER SUPPLY. <br />6. AREA OF RESCUE ASSISTANCE MASTER STATION. MOUNT <br />CENTER OF STATION 60" AFF. WIRE BACK TO SYSTEM <br />CONTROLLER/POWER SUPPLY. COORDINATE EXACT <br />REQUIREMENTS WITH SYSTEM INSTALLER AND OWNER <br />7. PROVIDE FINAL CONNECTION TO THE ELECTRIC WATER <br />COOLER. PROVIDE A RECEPTACLE CORD AND CAP AS <br />REQUIRED, <br />8. LOCATE A MICROWAVE OUTLET IN UPPER CABINET <br />MILLWORK AS DIRECTED BY ARCHITECT AS REQUIRED <br />FOR THE BUILT-IN MICROWAVE. COORDINATE WITH <br />- - - - MILLWORK INSTALLER. <br />L CTF,:1fCAL HVAC =If=�-INT D13GONN CT <br />AND FEEDER 5C�4DUL <br />UNIT ID <br />DESCRIPTION <br />WIRE AND CONDUIT SIZES <br />DISCONNECT <br />PH <br />VOLT <br />MCA <br />MOCP <br />VAV-AI <br />VAV UNIT, SKW <br />2 #a AND 1 #10 E.G. IN 3/4" C <br />60/2/40 <br />1 <br />2-1-1 <br />36.1 <br />40 <br />VAV-A2 <br />VAV UNIT, 5KW <br />2 010 AND 1 #}0 E.G. IN 3/4" C <br />30/2 / 25 <br />1 <br />211 <br />22.6 <br />25 <br />VAV-A3 <br />VAV UNIT, 7KW <br />2 #8 AND 1 #10 E.G. IN 3/4" C <br />60 / 2 / 35 <br />1 <br />27-1 <br />31.6 <br />35 <br />VAV-A4 <br />VAV UNIT, 5.5KW <br />2 010 AND 1 *10 E.G, IN 3/4" C <br />30/2 / 25 <br />1 <br />211 <br />24.8 <br />25 <br />VAV-A5 <br />VAV UNIT, 7KW <br />2 #8 AND 1 *10 E.G. IN 3/4" C <br />0012 / 35 <br />1 <br />211 <br />31fo <br />35 <br />VAV-A6 <br />VAV UNIT, SKW <br />2 #8 AND 1 #10 E.G. IN 3/4" G <br />60 / 2 / 40 <br />1 <br />271 <br />36.1 <br />40 <br />VAV-51 <br />VAV UNIT, SKW <br />2 #a AND 1 010 E.G. IN 3/4" C <br />60/2/40 <br />1 <br />211 <br />36.1 <br />40 <br />VAV-52 <br />VAV UNIT, 3BKW <br />2 #10 AND 1 010 E.G. IN 3/4" C <br />30/2 120 <br />1 <br />2-7 <br />15.5 <br />20 <br />VAV-53 <br />VAV UNIT, 4.5KW <br />2 #10 AND 1 010 E.G_ IN 3/4" C <br />30/2 / 25 <br />1 <br />211 <br />20.3 <br />25 <br />VAV-84 <br />VAV UNIT, 5.5KW <br />2 010 AND 1 #10 E.G_ IN 3/4" C <br />30/2 / 25 <br />1 <br />211 <br />24.8 <br />25 <br />VAV-55 <br />VAV UNIT, SKW <br />2 #a AND 1 #10 E.G. IN 3/4" G <br />60 / 2 / 40 <br />1 <br />21-1 <br />36.1 <br />40 <br />VAV-56 <br />VAV UNIT, 5.5KW <br />2 010 AND 1 #10 E.G. IN 3/4" C <br />30/2 / 25 <br />1 <br />211 <br />24.8 <br />25 <br />VAV-Bi <br />VAV UNIT, 5BKW <br />2 #10 AND 1#E.G. 10 EIN 3/4" C <br />30 / 2 / 25 <br />1 <br />2-1-1 <br />24.8 <br />25 <br />VAV-CI <br />VAV UNIT, SKW <br /># <br />2 #a AND i 10 E.G. IN 3/4 C <br />60 / 2 / 40 <br />1 <br />211 <br />36.1 <br />40 <br />VAV-C2 <br />VAV UNIT, 5.5KW <br />2 #10 AND 1 010 E.G. IN 3/4" C <br />30/2 / 25 <br />1 <br />271 <br />24.8 <br />25 <br />VAV-C3 <br />VAV UNIT, 4.5KW <br />2 1*10 AND 1 010 E.G. IN 3/4" C <br />30/2 / 25 <br />1 <br />2-11 <br />20.3 <br />25 <br />VAV-C4 <br />VAV UNIT, IKW <br />2 #a AND 1 010 E.G. IN 3/4" C <br />60 / 2 / 35 <br />1 <br />211 <br />31.6 <br />35 <br />VAV-05 <br />VAV UNIT, 5.5KW <br />2 010 AND 1 010 E.G. IN 3/4" C <br />30/2 / 25 <br />1 <br />211 <br />24.8 <br />25 <br />VAV-C6 <br />VAV UNIT, 5.5KW <br />2 #10 AND 1 010 E.G. IN 3/4" C <br />30/2 / 25 <br />1 <br />211 <br />242 <br />25 <br />VAV-C-( <br />VAV UNIT, SKW <br />2 #8 AND 1 4110 E.C. IN 3/4" C <br />6012140 <br />1 <br />211 <br />36.1 <br />40 <br />VAV-DI <br />VAV UNIT, I.-1KW <br />2 010 AND 1 410 E.G. IN 3/4" C <br />30/2 / 15 <br />1 <br />2-11 <br />1.1 <br />15 <br />VAV-D2 <br />VAV UNIT, 5.5KW <br />2 010 AND 1 010 E.G. IN 3/4" C <br />30/2 / 25 <br />1 <br />211 <br />24.8 <br />25 <br />VAV-D3 <br />VAV UNIT, 4.5KW <br />2 010 AND 1 010 E.G. IN 3/4" C <br />30/2 / 25 <br />1 <br />2-11 <br />20.3 <br />25 <br />VAV-D4 <br />VAV UNIT, I<W <br />2 #8 AND 1 #10 E.G. IN 3/4" C <br />60 / 2 / 35 <br />1 <br />2"11 <br />316 <br />35 <br />VAV D5 <br />VAV UNIT, 5.5KW <br />2 010 AND 1 010 EG. IN 3/4 C <br />30/2 / 25 <br />1 <br />277 <br />24.8 <br />25 <br />VAV-D6 <br />VAV UNIT, 5.5KW <br />2 010 AND 1 1*10 E.G. IN 3/4" C <br />30/2 / 25 <br />1 <br />211 <br />24,8 <br />25 <br />VAV-D_1 <br />VAV UNIT, 5.5KW <br />2 010 AND 1 010 ECG. IN 3/4" C <br />30/2 / 25 <br />1 <br />211 <br />24.8 <br />25 <br />VAV-D8 <br />VAV UNIT, SKW <br />2 08 AND 1 #10 E , IN 3/4" C <br />6012140 <br />1 <br />271 <br />36.1 <br />40 <br />RTU-1 <br />ROOF TOP UNIT <br />3 04 AND 1 #8 E.G. IN 1-1/2" C <br />100 / 3 / 70 / 3R <br />3 <br />460 <br />60.6 <br />70 <br />RTU-2 <br />ROOF TOP UNIT <br />3 04 AND 106 E.G. IN 1-112" C <br />100 / 3 / _10 / 3R <br />3 <br />460 <br />60.6 <br />10 <br />RTU-3 <br />ROOF TOP UNIT <br />3 04 AND 1 08 E.C. IN 1-1/2" C <br />100 / 3 / _10 / 3R <br />3 <br />460 <br />60.6 <br />10 <br />RTU-4 <br />ROOF TOP UNIT <br />3 04 AND 1 08 E.G. IN 1-1/2" C <br />100 / 3 / -10 / 3R <br />3 <br />46O <br />60.6 <br />-10 <br />AHU-1 <br />AIR HANDLING UNIT <br />2 012 AND 1 012 E.G. IN 1/2" C <br />30/2 / 15 <br />1 <br />120 <br />1.2 <br />15 <br />CU-1 <br />CONDENSING UNIT <br />2 010 AND 1 110 E.G_ IN 3/4" C <br />30 / 2 / 20 / 3R <br />1 <br />120 <br />16 <br />20 <br />EWH-1 <br />ELECTRICAL WATER <br />NEATER <br />2 #10 AND 1 #10 Era. IN 3/4" C <br />30 / 2 / NF <br />1 <br />211 <br />25 <br />EWH-2 <br />ELECTRICAL WATER <br />NEATER <br />2 010 AND 1 #10 E.G. IN 3/4" C <br />30 / 2 / NF <br />1 <br />217 <br />25 <br />O1ST FLOOR 1- <br />09-% �TIAL ELEC <br />SCALE: 3/16" . 1�-011 <br />CAL PLANS <br />9. PROVIDE FINAL CONNECTION TO GARBAGE DISPOSAL. <br />LOCATE SWITCH ABOVE COUNTER ADJACENT TO 51NC, <br />10. PROVIDE V X LENGTH AS SHOWN X 3/4" THICK PHONE <br />BOARD FOR COMMUNICATION SYSTEM REQUIREMENTS. <br />PAINT WITH 2 COATS OF FIRE RETARDANT PAINT. EXTEND <br />A 03/0 CU IN PC TO THE TO BUILDING GROUND SYSTEM. <br />11, PROVIDE A SWITCHED RECEPTACLE. BOTTOM <br />RECEPTACLE SHALL BE SWITCHED BY POWER PACK OF <br />THE CEILING MOUNTED OCCUPANCY SENSOR. PROVIDE <br />UN5WITCHED CONDUCTOR FOR UPPER RECEPTACLE. <br />12. FIRE ALARM ANNUNCIATION PANEL (FAAP). COORDINATE <br />EXACT LOCATION WITH AUTHORITY HAVING JURISDICTION <br />(AHJ) AND OWNER. <br />13. FIRE ALARM CONTROL PANEL (FACP). <br />14. PROVIDE AND INSTALL JUNCTION BOX FOR TENANT <br />PYLON SIGNAGE. PROVIDE DISCONNECT TO SIGNAGE <br />PER ARTICLE 600-2 OF THE N.E.C. ROUTE VIA NEW <br />CONTROL PANEL LCP. FIELD VERIFY AND COORDINATE <br />EXACT LOCATION WITH G.C. AND OWNER <br />15, PROVIDE A DISCONNECT AND FINAL CONNECTION TO <br />HVAC ROOF TOP UNIT. COORDINATE EXACT LOCATION <br />AND REQUIREMENTS WITH MECHANICAL CONTRACTOR. <br />FUSE PER NAMEPLATE. REFER TO ELECTRICAL HVAC <br />SCHEDULE ON SHEET Eld. <br />16. PROVIDE A DISCONNECT AND FINAL CONNECTION TO <br />HVAC VAV UNIT. COORDINATE EXACT LOCATION AND <br />REQUIREMENTS WITH MECHANICAL CONTRACTOR FUSE <br />PER NAMEPLATE. REFER TO ELECTRICAL HVAC <br />SCHEDULE ON SHEET Eld. <br />11, PROVIDE A DISCONNECT AND FINAL CONNECTION TO <br />HVAC AIR HANDLING OR CONDENSING UNIT. COORDINATE <br />EXACT LOCATION AND REQUIREMENTS WITH MECHANICAL <br />CONTRACTOR. FUSE PER NAMEPLATE, REFER TO <br />ELECTRICAL HVAC SCHEDULE ON SHEET Eld, <br />18. PROVIDE A DISCONNECT AND FINAL CONNECTION TO <br />ELECTRICAL WATER HEATER COORDINATE EXACT <br />LOCATION AND REQUIREMENTS WITH PLUMBING <br />CONTRACTOR AND DRAWINGS. <br />19. PROVIDE D15CONNECT5 AND FINAL CONNECTION TO <br />ELEVATOR CAB LIGHT AND CONTROLLER. FIELD VERIFY <br />EXACT LOCATION AND REQUIREMENTS WITH ELEVATOR <br />INSTALLER AND G.C_ <br />20. PROVIDE A RECEPTACLE AND TV/DATA OUTLETS FOR <br />TV. COORDINATE EXACT LOCATION AND HEIGHTS WITH <br />G.C. AND OWNER PRIOR TO ROUGH-iN. <br />21, PROVIDE FINAL CONNECTION TO HOOD, FIELD VERIFY <br />EXACT LOCATION AND REQUIREMENTS WITH HOOD <br />INSTALLER AND OWNER. <br />22, DATA OUTLET AT WORKSTATION IN EXAM ROOM TO <br />MOUNTED BELOW COUNTER. (TYPICAL FOR ALL EXAM) <br />ROOMS) <br />23, ALL RECEPTACLES AT THE EXAM 51NK AND <br />WORKSTATION TO BE MOUNTED ABOVE COUNTER. <br />(TYPICAL FOR ALL EXAM ROOMS). %} <br />KEY PLAN <br />REVISIONS <br />BY <br />�I 04. 21. 18 <br />WR <br />v <br />y <br />< - <br />x <br />------------ <br />g j ti <br />x � <br />s. <br />a <br />O <br />77 <br />04-27-18 tr ` <br />STARE CF c ; <br />Cu <br />ca <br />3 m O <br />Q�� z <br />gI d• a� +, <br />a w z r. u <br />0OOo N <br />Z � CU 0 <br />CL W �'- C`7 N <br />Q� ¢m6U�� <br />m <br />c O¢ y N N <br />g Ll (u +; <br />oZ M4, o, t <br />_LaJ�o� <br />d >1 <br />4 (m w Q O_ <br />U <br />ttJ O <br />u <br />C7 <br />W <br />Z_ 0 <br />0 <br />.� O M <br />M <br />m <br />W 0 <br />uj U <br />U N <br />m <br />� - -E m <br />a o <br />© m ¢ <br />Z 0 <br />J w <br />l_ <br />Date: 02. 13. 18 <br />Scale: AS NOTED <br />Project Mgr: AAY <br />Drawn: IT/WR <br />Job: 15-025 <br />Sheet <br />E 1 d <br />