Laserfiche WebLink
- - _I ! I I I I It 7 1 <br />GENERAL DEMOLITION NOTE: <br />1. THE FOLLOWING REQUIREMENTS FOR DEMOLITION, CUTTING AND PATCHING APPLY TO ALL WORK WHICH <br />IS ALTERED, WHETHER SUCH WORK IS NEW, EXISTING, RENOVATED OR REPLACED: <br />I 2. ASBESTOS SURVEY AND ABATEMENT: PRIOR TO DEMOLITION CUTTING TT NG OR PATCHING WORK, ENGAGE A <br />LICENSED ASBESTOS CONTRACTOR TO PERFORM AN ASBESTOS SURVEY, WHICH IDENTIFIES SPECIFIC <br />LOCATIONS WHERE ASBESTOS CONTAINING MATERIALS ARE FOUND, AND WHICH PRESCRIBES SPECIFIC <br />I I ACTIONS REQUIRED FOR ABATEMENT. ENGAGE A LICENSED ASBESTOS ABATEMENT CONTRACTOR TO <br />REMOVE OR ENCAPSULATE ALL ASBESTOS CONTAINING MATERIALS, ACCORDING TO THE <br />EXISTING RECOMMENDATIONS OF THE ASBESTOS CONSULTANT. WHERE ASBESTOS CONTAINING MATERIALS ARE <br />ENCAPSULATED IN THE BUILDING, PROVIDE THE OWNER WITH A DETAILED DESCRIPTION OF ALL <br />' °"Xio-°• REMAINING MATERIALS, INCLUDING LOCATIONS, APPROXIMATE QUALITIES, AND METHODS OF ECAPSULATED <br />AND INSTRUCTIONS FOR NOT DISTURBING THE ENCAPSULTED MATERIALS. <br />� I / <br />3. PRIOR TO DEMOLITION, CUTTING AND PATCHING, THE CONTRACTOR SHALL LOCATE AND DISCONNECT <br />UTILITY SERVICES AND ELECTRICAL / MECHANICAL SYSTEMS, OR TEMPORARILY CAP OFF SUCH SERVICES <br />3 TO THE AFFECTED AREAS. GIVE NOTICE TO, AND COORDINATE WITH UTILITY COMPANIES. OBTAIN <br />WRITTEN APPROVAL FROM, AND COOPERATE WITH OTHER PARTIES WHO MAY BE AFFECTED BY <br />INTERRUPTION OF SERVICES. <br />4. CLEARLY MARK THE AREAS AND LIMITS OF DEMOLITION, CUTTING AND PATCHING. IF FEASIBLE, <br />PRE—CUT THE LINE OF SEPARATION BETWEEN AREAS OF DEMOLITION AND AREAS TO BE PRESERVED. <br />UTILIZE DEMOLITION AND CUTTING TECHNIQUES WHICH ARE LEAST LIKELY TO DAMAGE SURROUNDING OR <br />w'wcR <br />I'v ,s o°- ADJOINING WORK. WHERE FEASIBLE, USE HAND TOOLS AND SMALL POWER TOOLS THAT ARE DESIGNED <br />FOR SAWING AND GRINDING, NOT HAMMERING OR CHOPPING. DO NOT USE EXPLOSIVES. <br />S. STRUCTURAL REQUIREMENTS: DO NOT CUT AND PATCH STRUCTURAL WORK IN A MANNER WHICH WILL <br />I <br />2 x REDUCE LOAD —CARRYING CAPACITY OR LOAD —DEFLECTION RATIO. WHERE STRUCTURAL WORK MUST BE <br />X CUT, PROVIDE ADEQUATE TEMPORARY SUPPORT (BRACING AND/OR SHORING) TO RESIST VERTICAL, <br />1 I I LATERAL AND DYNAMIC LOADS IN THE ENTIRE TRIBUTARY AREA OF THE AFFECTED STRUCTURAL <br />Rc"� X MEMBERS. WHERE REQUIRED, ENGAGE A LICENSED STRUCTURAL ENGINEER TO DESIGN SHORING / <br />EXISTING EXISTING EXISTING <br />BUFFET TABLE BUFFET TAB E BUFFET TAB E / / BRACING SYSTEMS AND JOINT OR CONNECTION DETAILS. <br />--- - - 6. OPERATIONAL AND SAFETY LIMITATIONS: DO NOT CUT AND PATCH OPERATIONAL ELEMENTS OR SAFETY <br />RELATED COMPONENTS IN A MANNER WHICH WILL REDUCE INTENDED PERFORMANCE OR SAFETY FACTOR, <br />OR WHICH WILL RESULT IN INCREASED MAINTENANCE OR REDUCED OPERATIONAL LIFE. <br />7. VISUAL REQUIREMENTS: DO NOT CUT AND PATCH WORK IN A MANNER WHICH WILL RESULT IN <br />II <br />LESSENING OF THE AESTHETIC QUALITIES OF THE BUILDING OR SITE, OR THAT WILL RESULT IN VISUAL <br />EVIDENCE OF CUT AND PATCH WORK. WHERE REQUIRED, EXTEND FINISH MATERIALS OVER ENTIRE <br />N ,4 1XI UNBROKEN SURFACE AREAS AFFECTED BY CUT AND PATCH WORK. REMOVE AND REPLACE CUT AND <br />PATCH WORK WHICH DOES NOT MEET VISUAL REQUIREMENTS. <br />I <br />1 8. PROTECTION: PROTECT OTHER WORK DURING CUTTING AND PATCHING OPERATIONS TO PREVENT <br />I� DAMAGE. PROVIDE PROTECTION OF ALL WORK FROM ADVERSE WEATHER CONDITIONS. WHERE <br />OPENINGS ARE CREATED IN ROOF OR EXTERIOR WALLS, PROVIDE TEMPORARY ENCLOSURE OF SUCH <br />OPENINGS ON A DAILY BASIS, AND WHENEVER ADVERSE WEATHER THREATENS OR EXISTS. <br />ID <br />1 <br />DE- O❑TON PLAN <br />DEMl: _.ITION KEYED NOTES: I ) <br />1. _�'EMOVE EXISTING PARTITION AND COUNTERS. TO REMOVE UNUSED ELECTRICAL WIRING BACK <br />10 NEAREST JUNCTION BOX. <br />2. ' 0 REMOVE EXISTING HOOD SYSTEM IN THE KITCHEN AREA <br />3. -10 DEMOLISH EXISTING RESTROOM. <br />4. ='OWER PANELS TO BE REMAINED. <br />5. 10 STRUCTURAL WORK. <br />6. 1,CCUMULATION OF AMBULATION OF COMBUSTIBLE WASTE MATERIAL, DUST, AND DEBRIS SHALL <br />,E REMOVED FROM THE STRUCTURE AND ITS IMMEDIATE VICINITY AT THE END OF EACH WORK <br />:.�HIFT OR MORE FREQUENTLY AS NECESSARY FOR SAFE OPERATIONS. NFPA 1:16.2.2.1 <br />7. ,URING DEMOLITION EXITS AND FIRE SAFETY EQUIPMENTS SHALL BE CLEARLY VISIBLE AND <br />..iNOBSTRUCTED. <br />8. 7 XISTING CEILING SYSTEM TO BE REMAINED <br />9. =',NY STRUCTURAL WORK AND THE PROPOSED TEMPORARY BRACING TO MAINTAIN THE <br />:TRUCTURAL INTEGRITY DURING CONSTRUCTION. <br />ELECTRICAL DEMOLITION NOTES <br />1 . THE CONTRACTOR SHALL REMOVE ALL UNUSED AND ABANDONED WIRING AND CABLING FROM THE <br />CEILING THAT ISN'T LABELED FOR FUTURE USE, AS REQUIRED BY THE NEC. THIS SHALL INCLUDE BUT <br />IS NOT LIMITED TO FIRE ALARM, POWER, SECURITY, CONTROLS, DATA, TELEPHONE, A/C ETC. <br />2.CIRCUITS MADE SPARE SHALL BE UPDATED ON PANEL SCHEDULES. DIRECTORY CARDS SHALL BE <br />REPLACED WITH NEW TYPED DIRECTORIES, INCLUDING ALL NEW LOADS IN ADDITION TO SPARES. <br />HAND —MARKED NOTES WILL NOT BE ACCEPTED. <br />3.CARE SHALL BE TAKEN TO RELOCATE ALL EXISTING EQUIPMENT THAT IS BEING MOVED BUT REMAINING <br />AFTER COMPLETION OF WORK. THE CONTRACTOR SHALL BE RESPONSIBLE TO KEEP ALL EXISTING TO <br />REMAIN OR RELOCATED EQUIPMENT AT THE SAME LEVEL OF FUNCTIONALITY FROM THE ACCEPTANCE OF <br />THE CONTRACT OF FINAL COMPLETION. ANY DAMAGE OR LOSS OF FUNCTIONALITY SHALL BE REMEDIED <br />BY THE CONTRACTOR AT NO ADDITIONAL EXPENSE TO THE OWNER. <br />4.EQUIPMENT INDICATED TO BE REMOVED AND NOT RE —USED SHALL REMAIN THE PROPERTY OF THE <br />OWNER AND RETURNED OR STORED AS DIRECTED. <br />5.CONDUITS AND RACEWAY SYSTEMS MAY BE ABANDONED WHERE CONCEALED HOWEVER SHALL BE <br />REMOVED WHERE EXPOSED. REMOVED OUTLETS SHALL BE PROVIDED WITH BLANK COVERS, COLOR PER <br />THE ARCHITECT'S DIRECTION. <br />6.EXISTING RACEWAYS AND WIRING ARE ALLOWED TO BE RE —USED PROVIDED THEY MEET THE <br />SPECIFICATIONS FOR THE NEW SYSTEM(S). <br />7.ALL OUTAGES SHALL BE COORDINATED WITH THE OWNER. THE CONTRACTOR SHALL PLAN TO MINIMIZE <br />ALL OUTAGES. <br />8.CIRCUITS SHALL STAY FUNCTIONAL WHERE DEVICES/FIXTURES ARE BEING DEMOLISHED THAT SHARE A <br />COMMON CIRCUIT WITH DEVICES/FIXTURES THAT ARE TO REMAIN. WIRING SHALL BE REMOVED AS FAR <br />AS POSSIBLE WHILE MAINTAINING EXISTING TO REMAIN OPERATION. <br />9.THE CONTRACTORS SHALL REMOVE ALL EXISTING ELECTRICAL EQUIPMENT NOT REUSED OR NOT <br />NECESSARY FOR THE COMPLETION OF THIS PROJECT. <br />U <br />o <br />Q� <br />Zo�Q� <br />0p <br />m <br />O M M <br />m w w <br />J uj <br />00 d <br />Cn ¢ U) <br />uj ui <br />0 V) n¢ <br />zw'�Q�wZ <br />mEs Uz <br />00 <br />~ QQ JO <br />Z <br />W <br />QC7aw� <br />NNF�-ZZ <br />< <br />0 <br />�Q;.• <br />��2;� Q <br />•�,; �(, of <br />�• �. _ <br />ul <br />z <br />:U <br />O•LJ <br />• I �i <br />� y. O � -J <br />Q ,'o <br />Uj <br />&all as <br />U <br />Q <br />0 <br />Q <br />Q <br />0 <br />w <br />� <br />z <br />Q <br />M <br />z <br />z <br />0 <br />U <br />Z Q <br />W <br />z <br />0 <br />W W <br />J <br />U O <br />W <br />tY <br />w <br />C� M <br />N <br />c <br />REVISION <br />1 1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />PROJECT TYPE: <br />RENOVATION <br />SCALE <br />AS SHOWN <br />ISSUED DATE: <br />03_08_2024 <br />DRAWN BY: <br />A.FENG <br />CHECKED BY: <br />A.LIANG <br />SHEET <br />■yaw <br />