EXISTING TRANSFER SWITCHES
<br />EXISTING DIESEL FUEL TANK
<br />EXISTING GENERATOR PAD
<br />LEGEND (NOTE: NOT ALL SYMBOLS UTILIZED)
<br />SYMBOL
<br />DESCRIPTION
<br />A
<br />�2ab
<br />LIGHT FIXTURE. "A" DENOTES FIXTURE TYPE, "2"
<br />"ab"
<br />DENOTES CIRCUIT, DENOTES CONTROL (TYPICAL)
<br />®❑
<br />LIGHT FIXTURE ON THE LIFE SAFETY BRANCH
<br />I.0
<br />WALL MOUNTED LIGHT
<br />0 ❑
<br />HID OR LIGHT FIXTURE
<br />®
<br />HID OR LIGHT FIXTURE ON THE LIFE SAFETY BRANCH
<br />EXIT LIGHT FIXTURE DIRECTION ARROWS AS SHOWN
<br />E1 ®
<br />SHADED QUADRANT INDICATES FACE(S) OF FIXTURE
<br />Sa
<br />SINGLE POLE SWITCH. "a" DENOTES CONTROL
<br />O
<br />JUNCTION BOX
<br />BRANCH CIRCUIT HOMERUN
<br />q --
<br />GROUND OR GROUND ROD AS NOTED
<br />30AF
<br />DISCONNECT SWITCH. SIZE AS NOTED. NF =
<br />20AT
<br />NON -FUSED AF = AMP FRAME, AT = AMP TRIP. NF=
<br />NON FUSED NEMA 1 UNLESS NOTED 30A NON FUSED
<br />WHERE NOT NOTED
<br />PANELBOARD SURFACE MOUNTED
<br />PANELBOARD RECESSED MOUNTED
<br />DUPLEX RECEPTACLE
<br />GFI RECEPTACLE. "WP" DENOTES WEATHERPROOF COVER
<br />A 0 LIGHTNING PROTECTION AIR TERMINAL.
<br />LETTER REFERENCES DETAILED TYPE.
<br />-- I LIGHTNING PROTECTION DOWN
<br />CONDUCTOR AND GROUND RODS
<br />DOUBLE DUPLEX CRITICAL RECEPTACLE
<br />30AF
<br />20AT DISCONNECT SWITCH. RATING ADJACENT
<br />yWP AT -AMP TRIP, AF=AMP FRAME, WP=WERTHERPROOF
<br />DISCONNECT SWITCHES AND WIREWAY
<br />LOCATED ON THE NORMAL SIDE OF
<br />TRANSFER SWITCHES
<br />EXISTING GENERATOR
<br />EXISTING GENERATOR
<br />EXISTING PHOTOS
<br />GENERAL NOTES
<br />1 INVESTIGATE ALL SITE CONDITIONS PRIOR TO SUBMITTING THE BID. SUBMIT FORMAL REQUEST
<br />FOR CLARIFICATION (RFC) DURING BIDDING. ALL RFC'S SHALL BE SEQUENTIALLY NUMBERED AND
<br />DATED. INVESTIGATE INTERIOR AREAS OF WHERE WORK WILL BE DONE AND EXTERIOR
<br />EQUIPMENT AND ELECTRICAL LOCATIONS BEFORE SUBMITTING THE BID. INVESTIGATE WALL
<br />RATINGS SHOWN ON LIFE SAFETY PLANS BEFORE SUBMITTING THE BID. INCLUDE ALL
<br />NECESSARY SCOPE OF WORK REQUIRED AS NOTED IN THE SPECIFICATIONS FIELD VERIFICATION
<br />AS PART OF THE BID.
<br />2 READ AND COMPLY WITH THE SPECIFICATIONS. SPECIFICATIONS ARE 8-1/2 X 11 MULTIPLE
<br />DIVISIONS SECTION 16000 AND 00100 THROUGH 00111. DO NOT BID THIS PROJECT WITHOUT
<br />THEM
<br />3 EQUIPMENT SHALL BE OF MATERIALS SUITABLE FOR AND NEMA RATED FOR THE ENVIRONMENT
<br />IN WHICH THEY ARE TO BE INSTALLED.
<br />4 WORKING CLEARANCES FOR ELECTRICAL EQUIPMENT SHALL BE IN COMPLIANCE WITH NFPA-70
<br />SECTION 110. THE EXCLUSIVELY DEDICATED SPACE EXTENDING FROM FLOOR TO STRUCTURAL
<br />CEILING WITH A WIDTH AND DEPTH OF THE PANELBOARD OR SWITCHBOARD MUST BE CLEAR OF
<br />ALL PIPING, DUCTS, EQUIPMENT FOREIGN TO THE ELECTRICAL EQUIPMENT OR BUILDING
<br />PHYSICAL APPURTENANCES IN ACCORDANCE WITH NFPA NFPA-70 APPROPRIATE ARTICLES.
<br />5 ANY REFERENCE TO INSTALL PER A SPECIFIC CODE SHALL NOT MEAN THAT MORE STRINGENT
<br />NOTES, AND DETAILS INDICATED WITHIN THE CONTRACT DOCUMENTS SHALL BE DEVIATED.
<br />DRAWING NOTES, SPECIFICATIONS AND DETAILS WHERE MORE STRINGENT SHALL APPLY. THE
<br />PROJECT ENGINEER SHALL DETERMINE WHAT IS MORE STRINGENT.
<br />6 THE CONTRACTOR SHALL OBTAIN ICRA INFORMATION FROM THE OWNERS REPRESENTATIVE.
<br />COMPLY WITH ALL CONSTRUCTION REQUIREMENTS, TEMPORARY PROTECTION ETC, AS REQUIRED.
<br />PROVIDE ALL REQUIREMENTS FOR INFECTION CONTROL INCLUDING TEMPORARY BARRIERS AND
<br />VENTILATION.
<br />7 ALL POWER AND LIGHTING WIRING SHALL HAVE INDIVIDUAL NEUTRALS PER CIRCUIT. NO SHARED
<br />NEUTRALS ARE ALLOWED.
<br />8 NEW DEVICES SHALL BE PROVIDED WITH GROUNDING IN ACCORDANCE WITH NFPA 250. PIGTAIL
<br />ALL GROUND CONDUCTORS, EXTEND THE GROUND BOND TO THE JUNCTION BOX. ALL RACEWAYS
<br />SHALL HAVE A GREEN INSULATED GROUND CONDUCTOR. DO NOT INSTALL BARE GROUNDS IN
<br />CONDUIT FEEDERS OR BRANCH WIRING.
<br />9 DO NOT COMBINE ANY BRANCH WIRING IN A COMMON RACEWAY WHICH WILL REQUIRE ANY FORM
<br />OF DERATING.
<br />10 NOTES DO NOT HAVE TO BE TAGGED ON THE FLOOR PLANS TO BE APPLICABLE. ALL NOTES
<br />SHALL BE COORDINATED WITH ALL DRAWINGS AND SPECS.
<br />11 SUBMIT FORMAL REQUESTS FOR INFORMATION. NUMBER EACH RFI NUMBERED SEQUENTIALLY.
<br />SUBMIT RFC (REQUEST FOR CLARIFICATIONS) DURING BIDDING. RFI, REQUEST FOR INFORMATION
<br />DURING CONSTRUCTION. SUBMIT IN WORD FORMAT ONLY.
<br />12 SUBMIT A FIRM TIME LINE OF CONSTRUCTION WITH THE BID. INCLUDE AL TASKS SCHEDULE AND
<br />RELATED DATES. INCLUDE THE START OF CONSTRUCTION, ALL CONSTRUCTION ACTIVITIES WITH
<br />TIME LINES ASSIGNED, INSTALLATION OF CONCRETE, INSTALLATION OF SPECIFIC WIRING,
<br />GENERATOR DELIVERY, GENERATOR INSTALLATION, GENERATOR WIRING, TRANSFER SWITCH
<br />INSTALLATION, DEMOTION ACTIVITIES, GENERATOR MANUFACTURER'S REP CHECK OUT AT SITE,
<br />80% AHCA INSPECTION, 2 HOUR ACTUAL BUILDING LOAD TRANSFER, CERTIFICATION PER NFPA
<br />110, AHCA 100% INSPECTION, LOCAL BUILDING DEPARTMENT INSPECTION AND FIRE MARSHAL
<br />INSPECTION.
<br />13 COMPLY WITH FRONT END SPECIFICATIONS 00100 THROUGH 00111 IN ADDITION TO DIVISION
<br />16000.
<br />DISCONNECT SWITCHES AND WIREWAY
<br />LOCATED ON THE NORMAL SIDE OF
<br />TRANSFER SWITCHES
<br />EXISTING GENERATOR AND LIFE
<br />SAFETY LIGHT
<br />BASIC SCOPE OF WORK
<br />NEW RECESSED (ON[
<br />ANNUNCIATOR
<br />SURFACE MOUNTED RIGID
<br />STEEL UP TO SOFFIT
<br />AND INTO ATTIC SPACE
<br />ABOVE. RUN TO NURSE
<br />STATION
<br />SERVICE
<br />TRANSFORMER
<br />11
<br />IITFF7l l
<br />N
<br />SITE PLAN
<br />1 PROJECT CONSTRUCTION SHALL CONSIST OF PROVIDING A NEW GENERATOR TO POWER THE ENTIRE
<br />BUILDING INCLUDING THE ESSENTIAL SYSTEM AND ALL AC EQUIPMENT.
<br />2 PROVIDE TEMPORARY POWER AS REQUIRED. TEMPORARY POWER SHALL PROVIDE POWER TO THE
<br />ESSENTIAL EMERGENCY SYSTEM DURING POWER OUTAGES EXTENDING MORE THAN TWO HOURS.
<br />3 PROVIDE NEW HURRICANE COMPLIANT PROTECTION FOR THE GENERATOR, FUEL TANK AND
<br />SPECIFIC ELECTRICAL EQUIPMENT
<br />4 PROVIDE ALL ELECTRICAL AND RELATED WORK AS REQUIRED BY THE DRAWINGS, SPECIFICATIONS
<br />AND APPLICABLE CODES.
<br />5 PROVIDE NEW LIGHTNING PROTECTION FOR THE NEW GENERATOR.
<br />6 PROVIDE REQUIRED CONNECTIONS TO THE NEW GENERATOR INCLUDING A NEW TRANSFER SWITCH.
<br />7 PROVIDE SPECIFIC MODIFICATIONS FOR THE POWER DISTRIBUTION SYSTEM AS NOTED ON THE POWER
<br />ONE -LINE DIAGRAM AND RELATED DOCUMENTS.
<br />8 PROVIDE NEW WIRING FOR THE EXISTING EMERGENCY DISTRIBUTION PANEL IN THE EXISTING
<br />EMERGENCY ELECTRICAL ROOM.
<br />9 PROVIDE NEW SURGE PROTECTION, GROUNDING AND BONDING
<br />10 PROVIDE ALL WORK PER THE PHASING REQUIREMENTS AND IN ACCORDANCE WITH THE OWNERS
<br />APPROVED SCHEDULE. THIS PROJECT MUST BE 100% COMPLETED, TESTED AND ACCEPTED BY ALL
<br />AUTHORITIES BEFORE OR ON MAY 15TH, 2018
<br />11 PROVIDE ALL WORK PER THE OWNERS ICRA PROGRAM AND SCHEDULE.
<br />12 PROVIDE TEMPORARY ELECTRICAL AS DIRECTED BY THE OWNER'S REPRESENTATIVE TO ALLOW 127
<br />HOURS OF GENERATOR FUEL TO SERVE THE ENTIRE BUILDING. MAINTAIN 80 DEGREES OR LESS
<br />FROM THE START OF CONSTRUCTION UNTIL FINAL ACCEPTANCE OF THE PERMANENT GENERATOR
<br />INSTALLATION.
<br />13 PROVIDE ALL TESTING, EXCAVATION, TRENCHING, CONCRETE, BARRIERS, UTILITY COORDINATION,
<br />BUILDING DEPARTMENT SUBMITTALS AND ALL REQUIRED WORK TO ACCOMPLISH A COMPLETE 100%
<br />INSTALLATION.
<br />14 THIS PROJECT WILL REQUIRE THREE AHCA INSPECTIONS MINIMUM. INSPECTIONS WILL INCLUDE;
<br />INSPECT THE TEMPORARY GENERATOR PRIOR TO ENERGIZING THE BUILDING IF IT IS INTENDED TO
<br />BE INSTALLED FOR MORE THAN 8 HOURS, 80% INSPECTION FOR THE NEW GENERATOR AND 100%
<br />FINAL INSPECTION. WHERE THE EXISTING GENERATOR REMAINS ACTIVE A TEMPORARY GENERATOR
<br />INSPECTION WILL NOT BE NOT NECESSARY. IF THE AHCA INSPECTIONS FAIL TO PASS, THE
<br />CONTRACTOR WILL BE RESPONSIBLE TO RESCHEDULE THE INSPECTION AND HAVE SUPPORT STAFF
<br />PRESENT.. NO EXTRA COSTS ARE ALLOWED FOR FAILED INSPECTIONS.
<br />_11. 0 0 0 0 0 0 r, o 0 0 0 0 o 0 0 4_,I
<br />F o o n o 9 — ---
<br />n/
<br />VEE�ti'`'PIXE
<br />C!-TY OF ZEPHY!�R LLS;�
<br />\J V
<br />MAIN ELECTRICAL
<br />ROOM
<br />NEbV TI
<br />JENERATOR G
<br />--- STING
<br />GENERATOR
<br />EXISTING
<br />DRAWING INDEX
<br />El 00
<br />LEGEND, NOTES AND DETAILS
<br />E200
<br />GENERATOR PLAN
<br />E300
<br />ELECTRICAL DETAILS
<br />E301
<br />PENETRATION DETAILS
<br />E400
<br />PANEL SCHEDULES
<br />E500
<br />ELECTRICAL POWER ONE LINE
<br />E600
<br />ICRA, PHASING AND DEMOLITION PLAN
<br />E�OK1�rv,,,�v E,
<br />�OOE NA1- OD
<br />EI.EOTRlG p�t11L1.s
<br />OF ZE
<br />ORO,,4FNGr_$
<br />/HCIlIHL VICVV
<br />N
<br />LOCATION
<br />KEY PLAN
<br />1
<br />m
<br />L-0
<br />o
<br />Lai
<br />Fw- cy)
<br />c�
<br />Q Q
<br />O �o O
<br />N
<br />UCD
<br />�� U
<br />0
<br />o�
<br />Q CO o
<br />1)0
<br />N
<br />o d
<br />Lr Q
<br />��
<br />O
<br />OZ
<br />m w
<br />O
<br />o w
<br />ON J
<br />Z�
<br />w
<br />Q�
<br />v'wz
<br />LL Z
<br />C7 Q`-' Z
<br />caw
<br />00 CE Q
<br />DQ�
<br />O F-
<br />w w
<br />V
<br />'n
<br />Z`�
<br />L!/z
<br />w�
<br />_
<br />0-�w
<br />J
<br />J
<br />V)�o
<br />WW
<br />W
<br />cDa_�
<br />Z
<br />w
<br />w
<br />Z Z
<br />_
<br />� C)
<br />oQ
<br />Z Z Z
<br />W
<br />z
<br />¢ w
<br />J LL
<br />U�a-
<br />W
<br />z Lli
<br />0
<br />�(n o
<br />LLJ
<br />n-
<br />f�
<br />o
<br />Ud�
<br />00ozQ
<br />00
<br />f�
<br />Lu
<br />i
<br />Q
<br />w cl- w
<br />=o�
<br />U
<br />w
<br />U
<br />a
<br />Cn
<br />J
<br />F-
<br />a
<br />N
<br />J
<br />o
<br />a
<br />—
<br />=
<br />z
<br />o
<br />U
<br />�ojL
<br />Z
<br />�
<br />J
<br />Z
<br />a
<br />I
<br />LL-
<br />o
<br />�
<br />w
<br />Z
<br />�
<br />N
<br />W
<br />0
<br />w
<br />N
<br />LL
<br />w
<br />J
<br />O
<br />Z
<br />U
<br />Q
<br />Q
<br />Z
<br />w
<br />Z
<br />a�
<br />�
<br />M
<br />w
<br />Z
<br />_
<br />z
<br />Q N
<br />z
<br />W
<br />N
<br />w
<br />r
<br />a
<br />1
<br />� J
<br />Ld
<br />C)
<br />�-�•L
<br />o
<br />dam- *
<br />� J ; W �
<br />W �: �_
<br />~Q C• OZ=
<br />�
<br />O•
<br />\
<br />REV
<br />REV
<br />REV 1Q GENERAL REV. 02/13/18
<br />AHCA STAGE III MAIL —IN
<br />REVIEW 12/26/17
<br />DATE 12/26/17
<br />DRAWN LF/BMA
<br />CHKD BY BOB DONNELLY
<br />E100