Laserfiche WebLink
EXISTING TRANSFER SWITCHES <br />EXISTING DIESEL FUEL TANK <br />EXISTING GENERATOR PAD <br />LEGEND (NOTE: NOT ALL SYMBOLS UTILIZED) <br />SYMBOL <br />DESCRIPTION <br />A <br />�2ab <br />LIGHT FIXTURE. "A" DENOTES FIXTURE TYPE, "2" <br />"ab" <br />DENOTES CIRCUIT, DENOTES CONTROL (TYPICAL) <br />®❑ <br />LIGHT FIXTURE ON THE LIFE SAFETY BRANCH <br />I.0 <br />WALL MOUNTED LIGHT <br />0 ❑ <br />HID OR LIGHT FIXTURE <br />® <br />HID OR LIGHT FIXTURE ON THE LIFE SAFETY BRANCH <br />EXIT LIGHT FIXTURE DIRECTION ARROWS AS SHOWN <br />E1 ® <br />SHADED QUADRANT INDICATES FACE(S) OF FIXTURE <br />Sa <br />SINGLE POLE SWITCH. "a" DENOTES CONTROL <br />O <br />JUNCTION BOX <br />BRANCH CIRCUIT HOMERUN <br />q -- <br />GROUND OR GROUND ROD AS NOTED <br />30AF <br />DISCONNECT SWITCH. SIZE AS NOTED. NF = <br />20AT <br />NON -FUSED AF = AMP FRAME, AT = AMP TRIP. NF= <br />NON FUSED NEMA 1 UNLESS NOTED 30A NON FUSED <br />WHERE NOT NOTED <br />PANELBOARD SURFACE MOUNTED <br />PANELBOARD RECESSED MOUNTED <br />DUPLEX RECEPTACLE <br />GFI RECEPTACLE. "WP" DENOTES WEATHERPROOF COVER <br />A 0 LIGHTNING PROTECTION AIR TERMINAL. <br />LETTER REFERENCES DETAILED TYPE. <br />-- I LIGHTNING PROTECTION DOWN <br />CONDUCTOR AND GROUND RODS <br />DOUBLE DUPLEX CRITICAL RECEPTACLE <br />30AF <br />20AT DISCONNECT SWITCH. RATING ADJACENT <br />yWP AT -AMP TRIP, AF=AMP FRAME, WP=WERTHERPROOF <br />DISCONNECT SWITCHES AND WIREWAY <br />LOCATED ON THE NORMAL SIDE OF <br />TRANSFER SWITCHES <br />EXISTING GENERATOR <br />EXISTING GENERATOR <br />EXISTING PHOTOS <br />GENERAL NOTES <br />1 INVESTIGATE ALL SITE CONDITIONS PRIOR TO SUBMITTING THE BID. SUBMIT FORMAL REQUEST <br />FOR CLARIFICATION (RFC) DURING BIDDING. ALL RFC'S SHALL BE SEQUENTIALLY NUMBERED AND <br />DATED. INVESTIGATE INTERIOR AREAS OF WHERE WORK WILL BE DONE AND EXTERIOR <br />EQUIPMENT AND ELECTRICAL LOCATIONS BEFORE SUBMITTING THE BID. INVESTIGATE WALL <br />RATINGS SHOWN ON LIFE SAFETY PLANS BEFORE SUBMITTING THE BID. INCLUDE ALL <br />NECESSARY SCOPE OF WORK REQUIRED AS NOTED IN THE SPECIFICATIONS FIELD VERIFICATION <br />AS PART OF THE BID. <br />2 READ AND COMPLY WITH THE SPECIFICATIONS. SPECIFICATIONS ARE 8-1/2 X 11 MULTIPLE <br />DIVISIONS SECTION 16000 AND 00100 THROUGH 00111. DO NOT BID THIS PROJECT WITHOUT <br />THEM <br />3 EQUIPMENT SHALL BE OF MATERIALS SUITABLE FOR AND NEMA RATED FOR THE ENVIRONMENT <br />IN WHICH THEY ARE TO BE INSTALLED. <br />4 WORKING CLEARANCES FOR ELECTRICAL EQUIPMENT SHALL BE IN COMPLIANCE WITH NFPA-70 <br />SECTION 110. THE EXCLUSIVELY DEDICATED SPACE EXTENDING FROM FLOOR TO STRUCTURAL <br />CEILING WITH A WIDTH AND DEPTH OF THE PANELBOARD OR SWITCHBOARD MUST BE CLEAR OF <br />ALL PIPING, DUCTS, EQUIPMENT FOREIGN TO THE ELECTRICAL EQUIPMENT OR BUILDING <br />PHYSICAL APPURTENANCES IN ACCORDANCE WITH NFPA NFPA-70 APPROPRIATE ARTICLES. <br />5 ANY REFERENCE TO INSTALL PER A SPECIFIC CODE SHALL NOT MEAN THAT MORE STRINGENT <br />NOTES, AND DETAILS INDICATED WITHIN THE CONTRACT DOCUMENTS SHALL BE DEVIATED. <br />DRAWING NOTES, SPECIFICATIONS AND DETAILS WHERE MORE STRINGENT SHALL APPLY. THE <br />PROJECT ENGINEER SHALL DETERMINE WHAT IS MORE STRINGENT. <br />6 THE CONTRACTOR SHALL OBTAIN ICRA INFORMATION FROM THE OWNERS REPRESENTATIVE. <br />COMPLY WITH ALL CONSTRUCTION REQUIREMENTS, TEMPORARY PROTECTION ETC, AS REQUIRED. <br />PROVIDE ALL REQUIREMENTS FOR INFECTION CONTROL INCLUDING TEMPORARY BARRIERS AND <br />VENTILATION. <br />7 ALL POWER AND LIGHTING WIRING SHALL HAVE INDIVIDUAL NEUTRALS PER CIRCUIT. NO SHARED <br />NEUTRALS ARE ALLOWED. <br />8 NEW DEVICES SHALL BE PROVIDED WITH GROUNDING IN ACCORDANCE WITH NFPA 250. PIGTAIL <br />ALL GROUND CONDUCTORS, EXTEND THE GROUND BOND TO THE JUNCTION BOX. ALL RACEWAYS <br />SHALL HAVE A GREEN INSULATED GROUND CONDUCTOR. DO NOT INSTALL BARE GROUNDS IN <br />CONDUIT FEEDERS OR BRANCH WIRING. <br />9 DO NOT COMBINE ANY BRANCH WIRING IN A COMMON RACEWAY WHICH WILL REQUIRE ANY FORM <br />OF DERATING. <br />10 NOTES DO NOT HAVE TO BE TAGGED ON THE FLOOR PLANS TO BE APPLICABLE. ALL NOTES <br />SHALL BE COORDINATED WITH ALL DRAWINGS AND SPECS. <br />11 SUBMIT FORMAL REQUESTS FOR INFORMATION. NUMBER EACH RFI NUMBERED SEQUENTIALLY. <br />SUBMIT RFC (REQUEST FOR CLARIFICATIONS) DURING BIDDING. RFI, REQUEST FOR INFORMATION <br />DURING CONSTRUCTION. SUBMIT IN WORD FORMAT ONLY. <br />12 SUBMIT A FIRM TIME LINE OF CONSTRUCTION WITH THE BID. INCLUDE AL TASKS SCHEDULE AND <br />RELATED DATES. INCLUDE THE START OF CONSTRUCTION, ALL CONSTRUCTION ACTIVITIES WITH <br />TIME LINES ASSIGNED, INSTALLATION OF CONCRETE, INSTALLATION OF SPECIFIC WIRING, <br />GENERATOR DELIVERY, GENERATOR INSTALLATION, GENERATOR WIRING, TRANSFER SWITCH <br />INSTALLATION, DEMOTION ACTIVITIES, GENERATOR MANUFACTURER'S REP CHECK OUT AT SITE, <br />80% AHCA INSPECTION, 2 HOUR ACTUAL BUILDING LOAD TRANSFER, CERTIFICATION PER NFPA <br />110, AHCA 100% INSPECTION, LOCAL BUILDING DEPARTMENT INSPECTION AND FIRE MARSHAL <br />INSPECTION. <br />13 COMPLY WITH FRONT END SPECIFICATIONS 00100 THROUGH 00111 IN ADDITION TO DIVISION <br />16000. <br />DISCONNECT SWITCHES AND WIREWAY <br />LOCATED ON THE NORMAL SIDE OF <br />TRANSFER SWITCHES <br />EXISTING GENERATOR AND LIFE <br />SAFETY LIGHT <br />BASIC SCOPE OF WORK <br />NEW RECESSED (ON[ <br />ANNUNCIATOR <br />SURFACE MOUNTED RIGID <br />STEEL UP TO SOFFIT <br />AND INTO ATTIC SPACE <br />ABOVE. RUN TO NURSE <br />STATION <br />SERVICE <br />TRANSFORMER <br />11 <br />IITFF7l l <br />N <br />SITE PLAN <br />1 PROJECT CONSTRUCTION SHALL CONSIST OF PROVIDING A NEW GENERATOR TO POWER THE ENTIRE <br />BUILDING INCLUDING THE ESSENTIAL SYSTEM AND ALL AC EQUIPMENT. <br />2 PROVIDE TEMPORARY POWER AS REQUIRED. TEMPORARY POWER SHALL PROVIDE POWER TO THE <br />ESSENTIAL EMERGENCY SYSTEM DURING POWER OUTAGES EXTENDING MORE THAN TWO HOURS. <br />3 PROVIDE NEW HURRICANE COMPLIANT PROTECTION FOR THE GENERATOR, FUEL TANK AND <br />SPECIFIC ELECTRICAL EQUIPMENT <br />4 PROVIDE ALL ELECTRICAL AND RELATED WORK AS REQUIRED BY THE DRAWINGS, SPECIFICATIONS <br />AND APPLICABLE CODES. <br />5 PROVIDE NEW LIGHTNING PROTECTION FOR THE NEW GENERATOR. <br />6 PROVIDE REQUIRED CONNECTIONS TO THE NEW GENERATOR INCLUDING A NEW TRANSFER SWITCH. <br />7 PROVIDE SPECIFIC MODIFICATIONS FOR THE POWER DISTRIBUTION SYSTEM AS NOTED ON THE POWER <br />ONE -LINE DIAGRAM AND RELATED DOCUMENTS. <br />8 PROVIDE NEW WIRING FOR THE EXISTING EMERGENCY DISTRIBUTION PANEL IN THE EXISTING <br />EMERGENCY ELECTRICAL ROOM. <br />9 PROVIDE NEW SURGE PROTECTION, GROUNDING AND BONDING <br />10 PROVIDE ALL WORK PER THE PHASING REQUIREMENTS AND IN ACCORDANCE WITH THE OWNERS <br />APPROVED SCHEDULE. THIS PROJECT MUST BE 100% COMPLETED, TESTED AND ACCEPTED BY ALL <br />AUTHORITIES BEFORE OR ON MAY 15TH, 2018 <br />11 PROVIDE ALL WORK PER THE OWNERS ICRA PROGRAM AND SCHEDULE. <br />12 PROVIDE TEMPORARY ELECTRICAL AS DIRECTED BY THE OWNER'S REPRESENTATIVE TO ALLOW 127 <br />HOURS OF GENERATOR FUEL TO SERVE THE ENTIRE BUILDING. MAINTAIN 80 DEGREES OR LESS <br />FROM THE START OF CONSTRUCTION UNTIL FINAL ACCEPTANCE OF THE PERMANENT GENERATOR <br />INSTALLATION. <br />13 PROVIDE ALL TESTING, EXCAVATION, TRENCHING, CONCRETE, BARRIERS, UTILITY COORDINATION, <br />BUILDING DEPARTMENT SUBMITTALS AND ALL REQUIRED WORK TO ACCOMPLISH A COMPLETE 100% <br />INSTALLATION. <br />14 THIS PROJECT WILL REQUIRE THREE AHCA INSPECTIONS MINIMUM. INSPECTIONS WILL INCLUDE; <br />INSPECT THE TEMPORARY GENERATOR PRIOR TO ENERGIZING THE BUILDING IF IT IS INTENDED TO <br />BE INSTALLED FOR MORE THAN 8 HOURS, 80% INSPECTION FOR THE NEW GENERATOR AND 100% <br />FINAL INSPECTION. WHERE THE EXISTING GENERATOR REMAINS ACTIVE A TEMPORARY GENERATOR <br />INSPECTION WILL NOT BE NOT NECESSARY. IF THE AHCA INSPECTIONS FAIL TO PASS, THE <br />CONTRACTOR WILL BE RESPONSIBLE TO RESCHEDULE THE INSPECTION AND HAVE SUPPORT STAFF <br />PRESENT.. NO EXTRA COSTS ARE ALLOWED FOR FAILED INSPECTIONS. <br />_11. 0 0 0 0 0 0 r, o 0 0 0 0 o 0 0 4_,I <br />F o o n o 9 — --- <br />n/ <br />VEE�ti'`'PIXE <br />C!-TY OF ZEPHY!�R LLS;� <br />\J V <br />MAIN ELECTRICAL <br />ROOM <br />NEbV TI <br />JENERATOR G <br />--- STING <br />GENERATOR <br />EXISTING <br />DRAWING INDEX <br />El 00 <br />LEGEND, NOTES AND DETAILS <br />E200 <br />GENERATOR PLAN <br />E300 <br />ELECTRICAL DETAILS <br />E301 <br />PENETRATION DETAILS <br />E400 <br />PANEL SCHEDULES <br />E500 <br />ELECTRICAL POWER ONE LINE <br />E600 <br />ICRA, PHASING AND DEMOLITION PLAN <br />E�OK1�rv,,,�v E, <br />�OOE NA1- OD <br />EI.EOTRlG p�t11L1.s <br />OF ZE <br />ORO,,4FNGr_$ <br />/HCIlIHL VICVV <br />N <br />LOCATION <br />KEY PLAN <br />1 <br />m <br />L-0 <br />o <br />Lai <br />Fw- cy) <br />c� <br />Q Q <br />O �o O <br />N <br />UCD <br />�� U <br />0 <br />o� <br />Q CO o <br />1)0 <br />N <br />o d <br />Lr Q <br />�� <br />O <br />OZ <br />m w <br />O <br />o w <br />ON J <br />Z� <br />w <br />Q� <br />v'wz <br />LL Z <br />C7 Q`-' Z <br />caw <br />00 CE Q <br />DQ� <br />O F- <br />w w <br />V <br />'n <br />Z`� <br />L!/z <br />w� <br />_ <br />0-�w <br />J <br />J <br />V)�o <br />WW <br />W <br />cDa_� <br />Z <br />w <br />w <br />Z Z <br />_ <br />� C) <br />oQ <br />Z Z Z <br />W <br />z <br />¢ w <br />J LL <br />U�a- <br />W <br />z Lli <br />0 <br />�(n o <br />LLJ <br />n- <br />f� <br />o <br />Ud� <br />00ozQ <br />00 <br />f� <br />Lu <br />i <br />Q <br />w cl- w <br />=o� <br />U <br />w <br />U <br />a <br />Cn <br />J <br />F- <br />a <br />N <br />J <br />o <br />a <br />— <br />= <br />z <br />o <br />U <br />�ojL <br />Z <br />� <br />J <br />Z <br />a <br />I <br />LL- <br />o <br />� <br />w <br />Z <br />� <br />N <br />W <br />0 <br />w <br />N <br />LL <br />w <br />J <br />O <br />Z <br />U <br />Q <br />Q <br />Z <br />w <br />Z <br />a� <br />� <br />M <br />w <br />Z <br />_ <br />z <br />Q N <br />z <br />W <br />N <br />w <br />r <br />a <br />1 <br />� J <br />Ld <br />C) <br />�-�•L <br />o <br />dam- * <br />� J ; W � <br />W �: �_ <br />~Q C• OZ= <br />� <br />O• <br />\ <br />REV <br />REV <br />REV 1Q GENERAL REV. 02/13/18 <br />AHCA STAGE III MAIL —IN <br />REVIEW 12/26/17 <br />DATE 12/26/17 <br />DRAWN LF/BMA <br />CHKD BY BOB DONNELLY <br />E100 <br />