My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
6444 Bar S Bar Trl
Zephyrhills
>
Building Department
>
Building Plans
>
6444 Bar S Bar Trl
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2025 4:53:34 PM
Creation date
2/18/2025 3:36:22 PM
Metadata
Fields
Template:
Building Plans
Street #
6444
Location
Bar S Bar Trl
Contractor
Lennar Homes LLC
Building Plans - Permit #
4650
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROOF FINISH <br />PER ELEVATION <br />ROOF SHEATHING <br />MANUFACTURED <br />ROOFTRUSS <br />MTL DRIP EDGE <br />ALUMINUM WRAP <br />ALUMINUM SOFFIT <br />NOTE: REFER TO STRUCTURAL SOFFIT <br />DETAIL SF01 SHEET SS FOR SOFFIT <br />ATTACHMENT DETAIL <br />5� ROOF O/H DETAIL <br />A _I T7Mr'- <br />nn141Trn nAInI l'1 <br />4" 6" <br />w o <br />CV N <br />2 1/2"' 1 1/2" <br />ROOF FINISH <br />PER ELEVATION <br />ROOF SHEATHING <br />MANUFACTURED <br />ROOF TRUSS <br />MTL DRIP EDGE <br />2X4 SUB -FASCIA <br />ALUMINUM WRAP <br />ALUMINUM SOFFIT <br />NOTE: REFER TO STRUCTURAL SOFFIT <br />DETAIL SF01 SHEET SS FOR SOFFIT <br />ATTACHMENT DETAIL <br />ROOF O/DETAIL <br />A <br />-11 <br />inn n1111i\ I 1 rlLllnl 1 <br />klrjWMi a <br />c <br />0 <br />TRIM BAND <br />8 O/H DETAIL 9 WINDOW DETAIL Lj <br />WINDOW DETAIL 11 WINDOW DETAIL <br />3/411 _ - 411 — - /411 — - /411 =1'-' <br />4' OFF <br />SHINGLE ROOF RIDGE VENT <br />6 12 12 6 SHINGLE ROOF <br />A5 5 A5 <br />6 <br />A5 5 12� ��5�Nni I I 111 11 <br />I I II <br />1'-0"' <br />O.H. <br />7/8 STUCCO <br />OVERFRAME <br />12" PAINTED RAISED <br />STUCCO BAND <br />DRIP "V" SCREED- <br />5/8 STUCCO <br />OVER CMU-----, <br />PAINTED METAL <br />GARAGE DOOR <br />on on on <br />mesons _ ■■■ <br />MEN ■■■ <br />u�ud11mIIIm�11 <br />y -- <br />�A <br />'_PUNTED RAISED <br />FRIM BAND <br />:ORED LINES <br />I I FLASHING --- <br />6" X 1 1/4" THICK <br />SMOOTH <br />STUCCO <br />BAND <br />M. <br />�0 <br />- 2 COLUMN DETAIL <br />i7/8" STUCCO I <br />OVERFRAME <br />C.J. C.J.I C.J. C.J.C.J. <br />6'-4" 10'-0" 10'-8" 10'-0" 6'-4" T-0" <br />4 DRIP "�V J <br />SCREED— <br />WEEP%-5/8" STUCCO <br />SCREED OVER CMU <br />M <br />ti <br />zo <br />5/8" SMOOTH It <br />00 <br />STUCCO <br />OVER CMU <br />N <br />_o <br />RAISED <br />TRIM BAND <br />ELEV AT 18'-0" <br />=COND FLOOR CEILING <br />_ ELEV AT 10'-0" <br />SECOND FLOOR FF <br />ELEV AT 8' 8. <br />FIRST FLOOR CEILING <br />ELEV AT 0'-0" <br />q� <br />FIRST FLOOR FF <br />\5 <br />1 FRONT ELEVATION A 3 RIGHT ELEVATION A <br />3/16 — 1 -0 3/16 — 11-011 <br />4' OFF RIDGE VENT <br />RIDGE VENT <br />6 SHINGLE ROOF SHINGLE ROOF 6 <br />A5 12 12 A5 <br />5 12 12 <br />III L113 I U- I IJu 11 1 # �11 #I I TFIE FF <br />IJ JI <br />_ ELEV AT 18' 0" _ ELEV AT 18'-0" <br />SECOND FLOOR CEILING SECOND FLOOR CEILING <br />z _�w I I I I I I I <br />�I I <br />I - is �-7/8" <br />7/8" STUCCO STUCCO , <br />ti N- r L OVER FRAME 12 I OVER FRAME <br />C.J.I ion r SS s <br />.J� C.J] C.J.I C.J.I C.J.I C.J.I n <br />8'-0"ILI <br />14'-0" 8'-0" 8 -8 8'-8" 8'-8" 8'-8 3_4 <br />ELEV AT 10' 0" 3-4_ _ _ _ _ 12 ELEV AT 10'-0" <br />SECOND FLOOR FF J—s �y _�- � - �- - 4 SECOND FLOOR FF <br />WEEP CASING BEAD <br />- SCREED W/ WEEPS ELEV AT 8' 8" ELEV AT 8'-8" <br />FIRST FLOOR AT 5/8" STUCCO WEEP 2'-0" FIRST FLOOR CEILING <br />OVER <br />FLASHING OVER CMU SCREED <br />o <br />00 ap ao <br />5/8" STUCCO CASING BEAD <br />OVER CMU W/ WEEPS <br />LL <br />OVER <br />_ _ _ _ _ _ ELEV AT 0'-0" _ _ _ _ _ FLASHING _ _ _ _ _ _ _ _ _ _ _ _ ELEV AT 0'-0" <br />Is <br />FIRST FLOOR FF I FIRST FLOOR FF <br />2 REAR ELEVATION A 4 LEFT ELEVATION A <br />3/16 — 1 -0 3/1611— 11-011 <br />■ <br />■ ■ <br />■ ■ ■ <br />■ ■ <br />_ ELEV AT 18'-0" <br />SECOND FLOOR CEILING <br />7/8 STUCCO <br />OVER PLYWOOD <br />CASING BEAD <br />W/ WEEPS OVER <br />12 - FLASHING <br />4 ELEV AT 10'-0" <br />SECOND FLOOR FF <br />_\ <br />ELEV AT 8' 8" <br />FIRST FLOOR CEILING <br />6" PAINTED RAISED <br />TRIM BAND <br />6" PAINTED RAISED <br />TRIM BAND <br />_ ELEV AT 0'-0" AIIIkN <br />FIRST FLOOR FF <br />FLASHING NOTES: <br />DUE TO CLARITY NOT ALL REQUIRED FLASHING ARE <br />INDICATED ON DRAWINGS. REFER TO FBC RES 2020 (7TH <br />EDITION), SECTION R703.4. AND R903.2 APPROVED <br />CORROSION -RESISTIVE FLASHING SHALL BE PROVIDED AT <br />ALL ROOFING SYSTEM INTERRUPTIONS, TERMINATIONS, <br />INTERSECTIONS, AND PENETRATIONS AND IN THE <br />EXTERIOR WALL ENVELOPE IN SUCH A MANNER AS TO <br />PREVENT ENTRY OF WATER INTO THE WALL CAVITY OR <br />PENETRATION OF WATER TO THE BUILDING STRUCTURAL <br />FRAMING COMPONENTS. THE FLASHING SHALL EXTEND <br />TO THE SURFACE OF THE EXTERIOR WALL FINISH AND <br />SHALL BE INSTALLED TO PREVENT WATER FROM <br />REENTERING THE EXTERIOR WALL ENVELOPE. APPROVED <br />CORROSION -RESISTANT FLASHING SHALL BE INSTALLED <br />AT ALL OF THE FOLLOWING LOCATIONS: <br />1. AT TOP OF ALL EXTERIOR WINDOW AND DOOR <br />OPENINGS IN SUCH A MANNER AS TO BE LEAK PROOF, <br />EXCEPT THAT SELF -FLASHING WINDOWS HAVING A <br />CONTINUOUS LAP OF NOT LESS THAN 1-1/8 INCHES (28 <br />MM) OVER THE SHEATHING MATERIAL AROUND THE <br />PERIMETER OF THE OPENING, INCLUDING CORNERS, DO <br />NOT REQUIRE ADDITIONAL FLASHING; JAMB FLASHING <br />MAY ALSO BE OMITTED WHEN SPECIFICALLY APPROVED <br />BY THE BUILDING OFFICIAL. <br />2. AT THE INTERSECTION OF CHIMNEYS OR OTHER <br />MASONRY CONSTRUCTION WITH FRAME OR STUCCO <br />WALLS, WITH PROJECTING LIPS ON BOTH SIDES UNDER <br />STUCCO COPINGS. <br />3. UNDER AND AT THE ENDS OF MASONRY, WOOD OR <br />METAL COPINGS AND SILLS. <br />4. CONTINUOUSLY ABOVE ALL PROJECTING WOOD <br />TRIM. <br />5. WHERE EXTERIOR PORCHES, DECKS OR STAIRS <br />ATTACH TO A WALL OR FLOOR ASSEMBLY OF <br />WOOD -FRAME CONSTRUCTION. <br />6. AT WALL AND ROOF INTERSECTIONS. <br />7. AT BUILT-IN GUTTERS. <br />8. WHENEVER THERE IS A CHANGE IN ROOF SLOPE OR <br />DIRECTION. <br />9. AT ROOF CRICKET OR SADDLE. <br />10. AROUND ROOF OPENINGS. <br />GENERAL FLASHING NOTES: <br />INSTALL FLASHING IN ACCORDANCE WITH FBC RES 7TH <br />EDITION (2020), SECTION R703.4 AND IN ACCORDANCE <br />WITH STANDARD APPLICATIONS ILLUSTRATED IN THE <br />ARCHITECTURAL SHEET METAL MANUAL (LATEST <br />EDITION) AS PUBLISHED BY THE SHEET METAL AND AIR <br />CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION, <br />INC. <br />WINDOW NOTE: <br />ALL NEW WINDOWS MUST MEET A MINIMUM 'U'-VALUE OF <br />0.4 OR LESS AND A'SHGC' OF 0.25 OR LESS. (UTILIZING <br />THE PRESCRIPTIVE METHOD FOR EXISTING STRUCTURES) <br />* EGRESS NOTE: <br />EACH BEDROOM MUST HAVE ONE WINDOW THAT <br />COMPLIES WITH EGRESS CODES, IF THERE IS NO ACCESS <br />TO EXTERIOR THROUGH A DOOR. THE WINDOW MUST <br />HAVE A MAXIMUM SILL HEIGHT OF 44" ABOVE FINISH <br />FLOOR LINE OF THAT PARTICULAR ROOM <br />SHINGLE / UNDERLAYMENT NOTE: <br />ASPHALT SHINGLES ARE IN ACCORDANCE WITH TABLE <br />R905.2.6.1, FBC 7TH EDITION (2020) - RESIDENTIAL <br />SHINGLE UNDERLAYMENT SHALL COMPLY WITH SECTION <br />905.1.1, FBC 7TH EDITION (2020) - RESIDENTIAL <br />GENERAL FINISH NOTES: <br />APPLICATION OF STUCCO (EXTERIOR PLASTER) <br />MUST BE IN ACCORDANCE WITH FBC R703.7, <br />ASTM C926 AND C1063 <br />ALL LATH AND LATH ATTACHMENTS TO BE OUT OF <br />CORROSION -RESISTANT MATERIAL. (REFER TO SHEET SN1 <br />FOR THE ENGINEERED METHOD FOR LATH ATTACHMENT) <br />JUN 1 i 2022 <br />T Inc. <br />roved <br />�io�ed 020 FBC 7th <br />l n.o <br />r tc1i - <br />t0r CoI'lC'e fiAt later PX2300 <br />Edition by Debra <br />ne <br />¢ a <br />N <br />N <br />CD <br />e <br />,9 <br />rn <br />N <br />C 0j <br />Co <br />t' <br />CD <br />00 <br />a <br />A <br />w <br />2 <br />0 <br />w <br />0 <br />z <br />Q <br />/N <br />> 0 0 <br />W L �o '? U <br />M N ti <br />4— <br />V <br />*- M U CO <br />ti 0 � � 2 <br />C u 0 <br />0 <br />0, <br />_p <br />'N <br />V W a� <br />W <br />L O E M <br />D� Q) <br />W WLu <br />ow vi wpE- <br />w8< w<g zz�=L <br />(� <br />�0g�� <br />Xcn0�CnLL000 <br />Qu)OoQ =w wozowmzQ <br />�¢z <br />O O <br />Z <br />0 0 Z Y p F Z� Q <br />¢~¢Ow_Q��w_z��cv.)�a <br />0 0 <br />LL <br />Ow �I—� �YZ<2 <br />Q <br />O 0 0 Q � <br />LL¢ 0 �¢,L <br />O <br />O <br />N <br />Z W <br />O F-- <br />_>(n0 <br />M O <br />Ln <br />�U)ILL <br />� <br />QWQU? <br />0- Co <br />00 <br />Q >- < <br />Z U I— <br />w <br />W <br />-1 O <br />O <br />tt <br />O <br />1 <br />I <br />1 <br />1 <br />I <br />1 <br />1 <br />I <br />I <br />`- <br />o <br />0 <br />0 <br />C <br />r• <br />0 <br />N <br />o <br />N <br />O <br />_O <br />r <br />O <br />N <br />O <br />00 <br />O <br />O <br />r <br />r <br />r <br />O <br />N <br />O <br />I <br />I <br />' <br />z <br />O <br />LW <br />0 <br />0 <br />0 <br />0 <br />0 <br />; <br />� <br />r <br />N <br />M <br />CY <br />L6 <br />VJ <br />}~ <br />zz <br />W <br />w <br />O 'III-0Q <br />W <br />z <br />Q <br />U <br />boo <br />UVW <br />mzj <br />O <br />Ow_ <br />Q <br />Z <br />�-< <br />�. <br />w Q <br />uj <br />N <br />�F-w <br />N <br />= <br />OzoO <br />W <br /><�D <br />. . Cy <br />O <br />zwo <br />Q <br />U <br />gz� <br />Z <br />az <br />U) <br />Z <br />U< <br />0 o <br />I- <br />W <br />Z <br />A5 <br />z <br />z <br />w <br />LU_j <br />� <br />0 <br />0 <br />T <br />LAST PLOT DATE <br />N <br />• <br />March 29, 2022 <br />z O <br />J <br />EXTERIOR <br />ELEVATIONS A <br />
The URL can be used to link to this page
Your browser does not support the video tag.