Laserfiche WebLink
:z N <br />CO to <br />2 LBS. EPS <br />FOAM <br />1 1/2" <br />1" = 1'-0" <br />N <br />0 2 LBS. EPS o <br />FOAM r <br />2 1/2" <br />6 BRACKET DETAIL <br />= _n <br />ill <br />0 <br />10 <br />2 LBS. EPS <br />FOAM <br />CV <br />v <br />4" 4" 4" 4" <br />1" <br />VDOW DETAIL <br />If = 1 ,_nil <br />1 1/2" <br />ROOF FINISH <br />12 <br />PER ELEVATION <br />15 <br />ROOF SHEATHING <br />MANUFACTURED <br />ROOFTRUSS <br />MTL DRIP EDGE <br />2X4 SUB -FASCIA <br />ALUMINUM WRAP <br />ALUMINUM SOFFIT <br />NOTE: REFER TO STRUCTURAL SOFFIT <br />DETAIL SF01 SHEET SS FOR SOFFIT <br />ATTACHMENT DETAIL <br />FFIT DETAIL <br />1I_ 1 1-hill <br />ROOF FINISH <br />PER ELEVATION <br />ROOF SHEATHING <br />MANUFACTURED <br />ROOFTRUSS <br />MTL DRIP EDGE <br />2X4 SUB -FASCIA <br />ALUMINUM WRAP <br />ALUMINUM SOFFIT <br />NOTE: REFER TO STRUCTURAL SOFFIT <br />DETAIL SF01 SHEET SS FOR SOFFIT <br />ATTACHMENT DETAIL <br />If = 1'_n" <br />7"XV THIC <br />PAINTED F <br />TRIM BAN <br />6"X1" THIC <br />PAINTED I <br />TRIM BAN <br />If = 1,_n„ <br />8"X1"THICK PAINTED <br />RAISED TRIM BAND — <br />BID <br />-x,-- E <br />CAA <br />CASING BEAD <br />W/ WEEPS <br />OVER <br />FLASHING <br />SHINGLE <br />ROOF <br />51 12 <br />8 <br />A5 <br />ELEV AT 18'-0" <br />T.O.P. <br />7/8" <br />STUCCO <br />OVER FRAME <br />CASING BEAD <br />W/ WEEPS <br />OVER <br />ELEV AT 1 U-0" FLASHING <br />2ND FLOOR FF <br />ELEV AT 8'-8" <br />- - <br />T.O.M. <br />WEEP SCREED <br />TYP. <br />— <br />m <br />ELEV AT 0'-0" <br />1ST FLOOR FF <br />FRONT ELEVATION B <br />1 /411 = 1'-011 <br />• RIDGE <br />�I■fin. <br />VENT <br />51 <br />�I■IIIIIINI%111�i.- <br />..aiauI —SHINGLE <br />i■�rui■irrrumri■urrl... <br />• , . 1aIaI i o0111 11111Q�11111,I11 11,111111111111111,1111111l1 1 1 <br />..� yin■unman■irrmnni■uuuiuri■mruiuri■iu0i■wri■uui■uni■ion._ <br />C.J.- <br />ON� <br />rlsl'rii un■■nnll <br />• r <br />M <br />A5 <br />A5 <br />IN <br />MEMNON <br />DRIP "V'SCREED, <br />AT BOTTOM OF <br />BAND <br />4' OFF RIDGE 9'-8" 6-0" 164" <br />51 12 VENT <br />SHINGLE 8 <br />ROOF A5 a <br />ON <br />cq v o <br />0 <br />ELEV AT 18'-0" _ ' <br />T.O.P. CN <br />C.J. C.J. C.J <br />z F- <br />ELEV AT 10'-0" C? o w p N <br />2ND FLOOR FF 3-0 ~ * CN * �7/8" STUCCO cJn ►ri <br />OVER <br />ELEV AT 8'-8" - - - - - - - - �M - 12- <br />4' GFF RIDGE <br />T.O.M. <br />VENT <br />DRIP "V" Q <br />SCREED 5/8"STUCWEEP 2'-0" <br />OVER CMU MU� TYPEED <br />ELEV AT 0'-0" <br />1 ST FLOOR FF <br />0 0 <br />0 0 <br />�/8 <br />EAI O B SLOPE `z U_z SLOPE <br />4 ow ow 1 = 1 �_0�� I 55:12 <br />4' OFF RIDGE <br />VENT SHINGLE <br />8 12 <br />A5 5 ROOF I <br />ELEV AT 18'-0" _ 11 <br />T.O.P. C.J. z C.J. <br />g _j _ 9 CASING <br />ELEV AT 10'-0" o w M C.J. A5 BEAD W/ a <br />2ND FLFF OOR 7/8" STUCCO iv _ ~ WEEPS <br />O 7 <br />�GVER RAME - - - - - - - FLASHING U) Lo I <br />ELEV AT 8'-8" 12 SLOPE SLOP <br />T.O.M. - — 5:12 5:12 <br />-Air TT <br />A/C UNIT WEEP <br />2'-0" SCREED <br />AND PAD - 5/8" _ SLOPE <br />tO CO TYP. <br />OVER CMU Zfl 5:12 <br />ELEV AT 0'-0" - - - - - - - - - - - — a <br />1ST FLOOR FF 0 N <br />J <br />SLOP <br />5:12 <br />4)�E�IELEVATION B 12 ROOF PLAN B <br />1 _0 <br />FLASHING NOTES: <br />DUE TO CLARITY NOT ALL REQUIRED FLASHING ARE <br />INDICATED ON DRAWINGS. REFER TO FBC RES 2020 (7TH <br />EDITION), SECTION R703.4. AND R903.2 APPROVED <br />CORROSION -RESISTIVE FLASHING SHALL BE PROVIDED AT <br />ALL ROOFING SYSTEM INTERRUPTIONS, TERMINATIONS, <br />INTERSECTIONS, AND PENETRATIONS AND IN THE <br />EXTERIOR WALL ENVELOPE IN SUCH A MANNER AS TO <br />PREVENT ENTRY OF WATER INTO THE WALL CAVITY OR <br />PENETRATION OF WATER TO THE BUILDING STRUCTURAL <br />FRAMING COMPONENTS. THE FLASHING SHALL EXTEND <br />TO THE SURFACE OF THE EXTERIOR WALL FINISH AND <br />SHALL BE INSTALLED TO PREVENT WATER FROM <br />REENTERING THE EXTERIOR WALL ENVELOPE. APPROVED <br />CORROSION -RESISTANT FLASHING SHALL BE INSTALLED <br />AT ALL OF THE FOLLOWING LOCATIONS: <br />1. AT TOP OF ALL EXTERIOR WINDOW AND DOOR <br />OPENINGS IN SUCH A MANNER AS TO BE LEAK PROOF, <br />EXCEPT THAT SELF -FLASHING WINDOWS HAVING A <br />CONTINUOUS LAP OF NOT LESS THAN 1-1/8 INCHES (28 <br />MM) OVER THE SHEATHING MATERIAL AROUND THE <br />PERIMETER OF THE OPENING, INCLUDING CORNERS, DO <br />NOT REQUIRE ADDITIONAL FLASHING; JAMB FLASHING <br />MAY ALSO BE OMITTED WHEN SPECIFICALLY APPROVED <br />BY THE BUILDING OFFICIAL. <br />2. AT THE INTERSECTION OF CHIMNEYS OR OTHER <br />MASONRY CONSTRUCTION WITH FRAME OR STUCCO <br />WALLS, WITH PROJECTING LIPS ON BOTH SIDES UNDER <br />STUCCO COPINGS. <br />3. UNDER AND AT THE ENDS OF MASONRY, WOOD OR <br />METAL COPINGS AND SILLS. <br />4. CONTINUOUSLY ABOVE ALL PROJECTING WOOD <br />TRIM. <br />5. WHERE EXTERIOR PORCHES, DECKS OR STAIRS <br />ATTACH TO A WALL OR FLOOR ASSEMBLY OF <br />WOOD -FRAME CONSTRUCTION. <br />6. AT WALL AND ROOF INTERSECTIONS. <br />7. AT BUILT-IN GUTTERS. <br />8. WHENEVER THERE IS A CHANGE IN ROOF SLOPE OR <br />DIRECTION. <br />9. AT ROOF CRICKET OR SADDLE. <br />10. AROUND ROOF OPENINGS. <br />GENERAL FLASHING NOTES: <br />INSTALL FLASHING IN ACCORDANCE WITH FBC RES 7TH <br />EDITION (2020), SECTION R703.4 AND IN ACCORDANCE <br />WITH STANDARD APPLICATIONS ILLUSTRATED IN THE <br />ARCHITECTURAL SHEET METAL MANUAL (LATEST <br />EDITION) AS PUBLISHED BY THE SHEET METAL AND AIR <br />CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION, <br />INC. <br />WINDOW NOTE: <br />ALL NEW WINDOWS MUST MEET A MINIMUM 'U'-VALUE OF <br />0.4 OR LESS AND A 'SHGC' OF 0.25 OR LESS. (UTILIZING <br />THE PRESCRIPTIVE METHOD FOR EXISTING STRUCTURES) <br />EGRESS NOTE: <br />EACH BEDROOM MUST HAVE ONE WINDOW THAT <br />COMPLIES WITH EGRESS CODES, IF THERE IS NO ACCESS <br />TO EXTERIOR THROUGH A DOOR. THE WINDOW MUST <br />HAVE A MAXIMUM SILL HEIGHT OF 44" ABOVE FINISH <br />FLOOR LINE OF THAT PARTICULAR ROOM <br />SHINGLE / UNDERLAYMENT NOTE: <br />ASPHALT SHINGLES ARE IN ACCORDANCE WITH TABLE <br />R905.2.6.1, FBC 7TH EDITION (2020) - RESIDENTIAL <br />SHINGLE UNDERLAYMENT SHALL COMPLY WITH SECTION <br />905.1.1, FBC 7TH EDITION (2020) - RESIDENTIAL <br />GENERAL FINISH NOTES: <br />APPLICATION OF STUCCO (EXTERIOR PLASTER) <br />MUST BE IN ACCORDANCE WITH FBC R703.7, <br />ASTM C926 AND C1063 <br />ALL LATH AND LATH ATTACHMENTS TO BE OUT OF <br />CORROSION -RESISTANT MATERIAL. (REFER TO SHEET SN1 <br />FOR THE ENGINEERED METHOD FOR LATH ATTACHMENT) <br />_R tAY 2 4 202 <br />VIRTUAL REVIEW ASSIST <br />Virtual Review Assist, Inc. <br />Plans Review completed and approv <br />for compliance with the 2020 FBC 7th <br />Edition by Debra Anne Klahr PX2300 <br />GENERAL NOTES: <br />* G.C. VERIFY ROOF PITCH <br />ROOF PITCH VARIES PER SUBDIVISIONS (5/12 PR 5.9/12) <br />IT IS THE CONTRACTORS RESPONSIBILITY TO VERIFY ROOF <br />SLOPE REQUIREMENTS WITH TRUSS MANUFACTURER. <br />ROOF CRITERIA <br />- 12" OVERHANG U.N.O. <br />- PLUMB CUT FASCIA <br />- ROOF PITCH PER ELEVATION <br />- WINDLOAD CALC. PER ASCE 7-98 (VARIES BY LOCATION) <br />- SHINGLE LOADING <br />ROOF VENT CALCULATIONS: <br />NOTE: VERIFY WITH GENERAL CONTRACTOR ALL ROOF VENT <br />LOCATIONS, QUANTITIES, AND SIZES. ROOF VENTS SHALL BE <br />INSTALLED FOR A MIN. OF VENTED AREA AS LISTED BELOW OR <br />EQUIVALENT SYSTEM PER 7TH EDITION (2020) FBC SECTION R806 <br />FORMULA = S.F. / 150 (1/150) * 144 (TO CONVERT TO SQ. INCHES) _ <br />NET SQ. INCH REQUIREMENT <br />ATTIC AREA = 1697 SQ FT <br />VENTILATION REQUIRED = 815 SQ IN <br />VENTILATION PROVIDED AT RIDGE = 407 SQ IN <br />VENTILATION PROVIDED AT SOFFIT = 1218 SQ IN <br />, <br />ATTIC V <br />VENTILATION <br />ONLCRIDA <br />ATTIC VENTILATION TOBpENIT COMPTH THE LIANCE <br />BUILDING CODE 7TH EDITION (2020) RESIDENTIAL R806. <br />THE MINIMUM NET FREE VENTILATING AREA SHALL BE 1/150 OF THE <br />AREA OF THE VENTED SPACE. THE VENTILATED AREA MAY BE <br />REDUCED TO 1/300 PROVIDED THAT AT LEAST 40% BUT NO MORE <br />THAN 50% OF THE REQUIRED VENTILATION IS PROVIDED IN THE <br />UPPER PORTION OF THE SPACE TO BE VENTILATED. UPPER <br />VENTILATORS SHALL BE LOCATED NO MORE THAN 3 FEET MEASURE <br />VERTICALLY) BELOW THE RIDGE OR HIGHEST POINT OF THE SPACE, <br />WITH THE BALANCE OF THE REQUIRED VENTILATION PROVIDED BY <br />EAVE OR CORNICE VENTS. <br />CALCULATIONS BASED ON THE FOLLOWING VALUES, SEE ROOF PLAN. <br />VALUES TO BE VERIFIED WITH MANUFACTURER SPECIFICATIONS) <br />RIDGE VENTS - 18 SQ. IN. OF NET FREE AREA / LINEAR FT. <br />* OFF -RIDGE VENTS - 138 SQ. IN. OF NET FREE AREA / UNIT <br />* SOFFIT VENTS - 7 SQ. IN. OF THE NET FREE AREA / SQ. FT. <br />IF NOT ENOUGH VENTED SOFFIT IS PROVIDED DUE TO FIRE <br />PROTECTION, THE CONTRACTOR SHALL USE DECK -AIR OF OTHER <br />APPROVED MATERIAL TO PROVIDE SUFFICIENT IN -TAKE VENTILATION <br />* LOMANCO DECK -AIR - 9 SQ. IN. OF NET FREE AREA / FT. FOR SHINGLE <br />36 SQ. IN. OF NET FREE AREA / FT. FOR TILE <br />NOTE: <br />EXTERIOR WINDOWS, SLIDING DOORS AND EXTERIOR SIDE -HINGE <br />DOORS SHALL BE TESTED AND LABELED WITH A PERMANENT LABEL <br />PROVIDING TRACE ABILITY TO MANUFACTURER AND PRODUCT <br />0) <br />t 00 <br />O <br />L0 <br />A 0 <br />w <br />w <br />0 <br />z <br />Q <br />>° <br />L L 0 C! u <br />j M <br />N <br />M <br />a <br />V O� u c� <br />Co" <br />E�� u = <br />� <br />_O <br />MINE —O LL o 0 Q <br />U�'° <br />._t <br />Lu <br />N C <br />nvi <br />W <br />CCQ <br />L 0 C M <br />n a <br />LLI <br />w <br />�W H W J W 2 00 O <br />Lu W0)M <br />Q fa'- 1-- <br />J�O��WLLv002 <br />C� <br />COWWOZ0E00mZZ�U <br />JO <br />O` O Z <br />W W — W — <br />CO CL 7 W W 7 I. Q <br />_j<< Lij zwZOw�pa <br />W J <br />LL. <br />QOw 2I-� 2Yo¢a <br />o:� oQQ� <br />a <br />oW <br />L. a 0 � IL <br />O <br />O <br />cV <br />Z LLJ <br />0P <br />W D ti <br />(n O <br />0f cy)O <br />Q u) (M � <br />LL <br />QWQIS) <br />M <br />00 <br />Q Q <br />Z V H <br />W <br />W <br />J O <br />O <br />CD <br />LO <br />I <br />I <br />I <br />I <br />� <br />I <br />I <br />I <br />l <br />O <br />O <br />O <br />O <br />O <br />O <br />N <br />N <br />N <br />N <br />CM <br />N <br />N <br />N <br />N <br />N <br />O <br />O <br />N <br />N <br />1 <br />z <br />0 <br />wo <br />> <br />0 <br />C.,i <br />0 <br />C', <br />0 <br />v <br />0 <br />ui <br />1 <br />� <br />I <br />z <br />W <br />QZ <br />C)w <br />W <br />000 <br />1- 0 <br />0 <br />0 <br />U � <br />L <br />0 <br />o�Q <br />Q <br />Z <br />a_a <br />Sri <br />= <br />Lu <br />= w <br />Ln <br />(� <br />m <br />F-�2 <br />N <br />� <br />zo= <br />W <br />o- <br /><�� <br />. . M <br />0 <br />ZWO <br />Z <br />U <br />5wW <br />Z" <br />. <br />Z <br />� <br />F-� <br />J <br />OU <br />0 <br />z <br />A5z <br />z <br />W <br />WV <br />J <br />~ <br />Lo <br />♦ <br />0 <br />0 <br />LAST PLOT DATE <br />O <br />March 29, 2022 <br />4_0 <br />O <br />EXTERIOR <br />_I <br />ELEVATIONS & ROOF <br />PLAN B <br />