c <br />GENERAL CONSTRUCTION NOTES <br />1. SEE PAVING, GRADING & DRAINAGE PLAN FOR SITE SPECIFIC BENCHMARK AND ELEVATION DATUM. <br />2. LOCATIONS, DIMENSIONS AND ELEVATIONS OF EXISTING UTILITIES, STRUCTURES, AND OTHER FEATURES ARE SHOWN ACCORDING TO <br />STANDARD UTILITY ATLAS SHEETS OR OTHER INFORMATION OBTAINED AT THE TIME OF PREPARATION OF THESE PLANS. PRIOR TO <br />CONSTRUCTION, THE CONTRACTOR SHALL FIELD VERIFY THE LOCATION, DIMENSIONS, AND ELEVATION OF ALL EXISTING UTILITIES, STRUCTURES <br />AND OTHER FEATURES AFFECTING THE WORK AND MAKE ARRANGEMENTS FOR REQUIRED RELOCATIONS WITH THE AFFECTED UTILITY. THE <br />CONTRACTOR SHALL COOPERATE WITH THE UTILITY DURING RELOCATION OPERATIONS. <br />3. THE CONTRACTOR SHALL EXERCISE EXTREME CAUTION IN AREAS OF BURIED UTILITIES AND SHALL PROVIDE AT LEAST 48 HOURS NOTICE TO <br />ALL UTILITY COMPANIES BEFORE PERFORMING ANY EXCAVATION. THE CONTRACTOR SHALL HAVE UTILITY LOCATIONS MARKED BY CALLING <br />"SUNSHINE 811" AT 1-800-432-4770 OR 811 AT LEAST 48 HOURS PRIOR TO THE START OF ANY EXCAVATION. CONTRACTOR IS RESPONSIBLE FOR <br />CONTACTING ALL UTILITIES NOT INCLUDED IN THE "SUNSHINE 811" PROGRAM. <br />4. CHAPTER 77-153 OF THE FLORIDA STATUTES REQUIRES THAT AN EXCAVATOR NOTIFY ALL GAS UTILITIES A MINIMUM OF TWO (2) WORKING <br />DAYS PRIOR TO EXCAVATING. THESE PLANS SHOW ONLY THE APPROXIMATE LOCATION OF GAS MAINS AND THE GAS MAINS MUST BE FIELD <br />VERIFIED BY ON SITE INSPECTION BY GAS COMPANY PERSONNEL, EXCAVATORS ARE INSTRUCTED TO TELEPHONE THE GAS COMPANY A MINIMUM <br />OF TWO (2) WORKING DAYS BEFORE ENTERING A CONSTRUCTION AREA. <br />5. THE CONTRACTOR SHALL REVIEW THE PLANS FOR CONFLICTS OR OTHER DISCREPANCIES PRIOR TO CONSTRUCTION. THE CONTRACTOR <br />SHALL NOTIFY THE ENGINEER AND OWNER OF ANY CONFLICTS OR DISCREPANCIES BEFORE PERFORMING ANY WORK. <br />6. ALL PROPOSED UNDERGROUND UTILITIES MUST BE IN PLACE, TESTED AND INSPECTED PRIOR TO PAVEMENT SURFACE COURSE <br />CONSTRUCTION. <br />7. IT IS THE CONTRACTOR'S RESPONSIBILITY TO BECOME FAMILIAR WITH THE CONDITIONS AND INSPECTION REQUIREMENTS OF ALL PERMITS <br />ISSUED FOR THE PROJECT. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS PRIOR TO CONSTRUCTION AND SHALL SCHEDULE ALL <br />INSPECTIONS IN ACCORDANCE WITH AGENCY REQUIREMENTS. <br />8. ALL SPECIFICATIONS AND DOCUMENTS REFERRED TO SHALL BE OF LATEST REVISIONS AND/OR LATEST EDITION. <br />9. THE CONTRACTOR SHALL COMPLETE THE WORK IN ACCORDANCE WITH ALL APPLICABLE STATUTES, RULES, REGULATIONS AND PERMIT <br />CONDITIONS, <br />10, THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS TO THE ENGINEER FOR ALL PRECAST AND MANUFACTURED ITEMS TO BE USED ON THE <br />PROJECT. ALL SHOP DRAWINGS ARE TO BE REVIEWED AND APPROVED BY THE CONTRACTOR PRIOR TO SUBMITTAL TO THE ENGINEER. <br />11. AT LEAST THREE (3) WORKING DAYS PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE ENGINEER, OWNER, AND APPROPRIATE <br />PERMITTING AGENCIES OF THE CONTRACTOR'S NAME, STARTING DATE, PROJECTED SCHEDULE, AND OTHER INFORMATION AS REQUIRED. <br />12. WORK PERFORMED UNDER THIS CONTRACT SHALL INTERFACE SMOOTHLY WITH OTHER WORK BEING PERFORMED ON SITE BY OTHERS. IT <br />WILL BE NECESSARY FOR THE CONTRACTOR TO COORDINATE AND SCHEDULE HIS ACTIVITIES WITH OTHERS WHERE NECESSARY. <br />13. SITE WORK CONCRETE SHALL HAVE A COMPRESSIVE STRENGTH OF AT LEAST 3,000 PSI. AT 28 DAYS UNLESS OTHERWISE NOTED. <br />14. ALL PRIVATE AND PUBLIC PROPERTY AFFECTED BY THIS WORK SHALL BE RESTORED TO A CONDITION EQUAL TO OR BETTER THAN EXISTING <br />CONDITIONS UNLESS SPECIFICALLY EXEMPTED BY THE PLANS. <br />15, ALL DISTURBED AREAS THAT ARE NOT TO BE SODDED, ARE TO BE SEEDED AND MULCHED IN ACCORDANCE WITH FDOT STANDARDS. THE <br />CONTRACTOR SHALL MAINTAIN ALL GRASSED AREAS UNTIL A SATISFACTORY STAND OF GRASS, ACCEPTABLE TO THE APPLICABLE REGULATORY <br />AGENCIES, OWNER, AND ENGINEER, HAS BEEN ACHIEVED. THE CONTRACTOR SHALL BEAR THE RESPONSIBILITY OF ALL REMEDIAL WORK <br />REQUIRED UNTIL THE SYSTEM HAS BEEN ACCEPTED. <br />16. ALL SODDED AND SEEDED AREAS BE WATERED AND FERTILIZED UNTIL THE PROJECT IS COMPLETED AND ACCEPTED BY THE OWNER. <br />17. THE CONTRACTOR SHALL LOCATE AND FLAG ALL PROPERTY CORNERS PRIOR TO FINAL ENGINEERING INSPECTION AND CERTIFICATION. THE <br />CONTRACTOR SHALL BEAR ALL COSTS INCURRED AS A CONSEQUENCE OF LOST OR DISTURBED PROPERTY CORNERS. LOST OR DISTURBED <br />PROPERTY CORNERS SHALL BE REESTABLISHED BY A PROFESSIONAL LAND SURVEYOR. <br />18, THE GEOTECHNICAL ENGINEER SHALL SUPPLY THE ENGINEER AND OWNER WITH A PHOTOCOPY OF ALL COMPACTION TESTS AND OTHER <br />REQUIRED MATERIALS TESTS UNDER THIS CONTRACT. THE GEOTECHNICAL ENGINEER SHALL CERTIFY, IN WRITING, TO THE ENGINEER AND <br />OWNER, THAT ALL TESTING REQUIREMENTS HAVE BEEN SATISFIED. <br />19, THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF ALL REQUIRED TESTING WITH THE GEOTECHNICAL ENGINEER. TESTING IS <br />REQUIRED AS DICTATED BY THE CONTRACT DOCUMENTS, CONSTRUCTION PLANS AND SPECIFICATIONS. UPON COMPLETION OF THE WORK, THE <br />GEOTECHNICAL ENGINEER SHALL SUBMIT CERTIFICATIONS TO THE ENGINEER AND OWNER THAT STATE THAT ALL REQUIREMENTS HAVE BEEN MET. <br />20. THE CONTRACTOR SHALL REVIEW THE PROJECT GEOTECHNICAL REPORT PRIOR TO BIDDING AND THE START OF CONSTRUCTION. PLEASE <br />REFER TO THE GEOTECHNICAL REPORT FOR RECOMMENDATIONS ON CUT/FILL PLACEMENT AND COMPACTION REQUIREMENTS. <br />21. THE CONTRACTOR SHALL MAINTAIN A COPY OF THE APPROVED CONSTRUCTION DRAWINGS AND ALL PERMITS AT THE CONSTRUCTION SITE. <br />22, THE CONSTRUCTION DRAWINGS DO NOT INCLUDE SPECIFICATION FOR CONSTRUCTION SAFETY, THE CONTRACTOR SHALL BE RESPONSIBLE <br />FOR ALL MEANS AND METHODS OF CONSTRUCTION SITE SAFETY. <br />23. ALL DESIGN RELATED REQEUSTS OR SUBMISSIONS ARE TO BE MADE TO THE ENGINEER OF RECORD (EOR) & THE FOR WILL COORDINATE <br />WITH OWNER (IF NEEDED). <br />TESTING SCHEDULE GUIDE <br />ITEM <br />TEST TYPE <br />TEST I.D. <br />REQUIREMENT <br />FREQUENCY <br />EMBANKMENT <br />MAXIMUM DENSITY <br />AASHTO T180 <br />N/A <br />PER SOIL TYPE <br />OPTIMUM MOISTURE <br />ASTM D1557 <br />FIELD DENSITY <br />AASHTO T191, T204 <br />95% OF MAXIMUM <br />ONE PER 2,500 S.F. <br />T238 <br />DENSITY <br />HORIZONTALLY; <br />ASTM D1556, D2937 <br />ALTERNATING LIFTS (12 INCHES) <br />D2922 <br />UTILITY <br />MAXIMUM DENSITY <br />AASHTO T180 <br />N/A <br />PER SOIL TYPE <br />TRENCH BACKFILL <br />OPTIMUM MOISTURE <br />ASTM D1557 <br />UNDER ROADWAYS <br />FIELD DENSITY <br />AASHTO T191, T204 <br />95% OF MAXIMUM <br />ONE PER 2,500 S.F. <br />AND STRUCTURES <br />T238 <br />DENSITY <br />HORIZONTALLY; <br />ASTM D1556, D2937 <br />EVERY 12" VERTICALLY <br />D2922 <br />D2922 <br />AT LEAST ONE FOR EACH PIPE RUN <br />BACKFILL OF MAXIMUM DENSITY AASHTO T180 N/A PER SOIL TYPE <br />STRUCTURES OPTIMUM MOISTURE ASTM D1557 <br />FIELD DENSITY AASHTO T191, T204 95% OF MAXIMUM EVERY 12" VERTICALLY <br />T238 DENSITY <br />ASTM D1556, D2937 <br />D2922 <br />SUBGRADE BEARING VALUES LBR - FLA. D.O.T. <br />MAXIMUM DENSITY AASHTO T180 <br />OPTIMUM MOISTURE ASTM D1557 <br />FIELD DENSITY & AASHTO T191 T238 <br />THICKNESS ASTM D1556, D2922 <br />BASE BEARING VALUES <br />LBR - FLA. D.O.T. <br />MAXIMUM DENSITY <br />AASHTO T180 <br />OPTIMUM MOISTURE <br />ASTM D1557 <br />THICKNESS <br />AASHTO T191, T238 <br />FIELD DENSITY <br />ASTM D1556, D2922 <br />GRADATION <br />AASHTO T27, T98 <br />AASHTO T90 <br />ATTERBERG LIMITS <br />ASTM C136, D423, D424 <br />SEE TYPICAL <br />PAVEMENT SECTION <br />ONE PER SOIL TYPE <br />CHECK POINT LBR AT <br />500 L.F. HORIZONTALLY <br />ONE PER SOIL TYPE <br />ONE PER 2,500 S.F. <br />HORIZONTALLY <br />ONE PER SOURCE OR AS MTL. CHANGES <br />CHECK POINT LBR AT 500 L.F. HORIZ. <br />SEE TYPICAL ONE PER SOURCE <br />PAVEMENT SECTION <br />ONE PER 2,500 S.F. <br />HORIZONTALLY <br />ONE PER SOURCE <br />SOIL CEMENT BASE MIX DESIGN <br />PORTLAND CEMENT <br />ONE PER SOIL TYPE <br />ASSOC. SPECIFICATIONS <br />(TO BE USED IF <br />MAXIMUM DENSITY <br />AASHTO T134 <br />ONE PER SOIL TYPE DAILY <br />SEPARATION BETWEEN <br />SEE TYPICAL <br />SHWT & BOTTOM OF <br />OPTIMUM MOISTURE <br />(STANDARD) PAVEMENT SECTION <br />BASE IS <1.5') <br />COMPRESSIVE <br />PORTLAND CEMENT <br />ONE SET OF 3 PER SOIL <br />STRENGTH SPECIMENS <br />ASSOC. SPECIFICATIONS <br />TEST CORES <br />PORTLAND CEMENT <br />ONE SET OF 3 PER SOIL <br />ASSOC. SPECIFICATIONS <br />FIELD DENSITY & <br />AASHTO T191, T238 <br />ONE PER 2,500 S.F. <br />THICKNESS <br />ASTM D1556, D2922 <br />HORIZONTAL <br />ASPHALTIC CONCRETE MATERIALS QUALITY AASHTO T164 <br />BITUMEN CONTENT, <br />ASTM D2172 <br />GRADATION <br />PER SPECIFICATIONS <br />ONE PER DAY <br />FIELD DENSITY <br />ASTM 02950-81 <br />95% OF LAB DENSITY <br />ONE PER 2,500 S.F. <br />HORIZONTAL <br />LOS ANGELES <br />AASHTO T96-77 <br />ABRASION <br />ASTM C131-81 <br />PER SPECIFICATIONS <br />ONE PER SOURCE <br />THICKNESS <br />N/A <br />PER SPECIFICATIONS <br />ONE PER 2,500 S.F. <br />CLEARING AND EROSION CONTROL NOTES <br />1. ALL TREES TO REMAIN SHALL BE PROTECTED IN ACCORDANCE WITH LOCAL REGULATIONS PRIOR TO THE START OF ANY <br />CONSTRUCTION ACTIVITIES. <br />2. THE CONTRACTOR SHALL PREPARE THE SITE AS DIRECTED BY THE GEOTECHNICAL ENGINEER PRIOR TO STARTING ACTUAL <br />CONSTRUCTION, COPIES OF THE GEOTECHNICAL ENGINEER'S RECOMMENDATIONS AND REPORT ARE AVAILABLE THROUGH THE <br />ENGINEER, ARCHITECT OR THE GEOTECHNICAL ENGINEER. QUESTIONS REGARDING SITE PREPARATION REQUIREMENTS SHALL BE <br />DIRECTED TO THE GEOTECHNICAL ENGINEER AND OWNER. <br />3. THE CONTRACTOR SHALL CLEAR AND GRUB ONLY THOSE PORTIONS OF THE SITE NECESSARY FOR CONSTRUCTION. ALL DISTURBED <br />OPEN AREAS SHALL BE SEEDED, MULCHED, OR PLANTED WITH OTHER APPROVED LANDSCAPE MATERIAL IMMEDIATELY FOLLOWING <br />CONSTRUCTION. <br />4. THE TOP SOIL REMOVED DURING CLEARING AND GRUBBING SHALL BE STOCKPILED AT A SITE DESIGNATED BY THE OWNER AND <br />SHALL BE USED FOR LANDSCAPING PURPOSES UNLESS OTHERWISE DIRECTED BY THE OWNER. <br />5. ALL CONSTRUCTION DEBRIS AND OTHER WASTE MATERIAL SHALL BE DISPOSED OF OFF -SITE IN ACCORDANCE WITH ALL APPLICABLE <br />REGULATIONS. <br />6. THE CONTRACTOR SHALL OBTAIN ALL PERMITS REQUIRED FOR REMOVAL OF EXISTING STRUCTURES. <br />7. THE CONTRACTOR SHALL NOTIFY ALL UTILITIES TO DISCONNECT OR REMOVE THEIR FACILITIES PRIOR TO REMOVAL OR <br />DEMOLITION OF EXISTING STRUCTURES. <br />8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAKING A VISUAL INSPECTION OF THE SITE AND SHALL BE RESPONSIBLE FOR <br />DEMOLITION AND REMOVAL OF ALL UNDERGROUND AND ABOVE GROUND STRUCTURES THAT WILL NOT BE INCORPORATED WITH <br />THE NEW FACILITIES. SHOULD ANY DISCREPANCY EXIST, THE CONTRACTOR SHALL CONTACT THE OWNER FOR CLARIFICATION <br />PRIOR TO DEMOLITION. <br />9. PRIOR TO THE COMPLETION OF CONSTRUCTION, THE RETENTION/DETENTION AREAS SHALL BE RESHAPED, CLEARED OF SILT, MUD <br />AND DEBRIS, AND GRASSED IN ACCORDANCE WITH THE CONSTRUCTION DRAWINGS. <br />PAVING, GRADING AND DRAINAGE NOTES <br />1. ALL DELETERIOUS SUBSTANCES (I.E. MUCK, PEAT, BURIED DEBRIS) SHALL BE EXCAVATED IN ACCORDANCE WITH THE PLANS AND <br />SPECIFICATIONS, OR AS DIRECTED BY THE GEOTECHNICAL ENGINEER OR OWNER. DELETERIOUS MATERIAL IS TO BE STOCKPILED <br />OR REMOVED FROM THE SITE AS DIRECTED BY THE OWNER. EXCAVATED AREAS SHALL BE BACKFILLED WITH APPROVED MATERIALS <br />AND COMPACTED AS SPECIFIED BY THE GEOTECHNICAL ENGINEER OR OWNER. <br />2. IT MAY BE NECESSARY TO FIELD ADJUST PAVEMENT ELEVATIONS TO PRESERVE THE ROOT SYSTEMS OF TREES TO BE SAVED. THE <br />CONTRACTOR SHALL COORDINATE WITH OWNER'S ENGINEER PRIOR TO ANY GRADE CHANGE. <br />3. THE CONTRACTOR IS TO SUBMIT A PROPOSED JOINTING PATTERN TO THE ENGINEER FOR APPROVAL PRIOR TO CONSTRUCTING <br />CONCRETE PAVEMENT. <br />4. THE CONTRACTOR SHALL PROVIDE AN EXPANSION JOINT AT ABUTMENT OF CONCRETE AND ANY STRUCTURE. <br />5. ALL PAVEMENT MARKINGS IN PUBLIC RIGHTS OF WAY SHALL BE MADE WITH PERMANENT THERMOPLASTIC, AND SHALL CONFORM TO <br />FDOT STANDARD PLANS INDEX NO. 711-001 UNLESS INDICATED OTHERWISE ON THE DRAWINGS. PARKING STALL STRIPING SHALL <br />BE 6" WIDE PAINTED WHITE STRIPES UNLESS INDICATED OTHERWISE ON THE DRAWINGS. <br />6. THE CONTRACTOR SHALL INSTALL EXTRA BASE MATERIAL WHEN THE DISTANCE BETWEEN THE PAVEMENT ELEVATION AND THE TOP <br />OF THE PIPE EXCEEDS THE MINIMUM DIMENSIONS SHOWN IN FDOT DRAINAGE MANUAL APPENDIX C (COVER HEIGHT TABLES). <br />7. STANDARD INDICES REFER TO THE LATEST EDITION OF FDOT "STANDARD PLANS FOR ROAD AND BRIDGE CONSTRUCTION". <br />8. ALL STORM SEWER PIPE SHALL BE REINFORCED CONCRETE CLASS III (ASTM C-76) UNLESS OTHERWISE INDICATED IN THE DRAWINGS <br />AND SPECIFICATIONS. <br />9. PVC STORM PIPE, 12" AND SMALLER, SHALL CONFORM TO AWWA C-900, SDR-18, CLASS 150, UNLESS OTHERWISE INDICATED IN THE <br />DRAWINGS AND SPECIFICATIONS. <br />10. PIPE LENGTHS SHOWN ARE APPROXIMATE. <br />11. ALL DRAINAGE STRUCTURE FRAMES, GRATES AND COVERS WITHIN TRAFFIC AREAS SHALL BE TRAFFIC RATED FOR H-20 LOADINGS. <br />12. THE CONTRACTOR IS TO GRASS THE RETENTION/DETENTION POND AS INDICATED ON PLANS WITHIN ONE -WEEK FOLLOWING <br />CONSTRUCTION OF THE POND. <br />13. MATERIALS AND CONSTRUCTION METHODS FOR STREETS AND STORM DRAINAGE CONSTRUCTION SHALL BE IN ACCORDANCE WITH <br />LOCAL REGULATIONS AND THE FLORIDA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE <br />CONSTRUCTION, LATEST REVISION THEREOF AND SUPPLEMENTAL SPECIFICATIONS THERETO. <br />14. THE CONTRACTOR SHALL PROVIDE CERTIFIED RECORD DRAWINGS, SIGNED AND SEALED BY A PROFESSIONAL LAND SURVEYOR. THE <br />RECORD DRAWINGS SHALL SHOW FINAL GRADES, INVERTS, AND LOCATIONS OF ALL STORMWATER FACILITIES INCLUDING THE <br />STORMWATER POND, DRAINAGE STRUCTURES, BERMS & SWALES. THE CONTRACTOR SHALL PROVIDE TEN COPIES OF THE CERTIFIED <br />RECORD DRAWINGS TO THE ENGINEER FOR THE PURPOSE OF CERTIFYING THE STORMWATER MANAGEMENT SYSTEM. <br />PAVING, GRADING & DRAINAGE TESTING AND INSPECTION <br />REQUIREMENTS <br />1. THE STORM DRAINAGE PIPING AND FILTRATION SYSTEM SHALL BE SUBJECT TO A VISUAL INSPECTION BY THE ENGINEER PRIOR TO <br />THE PLACEMENT OF BACKFILL. THE CONTRACTOR SHALL NOTIFY THE ENGINEER 48 HOURS IN ADVANCE TO SCHEDULE AN <br />INSPECTION. <br />2. THE CONTRACTOR SHALL MAINTAIN THE STORM DRAINAGE SYSTEMS UNTIL FINAL ACCEPTANCE OF THE PROJECT BY THE OWNER. <br />3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE REQUIRED TESTING WITH THE GEOTECHNICAL ENGINEER OR <br />THE OWNER'S MATERAILS TESTING CONSULTANT. TESTING IS REQUIRED IN ACCORDANCE WITH THE TESTING SCHEDULE FOUND IN <br />THE CONSTRUCTION DRAWINGS AND SPECIFICATIONS. UPON COMPLETION OF THE WORK, THE GEOTECHNICAL ENGINEER SHALL <br />SUBMIT CERTIFICATIONS TO THE ENGINEER AND OWNER STATING THAT ALL REQUIREMENTS HAVE BEEN MET. <br />SANITARY SEWER NOTES <br />1. ALL SANITARY SEWER MAINS AND LATERALS SHALL HAVE A MINIMUM OF 36 INCHES OF COVER. <br />2. ALL SANITARY SEWER WORK SHALL CONFORM TO LOCAL REGULATORY STANDARDS AND SPECIFICATIONS. <br />3. PRIOR TO COMMENCING WORK WHICH REQUIRES CONNECTING NEW WORK TO EXISTING LINES OR APPURTENANCES, THE <br />CONTRACTOR SHALL VERIFY LOCATION AND ELEVATION OF EXISTING CONNECTION POINT AND NOTIFY ENGINEER OF ANY <br />CONFLICTS OR DISCREPANCIES. <br />4. SANITARY SEWER PIPES SHALL MEET THE FOLLOWING MINIMUM CRITERIA; <br />T - 12' DEPTH SDR-35 <br />12'- 18' DEPTH SDR-26 <br />> 18' DEPTH DIP <br />5. ALL SANITARY SEWER PIPELINES SHALL BE SOLID GREEN IN COLOR. <br />6. ALL PVC FORCE MAINS SHALL BE PRESSURE CLASS 200, SDR 21, COLOR GREEN, WITH A GREEN MAGNETIC TAPE A MINIMUM OF 2" <br />WIDE PLACED 1 FOOT BELOW THE PROPOSED GRADE. THE PRINTING ON THE MAGNETIC TAPE SHALL READ "FORCE MAIN" <br />7. ALL DUCTILE IRON PIPE SHALL BE PRESSURE CLASS 350 IN ACCORDANCE WITH ANSI A 21.51-91 (AWWA C151) AND PIPE SHALL <br />RECEIVE EXTERIOR BITUMINOUS COATING IN ACCORDANCE WITH ANSI A 21.51 (AWWA C151) AND SHALL BE CEMENT MORTAR <br />LINED, STANDARD THICKNESS IN ACCORDANCE WITH ANSI A 21.4 (AWWA C104). <br />8. ALL SANITARY SEWER GRAVITY MAINS OR SANITARY SEWER FORCE MAINS THAT REQUIRE DIP ARE TO BE POLYLINED OR EPDXY <br />LINED. <br />9. ALL SANITARY SEWER RIMS AND COVERS SHALL BE TRAFFIC RATED FOR H-20 LOADING. <br />10. THE CONTRACTOR SHALL PROVIDE CERTIFIED UTILITY RECORD DRAWINGS, SIGNED AND SEALED BY A PROFESSIONAL LAND <br />AL SANITARY SEWER MAINS STRUCTURES <br />FINAL GRADES AND LOCATIONS ON L S N SURVEYOR. THE RECORD DRAWINGS SHALL SHOW INA G , <br />AND SERVICES. ALL RESTRAINED JOINTS SHALL BE SHOWN ON THE RECORD DRAWINGS. THE CONTRACTOR SHALL PROVIDE TEN <br />COPIES OF THE CERTIFIED RECORD DRAWINGS TO THE ENGINEER. <br />SANITARY SEWER TESTING AND INSPECTION REQUIREMENTS <br />1. ALL GRAVITY SEWER PIPING SHALL BE SUBJECT TO A VISUAL INSPECTION BY THE ENGINEER. CONTRACTOR SHALL NOTIFY THE <br />ENGINEER 48 HOURS IN ADVANCE TO SCHEDULE INSPECTION. <br />2. ALL GRAVITY SEWER PIPING SHALL BE VIDEO TAPED AND RESULTS FURNISHED TO THE LOCAL UTILITY AND THE ENGINEER. <br />3. THE GRAVITY SANITARY SEWER AND ALL SERVICE LATERALS SHALL BE SUBJECT TO ADDITIONAL TESTING AS REQUIRED BY LOCAL <br />REGULATIONS. TESTS ARE TO BE CERTIFIED BY THE ENGINEER OF RECORD AND SHALL BE SUBMITTED TO THE LOCAL AUTHORITIES <br />FOR APPROVAL. COORDINATION AND NOTIFICATION OF ALL PARTIES SHALL BE THE CONTRACTOR'S RESPONSIBILITY. <br />4. ALL FORCE MAINS SHALL BE SUBJECT TO A HYDROSTATIC PRESSURE TEST IN ACCORDANCE WITH LOCAL REGULATIONS. TESTS <br />SHALL BE CERTIFIED BY THE ENGINEER OF RECORD AND SUBMITTED TO THE LOCAL AUTHORITIES FOR APPROVAL. COORDINATION <br />AND NOTIFICATION OF ALL PARTIES SHALL BE THE CONTRACTOR'S RESPONSIBILITY. <br />WATER SYSTEM NOTES <br />1. ALL WATER MAINS SHALL HAVE A MINIMUM OF 36 INCHES OF COVER. <br />2. ALL WATER SYSTEM WORK SHALL CONFORM TO LOCAL REGULATORY STANDARDS AND SPECIFICATIONS. <br />3. CONFLICTS BETWEEN WATER AND STORM OR SANITARY SEWER SHALL BE RESOLVED BY ADJUSTING THE WATER LINES AS REQUIRED. <br />4. ALL DUCTILE IRON PIPE SHALL BE PRESSURE CLASS 350 IN ACCORDANCE WITH ANSI A 21.51 (AWWA C151) AND PIPE SHALL RECEIVE <br />EXTERIOR BITUMINOUS COATING IN ACCORDANCE WITH ANSI A 21.51 (AWWA C151) AND SHALL BE CEMENT MORTAR LINED, <br />STANDARD THICKNESS IN ACCORDANCE WITH ANSI A 21.4 (AWWA C104). <br />5. ALL FITTINGS 3" OR LARGER SHALL BE MECHANICAL JOINT, DUCTILE IRON PRESSURE CLASS 350 IN ACCORDANCE WITH ANSI A 21,10 <br />AND A 21.11 (AWWA C110 AND AWWA C111 RESPECTIVELY). FITTINGS SHALL BE CEMENT MORTAR LINED AND BITUMINOUS COATED <br />IN ACCORDANCE WITH AWWA C104 AND AWWA C151 RESPECTIVELY. <br />6. THE CONTRACTOR SHALL INSTALL TEMPORARY BLOW -OFFS AT THE END OF WATER SERVICE LATERALS TO ASSURE ADEQUATE <br />FLUSHING AND DISINFECTION. <br />7. ALL PVC WATER MAINS 3" THROUGH 12" SHALL BE IN ACCORDANCE WITH AWWA C900. PIPE SHALL BE CLASS 150 AND MEET THE <br />REQUIREMENTS OF SDR 18 IN ACCORDANCE WITH ASTM D-2241. <br />8. WATER MAIN PIPING LARGER THAN 2" AND SMALLER THAN 4" SHALL BE PRESSURE CLASS 200 AND MEET THE REQUIREMENTS OF SDR <br />21 IN ACCORDANCE WITH ASTM D2241 UNLESS SPECIFIED OTHERWISE. <br />9. ALL PIPE AND FITTINGS 2.5" AND SMALLER SHALL BE POLYETHYLENE TUBING PE4710 (CTS SDR9, PC200) WITH COMPRESSION <br />FITTINGS. <br />10. ALL GATE VALVES 2" OR LARGER SHALL BE RESILIENT SEAT OR RESILIENT WEDGE MEETING THE REQUIREMENTS OF AWWA C509 <br />11. ALL FIRE HYDRANTS SHALL MEET THE REQUIREMENTS OF AWWA C502 AND SHALL BE APPROVED BY THE LOCAL UTILITY AND FIRE <br />MARSHAL. <br />12. MATERIALS AND CONSTRUCTION METHODS FOR WATER DISTRIBUTION SYSTEMS SHALL BE IN ACCORDANCE WITH ALL LOCAL <br />REGULATIONS, PLANS, AND SPECIFICATIONS FOR CONSTRUCTION, LATEST REVISION THEREOF, AND SUPPLEMENTAL SPECIFICATIONS <br />THERETO. APPROVAL AND CONSTRUCTION OF ALL POTABLE WATER SERVICE MAIN EXTENSIONS AND CONNECTIONS MUST BE <br />COORDINATED THROUGH THE LOCAL REGULATORY AGENCY. <br />13. THE CONTRACTOR SHALL PROVIDE CERTIFIED UTILITY RECORD DRAWINGS, SIGNED AND SEALED BY A PROFESSIONAL LAND <br />SURVEYOR. THE RECORD DRAWINGS SHALL SHOW THE LOCATIONS, DIMENSIONS AND ELEVATIONS OF ALL WATER MAINS, <br />SERVICES, MANHOLES, GRAVITY SEWER MAINS, SERVICE LATERALS, PUMP STATIONS AND FORCE MAINS. ALL RESTRAINED JOINTS <br />SHALL BE SHOWN ON THE RECORD DRAWINGS. THE CONTRACTOR SHALL PROVIDE TEN COPIES OF THE CERTIFIED RECORD <br />DRAWINGS TO THE ENGINEER. <br />FDEP NOTES <br />1. ALL PIPE, PIPE FITTINGS, PIPE JOINT PACKING AND JOINTING MATERIALS, VALVES, FIRE HYDRANTS, AND METERS INSTALLED UNDER <br />THIS PROJECT WILL CONFORM TO APPLICABLE AMERICAN WATER WORKS ASSOCIATION (AWWA) STANDARDS. <br />2. ALL PUBLIC WATER SYSTEM COMPONENTS, EXCLUDING FIRE HYDRANTS, THAT WILL BE INSTALLED UNDER THIS PROJECT AND THAT <br />WILL COME INTO CONTACT WITH DRINKING WATER WILL CONFORM TO NSF INTERNATIONAL STANDARD 61. <br />3. ALL PIPE AND PIPE FITTINGS INSTALLED UNDER THIS PROJECT WILL CONTAIN NO MORE THAN 8.0% LEAD, AND ANY SOLDER OR <br />FLUX USED IN THIS PROJECT WILL CONTAIN NO MORE THAN 0.2% LEAD. <br />4. ALL PIPE AND PIPE FITTINGS INSTALLED UNDER THIS PROJECT WILL BE COLOR CODED OR MARKED IN ACCORDANCE WITH <br />SUBPARAGRAPH 62-555.320(21)(B)3, F.A.C., USING BLUE AS A PREDOMINANT COLOR. (UNDERGROUND PLASTIC PIPE WILL BE <br />SOLID -WALL BLUE PIPE, WILL HAVE A CO -EXTRUDED BLUE EXTERNAL SKIN, OR WILL BE WHITE OR BLACK PIPE WITH BLUE STRIPES <br />INCORPORATED INTO, OR APPLIED TO, THE PIPE WALL; AND UNDERGROUND METAL OR CONCRETE PIPE WILL HAVE BLUE STRIPES <br />APPLIED TO THE PIPE WALL. PIPE STRIPED DURING MANUFACTURING OF THE PIPE WILL HAVE CONTINUOUS STRIPES THAT RUN <br />PARALLEL TO THE AXIS OF THE PIPE, THAT ARE LOCATED AT NO GREATER THAN 90-DEGREE INTERVALS AROUND THE PIPE, AND <br />THAT WILL REMAIN INTACT DURING AND AFTER INSTALLATION OF THE PIPE. IF TAPE OR PAINT IS USED TO STRIPE PIPE DURING <br />INSTALLATION OF THE PIPE, THE TAPE OR PAINT WILL BE APPLIED IN A CONTINUOUS LINE THAT RUNS PARALLEL TO THE AXIS OF <br />THE PIPE AND THAT IS LOCATED ALONG THE TOP OF THE PIPE; FOR PIPE WITH AN INTERNAL DIAMETER OF 24 INCHES OR GREATER, <br />TAPE OR PAINT WILL BE APPLIED IN CONTINUOUS LINES ALONG EACH SIDE OF THE PIPE AS WELL AS ALONG THE TOP OF THE PIPE. <br />ABOVEGROUND PIPE WILL BE PAINTED BLUE OR WILL BE COLOR CODED OR MARKED LIKE UNDERGROUND PIPE.) <br />5. THE OPEN END OF THE AIR RELIEF PIPE FROM ALL AUTOMATIC AIR RELIEF VALVES INSTALLED UNDER THIS PROJECT WILL BE <br />EXTENDED TO AT LEAST ONE FOOT ABOVE GRADE AND WILL BE PROVIDED WITH A SCREENED, DOWNWARD -FACING ELBOW. <br />6. NEW OR ALTERED WATER MAINS INCLUDED IN THIS PROJECT WILL BE INSTALLED IN ACCORDANCE WITH APPLICABLE AWWA <br />STANDARDS OR IN ACCORDANCE WITH MANUFACTURERS' RECOMMENDED PROCEDURES. <br />7. A CONTINUOUS AND UNIFORM BEDDING WILL BE PROVIDED IN TRENCHES FOR UNDERGROUND PIPE INSTALLED UNDER THIS <br />PROJECT; BACKFILL MATERIAL WILL BE TAMPED IN LAYERS AROUND UNDERGROUND PIPE INSTALLED UNDER THIS PROJECT AND TO <br />A SUFFICIENT HEIGHT ABOVE THE PIPE TO ADEQUATELY SUPPORT AND PROTECT THE PIPE; AND UNSUITABLY SIZED STONES (AS <br />DESCRIBED IN APPLICABLE AWWA STANDARDS OR MANUFACTURERS' RECOMMENDED INSTALLATION PROCEDURES) FOUND IN <br />TRENCHES WILL BE REMOVED FOR A DEPTH OF AT LEAST SIX INCHES BELOW THE BOTTOM OF UNDERGROUND PIPE INSTALLED <br />UNDER THIS PROJECT. <br />8. ALL WATER MAIN TEES, BENDS, PLUGS, AND HYDRANTS INSTALLED UNDER THIS PROJECT WILL BE PROVIDED WITH THRUST BLOCKS <br />OR RESTRAINED JOINTS TO PREVENT MOVEMENT. <br />9. NEW OR ALTERED WATER MAINS THAT ARE INCLUDED IN THIS PROJECT AND THAT WILL BE CONSTRUCTED OF ASBESTOS -CEMENT <br />OR POLYVINYL CHLORIDE PIPE WILL BE PRESSURE AND LEAKAGE TESTED IN ACCORDANCE WITH AWWA STANDARD C603 OR C605, <br />RESPECTIVELY, AND ALL OTHER NEW OR ALTERED WATER MAINS INCLUDED IN THIS PROJECT WILL BE PRESSURE AND LEAKAGE <br />TESTED IN ACCORDANCE WITH AWWA STANDARD C600. <br />10. NEW OR ALTERED WATER MAINS, INCLUDING FIRE HYDRANT LEADS AND INCLUDING SERVICE LINES THAT WILL BE UNDER THE <br />CONTROL OF A PUBLIC WATER SYSTEM AND THAT HAVE AN INSIDE DIAMETER OF THREE INCHES OR GREATER, WILL BE DISINFECTED <br />AND BACTERIOLOGICALLY EVALUATED IN ACCORDANCE WITH RULE 62-555.340, F.A.C. <br />11. NEW OR ALTERED WATER MAINS THAT ARE INCLUDED IN THIS PROJECT AND THAT WILL CROSS UNDER SURFACE WATER WILL HAVE <br />A MINIMUM COVER OF TWO FEET. <br />WATER SYSTEM TESTING AND INSPECTION REQUIREMENTS <br />1. ALL COMPONENTS OF THE WATER SYSTEM, INCLUDING FITTINGS, HYDRANTS, CONNECTIONS, AND VALVES SHALL REMAIN <br />UNCOVERED UNTIL PROPERLY PRESSURE TESTED AND ACCEPTED BY THE ENGINEER AND LOCAL AUTHORITIES, PRESSURE TESTS <br />SHALL BE IN ACCORDANCE WITH LOCAL WATER DEPARTMENT & FDEP SPECIFICATIONS. CONTRACTOR SHALL NOTIFY OWNER'S <br />ENGINEER AND WATER DEPARTMENT INSPECTORS 48 HOURS IN ADVANCE OF PERFORMING TESTS. <br />2. CONTRACTOR IS RESPONSIBLE FOR ALL REQUIRED CHLORINATION/DISINFECTION AND BACTERIOLOGICAL SAMPLING IN <br />ACCORDANCE TO ITEM #10 ABOVE. CONTRACTOR SHALL OBTAIN CLEARANCE OF DOMESTIC WATER SYSTEM. COPIES OF ALL <br />BACTERIOLOGICAL TESTS (WHICH SHALL ALSO INDICATE THE CHLORINE RESIDUAL) SHALL BE SUBMITTED TO ENGINEER. <br />WATER CLEARANCE REQUIREMENTS <br />1. NEW OR RELOCATED, UNDERGROUND WATER MAINS INCLUDED IN THIS PROJECT WILL BE LAID TO PROVIDE A HORIZONTAL <br />DISTANCE OF AT LEAST THREE FEET BETWEEN THE OUTSIDE OF THE WATER MAIN AND THE OUTSIDE OF ANY EXISTING OR <br />PROPOSED VACUUM -TYPE SANITARY SEWER, STORM SEWER, STORMWATER FORCE MAIN, OR PIPELINE CONVEYING RECLAIMED <br />WATER REGULATED UNDER PART III OF CHAPTER 62-610, F.A.C.; A HORIZONTAL DISTANCE OF AT LEAST SIX FEET BETWEEN THE <br />OUTSIDE OF THE WATER MAIN AND THE OUTSIDE OF ANY EXISTING OR PROPOSED GRAVITY -TYPE SANITARY SEWER (OR A <br />HORIZONTAL DISTANCE OF AT LEAST THREE FEET BETWEEN THE OUTSIDE OF THE WATER MAIN AND THE OUTSIDE OF ANY EXISTING <br />OR PROPOSED GRAVITY -TYPE SANITARY SEWER IF THE BOTTOM OF THE WATER MAIN WILL BE LAID AT LEAST SIX INCHES ABOVE <br />THE TOP OF THE SEWER); A HORIZONTAL DISTANCE OF AT LEAST SIX FEET BETWEEN THE OUTSIDE OF THE WATER MAIN AND THE <br />OUTSIDE OF ANY EXISTING OR PROPOSED PRESSURE -TYPE SANITARY SEWER, WASTEWATER FORCE MAIN, OR PIPELINE CONVEYING <br />RECLAIMED WATER NOT REGULATED UNDER PART III OF CHAPTER 62-610, F.A.C.; AND A HORIZONTAL DISTANCE OF AT LEAST TEN <br />FEET BETWEEN THE OUTSIDE OF THE WATER MAIN AND ALL PARTS OF ANY EXISTING OR PROPOSED "ON -SITE SEWAGE TREATMENT <br />AND DISPOSAL SYSTEM". <br />2. NEW OR RELOCATED, UNDERGROUND WATER MAINS THAT ARE INCLUDED IN THIS PROJECT AND THAT WILL CROSS ANY EXISTING <br />OR PROPOSED GRAVITY- OR VACUUM -TYPE SANITARY SEWER OR STORM SEWER WILL BE LAID SO THE OUTSIDE OF THE WATER MAIN <br />IS AT LEAST SIX INCHES ABOVE THE OTHER PIPELINE OR AT LEAST 12 INCHES BELOW THE OTHER PIPELINE; AND NEW OR <br />RELOCATED, UNDERGROUND WATER MAINS THAT ARE INCLUDED IN THIS PROJECT AND THAT WILL CROSS ANY EXISTING OR <br />PROPOSED PRESSURE -TYPE SANITARY SEWER, WASTEWATER OR STORMWATER FORCE MAIN, OR PIPELINE CONVEYING RECLAIMED <br />WATER WILL BE LAID SO THE OUTSIDE OF THE WATER MAIN IS AT LEAST 12 INCHES ABOVE OR BELOW THE OTHER PIPELINE. <br />3. AT UTILITY CROSSINGS, ONE FULL LENGTH OF WATER MAIN PIPE WILL BE CENTERED ABOVE OR BELOW THE OTHER PIPELINE SO <br />THE WATER MAIN JOINTS WILL BE AS FAR AS POSSIBLE FROM THE OTHER PIPELINE OR THE PIPES WILL BE ARRANGED SO THAT ALL <br />WATER MAIN JOINTS ARE AT LEAST THREE FEET FROM ALL JOINTS IN VACUUM -TYPE SANITARY SEWERS, STORM SEWERS, <br />STORMWATER FORCE MAINS, OR PIPELINES CONVEYING RECLAIMED WATER REGULATED UNDER PART III OF CHAPTER 62-610, F.A.C., <br />AND AT LEAST SIX FEET FROM ALL JOINTS IN GRAVITY- OR PRESSURE -TYPE SANITARY SEWERS, WASTEWATER FORCE MAINS, OR <br />PIPELINES CONVEYING RECLAIMED WATER NOT REGULATED UNDER PART III OF CHAPTER 62-610, F.A.C. <br />REFERENCED DOCUMENTS <br />• "ZEPHYR COMMONS SITE PLAN" PROVIDED BY AVID GROUP - 11/16/2007 - ERP: 32080.000 <br />• "STORAGE/DRAINAGE ASBUILT ZEPHYR COMMONS PHASE 1 SPECIFIC PURPOSE ASBUILT SURVEY" PROVIDED BY SIMMONS & BEALL, <br />INC. SURVEYING & MAPPING - 06/16/2009 - EPR: 32080.001 <br />• "ZEPHYR COMMONS PHASE 1 PLAT" PROVIDED BY SIMMONS & BEALL, INC. SURVEYING & MAPPING - 12/30/2008 <br />• "GEOTECHNICAL EXPLORATION: ZEPHYR COMMONS - OUTPARCEL 7, LATTA ROUNDABOUT, ZEPHYRHILLS FLORIDA" PROVIDED BY <br />UNIVERSAL ENGINEERING SCIENCES <br />NOTE TO CONTRACTOR <br />• CONTRACTOR TO PROVIDE AS-BUILTS AS SOON AS UTILITY LINE HAS BEEN CONSTRUCTED. <br />• CONTRACTOR TO VERIFY EXISTING CONDITIONS AND LOCAL JURISDICTIONAL REQUIREMENTS OF UTILITIES PRIOR TO <br />CONSTRUCTION. <br />FDOT NOTES <br />• ALL DISTURBED AREAS IN FDOT RIGHT-OF-WAY WILL BE SODDED. <br />Immmmmmm®® .. <br />11111111110 <br />1111111111111 <br />r W n Ln M N+ z <br />aw> - V) -.Ozcn <br />Ln <br />LuCD N <br />Q�Wm O CD <br />O � cn <br />pEWoO'nU0) z Q O <br />Lu <br />W <br />O O z w LLL d N <br />Zm w ¢¢ r r N w Ln <br />8U a <br />a a a <br />* 0.91887 <br />v <br />-0 STATE OF <br />0• 07/25/2022 • �<v <br />OR I <br />cP C? `._ <br />10\ <br />NA L <br />m <br />U) <br />mi <br />W <br />V <br />ce <br />a <br />O <br />U) <br />z <br />O <br />O <br />V <br />ce <br />a <br />W <br />N <br />LL <br />-4 <br />0 <br />N <br />Wa <br />� <br />o <br />� <br />Ln N <br />O <br />rn <br />LL <br />� to <br />^ o V <br />J O m <br />N n d <br />�Q <br />O <br />U M <br />(V ce <br />n <br />z <br />o 00 <br />vC7 <br />O X <br />M Q d <br />= Q > <br />N G. M <br />d LL Q <br />z cn <br />U- <br />LL- <br />w z Q ¢ Lu <br />W a P > <br />Z _1 F Cie ce- <br />in- <br />Lu z z <br />J J � <br />U <br />Q <br />G <br />ce <br />Ind <br />>m <br />O <br />J <br />i <br />Yl LL <br />a <br />zv <br />W <br />oj� <br />ce <br />(a <br />.) <br />x >- <br />et <br />O W <br />� <br />V� <br />Oo <br />U <br />NOTES: <br />1. THE CONTRACTOR SHALL NOT PAVE OVER SOIL CEMENT BASE UNTIL A 30 DAY CURING TIME HAS ELAPSED <br />2. SHOULD ANY OF THE INFORMATION PROVIDED HEREIN CONFLICT WITH EITHER THE RECOMMENDATIONS OF THE GEOTECHNICAL ENGINEER, AND/OR <br />THE GEOTECHNICAL REPORT, THEN THE AFOREMENTIONED RECOMMENDATIONS WILL SUPERSEDE THIS "TESTING SCHEDULE GUIDE" <br />u i n-e8�com <br />S <br />E <br />E <br />T <br />N <br />0 <br />200 <br />