Laserfiche WebLink
PARTITIONS LEGEND <br />I SYMBOLS LEGEND I <br />AMERICANS WITH DISABILITIES ACT AND OTHER MOUNTING REQUIREMENTS <br />Iff m 1%w <br />PLATE <br />11-CAFF & <br />AT POWER "F <br />AND DATA OUTLETS <br />V0 AT SWITCHES AND PULL STATIONS <br />"ATTHERMOSTATS <br />ff4r AT ALARM DEVICES <br />TYPICAL OUTLET LOCATION <br />rml%r AT CMU WALL <br />STUD SPACING <br />ALL BOXES MUST BE <br />CONNECTED TO STUDS <br />ON TWO SIDES MINIMUM <br />THIS DETAIL APPLIES TO INSTALLATION OF ELECTRICAL BOXES IN <br />METAL STUD WALLS. <br />I/ �3 ELECTRICAL BOX <br />��' rml%w <br />FACE OF STUD <br />ORBLOCKWALL <br />fTVP.AT8lW <br />WALLSAND <br />TOBAM <br />OF FRAME <br />:�= 9.9�61. I - - <br />is' <br />TYPICAL DOOR LOCATION <br />EXIST. WALL <br />80 PARTMON TYPES IN THE DRAWINGS- SHEET A02 <br />FOR CONSTRUCTION DETAILING OF <br />PARTITION TYPES. FOR EXTERIOR <br />WALLS, SEE WALL SECTIONS. <br />,'&T,Tf JJT"';'(@� d - F_j <br />1. DIMENSIONS ON FLOOR PLANS TYPICALLY ARE TO FACE OF MASONRY <br />WALLS OR TO FACE OF GYP BD ON 87UD WALLS. THE <br />DIMENSIONS OF MASONRY AND STUD WALLS ARE NOMINAL <br />2. ALL DIMENSIONS MUST BE VERIFIED PRIOR TO MANUFACTURING ANY ITEM <br />TO BE INCORPORATED INTO THE WORK WHETHER OR NOT A SYMBOL SUCH <br />AS 0 + a IS SHOWN ON THE DRAWINGS. <br />I COMMON ABBREVIATIONS I <br />ACOUS. <br />A.F.F. <br />ACOUSTIC <br />ABOVE FINISH FLOOR <br />ALUM. <br />ALUMINUM <br />SOF <br />BACK OF FRAME <br />BlK <br />BOOKCASE <br />CI3 <br />CHALKBOARD <br />CLO. <br />CEILING <br />ci <br />CONTROL JOINT <br />COL. <br />COLUMN <br />OONSM <br />I ON <br />CONT. <br />CONTINUOUS <br />CPT <br />CARPET <br />CT <br />CERAMICTILE <br />OF <br />DRINKING FOUNTAIN <br />MkM. <br />DIAMETER <br />DO <br />DRAIN LEADERIDOWNSPOUT <br />EJ <br />EXPANSION JOINT <br />ECL <br />EQUAL <br />EWC <br />ELECTRIC WATER COOLER <br />EXH <br />EXHAUST <br />E)aST. <br />ExwnNG <br />EXT. <br />EXTEMOR <br />FE <br />FIRE EXTINGUISHER <br />FEC <br />FIRE EXTINGUISHER CABINET <br />FD <br />FLOOR DRAIN <br />GA <br />GAUGE <br />GYP. BD. <br />GYPSUM BOARD <br />GV <br />GRAVITYVENT <br />H <br />HEAD <br />HO <br />HOSE BE <br />HC <br />HANDICAPPED <br />ABBREVIATION DESCRIPTION <br />H.M. OR K MTL HOLLOW METAL <br />INSUL <br />INSULATION <br />i <br />JAM <br />JAN. <br />JANITOFt <br />in. <br />JOIST <br />MAX <br />MAXIMUM <br />MB <br />MARKIMBOARD <br />MR <br />MAP RAIL <br />MIN <br />MINIMUM <br />NIC <br />NOT IN CONTRACT <br />NTS <br />NOT TO SCALE <br />O.P.C.I. <br />OWNER PROV <br />CONTRACTOR INSTALLED <br />PS <br />PROJECTION SCREEN <br />PTD <br />PAINTED <br />RD <br />ROOF DRAIN <br />RDRF <br />RAISED DISC RUBBER FLOORING <br />w <br />SILLITRANSITION <br />as <br />SMARTBOARD <br />SIM <br />SIMILAR <br />STL <br />STEEL <br />STRUCT. <br />STRUCTURAL <br />TB <br />TACK BOARD <br />U.N.O. <br />UNLESS NOTED OTHERWISE <br />VCT <br />VINYL TILE <br />V7R <br />VENT THROUGH ROOF <br />WDw. <br />WINDOW <br />WWF <br />WOVEN WIRE FABRIC <br />� I � �.X I ql T". W I I � <br />INTERIOR ELEVATION <br />rWMNAW <br />Robm <br />227B ROOM mimem <br />1 SF <br />T ROW-NETAMA <br />DETAIL OR SECTION NUMBER <br />4- 8 OR SIM - MEANS SIMILAR <br />RVS — REVERSE OR OPP. HAND <br />ALI — <br />VIEW DIRECTION <br />SHEET NUMBEll <br />,e— DETAIL OR SECTION NUMBER <br />SECTION 3 RVS — REVERSE OR OPP HAND <br />SHEET NUMBER <br />STRUCTURAL GRID <br />COLUMN GRID DESIGNATION <br />GRID LINE <br />DETAIL OR SECTION NUMBSt <br />3 <br />DETAIL OR ALI <br />ENLARGED PLAN SHEET NUMBM <br />[s7j zi �jj I F=- <br />FEI <br />=1= <br />0m <br />Ida <br />A�00=7M��NQM <br />DOOR NUMBER <br />EKWrM ELIEVATIMI <br />-L�G' ;L'a1z" :d I] k' I :k i A <br />EC E-8- =-- FIRE EXTINWISHER <br />SURFACE MOUNTED FIRE ExnNWISHM <br />UEANMA.ARFt= <br />R. RM NO. I= <br />\11 <br />CITY OF ZEPHYRHILLS <br />RENOVATION <br />OF <br />FIRE RESCUE <br />STATION NO. 2 <br />ATSTWVWU <br />CONSTRUCTION <br />NOTE: <br />DOCUMENTS <br />1. INFORMATION ABOUT EXISTING CONSTRUCTION: THE EXISTING CONSTRUCTION CONSISTS OF A BUILDING CONSTRUCTED <br />OVER A PERIOD OF TIME THE BUILDING HAS HAD AMMONS ANDIOR SEVERAL REMODELING PROJECTS. THE <br />DRAWINGSFOR THIS PROJECT WERE DEVELOPED FROM AVAILABLE (OFTEN INCOMPLETE) A843ULT DRAWINGS AND <br />EXTENSIVE ONSITE INSPECTIONS AND MAY CONTAIN MINOR DISCREPANCIES AS TO ACTUAL. LATENT CONDITIONS. <br />SHOULD THE CONTRACTOR DISCOVER CONDITIONS SLIGHTLY DIFFERENT THAN THOSE SHOWN ON THESE DRAWINGS <br />THAT AFFECT THE NEW WORK, THE CONTRACTOR SHALL TAKE WHATEVER STEPS ARE NECESSARY TO CONSTRUCT THE <br />12-07-2012 <br />NEW WORK AS NEARLY AS POSSIBLE TO THAT SHOWN ON THE NEW DRAWINGS. ALL WITHOUT ADDITIONAL COST TO THE <br />CB+A #1 M2 <br />OWNER <br />* OWNER OCCUPANCY DURING CONSTRUCTION: <br />A. ONE FIRE TRUCK WILL REMAIN ON SITE. AND WILL BE READY TO RESPOND TO EMERGENCY CALLS, DURING <br />CONSTRUCTION. <br />91 <br />B. THE OWNER WILL HAVE A TEMPORARY OFFICE TRAILER ON SITE DURING CONSTRUCTION. <br />C. THE OWNER WILL NOT OCCUPY THE BUILDING DURING CONSTRUCTION. <br />* CONTRACT TIME" CONTRACTOR AGREES TO COMMENCE WORK ON THE DATE SPECIFIED IN THE VVIOTTEN ")TICE TO <br />CANERDAY <br />PROCEEIr FROMTHE CITY AND TO REACH SUBSTANTIAL COMPLETION OF THE PROJECT WITHIN ONE HUNDRED FIFTY <br />BELFSKY <br />(150) CONSECUTIVE CALENDAR DAYS THEREAFTER. SUBSTANTIAL COMPLETION IS WHEN THE PROJECT 18 SUFFICIENTLY <br />COMPLETE. IN ACCORDANCE WITH THE CONfrMUCrrON DOCUMENTS, 80 THAT THE OWNER MAY OCCUPY OR UTILIZE THE <br />+ <br />FACILITY. FINAL COMPLETION, 'THE SATISFACTION OF PUNCH LIST ITEMS, SHALL OCCUR THIRTY (30) DAYS AFnER <br />ARROYO <br />SUBSTANTIAL COMPLETION. <br />ARCHITECTS <br />M SEDOWAVENRJE SOUTH <br />ST. PETEFISSUP06 FL 33M <br />(72?)825-OM <br />AA2MXKW <br />INFORMATION SHEET <br />AO. 1 <br />SCALE All NOW <br />