Street #
38833
Location
10th Ave
Contractor
Kerns Family Construction
Building Plans - Permit #
17806
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Framina Layout Notes: <br />REVISIONS I <br />NOIDATTFSCRIPTION1 <br />1 Framing layout drawn by Daniel M. Ossman Drafting Service, Inc. is a schematic <br />representation only. It is the responsibility of the General ContracW to make a field <br />inspection to verify "ALL" existing field conditions including accuracy in dimensions with <br />Proposed Plans. General Contractor "MUST" certify in writing (the time aid date) that <br />this field inspection was conducted on and submitted to truss manufacture. If this field <br />inspection was "NOT" done prior to giving said plans to the truss manufacture, then the <br />"GENERAL CONTRACTOR WILL BE HELD LIABLE FOR ALL COST OF ANY / ALL <br />MISTAKES" on Pre-engineered trusses that are constructed for said prood. Dwiiel M. <br />Ossman Drafting Swvice, Inc. "WILL NOT BE HELD LIABLE" for errors nude on any <br />fran'ting (floor or roof) truss layouts. <br />2 Upon receMng said plans from the General Contractor ... the truss m&Wfacture <br />'MUST" make a their "OWN" fielcl inspection to "DOUBLE CHECK" aN existing fold <br />conclitions, roof sliopes, overhangs, and dinwwrions pnor to the mw%A4ctunng of any / all <br />trusses. Truss manufacture "MUST" certify (the tirne and date) that this field inspection <br />was conducted on by their company. This certification must be given to the General <br />Contractor in writing prior to the manufacturing of any / aN trusses on said project. <br />3 All thickened slabs / footing on foundation plan are located according to the schematic <br />truss layout drawn by Daniel M. Ossman Drafting Service, Inc. Only truss manufacture <br />can change these locations due to truss bearing points and "MUST" notify General <br />Contractor of these changes as soon as possible. <br />4 All hurricane truss straps specified on said project are to be used unless otherwise <br />specified by truss manufacture. All hurricane straps specified are "Simpson Strong Tie" <br />(or equal ), unless noted otherwise. Only truss manufacture can change any / or all <br />truss straps that are specified on truss layout drawn by Daniel M. Ossman Drafting <br />Service, Inc. Truss manufacture must first notify General Contractor in writing of these <br />changes as soon as possible. <br />5 Truss design drawings shall be prepared in accordance to and conformance with section <br />R802.1-6. 1. These documents shall be provided by the truss manufacture at time of truss <br />delivery and approved by the building official prior to the installation of the roof truss. <br />(See code section items 1-13). <br />� 0-1 -r- " <br />C,O JTIZ6C 0 Mo I J �5-FALL 4 <br />PIZE-E�J4t EFIF zooF-rejis s <br />IYEI ZOOF <br />&E'TWEE UCi.- ExISTI <br />7-F-LJ5S---Ffl IS NZIS& OF 9= <br />-TzUeZE-57-0 Fp�r,5p&r.,Lp no <br />rloef--n�l�,Q 2-4 O.c.&PT-F-1Z <br />Z - 2.,>( b WCOP <br />e;��H (-TYP,) <br />ROOF FRAMING LAYOUT <br />6 This plan as indicated is diagrammatical in nature for permit and contract purposes only. <br />Any revisions as required by the truss company's engineer as indicated on truss company's <br />sealed drawings shall superseded this drawing. This also includes truss company's <br />specified hurricane and other anchors supersede one shown on this drawing. <br />7 If shingles are being used, shingles MUST comply with section 905.2.2, 905.2.4.1 and <br />table R - 905.2.6.1 for wind resistance, FBC residential code 5th edition (2014) residential. <br />8 CONTRACTOR, MUST COORDINATE WITH TRUSS MANUFACTURE FOR ALL VAULTED, TRAY, <br />FLAT AND OR OTHER CEILING TYPES. CONTRACTOR IS 100% RESPONSOLE FOR THE <br />EXTERIOR WALL CONSTRUCTION METHOD WHERE A GABLE END IS CONSTRUCTED. <br />ALL EXTERIOR WALLS MUST COMPLY WITH THE FBC RESIDENTIAL CODE STH EDITION <br />(2014) RESIDENTIAL, SECTION R - 609 FOR CONSTRUCTION METHOD. SEE ADDITIONAL <br />ATTACHED STRUCTURAL SHEETS FOR GABLE END BRACWG DETAILS. DANIEL M. OSSMAN <br />DRAFTING SERVICE AND ARCHITECT WHO SIGNED I SEALED THE PLANS, ASSUMES NO <br />RESPONSIBILITY DUE TO NEGLIGENCE OF THE CONTRACTORS FAILURE TO FOLLOW <br />THE BUILDING CODE FOR GABLE END CONSTRUCTION. <br />e)e.F- ta�C-FU04t, <br />F0 Z 0 E4:� Z 25 1 Z- I- (7-rR <br />4 to X, 4- " P. I-, W <br />Pa5T (Typ') <br />'7- x + L-00 140 UT5 <br />e z-4 11 o - c. crrF) <br />F�'F- E, <br />200 1:: -M se�Ees (E <br />44 it 0. C - (Ty'p-) <br />IConnection Schedule I <br />Manufacturer <br />Model No. <br />Upuft <br />F1 Product Approval <br />Location / Use <br />Name <br />Number <br />14 <br />Simpson <br />ABA" <br />#"6 <br />FI 10860.2 <br />x 4 bottom post base anchor, with 1/2" anchor <br />Strong Tie <br />bolt (min 8") into concrete slab / ftg. <br />Simpson <br />Strong Tie <br />AC4 <br />#980 <br />FI 108W.5 <br />4 x 4 top post anchor to wood beam. <br />Simpson <br />Strong Tie <br />SPI <br />#685 <br />FI 10466.41 <br />Bottom plate connection to exterior wood stud. <br />Simpson <br />Strong Tie <br />SP2 <br />#1065 <br />FI 10456.42 <br />Double top plate connection to exterior wood stud. <br />Simpson <br />WS12 <br />#1000 <br />FI 10456.37 <br />Valley rafter tie - in connector to existing roof <br />Strong Tie <br />structure. <br />Simpson <br />Strong Tie <br />LTS12 <br />#775 <br />FI 10456.29 <br />Valley Jack rafter tie - in connector to ridge beam. <br />Simpson <br />LTS12 <br />#776 <br />FI 10466.29 <br />Pre-engineered roof truss connection to exterior <br />Strong Tie <br />frame wall. <br />Simpson <br />H10A <br />L <br />#865 <br />FL 11478.4 <br />lbsam. <br />Pre-engineered roof truss connection to wood <br />Strong Tie <br />Note: <br />1. Any products that are substituted, must "MUSr, or "EXCEED" products specified. Contractor -musr, provide <br />data to building inspector at time of inspection. <br />2. It*s the responsibility of the truss manufacture to coordinate all cathedral ceiling locations with General <br />Contractor before the manufacturing of any floor and / or roof trusses. All ceiling heights are to be a minimum <br />of 8' - 0" unless otherwise specified by General Contractor. <br />I <br />Fatheill 1/2" A& asebor bobs @ 21" o.c. <br />max. and aN ceivers, mW on ewh side of <br />aN door and wWow openiog (typ). <br />Pour new 4" concrete slab with min. 3,000 p.s.i <br />fibermesh or "opf'4" conc. slab w/ 6 x 6 x 10 x 10 <br />w.w.m. over 6 mil. vapor barrier over termite <br />treated and compacted clean fill. <br />'j., 100 1 -0 11 <br />IV &s!b Uri IE-D <br />&-r EX I �bi- <br />5FR <br />1619 x 16" x 12" coac pad <br />w/ -Z - #5 rebars each way <br />(typ)- V—P L <br />L <br />,:J <br />FOUNDATION PLAN <br />Z-il, 99 1 -10 11 <br />11V Nc-> 5 Li r-1 <br />M <br />r- <br />Dowel and epoxy (2) 16" bmg #5 rebars <br />$11 Into the exbtkg coac. ftg. and 81' lato <br />the am come. ftg. (typ). <br />101 r-% 11 <br />J\ <br />x 141, conc ft W/ <br />2 - 05 reban ewL w/ a <br />I" z $I' x1611 coac block <br />stenwal above or "opt." <br />12" x M" ummo ft w/ <br />2 - 05 reban cont. "I <br />WIWI <br />�-J <br />M <br />Ln <br />I'. <br />Ge <br />E CL <br />ga <br />0, <br />Or- <br />C <br />00 <br />Ix <br />E <br />E <br />E a <br />Ix <br />M W <br />6.0 <br />CC M 04 <br />CC L0 <br />00) <br />V C) <br />(L) .0 0= <br />04 < c) <br />-74) a Co <br />0 cf) 0 <br />> e <br />0 <br />UJ -j L-L <br />U- <br />C/) CL -.- <br />LO 0 <br />E F' - w 2 E <br />0 Fz <br />00 2 �5 0 V M <br />cn < . > CD <br />0 c E�o <br />M 0 d <br />'0 E To) <br />0 CD 4) C; <br />00 , M:r cc , <br />r- , 0-0 000 <br />0 *� — " <br />0 <br />iz <br />C <br />W �E 0 0 <br />0) =.r; V- = <br />0 C,4 a. <br />CN <br />> U') <br />C4r) <br />U) co <br />CU <br />z 'a <br />< 0 -2 <br />.J 'r- U- <br />C-e) <br />Cr) -C <br />00 >% <br />00 -C <br />z CL <br />CY) (D <br />0 N <br />00 <br />c-J <br />JOB NO. <br />38= 1 OTH AVE <br />DATE <br />AUGUST 28, 2016 <br />DRAWN BY <br />Daniel M. Ossman <br />SHEET NO. <br />A - 3 <br />SCALE: 1/4" = 1'- 0" <br />SCALE: 1/4� = 1 * - 0" <br />